SlideShare a Scribd company logo
Francisco Justo Sierra
Alejandra Débora Fissore
ARGENTINA
COUNTRY
REPORT
ARGENTINA
• 2,800,000 km2 (0.3 of Canada Total Area)
• 43,000,000 inh (1.2 of Canada Total Population)
• 80,000 km Paved Roads (0.2 of CPR)
• 7,500 Annual Road Fatalities (3.7 CARF)
• 17.6 deaths/100,000 inh (3 times Canada Road Death Rate)
PURPOSE
Final REPORT
2010 UPDATE of Geometric Design Standards
Argentina National Highway Administration
DNV 1967/80
WHO, WHAT, WHEN
• National Highway Administration (DNV)
Civil Engineering Mountain School of
San Juan National University (EICAM)
• 2010 Update of Geometric Design Standards
• April 2009 – Term: 12 months
WHY
• Milestones in Geometric Design 1967-2009
not covered in the current DNV Standard 1967/80
 The Clear Zone concept
 AASHO 1971 Addendum
 Highway Design Consistency
 Modern Roundabouts
 Test Levels and Justification of devices
Chronology of Sources 1954-1980
AASHO-BLUEBOOK1(RURAL)
AASHO-REDBOOK1(URBAN)
AASHO-BLUEBOOK2(RURAL)
AASHO-YELLOWBOOK1+FHW
AASHO-ADENDUMSIGHTDISTANCE
AASHO-REDBOOK2(URBAN)
AASHTO-YELLOWBOOK2+FHW
AASHTOBARRIERGUIDE
54 57 65 67 68 71 73 74 77 80
STANDARDDNV67
STANDARDDNV80
Chronology of Sources 1980-2010
AASHTO-GRRENBOOK1
AASHTO-ROADSIDEDESIGNGUIDE1
AASHTO-GRRENBOOK2
AASHTO-GRRENBOOK3
AASHTO-ROADSIDEDESIGNGUIDE2
FHWAROUNDABOUTGUIDE
AASHTO-GRRENBOOK4
AASHTO-ROADSIDEDESIGNGUIDE3
PIARCROADSAFETYMANUAL
AASHTO-GRRENBOOK5
80 84 89 90 94 96 97 98 99 0 1 2 3 4 5 6 7 10
STANDARDDNV80
HONDURAS
AUSTRALIA
COLOMBIA
CANADA
PERU-CENTRALAMERICA
CHILE
UNITEDKINGDOM
SOUTHAFRICA
BOLIVIA-DOCUMENTDNV
UPDATEDNV10
BACKGROUND
• Based on an Eclectic Selection of the most
important findings over the past 50 years
 Ken Stonex
 AASHTO: Green and Yellow Book, Roadside Design Guide,
Highway Safety Manual (draft)
 Standards from Canada, South Africa, Australia, New Zeeland,
European Countries, South and Central American Countries
OBJECTIVES
• Systematize, organize and standardize criteria
• Promote design and construction of safer roads
• Gather current DNV technical documents
• Emphasize document’s Self-sufficiency and
Graphic Design
SCOPE
Broad spectrum of roads in the National Network
• Multilane highways, with
10,000 vehicles per hour
• Single two-lane two-way
roads, with ADT<500
CONTENTS
4 Volumes - 10 Chapters - 1 Atlas - 264 References
C1 INTRODUCTION
• New approaches in the design philosophy
• Compulsory Standards: V; SSD; Rmin; emax;
Lane, Paved Shoulders and Median Width; TL
• Recommendations: CZ, DSD, ROW, Rumble
Strips, Barrier Alignment, Urban Crossing
• Glossary
C2 DESIGN CONTROLS
• Human Factor: to acknowledge possibility of
errors induced by Road Design
• Speed: interactive relationship road design - speed
• Access Management: planning and regulation to
reduce congestion and conflicts
C3 GEOMETRIC DESIGN
• SSD according to AASHTO ’94
Brake reaction t = 2.5 s; fl = wet pavement;100% V
• Distribution e and f
According to DNV Nº 3
similar to AASHTO Nº 4
(1)
C3 GEOMETRIC DESIGN
• Ratio Design
• Length of the transition
spirals is limited. Long
transitions are not
recommended
(2)
C3 GEOMETRIC DESIGN
• Clear Zone (ZD)
(3)
• Roadsides (CDC)
C3 GEOMETRIC DESIGN
• Coordination of Horizontal
and Vertical Alignment
• Aesthetics of Road Design
• Design Consistency
(4)
C4 FREEWAYS
• Argentinian Superior Road Designs:
Freeway, Autovía, Semi-Freeway
• General Considerations:
Route-location and Alignments, Cross Section,
Median, Lane Balance, Frontage Roads
• Good and wrong practices
• Latest improvements borrowed from international practice:
 Charts to select types of intersection, Alberta
 Intersection Sight Triangles, AASHTO
 Ramp width, DNV
 Turning Paths computer software
 Sizing of channelization components
 Modern Roundabouts, FHWA
C5 INTERSECTIONS
C6 INTERCHANGES
• Selection and Warrant
• Desirable Design features
• Ramp Design
• Review of the length of speed-change lanes
• Types
• Other issues: pedestrian’s facilities, lighting
• FC and ROR may be the result of drivers’ actions
C7 ROADAND ROADSIDE SAFETY
(1)
 Involuntary: Driver own error, or due to
Road condition or Vehicle failure
 Voluntary: incorrect passing manoeuvre
or maneuvers to avoid a dangerous
situation
• To reduce the number of deaths, serious injuries
and material damage, the following should be
taken into account:
 The safety of vehicles on the roadway
 Reduction of risk in the event of a ROR crash
 Reduction of the severity of the damage in such case
C7 ROADAND ROADSIDE SAFETY
(2)
 Keeping vehicles on the roadway
C7 ROADAND ROADSIDE SAFETY
(3)
 Hazardous Conditions
(4)
 Hazardous Objects
C7 ROADAND ROADSIDE SAFETY
 Hazardous conditions
 Flatten slopes
more than 1:4
 Design traversable profile
ditches and rounded
edges
(5)
 Hazardous objects
 Remove
 Redesign
 Relocate
 Reduce impact severity
 Redirect
 Delineate
C7 ROADAND ROADSIDE SAFETY
• Hazard treatments on forgiving roadside
to reduce the risk and severity of crashes
(6)
 Sometimes they are
Not Necessary
C7 ROADAND ROADSIDE SAFETY
Barriers are Hazardous
 Sometimes they are of
Utmost Importance
(7)
C7 ROADAND ROADSIDE SAFETY
Barriers
 Classification  Justification
 TL selection
 End Treatments
 Transitions
 Bridge Railings
(8)
 Length of Need
C7 ROADAND ROADSIDE SAFETY
C8 SPECIAL DESIGNS
C9 ROUTE LOCATION
• Stages definition and project documentation
• Topographic surveys
• Measurement tolerance
• Project plans
• Engineering reports submission
• Technical and administrative procedures for Design Exceptions
C10 GENERAL INSTRUCTION
ATLAS
Complete text and all references can be downloaded
http://ingenieriadeseguridadvial.blogspot.com.ar
• General Reference Literature: 40 Spanish or translated into
Spanish documents included
• Particular Reference Literature: 224 Spanish or translated into
Spanish documents included
REFERENCES
• Ezra Hauer
“Roads designed to standards are not safe, unsafe or
appropriately safe; they have an unpremeditated level of
safety. There are only more or less safe roads.”
A myth to be dispelled: “Only drivers cause crashes, not roads.”
(1999)
CONCEPTUAL APPROACH
• Pascual Palazzo
“There is but one way to avoid crashes, and that is to make
them unlikely. But not unlikely for an ideal species of
prudent, thoughtful, intelligent drivers and pedestrians with
rapid reactions, but for ordinary men as they are or become
in the different circumstances of daily life.” (1937)
CONCEPTUAL APPROACH
STANDARD
UPDATE
NOT
ENFORCED
June 2015
STATUS
ACKNOWLEDGMENT
The authors are grateful for the help
and the permanent encouragement of
Dr. John Morrall, P.Eng.
And to you for your attention
01 argentina countryreportlecternpresentation

More Related Content

Similar to 01 argentina countryreportlecternpresentation

01 ArgentinaCountryReportLecternPresentation02 ISGD2015.pdf
01 ArgentinaCountryReportLecternPresentation02 ISGD2015.pdf01 ArgentinaCountryReportLecternPresentation02 ISGD2015.pdf
01 ArgentinaCountryReportLecternPresentation02 ISGD2015.pdf
FRANCISCOJUSTOSIERRA
 
Highway design presentation (Malyar Talash)
Highway design presentation (Malyar Talash)Highway design presentation (Malyar Talash)
Highway design presentation (Malyar Talash)
Malyar Talash
 
Diapositivas mod3
Diapositivas mod3Diapositivas mod3
Diapositivas mod3
JersonNietoAguirre1
 
165. argentina country report
165. argentina country report165. argentina country report
165. argentina country report
Sierra Francisco Justo
 
10.16 165. argentina country report simposio vancouver 2015
10.16   165. argentina country report simposio vancouver 201510.16   165. argentina country report simposio vancouver 2015
10.16 165. argentina country report simposio vancouver 2015
Sierra Francisco Justo
 
165. argentina country report
165. argentina country report165. argentina country report
165. argentina country report
Sierra Francisco Justo
 
day 23.pdf
day 23.pdfday 23.pdf
day 23.pdf
NitishMotikar
 
GTA West Corridor - Project Proposal - Ryerson University Capstone 2021
GTA West Corridor - Project Proposal - Ryerson University Capstone 2021GTA West Corridor - Project Proposal - Ryerson University Capstone 2021
GTA West Corridor - Project Proposal - Ryerson University Capstone 2021
Neha Patel
 
23a_IRC582015_RP_Design(1).pdf
23a_IRC582015_RP_Design(1).pdf23a_IRC582015_RP_Design(1).pdf
23a_IRC582015_RP_Design(1).pdf
SivaRamaKrishnaUppul
 
transportation
transportationtransportation
transportation
Navneet Singh
 
Innovative intersection-ppt
Innovative intersection-pptInnovative intersection-ppt
Innovative intersection-ppt
Sierra Francisco Justo
 
HIGHWAY ENGINEERING 1 (ii).doc
HIGHWAY ENGINEERING 1 (ii).docHIGHWAY ENGINEERING 1 (ii).doc
HIGHWAY ENGINEERING 1 (ii).doc
sydneyaugust1
 
design.pptx
design.pptxdesign.pptx
design.pptx
SantoshKapse9
 
Minor project ppt1.pdf
Minor project ppt1.pdfMinor project ppt1.pdf
Minor project ppt1.pdf
AnshuRaj51911
 
Managing gravel road maintenance
Managing gravel road maintenanceManaging gravel road maintenance
Managing gravel road maintenance
Florida Public Works Expo
 
Highway Design - Techniques for proper Planning and Execution .
Highway Design - Techniques for proper Planning and Execution . Highway Design - Techniques for proper Planning and Execution .
Highway Design - Techniques for proper Planning and Execution .
gunjatetm
 
Chapter 2 Road geometrics
Chapter 2 Road geometricsChapter 2 Road geometrics
Chapter 2 Road geometrics
KHUSHBU SHAH
 
raiway
raiwayraiway
raiway
self
 
Highway
HighwayHighway
Highway
beerappa143
 
JP RESEARCH INDIA, PVT. LTD
JP RESEARCH INDIA, PVT. LTD JP RESEARCH INDIA, PVT. LTD
JP RESEARCH INDIA, PVT. LTD
Suraj Puri
 

Similar to 01 argentina countryreportlecternpresentation (20)

01 ArgentinaCountryReportLecternPresentation02 ISGD2015.pdf
01 ArgentinaCountryReportLecternPresentation02 ISGD2015.pdf01 ArgentinaCountryReportLecternPresentation02 ISGD2015.pdf
01 ArgentinaCountryReportLecternPresentation02 ISGD2015.pdf
 
Highway design presentation (Malyar Talash)
Highway design presentation (Malyar Talash)Highway design presentation (Malyar Talash)
Highway design presentation (Malyar Talash)
 
Diapositivas mod3
Diapositivas mod3Diapositivas mod3
Diapositivas mod3
 
165. argentina country report
165. argentina country report165. argentina country report
165. argentina country report
 
10.16 165. argentina country report simposio vancouver 2015
10.16   165. argentina country report simposio vancouver 201510.16   165. argentina country report simposio vancouver 2015
10.16 165. argentina country report simposio vancouver 2015
 
165. argentina country report
165. argentina country report165. argentina country report
165. argentina country report
 
day 23.pdf
day 23.pdfday 23.pdf
day 23.pdf
 
GTA West Corridor - Project Proposal - Ryerson University Capstone 2021
GTA West Corridor - Project Proposal - Ryerson University Capstone 2021GTA West Corridor - Project Proposal - Ryerson University Capstone 2021
GTA West Corridor - Project Proposal - Ryerson University Capstone 2021
 
23a_IRC582015_RP_Design(1).pdf
23a_IRC582015_RP_Design(1).pdf23a_IRC582015_RP_Design(1).pdf
23a_IRC582015_RP_Design(1).pdf
 
transportation
transportationtransportation
transportation
 
Innovative intersection-ppt
Innovative intersection-pptInnovative intersection-ppt
Innovative intersection-ppt
 
HIGHWAY ENGINEERING 1 (ii).doc
HIGHWAY ENGINEERING 1 (ii).docHIGHWAY ENGINEERING 1 (ii).doc
HIGHWAY ENGINEERING 1 (ii).doc
 
design.pptx
design.pptxdesign.pptx
design.pptx
 
Minor project ppt1.pdf
Minor project ppt1.pdfMinor project ppt1.pdf
Minor project ppt1.pdf
 
Managing gravel road maintenance
Managing gravel road maintenanceManaging gravel road maintenance
Managing gravel road maintenance
 
Highway Design - Techniques for proper Planning and Execution .
Highway Design - Techniques for proper Planning and Execution . Highway Design - Techniques for proper Planning and Execution .
Highway Design - Techniques for proper Planning and Execution .
 
Chapter 2 Road geometrics
Chapter 2 Road geometricsChapter 2 Road geometrics
Chapter 2 Road geometrics
 
raiway
raiwayraiway
raiway
 
Highway
HighwayHighway
Highway
 
JP RESEARCH INDIA, PVT. LTD
JP RESEARCH INDIA, PVT. LTD JP RESEARCH INDIA, PVT. LTD
JP RESEARCH INDIA, PVT. LTD
 

More from Sierra Francisco Justo

15 Causa y prevencion de choques.pdf
15 Causa y prevencion de choques.pdf15 Causa y prevencion de choques.pdf
15 Causa y prevencion de choques.pdf
Sierra Francisco Justo
 
10. PrediccionComportamientoCR2C Resumen.pdf
10. PrediccionComportamientoCR2C Resumen.pdf10. PrediccionComportamientoCR2C Resumen.pdf
10. PrediccionComportamientoCR2C Resumen.pdf
Sierra Francisco Justo
 
10. PrediccionComportamientoCR2C Resumen.pdf
10. PrediccionComportamientoCR2C Resumen.pdf10. PrediccionComportamientoCR2C Resumen.pdf
10. PrediccionComportamientoCR2C Resumen.pdf
Sierra Francisco Justo
 
9. Ancho Carril y Seguridad.pdf
9. Ancho Carril y Seguridad.pdf9. Ancho Carril y Seguridad.pdf
9. Ancho Carril y Seguridad.pdf
Sierra Francisco Justo
 
14 AdministracionSV SegunConocimiento EH&otros.pdf
14 AdministracionSV SegunConocimiento EH&otros.pdf14 AdministracionSV SegunConocimiento EH&otros.pdf
14 AdministracionSV SegunConocimiento EH&otros.pdf
Sierra Francisco Justo
 
10. PrediccionComportamientoCR2C Resumen.pdf
10. PrediccionComportamientoCR2C Resumen.pdf10. PrediccionComportamientoCR2C Resumen.pdf
10. PrediccionComportamientoCR2C Resumen.pdf
Sierra Francisco Justo
 
9 Ancho Carril y Seguridad Borrador.pdf
9 Ancho Carril y Seguridad Borrador.pdf9 Ancho Carril y Seguridad Borrador.pdf
9 Ancho Carril y Seguridad Borrador.pdf
Sierra Francisco Justo
 
12. SeguridadNormasDisenoGeometrico 21p.pdf
12. SeguridadNormasDisenoGeometrico 21p.pdf12. SeguridadNormasDisenoGeometrico 21p.pdf
12. SeguridadNormasDisenoGeometrico 21p.pdf
Sierra Francisco Justo
 
8 Causa&EfectoSeccionTransversal&SeguridadVial DRAFT.pdf
8 Causa&EfectoSeccionTransversal&SeguridadVial DRAFT.pdf8 Causa&EfectoSeccionTransversal&SeguridadVial DRAFT.pdf
8 Causa&EfectoSeccionTransversal&SeguridadVial DRAFT.pdf
Sierra Francisco Justo
 
13. CAMJ 2012 Defensa Conductores Ancianos.pdf
13. CAMJ 2012 Defensa Conductores Ancianos.pdf13. CAMJ 2012 Defensa Conductores Ancianos.pdf
13. CAMJ 2012 Defensa Conductores Ancianos.pdf
Sierra Francisco Justo
 
7. Seguridad&Evidencia.pdf
7. Seguridad&Evidencia.pdf7. Seguridad&Evidencia.pdf
7. Seguridad&Evidencia.pdf
Sierra Francisco Justo
 
6. IngenieriaSeguridad&SeguridadIngenieria.pdf
6. IngenieriaSeguridad&SeguridadIngenieria.pdf6. IngenieriaSeguridad&SeguridadIngenieria.pdf
6. IngenieriaSeguridad&SeguridadIngenieria.pdf
Sierra Francisco Justo
 
5 . Camino Por Recorrer.pdf
5 . Camino Por Recorrer.pdf5 . Camino Por Recorrer.pdf
5 . Camino Por Recorrer.pdf
Sierra Francisco Justo
 
4. HAUER Hwy 407 PEO Canada'97.pdf
4. HAUER Hwy 407 PEO Canada'97.pdf4. HAUER Hwy 407 PEO Canada'97.pdf
4. HAUER Hwy 407 PEO Canada'97.pdf
Sierra Francisco Justo
 
3. Revision Seguridad Autopista 407 Toronto.pdf
3. Revision Seguridad Autopista 407 Toronto.pdf3. Revision Seguridad Autopista 407 Toronto.pdf
3. Revision Seguridad Autopista 407 Toronto.pdf
Sierra Francisco Justo
 
1516Resumenes Ingenieria Seguridad Vial x16 3p.pdf
1516Resumenes Ingenieria Seguridad Vial x16 3p.pdf1516Resumenes Ingenieria Seguridad Vial x16 3p.pdf
1516Resumenes Ingenieria Seguridad Vial x16 3p.pdf
Sierra Francisco Justo
 
1516Resumenes Ingenieria Seguridad Vial x16 3p.pdf
1516Resumenes Ingenieria Seguridad Vial x16 3p.pdf1516Resumenes Ingenieria Seguridad Vial x16 3p.pdf
1516Resumenes Ingenieria Seguridad Vial x16 3p.pdf
Sierra Francisco Justo
 
1516Resumenes Ingenieria Seguridad Vial x16 3p.pdf
1516Resumenes Ingenieria Seguridad Vial x16 3p.pdf1516Resumenes Ingenieria Seguridad Vial x16 3p.pdf
1516Resumenes Ingenieria Seguridad Vial x16 3p.pdf
Sierra Francisco Justo
 
11121314Resumenes Ingenieria Seguridad Vial x16 4p.pdf
11121314Resumenes Ingenieria Seguridad Vial x16 4p.pdf11121314Resumenes Ingenieria Seguridad Vial x16 4p.pdf
11121314Resumenes Ingenieria Seguridad Vial x16 4p.pdf
Sierra Francisco Justo
 
78Resumenes Ingenieria Seguridad Vial x16 3p.pdf
78Resumenes Ingenieria Seguridad Vial x16 3p.pdf78Resumenes Ingenieria Seguridad Vial x16 3p.pdf
78Resumenes Ingenieria Seguridad Vial x16 3p.pdf
Sierra Francisco Justo
 

More from Sierra Francisco Justo (20)

15 Causa y prevencion de choques.pdf
15 Causa y prevencion de choques.pdf15 Causa y prevencion de choques.pdf
15 Causa y prevencion de choques.pdf
 
10. PrediccionComportamientoCR2C Resumen.pdf
10. PrediccionComportamientoCR2C Resumen.pdf10. PrediccionComportamientoCR2C Resumen.pdf
10. PrediccionComportamientoCR2C Resumen.pdf
 
10. PrediccionComportamientoCR2C Resumen.pdf
10. PrediccionComportamientoCR2C Resumen.pdf10. PrediccionComportamientoCR2C Resumen.pdf
10. PrediccionComportamientoCR2C Resumen.pdf
 
9. Ancho Carril y Seguridad.pdf
9. Ancho Carril y Seguridad.pdf9. Ancho Carril y Seguridad.pdf
9. Ancho Carril y Seguridad.pdf
 
14 AdministracionSV SegunConocimiento EH&otros.pdf
14 AdministracionSV SegunConocimiento EH&otros.pdf14 AdministracionSV SegunConocimiento EH&otros.pdf
14 AdministracionSV SegunConocimiento EH&otros.pdf
 
10. PrediccionComportamientoCR2C Resumen.pdf
10. PrediccionComportamientoCR2C Resumen.pdf10. PrediccionComportamientoCR2C Resumen.pdf
10. PrediccionComportamientoCR2C Resumen.pdf
 
9 Ancho Carril y Seguridad Borrador.pdf
9 Ancho Carril y Seguridad Borrador.pdf9 Ancho Carril y Seguridad Borrador.pdf
9 Ancho Carril y Seguridad Borrador.pdf
 
12. SeguridadNormasDisenoGeometrico 21p.pdf
12. SeguridadNormasDisenoGeometrico 21p.pdf12. SeguridadNormasDisenoGeometrico 21p.pdf
12. SeguridadNormasDisenoGeometrico 21p.pdf
 
8 Causa&EfectoSeccionTransversal&SeguridadVial DRAFT.pdf
8 Causa&EfectoSeccionTransversal&SeguridadVial DRAFT.pdf8 Causa&EfectoSeccionTransversal&SeguridadVial DRAFT.pdf
8 Causa&EfectoSeccionTransversal&SeguridadVial DRAFT.pdf
 
13. CAMJ 2012 Defensa Conductores Ancianos.pdf
13. CAMJ 2012 Defensa Conductores Ancianos.pdf13. CAMJ 2012 Defensa Conductores Ancianos.pdf
13. CAMJ 2012 Defensa Conductores Ancianos.pdf
 
7. Seguridad&Evidencia.pdf
7. Seguridad&Evidencia.pdf7. Seguridad&Evidencia.pdf
7. Seguridad&Evidencia.pdf
 
6. IngenieriaSeguridad&SeguridadIngenieria.pdf
6. IngenieriaSeguridad&SeguridadIngenieria.pdf6. IngenieriaSeguridad&SeguridadIngenieria.pdf
6. IngenieriaSeguridad&SeguridadIngenieria.pdf
 
5 . Camino Por Recorrer.pdf
5 . Camino Por Recorrer.pdf5 . Camino Por Recorrer.pdf
5 . Camino Por Recorrer.pdf
 
4. HAUER Hwy 407 PEO Canada'97.pdf
4. HAUER Hwy 407 PEO Canada'97.pdf4. HAUER Hwy 407 PEO Canada'97.pdf
4. HAUER Hwy 407 PEO Canada'97.pdf
 
3. Revision Seguridad Autopista 407 Toronto.pdf
3. Revision Seguridad Autopista 407 Toronto.pdf3. Revision Seguridad Autopista 407 Toronto.pdf
3. Revision Seguridad Autopista 407 Toronto.pdf
 
1516Resumenes Ingenieria Seguridad Vial x16 3p.pdf
1516Resumenes Ingenieria Seguridad Vial x16 3p.pdf1516Resumenes Ingenieria Seguridad Vial x16 3p.pdf
1516Resumenes Ingenieria Seguridad Vial x16 3p.pdf
 
1516Resumenes Ingenieria Seguridad Vial x16 3p.pdf
1516Resumenes Ingenieria Seguridad Vial x16 3p.pdf1516Resumenes Ingenieria Seguridad Vial x16 3p.pdf
1516Resumenes Ingenieria Seguridad Vial x16 3p.pdf
 
1516Resumenes Ingenieria Seguridad Vial x16 3p.pdf
1516Resumenes Ingenieria Seguridad Vial x16 3p.pdf1516Resumenes Ingenieria Seguridad Vial x16 3p.pdf
1516Resumenes Ingenieria Seguridad Vial x16 3p.pdf
 
11121314Resumenes Ingenieria Seguridad Vial x16 4p.pdf
11121314Resumenes Ingenieria Seguridad Vial x16 4p.pdf11121314Resumenes Ingenieria Seguridad Vial x16 4p.pdf
11121314Resumenes Ingenieria Seguridad Vial x16 4p.pdf
 
78Resumenes Ingenieria Seguridad Vial x16 3p.pdf
78Resumenes Ingenieria Seguridad Vial x16 3p.pdf78Resumenes Ingenieria Seguridad Vial x16 3p.pdf
78Resumenes Ingenieria Seguridad Vial x16 3p.pdf
 

Recently uploaded

学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
NazakatAliKhoso2
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
enizeyimana36
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 

Recently uploaded (20)

学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 

01 argentina countryreportlecternpresentation

  • 1.
  • 2. Francisco Justo Sierra Alejandra Débora Fissore ARGENTINA COUNTRY REPORT
  • 3. ARGENTINA • 2,800,000 km2 (0.3 of Canada Total Area) • 43,000,000 inh (1.2 of Canada Total Population) • 80,000 km Paved Roads (0.2 of CPR) • 7,500 Annual Road Fatalities (3.7 CARF) • 17.6 deaths/100,000 inh (3 times Canada Road Death Rate)
  • 4. PURPOSE Final REPORT 2010 UPDATE of Geometric Design Standards Argentina National Highway Administration DNV 1967/80
  • 5. WHO, WHAT, WHEN • National Highway Administration (DNV) Civil Engineering Mountain School of San Juan National University (EICAM) • 2010 Update of Geometric Design Standards • April 2009 – Term: 12 months
  • 6. WHY • Milestones in Geometric Design 1967-2009 not covered in the current DNV Standard 1967/80  The Clear Zone concept  AASHO 1971 Addendum  Highway Design Consistency  Modern Roundabouts  Test Levels and Justification of devices
  • 7. Chronology of Sources 1954-1980 AASHO-BLUEBOOK1(RURAL) AASHO-REDBOOK1(URBAN) AASHO-BLUEBOOK2(RURAL) AASHO-YELLOWBOOK1+FHW AASHO-ADENDUMSIGHTDISTANCE AASHO-REDBOOK2(URBAN) AASHTO-YELLOWBOOK2+FHW AASHTOBARRIERGUIDE 54 57 65 67 68 71 73 74 77 80 STANDARDDNV67 STANDARDDNV80
  • 8. Chronology of Sources 1980-2010 AASHTO-GRRENBOOK1 AASHTO-ROADSIDEDESIGNGUIDE1 AASHTO-GRRENBOOK2 AASHTO-GRRENBOOK3 AASHTO-ROADSIDEDESIGNGUIDE2 FHWAROUNDABOUTGUIDE AASHTO-GRRENBOOK4 AASHTO-ROADSIDEDESIGNGUIDE3 PIARCROADSAFETYMANUAL AASHTO-GRRENBOOK5 80 84 89 90 94 96 97 98 99 0 1 2 3 4 5 6 7 10 STANDARDDNV80 HONDURAS AUSTRALIA COLOMBIA CANADA PERU-CENTRALAMERICA CHILE UNITEDKINGDOM SOUTHAFRICA BOLIVIA-DOCUMENTDNV UPDATEDNV10
  • 9. BACKGROUND • Based on an Eclectic Selection of the most important findings over the past 50 years  Ken Stonex  AASHTO: Green and Yellow Book, Roadside Design Guide, Highway Safety Manual (draft)  Standards from Canada, South Africa, Australia, New Zeeland, European Countries, South and Central American Countries
  • 10. OBJECTIVES • Systematize, organize and standardize criteria • Promote design and construction of safer roads • Gather current DNV technical documents • Emphasize document’s Self-sufficiency and Graphic Design
  • 11. SCOPE Broad spectrum of roads in the National Network • Multilane highways, with 10,000 vehicles per hour • Single two-lane two-way roads, with ADT<500
  • 12. CONTENTS 4 Volumes - 10 Chapters - 1 Atlas - 264 References
  • 13. C1 INTRODUCTION • New approaches in the design philosophy • Compulsory Standards: V; SSD; Rmin; emax; Lane, Paved Shoulders and Median Width; TL • Recommendations: CZ, DSD, ROW, Rumble Strips, Barrier Alignment, Urban Crossing • Glossary
  • 14. C2 DESIGN CONTROLS • Human Factor: to acknowledge possibility of errors induced by Road Design • Speed: interactive relationship road design - speed • Access Management: planning and regulation to reduce congestion and conflicts
  • 15. C3 GEOMETRIC DESIGN • SSD according to AASHTO ’94 Brake reaction t = 2.5 s; fl = wet pavement;100% V • Distribution e and f According to DNV Nº 3 similar to AASHTO Nº 4 (1)
  • 16. C3 GEOMETRIC DESIGN • Ratio Design • Length of the transition spirals is limited. Long transitions are not recommended (2)
  • 17. C3 GEOMETRIC DESIGN • Clear Zone (ZD) (3) • Roadsides (CDC)
  • 18. C3 GEOMETRIC DESIGN • Coordination of Horizontal and Vertical Alignment • Aesthetics of Road Design • Design Consistency (4)
  • 19. C4 FREEWAYS • Argentinian Superior Road Designs: Freeway, Autovía, Semi-Freeway • General Considerations: Route-location and Alignments, Cross Section, Median, Lane Balance, Frontage Roads • Good and wrong practices
  • 20. • Latest improvements borrowed from international practice:  Charts to select types of intersection, Alberta  Intersection Sight Triangles, AASHTO  Ramp width, DNV  Turning Paths computer software  Sizing of channelization components  Modern Roundabouts, FHWA C5 INTERSECTIONS
  • 21. C6 INTERCHANGES • Selection and Warrant • Desirable Design features • Ramp Design • Review of the length of speed-change lanes • Types • Other issues: pedestrian’s facilities, lighting
  • 22. • FC and ROR may be the result of drivers’ actions C7 ROADAND ROADSIDE SAFETY (1)  Involuntary: Driver own error, or due to Road condition or Vehicle failure  Voluntary: incorrect passing manoeuvre or maneuvers to avoid a dangerous situation
  • 23. • To reduce the number of deaths, serious injuries and material damage, the following should be taken into account:  The safety of vehicles on the roadway  Reduction of risk in the event of a ROR crash  Reduction of the severity of the damage in such case C7 ROADAND ROADSIDE SAFETY (2)
  • 24.  Keeping vehicles on the roadway C7 ROADAND ROADSIDE SAFETY (3)
  • 25.  Hazardous Conditions (4)  Hazardous Objects C7 ROADAND ROADSIDE SAFETY
  • 26.  Hazardous conditions  Flatten slopes more than 1:4  Design traversable profile ditches and rounded edges (5)  Hazardous objects  Remove  Redesign  Relocate  Reduce impact severity  Redirect  Delineate C7 ROADAND ROADSIDE SAFETY • Hazard treatments on forgiving roadside to reduce the risk and severity of crashes
  • 27. (6)  Sometimes they are Not Necessary C7 ROADAND ROADSIDE SAFETY Barriers are Hazardous  Sometimes they are of Utmost Importance
  • 28. (7) C7 ROADAND ROADSIDE SAFETY Barriers  Classification  Justification  TL selection
  • 29.  End Treatments  Transitions  Bridge Railings (8)  Length of Need C7 ROADAND ROADSIDE SAFETY
  • 32. • Stages definition and project documentation • Topographic surveys • Measurement tolerance • Project plans • Engineering reports submission • Technical and administrative procedures for Design Exceptions C10 GENERAL INSTRUCTION
  • 33. ATLAS
  • 34. Complete text and all references can be downloaded http://ingenieriadeseguridadvial.blogspot.com.ar • General Reference Literature: 40 Spanish or translated into Spanish documents included • Particular Reference Literature: 224 Spanish or translated into Spanish documents included REFERENCES
  • 35. • Ezra Hauer “Roads designed to standards are not safe, unsafe or appropriately safe; they have an unpremeditated level of safety. There are only more or less safe roads.” A myth to be dispelled: “Only drivers cause crashes, not roads.” (1999) CONCEPTUAL APPROACH
  • 36. • Pascual Palazzo “There is but one way to avoid crashes, and that is to make them unlikely. But not unlikely for an ideal species of prudent, thoughtful, intelligent drivers and pedestrians with rapid reactions, but for ordinary men as they are or become in the different circumstances of daily life.” (1937) CONCEPTUAL APPROACH
  • 38. ACKNOWLEDGMENT The authors are grateful for the help and the permanent encouragement of Dr. John Morrall, P.Eng. And to you for your attention