REPORT
OF
AN INDUSTRIAL VISIT AT
LUCKNOW METRO RAIL CORPORATION
(LMRC, LUCKNOW)
Submitted by: - Submitted to:-
Atul Kumar Shukla Ashraf Hussain
Civil 4th yr HOD Civil Engineering
1450500009
Allenhouse Institute of Technology, Kanpur
INTRODUCTION: -
Lucknow Metro is a rapid transit system under construction in the city of Lucknow, Uttar
Pradesh. The commencement of civil works started on 27 September 2014. Lucknow Metro
Rail Corporation Limited a joint venture of the Government of India and the Government of
Uttar Pradesh entrusted to build and operate the Lucknow Metro.
Lucknow Metro will have 2 Lines, the North-South line and the East-West line. The North-
South corridor starts at Airport and goes to Munshi Pulia, with a total length of 22.878
kilometers (14.216 miles). The East-West corridor starts at Charbagh Railway Station and
ends at Vasant Kunj. Both lines will intersect at Charbagh Railway Station.
The project will be the most expensive public transport system in the state. Total cost of
phase 1 and 2 will be about $2 billion, of which ₹6,928 crore (US$1 billion) is being spent on
phase 1. Partial commercial operation of Line 1 from Transport Nagar to Lucknow Charbagh
Railway Station a distance of 8.5 km is expected by August 2017.
Fig: - 1 Entrance of LMRC Depot
The designed speed of metro would be 90 km/h (56 mph) while the scheduled speed would
be 34 km/h (21 mph) for North-South corridor and 32 km/h (20 mph) for East-West corridor.
There would be only one depot at Vasant Kunj spread over a land measuring 20 hectares (49
acres). The Amausi Depot has been done away because of its proximity to the Airport and the
subsequent reasons of security and safety.
ROUTE OF LMRC:-
The routes for running of metro rail are as given below:[41]
Line
First
opera
tional
Stati
ons
Len
gth
(km)
Terminals
Rolling
stock
Gauge Power
North-
South
Corridor
Under
Constru
ction
22 22.878
CCS
Internatio
nal Airport
Muns
hi
Pulia
Alstom 1435mm
25kV
OHE
East-
West
Corridor
Planned 12 11.098
Charba
gh
Railway
Station
Vasant
Kunj
NA 1435mm
25kV
OHE
METRO STATIONS IN 1ST
AND 2ND
CORRIDOR
North-South Corridor
1. Chaudhary Charan Singh
International Airport
2. Amausi 3. Transport Nagar
4. Krishna Nagar 5. Singaar Nagar 6. Alambagh
7. ISBT Alambagh 8. Mawaiya 9. Durgapuri
10. Lucknow Charbagh
Railway Station
11. Hussain Ganj 12. Sachivalaya
13. Hazratganj 14. KD Singh Babu Stadium 15. Lucknow University
16. IT Chauraha 17. Mahanagar 18. Badshahnagar
19. Lekhraj Market 20. Ramsagar Mishra Nagar 21. Indira Nagar
22. Munshi Pulia
East-West Corridor
1. Gautam Buddha Marg 2. Aminabad 3. Pandeyganj
4. Lucknow City Railway
Station
5. Medical College
Chauraha
6. Nawazganj
7. Thakurganj 8. Balaganj 9. Sarfarazganj
10. Musabagh
11. Vasant Kunj
Construction Methodology: -
Only one methodology is not sufficient for Metro Project as it requires different approach of
construction for various metro line and stations. The methodology also depends on the
geological profile of the area. Largely, Lucknow metro is precast Twin U-girder for elevated
viaduct and cut and cover Methodology for construction its underground stations while
Tunnel Boring Machine (TBM) are being used for tunnel excavation. The new Austrian
tunneling method (NATM) is also applied while doing excavation/tunneling in soft soil
Fig: -2 Arrangement of Pier with U-Girders
Challenges during Project Implementation:-
 Project is being executed in a very difficult urban environment,
 Being the capital city, all actions are under close security of VVIPS, Media/press.
 The project has been approved on the completion cost.
 The project implementation period is extremely compressed with a very strict
completion target.
 Metro being constructed to world class standards with frontline technology
 The sensitivity of the city to be respected during construction.
Major Engineering Challenges: -
At Mawaiya Railway crossing, LMRC is carrying out its work for construction of a special
balances cantilever span of 255 meters (central span 105 meters; end span of 75 meters each).
This is one of the most challenging and a critical job which is being executed at a height of
21.5 meters above the ground level while surpassing over a railway crossing at a height of
15.2 meters from the ground level under extremely difficult situations in the middle of the
main road traffic.
At Awadh Rotary, luck now metro has launching a 60 meter special steel span bridge
crossing the rotary over the statue in the middle of the rotary. This bridge which has been
built at a height of approximately 13 meter above the ground will connect both the ends of
the metro viaduct to provide a special seamless connectivity for metro train operation. It is
one of the rare kinds of work being done.
Fig: -3 A 60 meter special steel span bridge crossing at Awadh Rotary
Fig: -4 Cantilever span of 255 meters at Mawaiya railway crossing
Workshop cum Maintenance Depot: - LMRC depot cum workshop has the facility
for today maintenance and overhauling of rolling stock equipments adopting the concept of
condition monitoring of key equipments requiring minimum man power. Depot has a facility
for maintaining 42 rakes of 6 cars.
Fig: -5 Workshop line with epoxy flooring
Fig: -6 Maintenance depot
The state of art facilities includes: -
 Auto coach wash plant,
 Pit wheel lathe,
 Heavy interior and exterior cleaning plant
 Covered stabling line with puff based heat insulated roof panel duly integrated with
turbo fans.
 Epoxy floor coating to ensure hazard based smooth flow process for maintenance
including providing dust free environment.
 Solar power plant of one megawatt capacity is planned on the roof of depot
Fig: -7 Transport nagar depot project
Depot Control Center (DCC): - the depot control center of luck now metro is being
constructed inside the workshop cum maintenance depot. The DCC will have a backup
control centre that will regulate the operation of the metro trains. It will be the never centre of
LMRC that will control and supervise train operations, monitoring passenger information and
oversee the automatic fare collection system. Trains maintenance personnel, train operator
and the station staff will be conducted with this control centre at all times with the latest
communication system.
Fig: -8 LMRC depot control centre
Training and motivation of visitors/ employees:-
LMRC has established a “C entre of Excellence for training” that is imparting a specialized
training to all its newly recruited staff/officers/ visitors to infuse a sense of belongingness
among them from the very first day of their joining the organizational values of the
corporation.
Fig: -9 Centre of excellence for training
Benefits of Lucknow metro: -
 Can achieved very high carrying capacity 40,000 peak hour peak direction traffic
(PHPDT)
 Causes no air pollution in the city
 Causes lesser noise level.
 Is one of the safest modes of public transport as compared to the alarming level of the
ever increasing road accidents.
 Is more reliable, comfortable & safer than road based system

More Related Content

What's hot

Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityPramod Kumar
 
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTSatyam Anand
 
planning of central railway station
planning of central railway stationplanning of central railway station
planning of central railway stationUpasana Panchal
 
Metro rail seminor
Metro rail seminor Metro rail seminor
Metro rail seminor Joseph Jincy
 
Moud tod policy 29_sept 2013_secy_ud
Moud tod policy 29_sept 2013_secy_udMoud tod policy 29_sept 2013_secy_ud
Moud tod policy 29_sept 2013_secy_udUttipec Dda
 
DMRC REPORT ON UNDERGROUND CONSTRUCTION
DMRC REPORT ON UNDERGROUND CONSTRUCTIONDMRC REPORT ON UNDERGROUND CONSTRUCTION
DMRC REPORT ON UNDERGROUND CONSTRUCTIONMd Shadab
 
CHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURM
CHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURMCHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURM
CHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURMThe King
 
MASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMMASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMChandanPadhi3
 
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO Akanksha Priya
 
ZONAL DEVELOPMENT PLAN OF HERITAGE ZONE BHOPAL
ZONAL DEVELOPMENT  PLAN OF  HERITAGE ZONE  BHOPAL ZONAL DEVELOPMENT  PLAN OF  HERITAGE ZONE  BHOPAL
ZONAL DEVELOPMENT PLAN OF HERITAGE ZONE BHOPAL shrikrishna kesharwani
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India pptNikita James
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase IKaran Shah
 
Public Spaces for All
Public Spaces for AllPublic Spaces for All
Public Spaces for AllIEI GSC
 
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESHPRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESHImrul Quesh
 

What's hot (20)

metro station planning ar.ravi sankar alumni(auce architecture)
metro station planning ar.ravi sankar alumni(auce architecture)metro station planning ar.ravi sankar alumni(auce architecture)
metro station planning ar.ravi sankar alumni(auce architecture)
 
Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable city
 
Bangalore Metro Project
Bangalore Metro ProjectBangalore Metro Project
Bangalore Metro Project
 
Surat BRTS - Abhijit Lokre
Surat BRTS - Abhijit LokreSurat BRTS - Abhijit Lokre
Surat BRTS - Abhijit Lokre
 
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
 
planning of central railway station
planning of central railway stationplanning of central railway station
planning of central railway station
 
Metro rail seminor
Metro rail seminor Metro rail seminor
Metro rail seminor
 
Moud tod policy 29_sept 2013_secy_ud
Moud tod policy 29_sept 2013_secy_udMoud tod policy 29_sept 2013_secy_ud
Moud tod policy 29_sept 2013_secy_ud
 
DMRC REPORT ON UNDERGROUND CONSTRUCTION
DMRC REPORT ON UNDERGROUND CONSTRUCTIONDMRC REPORT ON UNDERGROUND CONSTRUCTION
DMRC REPORT ON UNDERGROUND CONSTRUCTION
 
CHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURM
CHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURMCHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURM
CHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURM
 
Urban streets
Urban streetsUrban streets
Urban streets
 
MASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMMASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEM
 
Brts
BrtsBrts
Brts
 
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
 
ZONAL DEVELOPMENT PLAN OF HERITAGE ZONE BHOPAL
ZONAL DEVELOPMENT  PLAN OF  HERITAGE ZONE  BHOPAL ZONAL DEVELOPMENT  PLAN OF  HERITAGE ZONE  BHOPAL
ZONAL DEVELOPMENT PLAN OF HERITAGE ZONE BHOPAL
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India ppt
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase I
 
Public Spaces for All
Public Spaces for AllPublic Spaces for All
Public Spaces for All
 
Railway Station Design 251115
Railway Station Design 251115Railway Station Design 251115
Railway Station Design 251115
 
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESHPRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
 

Similar to Lucknow metro report

Doubling progress report
Doubling progress reportDoubling progress report
Doubling progress reportNeha Singh
 
Lucknow metro rail project internship report
Lucknow metro rail project internship report Lucknow metro rail project internship report
Lucknow metro rail project internship report Aditya Pratap Singh
 
central railway internship report
central railway internship reportcentral railway internship report
central railway internship reportrahul waghmare
 
Maintenance and Manufacturing of Railways
Maintenance and Manufacturing of RailwaysMaintenance and Manufacturing of Railways
Maintenance and Manufacturing of RailwaysSwapnil Pawar
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro raillibin paul
 
Project brief updated_aug081
Project brief updated_aug081Project brief updated_aug081
Project brief updated_aug081Anush verma
 
RDSO (Indian Railways) Industrial Training Report
RDSO (Indian Railways) Industrial Training ReportRDSO (Indian Railways) Industrial Training Report
RDSO (Indian Railways) Industrial Training ReportNeha Arya
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET Journal
 
Sarita Vihar Depot, Dmrc summer training report
Sarita Vihar Depot, Dmrc summer training reportSarita Vihar Depot, Dmrc summer training report
Sarita Vihar Depot, Dmrc summer training reportGAURAV KUMAR CHAUBEY
 
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailTime Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailIRJET Journal
 
Tunnels infographic
Tunnels infographicTunnels infographic
Tunnels infographicIQPC Asia
 
INTERNSHIP REPORT (FINAL)
INTERNSHIP REPORT (FINAL)INTERNSHIP REPORT (FINAL)
INTERNSHIP REPORT (FINAL)Sindhuja Balaji
 
A_detailed_training_report_on_JAIPUR_ME.pdf
A_detailed_training_report_on_JAIPUR_ME.pdfA_detailed_training_report_on_JAIPUR_ME.pdf
A_detailed_training_report_on_JAIPUR_ME.pdfDeebakAshwinViswanat2
 
Arts final project(MOBILE BRIDGE PLATFORM)
Arts final project(MOBILE BRIDGE PLATFORM)Arts final project(MOBILE BRIDGE PLATFORM)
Arts final project(MOBILE BRIDGE PLATFORM)Thanku Anna Baiju
 
Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiPrabjeet Singh
 

Similar to Lucknow metro report (20)

Cmrl ppt
Cmrl pptCmrl ppt
Cmrl ppt
 
Doubling progress report
Doubling progress reportDoubling progress report
Doubling progress report
 
Lucknow metro rail project internship report
Lucknow metro rail project internship report Lucknow metro rail project internship report
Lucknow metro rail project internship report
 
JMRC PRESENTATION
JMRC PRESENTATIONJMRC PRESENTATION
JMRC PRESENTATION
 
central railway internship report
central railway internship reportcentral railway internship report
central railway internship report
 
Maintenance and Manufacturing of Railways
Maintenance and Manufacturing of RailwaysMaintenance and Manufacturing of Railways
Maintenance and Manufacturing of Railways
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro rail
 
lucknow metro rail carporation (signalling)
lucknow metro rail carporation (signalling)lucknow metro rail carporation (signalling)
lucknow metro rail carporation (signalling)
 
Project brief updated_aug081
Project brief updated_aug081Project brief updated_aug081
Project brief updated_aug081
 
RDSO (Indian Railways) Industrial Training Report
RDSO (Indian Railways) Industrial Training ReportRDSO (Indian Railways) Industrial Training Report
RDSO (Indian Railways) Industrial Training Report
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
 
Sarita Vihar Depot, Dmrc summer training report
Sarita Vihar Depot, Dmrc summer training reportSarita Vihar Depot, Dmrc summer training report
Sarita Vihar Depot, Dmrc summer training report
 
sky bus
sky bussky bus
sky bus
 
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai MonorailTime Overrun in Transportation Project - A Case Study of Mumbai Monorail
Time Overrun in Transportation Project - A Case Study of Mumbai Monorail
 
Tunnels infographic
Tunnels infographicTunnels infographic
Tunnels infographic
 
INTERNSHIP REPORT (FINAL)
INTERNSHIP REPORT (FINAL)INTERNSHIP REPORT (FINAL)
INTERNSHIP REPORT (FINAL)
 
A_detailed_training_report_on_JAIPUR_ME.pdf
A_detailed_training_report_on_JAIPUR_ME.pdfA_detailed_training_report_on_JAIPUR_ME.pdf
A_detailed_training_report_on_JAIPUR_ME.pdf
 
Arts final project(MOBILE BRIDGE PLATFORM)
Arts final project(MOBILE BRIDGE PLATFORM)Arts final project(MOBILE BRIDGE PLATFORM)
Arts final project(MOBILE BRIDGE PLATFORM)
 
Indian railways
Indian railwaysIndian railways
Indian railways
 
Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New Delhi
 

Recently uploaded

GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture designssuser87fa0c1
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 

Recently uploaded (20)

GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture design
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 

Lucknow metro report

  • 1. REPORT OF AN INDUSTRIAL VISIT AT LUCKNOW METRO RAIL CORPORATION (LMRC, LUCKNOW) Submitted by: - Submitted to:- Atul Kumar Shukla Ashraf Hussain Civil 4th yr HOD Civil Engineering 1450500009 Allenhouse Institute of Technology, Kanpur
  • 2. INTRODUCTION: - Lucknow Metro is a rapid transit system under construction in the city of Lucknow, Uttar Pradesh. The commencement of civil works started on 27 September 2014. Lucknow Metro Rail Corporation Limited a joint venture of the Government of India and the Government of Uttar Pradesh entrusted to build and operate the Lucknow Metro. Lucknow Metro will have 2 Lines, the North-South line and the East-West line. The North- South corridor starts at Airport and goes to Munshi Pulia, with a total length of 22.878 kilometers (14.216 miles). The East-West corridor starts at Charbagh Railway Station and ends at Vasant Kunj. Both lines will intersect at Charbagh Railway Station. The project will be the most expensive public transport system in the state. Total cost of phase 1 and 2 will be about $2 billion, of which ₹6,928 crore (US$1 billion) is being spent on phase 1. Partial commercial operation of Line 1 from Transport Nagar to Lucknow Charbagh Railway Station a distance of 8.5 km is expected by August 2017. Fig: - 1 Entrance of LMRC Depot The designed speed of metro would be 90 km/h (56 mph) while the scheduled speed would be 34 km/h (21 mph) for North-South corridor and 32 km/h (20 mph) for East-West corridor. There would be only one depot at Vasant Kunj spread over a land measuring 20 hectares (49 acres). The Amausi Depot has been done away because of its proximity to the Airport and the subsequent reasons of security and safety.
  • 3. ROUTE OF LMRC:- The routes for running of metro rail are as given below:[41] Line First opera tional Stati ons Len gth (km) Terminals Rolling stock Gauge Power North- South Corridor Under Constru ction 22 22.878 CCS Internatio nal Airport Muns hi Pulia Alstom 1435mm 25kV OHE East- West Corridor Planned 12 11.098 Charba gh Railway Station Vasant Kunj NA 1435mm 25kV OHE METRO STATIONS IN 1ST AND 2ND CORRIDOR North-South Corridor 1. Chaudhary Charan Singh International Airport 2. Amausi 3. Transport Nagar 4. Krishna Nagar 5. Singaar Nagar 6. Alambagh 7. ISBT Alambagh 8. Mawaiya 9. Durgapuri 10. Lucknow Charbagh Railway Station 11. Hussain Ganj 12. Sachivalaya 13. Hazratganj 14. KD Singh Babu Stadium 15. Lucknow University 16. IT Chauraha 17. Mahanagar 18. Badshahnagar 19. Lekhraj Market 20. Ramsagar Mishra Nagar 21. Indira Nagar 22. Munshi Pulia
  • 4. East-West Corridor 1. Gautam Buddha Marg 2. Aminabad 3. Pandeyganj 4. Lucknow City Railway Station 5. Medical College Chauraha 6. Nawazganj 7. Thakurganj 8. Balaganj 9. Sarfarazganj 10. Musabagh 11. Vasant Kunj Construction Methodology: - Only one methodology is not sufficient for Metro Project as it requires different approach of construction for various metro line and stations. The methodology also depends on the geological profile of the area. Largely, Lucknow metro is precast Twin U-girder for elevated viaduct and cut and cover Methodology for construction its underground stations while Tunnel Boring Machine (TBM) are being used for tunnel excavation. The new Austrian tunneling method (NATM) is also applied while doing excavation/tunneling in soft soil Fig: -2 Arrangement of Pier with U-Girders Challenges during Project Implementation:-  Project is being executed in a very difficult urban environment,  Being the capital city, all actions are under close security of VVIPS, Media/press.  The project has been approved on the completion cost.  The project implementation period is extremely compressed with a very strict completion target.  Metro being constructed to world class standards with frontline technology  The sensitivity of the city to be respected during construction.
  • 5. Major Engineering Challenges: - At Mawaiya Railway crossing, LMRC is carrying out its work for construction of a special balances cantilever span of 255 meters (central span 105 meters; end span of 75 meters each). This is one of the most challenging and a critical job which is being executed at a height of 21.5 meters above the ground level while surpassing over a railway crossing at a height of 15.2 meters from the ground level under extremely difficult situations in the middle of the main road traffic. At Awadh Rotary, luck now metro has launching a 60 meter special steel span bridge crossing the rotary over the statue in the middle of the rotary. This bridge which has been built at a height of approximately 13 meter above the ground will connect both the ends of the metro viaduct to provide a special seamless connectivity for metro train operation. It is one of the rare kinds of work being done. Fig: -3 A 60 meter special steel span bridge crossing at Awadh Rotary Fig: -4 Cantilever span of 255 meters at Mawaiya railway crossing
  • 6. Workshop cum Maintenance Depot: - LMRC depot cum workshop has the facility for today maintenance and overhauling of rolling stock equipments adopting the concept of condition monitoring of key equipments requiring minimum man power. Depot has a facility for maintaining 42 rakes of 6 cars. Fig: -5 Workshop line with epoxy flooring Fig: -6 Maintenance depot The state of art facilities includes: -  Auto coach wash plant,  Pit wheel lathe,  Heavy interior and exterior cleaning plant  Covered stabling line with puff based heat insulated roof panel duly integrated with turbo fans.  Epoxy floor coating to ensure hazard based smooth flow process for maintenance including providing dust free environment.  Solar power plant of one megawatt capacity is planned on the roof of depot
  • 7. Fig: -7 Transport nagar depot project Depot Control Center (DCC): - the depot control center of luck now metro is being constructed inside the workshop cum maintenance depot. The DCC will have a backup control centre that will regulate the operation of the metro trains. It will be the never centre of LMRC that will control and supervise train operations, monitoring passenger information and oversee the automatic fare collection system. Trains maintenance personnel, train operator and the station staff will be conducted with this control centre at all times with the latest communication system. Fig: -8 LMRC depot control centre
  • 8. Training and motivation of visitors/ employees:- LMRC has established a “C entre of Excellence for training” that is imparting a specialized training to all its newly recruited staff/officers/ visitors to infuse a sense of belongingness among them from the very first day of their joining the organizational values of the corporation. Fig: -9 Centre of excellence for training Benefits of Lucknow metro: -  Can achieved very high carrying capacity 40,000 peak hour peak direction traffic (PHPDT)  Causes no air pollution in the city  Causes lesser noise level.  Is one of the safest modes of public transport as compared to the alarming level of the ever increasing road accidents.  Is more reliable, comfortable & safer than road based system