SlideShare a Scribd company logo
YOGESH KUMAR.S
E mail: eee.yogesh@gmail.com Mobile: +91 9629992889
ELECTRICAL ENGINEER PROFILE
A challenging assignment in the Oil & Gas industry to utilize acquired skills & knowledge in project execution and
achieve predefined objectives
EXECUTIVE SYNOPSIS
• Resourceful Electrical Engineer with 5 years of rich project experience in diverse sectors in the Middle East
and India.
• Extensive experience covering onshore, Oil & Gas and high rise commercial & residential and Industry
projects delivering consistently outstanding performances.
• Possess technical expertise and hands on experience in project management, site supervision and working
in high work pressure environment
• Proficient in planning, executing and completing jobs on time, within budgets and adhering to
specifications.
• Well versed in study & analysis of drawings, material take off, mobilizing materials and coordinating with
clients to maintain project progress.
• Adept in leading, motivating and monitoring multinational teams eliciting superior performances.
• Dedicated, results driven professional with excellent communication, coordination, planning and execution
skills.
KEY STRENGTH
Site/Project Management, Client/Consultant facing, Meeting presentation, Knowledge in Auto CAD, Project
Planning, and Schedule preparation by using primavera p6, Productivity reports submission, Manpower and
material forecast depend up on the schedules. Two week/four week look ahead schedules preparation as per
priority basis, S curve preparation and highly focused on Quality and EHS standard.
PROFESSIONAL EXPERIENCE
CONTROL & APPLICATIONS EMIRATES, ABU DHABI, UAE
Electrical Engineer (Dec 2012 - Dec 2014)
Company Brief: Control And Application Emirates (CAE) is a leading E&I, MEP, EPC & maintenance contractor
servicing the Oil &Gas and energy sector (on shore) in the Middle East. Web address. www.caeme.com
Key Responsibilities:
• Lead the team and provide direction & control in executing all electrical works including.
• Laying, jointing and termination of HV & LV cables for Substation and building electrification.
• Supervise the preparation and revise shop drawings ensuring adherence to project specifications.
• Monitor all works at site and assure compliance with approved methods, drawings and achievement of
schedules.
• Ensure optimum utilization of all resources including manpower, equipment and materials to keep costs within
budgeted limits.
• Coordinate with client, consultant, subcontractors, vendors and service providers for meeting all predefined
milestones.
• Prepare as built drawings of all completed installations.
• Preparation of Method statement and Task risk Assessment for all activities involved in the project
• Ensuring fulfilment of all inspection & test requirements at all stage as per the QCP and contract Requirements
and maintained
• Identifying potential skills & training needs among the team members, providing opportunity for enhancing
their skills & career growth and appraising performance.
• Ensure compliance to all safety and quality regulations during all stages of the project.
• Lead the Team to Closure of Project MCCR (Mechanical Check Completion Record) as Per QA/QC Procedure.
• Preparation of Project Reconsolidation.
Yogesh kumar. S: Page 1 of 4
• Preparation of construction dossiers.
Project Management
• Handle the complete projects from quotation stage to the finalization and payment collection stage successfully.
• Coordinate technical aspects of projects, supervise site and report progress to manager.
• Manage resource requirement by identifying all the required resources for the project and the availability of
resources.
• Create project plans-discuss with management for approvals. Identify-collate specific information on project
milestone-timelines to be shared among various functional teams.
• Discuss various risk elements and mitigation strategies involved in the project during Team Review Meetings.
Track-monitor project progress as per timelines in the project schedule.
• Highly capable in Man/Sub-contractor/Vendor Management.
• Maintain project cost control and analyse the causes of variances against the budget.
• Manage Sub contractor billing and account receivables as per project milestones.
Projects
• INTEGRATED GAS DEVELOPMENT PROJECT (DEC 2012 - SEP 2013)
Client : ADGAS, DAS ISLAND (OFFSHORE)
Main Contractor : Hyundai Heavy Industries co., LTD. Construction testing and commissioning of all
electrical systems on 33/11KV 16 MVA transformer substation, associated distribution transformer, HV
cable laying, 33KV MDB, PCC, MCC, instrument panel, DCS system, ESD system, VFDs, UPS, MOVs and
various motors.
Designation : Electrical Engineer
• Ruwais Refinery Expansion Project EPC 4 – Tankage & Piping (OCT 2013 – SEP 2014)
Client : TAKREER Abu Dhabi Oil Refining Company
Main Contractor : DAEWOO E&C – Erection testing & commissioning of power transformers, MDBs,
SMDBs, FDBs, PCCs, MCCs, AFFCPs, DG sets and HV/LV motors
Designation : Electrical Engineer
• Ruwais Sulphur Handling terminal-2, Abu Dhabi, UAE. (OCT 2014 – DEC 2014)
Client : GASCO
Main Contractor : Al Jaber energy services
Designation : Projects Control & Planning Engineer
• Buhasa 11/3.3 KV SWGR Replacement Project, Abu Dhabi, UAE. (OCT 2014 – DEC 2014)
Client : Abu Dhabi Gas Industries Ltd. (GASCO)
Main Contractor : Control and Application Emirates.
Designation : Projects Control Engineer
• ZADCO-Satah Development Project(OCT 2014 – DEC 2014)
Client : Zakum Development Company (ZADCO)
Main Contractor : GCC.
Scope of work : Electrical work for light and power, F & G system, lightning protection system, telecom
system, CCTV system
Designation : Projects Control Engineer
• ASAB-1 MAIN CONTROL BUILDING REFURBISHMENT E&I WORKS (OCT 2014 – DEC 2014)
Client : GASCO
Main Contractor : ACTCO
Designation : Project Control Engineer
• ZIRKU FACILITIES - EPC FOR POWER UPGRADE (OCT 2014 – DEC 2014)
Client : Zakum Development Company (ZADCO)
Main Contractor : ABB SpA-PA Div
Designation : Projects Control Engineer
• REHABILATATION OF ELECTRICAL DISTRIBUTION SUPERVISORY SYSTEM (EDSS) AT NEB FIELDS
(OCT 2014 – DEC 2014)
Client : Abu Dhabi Company for Onshore Oil Operations (ADCO)
Main Contractor : Control and Application Emirates.
Designation : Projects Control Engineer
Yogesh kumar. S: Page 2 of 4
SRI LAKSHMI VINAYAGAYAR ENTERPRISES, CHENNAI
Design Engineer – (Oct 2009 to Nov 2012)
Company Brief: A leading Manufacturer, Supplier of LT & HT Panels & Contractor doing the projects in the Mall,
Villas, Industrial, Commercial and the high rise, Multi-storeyed building and power plants.
Key Responsibilities:
• Operation and maintenance of Electrical panels, PLC based automation system.
• Planning, monitoring & controlling all site activities including manpower planning, resource planning & material
planning and finalization of responsibility matrix for site engineers
• Attending site coordination meeting with client on regular basis for reviewing site progress & resolving
problems.
• Making correspondences on regular basis with Client to build Customer relationship and sort out any disputes
(technical or commercial) at site.
• Preparing Commercial offer for Tender.
• Preparing Quotation & BOQ For LT Electrical Panels
• Preparation of Detail Drawings for Single Line Diagram, and Control Schemes, Cable Schedules, Cable Layout etc
• Designing Panel Layout and Power Diagram
• Cost Estimation and Technical Scrutiny.
• Procurement of Transformer, MCC, PLC Panels, Control Desk, All types of Cables etc.
• Inventory, inspect, monitor, document and report the cost and performance of each piece of equipment
• Accepts responsibility in multifunctional area
• Preparing Stock list.
EDUCATION
• B.E. (Electrical and Electronics) from Prathyusha Institute of Technology And Management, Tiruvallur,
certificate Aggregate of 63 %, (2009).
• Higher secondary (HSC), from S.M.S Vimal Mat Hr. Sec School with Aggregate of 58 %, (2005).
• Secondary School leaving certificate from State Board of Tamil Nadu, with Aggregate of 74 %, (2003).
COMPUTER SKILLS
• AutoCAD (2D) – Drafting
• PC Schematic EL Automation - Electrical Designing
• PPM Concepts - Project planning and Management
• Microsoft Project 2010
• Primavera P6V7
• MS Office 2013
TRAINING / CERTIFICATIONS
• ADGAS Das Island Permit to Work system, Abu Dhabi
• DAEWOO, Takreer Permit to Work system, Abu Dhabi
• Master Diploma in Electrical Cad(MDEC)
• Final Year Project Certification in ETPS(Ennore Thermal Power Station)
PERSONAL PROFILE
• Date of Birth : 22 March 1987
• Gender : Male
• Marital Status : Married
• Languages Known : Tamil, English
• Nationality : Indian
• Address : 4/706, Teachers Colony 1st
Street, Poonganagar, Tiruvallur-602001.
• PASSPORT NUMBER : K5820505 & EXPIRE - OCT 2022
• India Mobile no : 919629992889
DECLARATION
Yogesh kumar. S: Page 3 of 4
I hereby declare that the above mentioned information is correct up to my knowledge and
I bear the responsibility for the correctness of the above mentioned particulars
YOGESH KUMAR.S
Yogesh kumar. S: Page 4 of 4

More Related Content

What's hot

MEP Engineer with Revit Certification
MEP Engineer with Revit CertificationMEP Engineer with Revit Certification
MEP Engineer with Revit CertificationVishnuprasad P
 
SYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEERSYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEER
javed hazari
 
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINSenior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINHossam Fattah
 
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
robinjacob0101
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume
Arun Das
 
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution Raushan Kumar
 
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Mohammed Fazaluddin
 
Hanif cv 2015 Project engineer (electrical)
Hanif cv 2015   Project engineer (electrical)Hanif cv 2015   Project engineer (electrical)
Hanif cv 2015 Project engineer (electrical)
Mohd Hanif Abd Hadi
 
anthony-j.-martini-resume 20161021
anthony-j.-martini-resume 20161021anthony-j.-martini-resume 20161021
anthony-j.-martini-resume 20161021Anthony Martini
 
emf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manageremf CV MEP Project-Construction Manager
emf CV MEP Project-Construction ManagerEdwardo Figuracion
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) Mudassir Nazar Dabilkar
 
Prem CV Oct 2015
Prem CV Oct 2015Prem CV Oct 2015
Prem CV Oct 2015Prem Kumar
 
Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015???? ?????
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 

What's hot (19)

CV of Dinesh
CV of DineshCV of Dinesh
CV of Dinesh
 
RESUME - AMB- N
RESUME - AMB- NRESUME - AMB- N
RESUME - AMB- N
 
MEP Engineer with Revit Certification
MEP Engineer with Revit CertificationMEP Engineer with Revit Certification
MEP Engineer with Revit Certification
 
SYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEERSYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEER
 
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINSenior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
 
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume
 
cv Rashid Tagelsir updated . -2016
cv Rashid Tagelsir   updated . -2016cv Rashid Tagelsir   updated . -2016
cv Rashid Tagelsir updated . -2016
 
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
 
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016
 
Hanif cv 2015 Project engineer (electrical)
Hanif cv 2015   Project engineer (electrical)Hanif cv 2015   Project engineer (electrical)
Hanif cv 2015 Project engineer (electrical)
 
anthony-j.-martini-resume 20161021
anthony-j.-martini-resume 20161021anthony-j.-martini-resume 20161021
anthony-j.-martini-resume 20161021
 
emf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manageremf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manager
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
 
Prem CV Oct 2015
Prem CV Oct 2015Prem CV Oct 2015
Prem CV Oct 2015
 
Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 

Viewers also liked

приказ
приказприказ
Momentum
MomentumMomentum
Momentum
ednalynserrano
 
CBE16 - Exporting to the UK and Europe
CBE16 - Exporting to the UK and EuropeCBE16 - Exporting to the UK and Europe
CBE16 - Exporting to the UK and Europe
CraftBev
 
Keep safe online
Keep safe onlineKeep safe online
Keep safe online
Rutaka
 
άρτα μια πανέμορφη πόλη
άρτα μια πανέμορφη πόληάρτα μια πανέμορφη πόλη
άρτα μια πανέμορφη πόλη
annatats
 
приказ
приказприказ
Vodafone Marketing MIX
Vodafone Marketing MIXVodafone Marketing MIX
Vodafone Marketing MIX
Kamil Farooq
 
Infinite Business Solutions - 5S Case study
Infinite Business Solutions - 5S Case studyInfinite Business Solutions - 5S Case study
Infinite Business Solutions - 5S Case studyChadwin Minnaar
 
Three Must-Haves for Workplace Happiness and Success
Three Must-Haves for Workplace Happiness and SuccessThree Must-Haves for Workplace Happiness and Success
Three Must-Haves for Workplace Happiness and Success
The Alligator Wrangler
 
عزل الفيبر جلاس الخزانات الارضية العلوية الخرسانية فوم حراري قوية ومتينة لمنع...
عزل الفيبر جلاس الخزانات الارضية العلوية الخرسانية فوم حراري قوية ومتينة لمنع...عزل الفيبر جلاس الخزانات الارضية العلوية الخرسانية فوم حراري قوية ومتينة لمنع...
عزل الفيبر جلاس الخزانات الارضية العلوية الخرسانية فوم حراري قوية ومتينة لمنع...
o2adv تسويق وارشفة مسك كلمات بجوجل
 
Choice of succession in african and asian owned business
Choice of succession in african and asian owned businessChoice of succession in african and asian owned business
Choice of succession in african and asian owned businessJohn Johari
 
Synthesis itec present
Synthesis itec presentSynthesis itec present
Synthesis itec present
ricooc
 
Proyecto de vida
Proyecto de vidaProyecto de vida
Proyecto de vidaasjugahi
 
Bath 2016
Bath 2016Bath 2016
Bath 2016
fmvanbommel
 
Digital search tree
Digital search treeDigital search tree
Digital search tree
Mahmudul Hasan
 

Viewers also liked (17)

приказ
приказприказ
приказ
 
PATRIOTS
PATRIOTSPATRIOTS
PATRIOTS
 
Momentum
MomentumMomentum
Momentum
 
CBE16 - Exporting to the UK and Europe
CBE16 - Exporting to the UK and EuropeCBE16 - Exporting to the UK and Europe
CBE16 - Exporting to the UK and Europe
 
Keep safe online
Keep safe onlineKeep safe online
Keep safe online
 
άρτα μια πανέμορφη πόλη
άρτα μια πανέμορφη πόληάρτα μια πανέμορφη πόλη
άρτα μια πανέμορφη πόλη
 
BULLETIN CONSTRUCTION SERVICE New 14
BULLETIN CONSTRUCTION SERVICE New 14BULLETIN CONSTRUCTION SERVICE New 14
BULLETIN CONSTRUCTION SERVICE New 14
 
приказ
приказприказ
приказ
 
Vodafone Marketing MIX
Vodafone Marketing MIXVodafone Marketing MIX
Vodafone Marketing MIX
 
Infinite Business Solutions - 5S Case study
Infinite Business Solutions - 5S Case studyInfinite Business Solutions - 5S Case study
Infinite Business Solutions - 5S Case study
 
Three Must-Haves for Workplace Happiness and Success
Three Must-Haves for Workplace Happiness and SuccessThree Must-Haves for Workplace Happiness and Success
Three Must-Haves for Workplace Happiness and Success
 
عزل الفيبر جلاس الخزانات الارضية العلوية الخرسانية فوم حراري قوية ومتينة لمنع...
عزل الفيبر جلاس الخزانات الارضية العلوية الخرسانية فوم حراري قوية ومتينة لمنع...عزل الفيبر جلاس الخزانات الارضية العلوية الخرسانية فوم حراري قوية ومتينة لمنع...
عزل الفيبر جلاس الخزانات الارضية العلوية الخرسانية فوم حراري قوية ومتينة لمنع...
 
Choice of succession in african and asian owned business
Choice of succession in african and asian owned businessChoice of succession in african and asian owned business
Choice of succession in african and asian owned business
 
Synthesis itec present
Synthesis itec presentSynthesis itec present
Synthesis itec present
 
Proyecto de vida
Proyecto de vidaProyecto de vida
Proyecto de vida
 
Bath 2016
Bath 2016Bath 2016
Bath 2016
 
Digital search tree
Digital search treeDigital search tree
Digital search tree
 

Similar to YOGESH ELECTRICAL ENGG

ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
Ajith Chandramohan
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
Engr.Arsalan .
 
Jasim_CV_-_2016_W_MEP
Jasim_CV_-_2016_W_MEPJasim_CV_-_2016_W_MEP
Jasim_CV_-_2016_W_MEPJasim MK
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resumebarun dutta
 
RAHUL_CV-2015
RAHUL_CV-2015RAHUL_CV-2015
RAHUL_CV-2015RAHUL P
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar
 
Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)
Sarim Mujtaba
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa
 
Samuel resume cv
Samuel resume cvSamuel resume cv
Samuel resume cv
Samuel Michel
 

Similar to YOGESH ELECTRICAL ENGG (20)

ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
 
saif.resume dxb
saif.resume dxbsaif.resume dxb
saif.resume dxb
 
JAI RESUME
JAI RESUMEJAI RESUME
JAI RESUME
 
Mohammed Islam's Resume-05-20-15
Mohammed Islam's Resume-05-20-15Mohammed Islam's Resume-05-20-15
Mohammed Islam's Resume-05-20-15
 
Hussein Ahmad Salem-CV
Hussein Ahmad Salem-CVHussein Ahmad Salem-CV
Hussein Ahmad Salem-CV
 
Abdelmagid Abdel Aziz
Abdelmagid Abdel AzizAbdelmagid Abdel Aziz
Abdelmagid Abdel Aziz
 
Brijesh cv
Brijesh cvBrijesh cv
Brijesh cv
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
Jasim_CV_-_2016_W_MEP
Jasim_CV_-_2016_W_MEPJasim_CV_-_2016_W_MEP
Jasim_CV_-_2016_W_MEP
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 
R.Kumar
R.KumarR.Kumar
R.Kumar
 
shahul updated resume
shahul updated resumeshahul updated resume
shahul updated resume
 
RAHUL_CV-2015
RAHUL_CV-2015RAHUL_CV-2015
RAHUL_CV-2015
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
 
Final_Resume Abdul Jameel
Final_Resume Abdul JameelFinal_Resume Abdul Jameel
Final_Resume Abdul Jameel
 
Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)
 
MANZAR_CVH
MANZAR_CVHMANZAR_CVH
MANZAR_CVH
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Samuel resume cv
Samuel resume cvSamuel resume cv
Samuel resume cv
 

YOGESH ELECTRICAL ENGG

  • 1. YOGESH KUMAR.S E mail: eee.yogesh@gmail.com Mobile: +91 9629992889 ELECTRICAL ENGINEER PROFILE A challenging assignment in the Oil & Gas industry to utilize acquired skills & knowledge in project execution and achieve predefined objectives EXECUTIVE SYNOPSIS • Resourceful Electrical Engineer with 5 years of rich project experience in diverse sectors in the Middle East and India. • Extensive experience covering onshore, Oil & Gas and high rise commercial & residential and Industry projects delivering consistently outstanding performances. • Possess technical expertise and hands on experience in project management, site supervision and working in high work pressure environment • Proficient in planning, executing and completing jobs on time, within budgets and adhering to specifications. • Well versed in study & analysis of drawings, material take off, mobilizing materials and coordinating with clients to maintain project progress. • Adept in leading, motivating and monitoring multinational teams eliciting superior performances. • Dedicated, results driven professional with excellent communication, coordination, planning and execution skills. KEY STRENGTH Site/Project Management, Client/Consultant facing, Meeting presentation, Knowledge in Auto CAD, Project Planning, and Schedule preparation by using primavera p6, Productivity reports submission, Manpower and material forecast depend up on the schedules. Two week/four week look ahead schedules preparation as per priority basis, S curve preparation and highly focused on Quality and EHS standard. PROFESSIONAL EXPERIENCE CONTROL & APPLICATIONS EMIRATES, ABU DHABI, UAE Electrical Engineer (Dec 2012 - Dec 2014) Company Brief: Control And Application Emirates (CAE) is a leading E&I, MEP, EPC & maintenance contractor servicing the Oil &Gas and energy sector (on shore) in the Middle East. Web address. www.caeme.com Key Responsibilities: • Lead the team and provide direction & control in executing all electrical works including. • Laying, jointing and termination of HV & LV cables for Substation and building electrification. • Supervise the preparation and revise shop drawings ensuring adherence to project specifications. • Monitor all works at site and assure compliance with approved methods, drawings and achievement of schedules. • Ensure optimum utilization of all resources including manpower, equipment and materials to keep costs within budgeted limits. • Coordinate with client, consultant, subcontractors, vendors and service providers for meeting all predefined milestones. • Prepare as built drawings of all completed installations. • Preparation of Method statement and Task risk Assessment for all activities involved in the project • Ensuring fulfilment of all inspection & test requirements at all stage as per the QCP and contract Requirements and maintained • Identifying potential skills & training needs among the team members, providing opportunity for enhancing their skills & career growth and appraising performance. • Ensure compliance to all safety and quality regulations during all stages of the project. • Lead the Team to Closure of Project MCCR (Mechanical Check Completion Record) as Per QA/QC Procedure. • Preparation of Project Reconsolidation. Yogesh kumar. S: Page 1 of 4
  • 2. • Preparation of construction dossiers. Project Management • Handle the complete projects from quotation stage to the finalization and payment collection stage successfully. • Coordinate technical aspects of projects, supervise site and report progress to manager. • Manage resource requirement by identifying all the required resources for the project and the availability of resources. • Create project plans-discuss with management for approvals. Identify-collate specific information on project milestone-timelines to be shared among various functional teams. • Discuss various risk elements and mitigation strategies involved in the project during Team Review Meetings. Track-monitor project progress as per timelines in the project schedule. • Highly capable in Man/Sub-contractor/Vendor Management. • Maintain project cost control and analyse the causes of variances against the budget. • Manage Sub contractor billing and account receivables as per project milestones. Projects • INTEGRATED GAS DEVELOPMENT PROJECT (DEC 2012 - SEP 2013) Client : ADGAS, DAS ISLAND (OFFSHORE) Main Contractor : Hyundai Heavy Industries co., LTD. Construction testing and commissioning of all electrical systems on 33/11KV 16 MVA transformer substation, associated distribution transformer, HV cable laying, 33KV MDB, PCC, MCC, instrument panel, DCS system, ESD system, VFDs, UPS, MOVs and various motors. Designation : Electrical Engineer • Ruwais Refinery Expansion Project EPC 4 – Tankage & Piping (OCT 2013 – SEP 2014) Client : TAKREER Abu Dhabi Oil Refining Company Main Contractor : DAEWOO E&C – Erection testing & commissioning of power transformers, MDBs, SMDBs, FDBs, PCCs, MCCs, AFFCPs, DG sets and HV/LV motors Designation : Electrical Engineer • Ruwais Sulphur Handling terminal-2, Abu Dhabi, UAE. (OCT 2014 – DEC 2014) Client : GASCO Main Contractor : Al Jaber energy services Designation : Projects Control & Planning Engineer • Buhasa 11/3.3 KV SWGR Replacement Project, Abu Dhabi, UAE. (OCT 2014 – DEC 2014) Client : Abu Dhabi Gas Industries Ltd. (GASCO) Main Contractor : Control and Application Emirates. Designation : Projects Control Engineer • ZADCO-Satah Development Project(OCT 2014 – DEC 2014) Client : Zakum Development Company (ZADCO) Main Contractor : GCC. Scope of work : Electrical work for light and power, F & G system, lightning protection system, telecom system, CCTV system Designation : Projects Control Engineer • ASAB-1 MAIN CONTROL BUILDING REFURBISHMENT E&I WORKS (OCT 2014 – DEC 2014) Client : GASCO Main Contractor : ACTCO Designation : Project Control Engineer • ZIRKU FACILITIES - EPC FOR POWER UPGRADE (OCT 2014 – DEC 2014) Client : Zakum Development Company (ZADCO) Main Contractor : ABB SpA-PA Div Designation : Projects Control Engineer • REHABILATATION OF ELECTRICAL DISTRIBUTION SUPERVISORY SYSTEM (EDSS) AT NEB FIELDS (OCT 2014 – DEC 2014) Client : Abu Dhabi Company for Onshore Oil Operations (ADCO) Main Contractor : Control and Application Emirates. Designation : Projects Control Engineer Yogesh kumar. S: Page 2 of 4
  • 3. SRI LAKSHMI VINAYAGAYAR ENTERPRISES, CHENNAI Design Engineer – (Oct 2009 to Nov 2012) Company Brief: A leading Manufacturer, Supplier of LT & HT Panels & Contractor doing the projects in the Mall, Villas, Industrial, Commercial and the high rise, Multi-storeyed building and power plants. Key Responsibilities: • Operation and maintenance of Electrical panels, PLC based automation system. • Planning, monitoring & controlling all site activities including manpower planning, resource planning & material planning and finalization of responsibility matrix for site engineers • Attending site coordination meeting with client on regular basis for reviewing site progress & resolving problems. • Making correspondences on regular basis with Client to build Customer relationship and sort out any disputes (technical or commercial) at site. • Preparing Commercial offer for Tender. • Preparing Quotation & BOQ For LT Electrical Panels • Preparation of Detail Drawings for Single Line Diagram, and Control Schemes, Cable Schedules, Cable Layout etc • Designing Panel Layout and Power Diagram • Cost Estimation and Technical Scrutiny. • Procurement of Transformer, MCC, PLC Panels, Control Desk, All types of Cables etc. • Inventory, inspect, monitor, document and report the cost and performance of each piece of equipment • Accepts responsibility in multifunctional area • Preparing Stock list. EDUCATION • B.E. (Electrical and Electronics) from Prathyusha Institute of Technology And Management, Tiruvallur, certificate Aggregate of 63 %, (2009). • Higher secondary (HSC), from S.M.S Vimal Mat Hr. Sec School with Aggregate of 58 %, (2005). • Secondary School leaving certificate from State Board of Tamil Nadu, with Aggregate of 74 %, (2003). COMPUTER SKILLS • AutoCAD (2D) – Drafting • PC Schematic EL Automation - Electrical Designing • PPM Concepts - Project planning and Management • Microsoft Project 2010 • Primavera P6V7 • MS Office 2013 TRAINING / CERTIFICATIONS • ADGAS Das Island Permit to Work system, Abu Dhabi • DAEWOO, Takreer Permit to Work system, Abu Dhabi • Master Diploma in Electrical Cad(MDEC) • Final Year Project Certification in ETPS(Ennore Thermal Power Station) PERSONAL PROFILE • Date of Birth : 22 March 1987 • Gender : Male • Marital Status : Married • Languages Known : Tamil, English • Nationality : Indian • Address : 4/706, Teachers Colony 1st Street, Poonganagar, Tiruvallur-602001. • PASSPORT NUMBER : K5820505 & EXPIRE - OCT 2022 • India Mobile no : 919629992889 DECLARATION Yogesh kumar. S: Page 3 of 4
  • 4. I hereby declare that the above mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above mentioned particulars YOGESH KUMAR.S Yogesh kumar. S: Page 4 of 4