1. B.SINGARAVELU
No:38/51 Gandhi Nagar,
Chidambaram, Cuddalore Dist,
TAMIL NADU,
INDIA
E-mail: singarkarthik@gmail.com
Mobile no: +919789228342(INDIA)
APPLIED POSITION
INSTRUMENT ENGINEER
HIGHLIGHTS
• 19 Years and 7 months in the relevant field of construction , Commissioning &
maintenance field .
• Having maintenance experience in refinery & power plant and construction experience in
LNG PLANT & power plant with specialization in repair, maintenance and
troubleshooting of instruments and other instrument related equipment at the plant.
CAREER OBJECTIVES
• To be able to have a good and exciting position where I can full apply my knowledge and
skills in the field of my experiences.
• To contribute on the company’s development in the best of my ability.
.
WORK EXPERIENCE
From September 2014 To December 2015(1 year 4months)
Employer : HYUNDAI HEAVY INDUSTRIES LTD
Project : JEDDAH SOUTH POWER PLANT 723 MW X 4
Role : E & I ENGINEER EPC (CONSTUCTION)
JEDDAH SOUTH POWER PLANT (SAUDI ELECTRICITY COMPANY)
E& I DEPARTMENT.
• Executing the work front to the sub-contractor and monitoring daily activities.
• Coordinate with design dept for as-built. ( FCN)
2. • Coordinate with vendor for all vendor related works in instrumentation
• Regular meeting with sub-contractor & owner .
• Walkthrough with manger & O/E (owner).
• Periodic checking of material issue and stock availability.
• Coordinate with the Client QC inspectors for the resolution of site problems when
applicable.
• Checking the invoice of the sub-contract with the bill of quantity.
From NOVEMBER 2012 to April 2014 (1YEAR 6 MONTH)
Employer : CONTROL & APPLICATIONS EMIRATES(UAE)
Project : IGD-DAS island (HYUNDAI HEAVY INDUSTRIES LTD)
OPTIMA NO : 847298
Role : Instrument Supervisor ( CONSTUCTION)
• In DAS ISLAND(ADGAS) in the project of (IGD) in calibration and troubleshooting of
ESD (ON/OFF) valves make(BEFI) ,control valves make (CCI), positioned (MESTRO )
Transmitter, radar level transmitter (ABB) and GE COMPRESSOR skid (INSTRUMENT)
• Maintained three separate teams handling in calibration of bench & site (skid instrument
and control valves), impulse line leak test, loop checking(Commissioning activities )
• Loop checking, functional test, Commissioning & troubleshooting through HART system’s
form filed to DCS CABINETS.
• Coordinate with the Client QC inspectors for the resolution of site problems when
applicable
From September 2007 to OCTOBER 2012(5 years 4 month)
Employer : sub contract - Neyveli Lignite Corporation
Project : N.L.C Ltd Thermal Expansion (Neyveli) 2x210MW
Role : Instrument Supervisor/Engineer (MAINTENANCE)
• Preparation schedule for preventive maintenance.
• Major shutdown activities in boiler, turbine and generator
• In boiler (Burner management system)
• In boiler maintenance , servicing and calibration of control valves and power
cylinders ( single action & double action)
• IN TURBINE.
I. Calibration of hydraulic valves (lvdt), and tubovisery
instruments
3. II. Turbine bearing instrument, vibration, seal oil, and lube oil
system.
III. In servicing of servo valves.
IV. Maintenance of compressor for( instrument & service air)
V. Handling manpower in preventive maintenance schedule and
shut down activites.
4. From December 2005 to August 2007 (1 Year 8 Months)
Employer : Kharafi National
Project : KNPC (SHUAIBA REFINERY, KUWAIT)
ROLE : Instrument Foreman. (MAINTENANCE)
• Worked on KNPC in the maintenance field for Calibration of transmitters, level troll,
Pressure switches, Float switch, Pressure gauges, Solenoid value, Control value,
Pressure controller.
• Worked on process control Instruments to monitor and control flow, pressure,
temperature and level. The Instrument used for these parameters are form various
manufactures like ABB, Fisher-Rosemount’s, Bells, Yokogawa, Blue Star &
Siemens.
• Worked on fisher Analyzer for Co. & O2 measurement which in working on Infrared
absorption technique.
From June 2005 to December 2005(7 Months)
Employer : Radha Engineering Works
Project : N.L.C Ltd Thermal Expansion (Neyveli) 2X210MW
Role : Instrument Supervisor. (MAINTENANCE)
• Preparation schedule for preventive maintenance.
• Installation of fisher Analyzer for Co. & O2 measurement which in working on
Infrared absorption technique.
• Erection and commissioning of So2/NOX/CO (Yokogawa)
• Maintenance activities in the final control elements, pneumatic diaphragm operated
control values cylinder operated values and solenoid values.
From October 2003 to October-2004 (1 Year)
Employer : Kharafi National
Project : KNPC (SHUAIBA REFINERY, KUWAIT)
Role : Instrument Mechanic. (MAINTENANCE)
• In KNPC refinery ( workshop )in calibration of level troll ( rosmount) ,Transmitter ,
level switch ( float) , control valves .
• Maintained separate history card for each instrument.
5. • Maintained the spares for instruments and compression fitting .
From October 2002 to June-2003 (8 Months)
Employer : Tata Projects Limited
Project : NLC Thermal Expansion (Neyveli)
Role : Instrument Supervisor (CONSTRUCTION)
• Installation of air dampers with ABB ( TZID-C) positioner .
• Loop checking , functional test, Commissioning activities.
August 2002 to September 2002 (1 Month)
Employer : Mc Nally Bharat Engineering
Project : Commissioning and Calibration of Instrument in Ash
Handling System
Role : Instrument Technician. (CONSTRUCTION )
• Installation of pressure, temperature switches .
February 1995 to March 2002 (7 years)
Employer : sub contract-Neyveli Lignite Corporation, (Fertilizer Plant)
Project : Maintenance of Instrument in Fertilizer plant.
Role : Instrument Technician. (MAINTENANCE)
• Maintenance of instruments such as pneumatic control valve positioner ,
pressure ,flow, level transmitter .
• Shutdown activities full servicing of control valves ( plug seating , lapping & re-
assembling and bench calibration .
EDUCATIONAL BACKGROUND
GOVERNMENT OF TAMIL NADU .
DEPARTMENT OF TECHNICAL EDUCATION.
CHENNAI ( TAMIL NADU)
DIPLOMA IN ELECTRICAL & ELECTRONICS ENGINEERING .
PERSONAL INFORMATION
Father’s Name : T. BALASUBRAMANIAM
Date of Birth : 04-10-1973
Age : 42 years old
Gender : Male