This document discusses risk management, cost control, and communication in construction projects. It describes how risk management involves identifying, assessing, and treating risks through various models and communication is key to preventing defects. It also explains that cost control is important for meeting project goals and involves establishing budgets, monitoring costs, and controlling changes. Effective integration of these three areas is important for construction project success.
Presentation focuses on the cost effectiveness of buildings through rationalizing architectural design, opting for green buildings, looking at life cycle cost, promoting professional management, optimising labour, materials, plants time etc to avoid time/cost over-run and to finish the project within defined scope, money and time
This is the 5th presentation as part of PM Awareness Sessions I\'ve made for my company\'s (ITEC) staff to increase their awareness of PM best practices.
Presentation focuses on the cost effectiveness of buildings through rationalizing architectural design, opting for green buildings, looking at life cycle cost, promoting professional management, optimising labour, materials, plants time etc to avoid time/cost over-run and to finish the project within defined scope, money and time
This is the 5th presentation as part of PM Awareness Sessions I\'ve made for my company\'s (ITEC) staff to increase their awareness of PM best practices.
Project Procurement Management (PPM) includes the processes necessary to purchase or acquire products, services, or results needed from outside the project teams. It also includes the contract management and change control processes required to develop and administer contracts or purchase orders issued by authorized project team members.
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
help.mbaassignments@gmail.com
or
call us at : 08263069601
The construction industry is a complex and multifaceted sector that involves numerous stakeholders, including owners, architects, engineers, subcontractors, and suppliers. As a result, general contractors (GCs) face significant challenges in managing construction projects effectively.
Project Procurement Management (PPM) includes the processes necessary to purchase or acquire products, services, or results needed from outside the project teams. It also includes the contract management and change control processes required to develop and administer contracts or purchase orders issued by authorized project team members.
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
help.mbaassignments@gmail.com
or
call us at : 08263069601
The construction industry is a complex and multifaceted sector that involves numerous stakeholders, including owners, architects, engineers, subcontractors, and suppliers. As a result, general contractors (GCs) face significant challenges in managing construction projects effectively.
Building Better_Maximizing Efficiency with Construction Management Software S...iFieldsmart Technologies
Building Better: Maximizing Efficiency with Construction Management Software Solutions
Efficiency within the construction landscape points to accomplishing tasks, processes, and projects with minimum effort, resources, and time. This improves productivity and ensures positive outcomes. In the construction industry, efficiency is critical to meet project timelines, achieve planned costs, and produce high-quality outcomes.
Read More : https://www.ifieldsmart.com/blogs/building-better-maximizing-efficiency-with-construction-management-software-solutions/
Visit : www.ifieldsmart.com
Top 7 reasons why preemptive construction management is crucial for construct...iFieldsmart Technologies
Subject to a myriad of reasons and market fluctuations, construction can be extremely competitive. The economic survival of construction companies and the victory of each construction project rely on effective construction coordination/management, accurate planning, improved use of resources, and performance – in simpler words, powerful construction management. It is impossible to achieve success in the field without best-in-class construction management apps or software. New and existing construction firms cannot showcase negligence in construction management.
Schedule Demo-www.ifieldsmart.com/schedule_demo
Ways to mitigate construction risks using bim workflow managementnibtedu
There is always an element of risk when a construction project is undertaken, be it the risk of cost overruns, project lags, building performance, sustainability, and more
Top 7 reasons why preemptive construction management is crucial for construct...iFieldsmart Technologies
Subject to a myriad of reasons and market fluctuations, construction can be extremely competitive. The economic
survival of construction companies and the victory of each construction project rely on effective construction
coordination/management, accurate planning, improved use of resources, and performance – in simpler words,
powerful construction management. It is impossible to achieve success in the field without best-in-class
construction management apps or software. New and existing construction firms cannot showcase negligence in
construction management.
Schedule Demo - www.ifieldsmart.com/schedule_demo
Cost Overrun Causes Related to the Design Phase in the Egyptian Construction ...World-Academic Journal
Cost overrun is one of the most common problems that threaten any construction project. As the Design phase is responsible for many critical decisions, many of cost overrun causes are related to such phase. This paper aims to identify the most significant causes of cost overrun related to the design phase in the Egyptian construction industry from the point of view of owners, consultant, designers, project managers and contractors. A list of cost overrun causes related to the design phase collected through an extensive literature review, main causes were adapted to the Egyptian construction industry through seven semi-structured interviews. The resultant list was submitted to a questionnaire survey for the impact and frequency quantitative evaluation. the results of the research is expected to help the participants in the design phase to develop more optimized design and avoid the most usual flaws that could led to cost overruns.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
2. RISK MANAGEMENT
Risks have a significant impact on a
construction project’s performance in
terms of:
cost
Time
quality
Size and complexity of the projects have
increased over the past 30 years.
The ability to manage risks throughout
the construction process has become a
major factor for preventing risk.
3. RISK MANAGEMENT
Supply chain must share the risk.
Risk to a large extent is governed by
the procurement option and the
content of the related contract
documents.
Selecting an appropriate project
procurement option is a key issue for
risk reduction.
4. RISK MANAGEMENT
A systematic process of:
identifying
assessing and responding to project
risk
The aims and objectives of the risk
management process is to maximize
the opportunities and minimize the
consequences of a risk event.
A variety of risk management
models with different numbers of
stages can be obtained.
5. RISK MANAGEMENT
The international standard “Project risk
management – Application guidelines”
(IEC 2001) is a good source for risk
management.
IEC suggest a model with 5 steps:
1. risk identification
2. risk assessment
3. risk treatment
4. risk review
5. monitoring
6. RISK MANAGEMENT
PMBOK’s model (PMI 2000) is
similar but divides risk assessment
into two processes. They are:
1. qualitative risk analysis
2. quantitative risk analysis
Baloi and Price (2003) include an
additional step of risk
management process it is:
communication.
7. RISK MANAGEMENT
Risk Transfer &
Indemnification
Two most problematic areas
for construction management
teams are:
1.contractual risks
2.the insurability of projects.
8. RISK MANAGEMENT
Risk management can reduce risk in the
different procurement options.
Design and build contracts and
collaborative form of partnering.
Better understanding is expected to
contribute to a more effective risk
management.
Therefore, a better project output and
better value for both clients and
contractors.
9. RISK MANAGEMENT
A clear link between the
procurement option and risk
management
Design-build projects offer better
cooperative work by the architects
and contractors in early phases
Therefore, more thorough risk
management.
11. RISK MANAGEMENT
RISK ASSESSMENT-SUPPLY CHAIN
1. identify risks
2. evaluated risks
3. ranked risks
4. use both qualitative and quantitative
methods for assessment
5. based on fuzzy estimates of risk
components or a better option
6. Identify risk to cover all KPI’s (TIME-
COST-QUALITY-CUSTOMER
SATIFACTION-SAFTEY)
16. COST CONTROL
Cost control is a key factor and an
important determinant during
construction for achieving project’s KPIs.
Construction costs control includes:
performing an adequate constructability
review to minimize unexpected costs;
establishing a construction cost cash flow
plan;
monitoring cost performance to detect and
understand variances from plan;
17. COST CONTROL
ensuring that all appropriate
changes are recorded;
preventing incorrect, inappropriate,
or unauthorized changes from being
included in the project;
Informing appropriate stakeholders
of authorized changes;
Acting to bring expected costs within
acceptable cost limits.
18. COST CONTROL
Cost control must be thoroughly
integrated with the other control
processes such as:
scope change control;
schedule control and quality
control.
Any inappropriate responses to
cost variations can cause quality
or schedule problems.
19. COST CONTROL
Removing gang members from
one job to another can increase
the contract duration.
Decreasing gang members can
also increase the cost.
It also can produce an
unacceptable level of risk later
in the project.
20. COST CONTROL
construction costs include:
contractor costs;
the client cost;
consultant costs;
Any other hidden cost such as in
case of any major dispute
between contractor and the
client.
21. COST CONTROL
RESPONSIBILITIES
Project Manager (PM): The PM is responsible
for overall project cost control, running of the
project.
The PM should work closely with the
Construction Site Manager, Site Engineers to
ensure that changes are minimized.
Make sure the project is completed within
budget.
22. COST CONTROL
Construction Manager (CM)-Project
manager (PM)-Site Manager (SM)
Once the construction work starts on site,
the management team on site will be
responsible for day-to-day cost control as
well as other responsibilities.
The CM,PM, must not only know the
project’s costs to date, but also be able to
project costs For any additional work.
The CM, PM,.. is responsible for
controlling costs to ensure that
construction is completed within budget.
23. COST CONTROL
If any changes are anticipated during
the construction process, immediate
steps must be taken and they are:
1. the CM must notify the senior
management as soon as possible;
2. an informed decision can be made on
whether or not to proceed with the
change;
3. Once the decision is made can the
necessary funding be obtained?
28. DATA MODEL FOR LABOUR,
MATERIAL AND MACHINERY
COST OVERRUN
29. COMMUNICATION
Every year defects in the UK
construction industry cost at least
£20 billion to repair or rebuild
Some of the defects are as the result
issues such as:
Poor communication;
Poorly detailed drawing;
Incorrect instructions or technical
information not being available on time;
30. COMMUNICATION
Meeting types and frequencies;
Method's of drawing transfer;
Use and control of revised drawings,
or unconfirmed drawings;
Reporting and tracking of defects;
Lack of knowledge in detecting
defects on time.
31. COMMUNICATION
Single points of contact
Consideration should be given to
appointing defined, single points
of contact at suppliers, design
offices and contractors.
This should help to avoid delays,
confusion and duplication of
effort.
32. COMMUNICATION
Upwards feedback
Establish means by which
information can be effectively fed
back up through the formal
management structure.
Two key areas where this can be
particularly important are as
follows:
33. COMMUNICATION
1. operatives to site office (e.g.
reporting on an incorrect drawing);
2. Site office to head office (e.g. where
an incorrect detail is discovered;
3. this should be reported back to the
design office and the drawings
corrected).
34. COMMUNICATION
There are different communication instruments,
such
as:
e-mail
document
telephone
meeting
contracts
specifications
reports
manuals
schedules
calculations
35. COMMUNICATION
drawings
computer files
Disks
print-outs
photographs
agenda’s and minutes of meetings
The management of documentation and
communication used in a project is used
by a number of subcontractors, the
storage and retrieval thereof for further
use.