1. ______________________________________________________________________________________________
Position:
(contact no:+9137777566.skype id:mitesh.gudekar1)
Present Contact- +966-562172694.
______________________________________________________________________
Name: Nationality Date of Birth
Gudekar Mitesh Dilipbhai INDIAN 11-05-1981
______________________________________________________________________
Technical Qualification : DME,B tech
Professional Qualification : Certified Welding Inspector CSWIP 3.1 (2008
: ASNT Level II in RT, UT, MT,PT
Total Experience : 15 years(Oil & Gas Projects)
PUNJLLOYD(FEB 2016 TO Sept 2016)(Shut Down Project)
Presently I am working in Saudi Arab(shut down job-Saudi Aramco Yanbu Refinery)
and looking for some chalallanging and resosnsible job to settle in india or abroad
forbright future.
I have major experience in Cross country and city Gas distribution pipeline,offshore
pipeline,plant piping,and Tankages.
_____________________________________________________________________________
EMPLOYMENT HISTORY:
From: Feb 2016 to Sept 2016 : Dahim Punjlloyd(Saudi Arab,Yanbu Aramco Refinery Project)
Worked as a QC Inspector in YERP,SHY 1 & Petrorabigh P/L(MC-7 Remaining works-Shut down
Project)
1. All type fit up and weld visual inspection
2. Conduction Welder Test and Pqr.
3. Preparing Welder performance and Welder rejection chart.
4. Witness of hydtrotest to check leak test and weld joint strength.
5. Review and prepare site as built drawings after completition of job.
Page 1 of 8
2. From December 2014 to Jan 2015 : Doha Petroleum Construction Co. Ltd,Qatar
Designation : welding Qc Inspector
RESPONSIBILITIES
• Carry out quality control activities including inspection, examination and testing to
verify the quality of the installations and ensure construction operations are in
compliance with project specifications
• Review contractors quality control procedures and Inspections test plans
• Conduct & Witness of Welding Procedure Qualification, Welder Qualification &
Destructive Testing
• Preparation & Review of Documents for ITP (inspection Test Plan), WPS (Welding
Procedure Specification), PQR (Procedure Qualification Record), WQR (Welder
Qualification Record), welder Certificate’s and Identity Card & Hydrostatic Test
packages
• Liaison with client & client inspectors for inspections of Hold and Witness Points
• Daily functional reporting of responsibilities and any quality issues to assigned
Project QA/QC Manager
• Control calibrated measuring and test equipment used on the project
• Ensuring of compliance with standards and procedures including maintaining
inspection records.
• Inspection of Long Seam Submerged Arc & Spiral Welded API Line Pipes
• Inspection of Fittings according to specifications & standards
• Inspection of fit up, pipe & welds identification, preheat & inter-pass temperature
• Witness of Weld repair activities as per client approved WPS
• Inspection of Mainline & Tie-In welding activities
• Inspection of DSS (Duplex Stainless Steel) & CS (Carbon Steel) Welding in pipelines
• Inspection of SMAW, SAW, GTAW & GMAW welding processes
• Weld visual inspection of welded joints and preparation of welds history sheet
• Review RT films and witnessing other NDE methods
Page 2 of 8
3. • Review of mechanical & chemical test reports as per specification & standards
• Line walk and Punch List preparation before Hydrostatic Test
• Witness of Hydro testing, Pneumatic testing as per client approved procedures
• Verification of Mechanical completion Package / Inspection Record Books
• Preparation & Review of Daily Welding reports, Welding Pipe book & Hydro-test
Package
• Issue & Records of Non- conformance reports & verification of Corrective/Preventive
action
• Attend Quality, construction & safety meetings with client & TPI
Projects Involved :
1. Client : Qatar Petroleum.
Project Name: Epic for Injection of Khuff Gas to Arab-D Gas Cap using at north field
Injection Station Phase-1
2.Client : Ras Gas(offshore Project)
Project Name:Slide valves distributer relocation,HE-1,Train 1 & 2.
3.Client : Total E & P Qatar.(offshore Project)
Project Name: Halul Island Prodeuced Water Treatment and Crude oil Disolting
Project.
Project Name:12” Water Injection pipeline from PP1 to WP-3(offshore project)
Responsibility:
1. All type fit up and weld visual inspection
2.Conduction Welder Test and Pqr.
3.Preparing Welder performance and Welder rejection chart.
4.Witness of hydtrotest to check leak test and weld joint strength.
5.Review and prepare site as built drawings after completition of job.
Page 3 of 8
4. Punj Lloyd Ltd.(Jan 2012 to Nov 2014)
Completed Projects:Recently Completed BLNG Shutdown Project as a Qc(Deputy
Manager) at Brunei .
Completed Offshore WO 16 Pipeline and BG Plem Installation Project at Mumbai High.
Completed Myanmar China Pipeline Project as a QC (Deputy Manager) in 2013.
Key Responsibility:
• All visual inspection of welding joint.
• Preparing All type of WPS related to pipeline and Piping works.
• Prepare and review procedures.
• Conducting welder test.
• Preparing welder performance and weld rejection chart.
• Approval and witness of welder qualification.
Witness of hydro test to check leak test and level of tank as per procedure.
Tractebel Eng.Pvt.Ltd. (Nov 2009 to Dec 2011)
Worked in Tractebel Eng. as a qc senior engineer in City Gas
Distribution Project.
• Recently Completed projects.
• Umargam City Gas Distribution Project.
Page 4 of 8
5. • Shri Krishna Hook up for CNG Expansion for Domestic use.
• Atul Industrial Gas Distribution Project.
• Chikhli City Gas Distribution Project(In Process)
Key Responsibility.
• Approving procedure for all activity related to pipeline.
• Approving all type of WPS and PQT for welding activity.
• Review and approve all site drawing and as built drawing.
• Review and approve all measurement sheet for projects.
• Monitoring all pipeline activities.
• Qualifying piping structure welding procedures & welders as per applicable codes.
• Validating weld joints strength by witnessing hydrostatic testing of pipeline
Punjlloyd Ltd.(Jan 2008 to Oct 2009)
1.8 Years experience in Saudi Arab in Early Need Tankages Project as
a welding inspector.
Key Responsibility:
• All visual inspection of welding joint.
• Prepare and review procedures.
• Conducting welder test.
• Preparing welder performance and weld rejection chart.
• Approval and witness of welder qualification.
Witness of hydro test to check leak test and level of tank as per procedure.
Mac Crown Enter Prise.(Aug 2007 to Nov 2007)
Worked as a Site Eng in New Depot Project Kafco (KUWAIT).
Page 5 of 8
6. Worked there as a Main Line In-charge. Responsible for maintaining the quality, minimise
repair, close monitoring of welding performance by each welders, checking the essential
variables of welding, perform task observation of welders to verify compliance of approved
PQR. Supported stringing activity for placing the line pipes as per alignment sheets
considering class location.
Key responsibility:
• All visual inspection of main line welding joints including fit-up.
• Preparing welding procedure and interpretation of RT films.
• Preparation of mainline activity reports like stringing, main line welding and coating.
• Preparing weekly and monthly welder performance record.
• Preparing pipe book for release hydro test which one finished all activities.
JP Kenny Triune Ltd.(Dec 2006 to July 2007)
Worked as a site QC engineer in city gas distribution project at Valsad(Gujarat)
Monitoring welding process related activities, approval of plans & procedure and controlling
all associated quality record.
Key responsibilities
• Review and approve all procedure.
• Review and witness all welding procedure including welder qualification.
• Review all site drawing and as built drawings.
• Review and approved all site RA bills and sending for client approval.
• Witness of H.D.D. process and check level report and continuity of process.
Gujarat State Petronet Ltd.(S M Aker Consultant ,Mumbai)(Jan 2005 to Nov
2006)
• Worked as a site construction engineer with GSPL.(India’s second largest gas
transmission company.)
• Anklav-Dhuavaran Pipe Line Project.(Pipe Grade: 16”X 32 K.M. Api 5LX 65).
Page 6 of 8
7. • Kalol-Himmat Nagar Pipe Line Project.(Pipe Grade: 12”X 60 K.M. Api 5LX65).
• Key responsibilities
1. Monitoring all Pipe line Project activities.
2. Reviewed RT films & witness UT of pipeline joint.
3. Qualifying Piping & Structural welding Procedures & welders as per
applicable Codes
& Project Specification.
4. Validating weld joint strength by witnessing Hydrostatic Testing of Pipeline.
5. Monitoring all welding resume involving Weld no, welder ID, Repair status.
6. Review of Quality Procedures related to Welding and non destructive testing
Inspection & test plan.
7. Witness all important activities like hydro test, pneumatic test and pigging.
Before and after hydro test.
Corrtech International Pvt.Ltd.(Jan 2003 to Dec 2004)
Key responsibilities
• Worked as a site engineer in South Gujarat Gas Pipe Line Project.(Pipe Grade:16”
Dia X 29 K.M. Api 5L X 65).
• Worked as a site engineer in IPCL to GIPCL spur line Project.
• Worked as a QA/QC assistance in Kalol-Santej Gas Pipe Line Project.(Pipe
Grade:16”X 14 K.M. Api 5L Gr.B)
• Worked as a QA/QC incharge in GFL Spur Line Project.(Pipe Grade: 8”X 7.5 K.M.
Api 5L X 60).
• Key responsibility was development of WPS, establishing PQR, witness radiography
and manual ultrasonic testing and lamination check for field bevelling. Selection and
estimation of electrodes, performance monitoring of welders, identification of root
cause for defect and communication in the field for preventive actions
Jai Somnath Iron Works:(May 2002 to Dec 2002)
Key responsibilities
Page 7 of 8
8. • Worked as a site engineer in Agra to Firozabad Gas Pipe Line Project.(Pipe
Grade:10”Dia X 33 K.M. Api 5LX 60)
• Worked as a site engineer in Gurgaon Chainsa Natural Gas Pipe Line Project.
(Grade:16”Dia X 60 K.M.Api 5L X65).
• Development of WPS, establishing PQR, witness radiography and manual
ultrasonic testing and lamination check for field bevelling.
• Marking the test specimens for destructive testing
Jai Hind Project Ltd.(May 2001 to April 2002)
Key responsibilities
• Worked as a site engineer in gutthalam to PPN Project.(Pipe Grade:18”Dia X 35
K.M.Api 5LX65).
• Worked as a site engineer in Vizag to Secundrabad.(VSPL Project).(Pipe
Grade:12”Dia X 84 K.M. Api 5LX60)
• Development of WPS, establishing PQR, witness radiography and manual
ultrasonic testing and lamination check for field bevelling.
Monitoring inspection in main line welding for fit up, inter-pass temperature & weld visual
PEC Pumps:(Aug 2000 to April 2001)
Worked as a Assistance Quality Inspector in P.E.C. Pump(ISO 9001) for one year.
Inspection of all incoming raw materials and casting and forging parts of the pump.
Checked all dimensional and physical property of all manufactured parts of all pump.
Witness and approval of hydro test all pumps.
Page 8 of 8