MANISH SAGAR Email Id: manishsagar31@gmail.com 
Male M. No: 8800118373, 8489913415 
OVERVIEW 
 A competent professional with nearly 4 Years & above experience in Power Plant Project Management / 
Engineering /Planning & Scheduling /Erection/ Operation & Maintenance. 
 Presently Working as Project Engineer on 2X150 MW Nagai Thermal Power Project, Nagapattinam (T. N.). 
 Worked as Shift Engineer on 63 MW SV Power Pvt Ltd (Korba, CG). Mainly the Control room desk operation. 
 B.TECH in Mechanical Engg and PGDC in Thermal Power Plant from NPTI (Badarpur, N.D.). 
 An effective communicator with analytical and interpersonal skills . 
 Willingness to learn and manage the changes. 
Area of Expertise 
Project Management, Engineering and Planning 
 Monitoring project activities and coordinating with various agencies to maintain targeted schedules. 
 Engineering drawings and P&ID’s review for PF Boiler, Steam Turbine and Thermal cycle and also check the 
implementation of comments. 
 Design reviews for Piping layout, Equipment layout and also checks the implementation of comments. 
 Reviewed the(Basic and Detail Engineering) Design Basis Report, P&ID’s and Technical Specification of BOP 
packages – Air Cooled Condenser, Plant Water System, Coal Handling System, Ash Handling System, Mill 
Reject System, Cooling Tower and check the implementation of Comments. 
 Working knowledge of Primavera P6 and MS Project software for Planning and scheduling. 
 Maintain project schedule, Progress and MIS Report. 
 Prepare project summary & frame in technical reports. 
Project Erection 
 Supervision for erection of Boiler structure, Pressure parts, ESP and Rotating Equipments –ID, FD & PA Fans 
and Air Cooled Condenser structure. 
 Handling site preparations, mobilization of contractors for carrying out erection activities . 
Operation & Maintenance 
 Worked as a shift Engineer to take care of shift operation. Operations of the steam turbine, boiler, generator. 
Mainly the control room desk operations. 
 During long shut down take care of preservation of Boiler, Steam Turbine and rotating equipment’s like PA fan, 
FD fan , ID fan and BFP. 
Work Experience (52 Months) 
From Jan’13 to till date with 2X150 MW Nagai Power Project, Nagapattinam (T.N.) as Engineer Projects. 
Responsibilities 
 Supervise the Erection of Boiler structure, Pressure Parts, ESP Structure and Rotating Equipments - ID, FD and 
PA Fans & its alignment and Air cooled condenser. 
From Mar’11 to Dec’12 with 2X150 MW Nagai power Project (KVK Energy) Hyedrabad as Engineer Projects 
(Mechanical). 
 Review the Basic and Detail drawings in BTG – Boiler P&ID’s, Turbine, Generator, Piping and other 
equipment’s coming Inside the Power House Building and in BOP -Air Cooled Condenser, Plant Water system, 
Coal Handling Plant and Ash Handling Plant 
 Co-ordination between our Engineering team, EPC contractor, Turbine vendor & sub vendor, Air cooled 
condenser vendor and our consultant for resolving engineering issues. 
 Maintain project schedule, Progress and MIS Report. 
 Technical follow-ups with the vendors for all related drawings. 
 Follow up with vendors regarding material delivery / manufacturing Status. 
 Leading Weekly Progress meetings with all departments (Civil, Mechanical, Electrical and C&I) to monitor their 
progress and recording it in MS Excel and circulating to everyone involved with the Project. 
 Frame Monthly Progress Report for Lender’s Engineer. 
 Involved in review meetings held by Top Management with vendors on Monthly Basis.
 Preparing MOMs of the meetings and circulating it to everyone involved in meeting. 
 To review and make comments on draft of Monthly progress report received from EPC contractor. 
 Certify the bill of exchange raised by EPC contractor and sub vendors . 
Achievements 
 Actively involved from initial stage of Project . 
 Successfully did an assignment on Water Balance Diagram to reduce the consumption of water. 
 Project Management for IPP. 
 Developed good relations with vendors, which has given immense benefit to the company in terms of spares 
and service. 
From Aug’10 to Feb’11 on 63 MW Thermal Power Plant as Shift Engineer (MECH). 
Responsibilities 
 Control room Desk Operation for Boiler, Turbine and Generator. 
 Cost calculation of Generation. 
 During shutdown Preservation of Boiler, Turbine and rotating equipment’s .. 
Practical Exposure /Industrial Training 
Organization: NTPC, Badarpur September ‘09 – August’10 
 One year industrial training in NTPC-BADARPUR, O&M of 210MW LMW turbine and 684 tons P.F. Boiler, 
(under the PGDC course of NPTI(PETS) is duly recognized by AICTE and Central Electricity Authority).Also, it 
authorizes the engineer to operate or undertake the maintenance of 100MW or above capacity power plant. 
 Completed scheme tracing modules for various steam, water, coal cycles for the 210MW (Unit -5). 
 Completed rotational on job trainings (operation & maintenance) for an entire 45 days period. 
Organization: National Power Training Institute (PETS), New Delhi and Faridabad Feb’10 (20 Days) 
 Completed four week training in Fossil Fuel Fired Power Plant Simulator 500MW and 210MW. 
Organization: NTPC, Dadri June’07(15 Days) 
 Undertaken summer training in Ash Handling Plant. 
Academic Background 
2010 PGDC (Thermal Power Plant) from National Power Training Institute, Badarpur, secured 73%. 
2008 B.Tech. (Mechanical) from AKGEC, Ghaziabad under UPTU, Lucknow secured 61%. 
2003 B.SC-1st Year (PCM) from Govt. National College,Sirsa (HR). 
2002 XII (Science) from Central Senior Secondary School, Sirsa (HR) secured 55.8%. 
1999 X from Anupam Senior High School,Sirsa (HR), secured 76.5%. 
Academic Achievements 
 Distinction in 10th Standard. 
IT Tool Awareness 
 Primavera P6, MS Project 
 Auto CAD, Pro-Engineer Wildfire 
 MS Office (Word, Excel and PowerPoint) 
 Windows (2000, XP,7,8) 
Extra-Curricular Activities 
 Won Second Prize in Robonoid in tech fest08 at college level in 2008. 
 Won Third Prize in Beat The Weight in tech fest08 at college level in 2008. 
 Participated in Play Glani in cultural fest at college level in 2007. 
 Head of discipline committee 
Personal Dossier 
Date of Birth : 31October’1984 
Permanent Address : H. NO-B 3, HSDC Colony Hissar Raod, Sirsa Haryana -125055 
Contact Address : No 11, 1st Floor,2nd cross, Bharathidasan Nagar, Karaikal (UT-Pondicheery). 
Linguistic Abilities : Hindi, English, Haryanvi and Punjabi.
Manish_Sagar 4 Year

More Related Content

What's hot (20)

Patrick Greer Senior Resume
Patrick Greer Senior ResumePatrick Greer Senior Resume
Patrick Greer Senior Resume
 
Nitesh Hinduja _Mechanical Engineer CV
Nitesh Hinduja _Mechanical   Engineer CVNitesh Hinduja _Mechanical   Engineer CV
Nitesh Hinduja _Mechanical Engineer CV
 
Ronald saldanha (1)
Ronald saldanha (1)Ronald saldanha (1)
Ronald saldanha (1)
 
ANUPAM RESUME
ANUPAM RESUMEANUPAM RESUME
ANUPAM RESUME
 
Iqbal cv...final
Iqbal cv...finalIqbal cv...final
Iqbal cv...final
 
GOWTHAMAN UPDATED ON 28 OCT 3PM
GOWTHAMAN UPDATED ON 28 OCT 3PM GOWTHAMAN UPDATED ON 28 OCT 3PM
GOWTHAMAN UPDATED ON 28 OCT 3PM
 
BINOD UPDATED RESUME (2)
BINOD UPDATED RESUME (2)BINOD UPDATED RESUME (2)
BINOD UPDATED RESUME (2)
 
KASHIF DADA - Projects List
KASHIF DADA - Projects ListKASHIF DADA - Projects List
KASHIF DADA - Projects List
 
Updated cv shailendra 11.05.16
Updated cv shailendra 11.05.16Updated cv shailendra 11.05.16
Updated cv shailendra 11.05.16
 
Resume - Anirvan
Resume - AnirvanResume - Anirvan
Resume - Anirvan
 
JANARDAN
JANARDANJANARDAN
JANARDAN
 
UpdatedCV_2015
UpdatedCV_2015UpdatedCV_2015
UpdatedCV_2015
 
Resume Gupta Ravi
Resume Gupta RaviResume Gupta Ravi
Resume Gupta Ravi
 
Resume
ResumeResume
Resume
 
Project Management
Project ManagementProject Management
Project Management
 
Mechanical Engineer C.V
Mechanical Engineer C.VMechanical Engineer C.V
Mechanical Engineer C.V
 
CV PANKAJ SINGHAI
CV PANKAJ SINGHAICV PANKAJ SINGHAI
CV PANKAJ SINGHAI
 
Resume
ResumeResume
Resume
 
Shabd saran sahu
Shabd saran sahuShabd saran sahu
Shabd saran sahu
 
ResumE-Rakesh Kumar Singh
ResumE-Rakesh Kumar SinghResumE-Rakesh Kumar Singh
ResumE-Rakesh Kumar Singh
 

Viewers also liked

26 as bank_website_26032014
26 as bank_website_2603201426 as bank_website_26032014
26 as bank_website_26032014selvakumaran g
 
Workshop Proceedings - Agricultural Water Management Platform (Latest version)
Workshop Proceedings - Agricultural Water Management Platform (Latest version)Workshop Proceedings - Agricultural Water Management Platform (Latest version)
Workshop Proceedings - Agricultural Water Management Platform (Latest version)Tadesse (IWMI)
 
สื่อใหม่พิพิธภัณฑ์ญี่ปุ่น
สื่อใหม่พิพิธภัณฑ์ญี่ปุ่นสื่อใหม่พิพิธภัณฑ์ญี่ปุ่น
สื่อใหม่พิพิธภัณฑ์ญี่ปุ่นNarut Lokulprakit
 
Estu Astiningtyas_Tugas 4_Rumah Type
Estu Astiningtyas_Tugas 4_Rumah TypeEstu Astiningtyas_Tugas 4_Rumah Type
Estu Astiningtyas_Tugas 4_Rumah TypeEstu Astiningtyas
 
Musum กับความหมายที่เคลื่อนไป
Musum กับความหมายที่เคลื่อนไปMusum กับความหมายที่เคลื่อนไป
Musum กับความหมายที่เคลื่อนไปNarut Lokulprakit
 
Treatment resistant schizophrenia
Treatment resistant schizophreniaTreatment resistant schizophrenia
Treatment resistant schizophreniaTejaswi Tp
 
Why bother about Ocean Sustainability
Why bother about Ocean SustainabilityWhy bother about Ocean Sustainability
Why bother about Ocean SustainabilityKim Dyan Calderon
 
2015 perancangan strategik moral
2015 perancangan strategik   moral2015 perancangan strategik   moral
2015 perancangan strategik moralsktpr
 

Viewers also liked (14)

26 as bank_website_26032014
26 as bank_website_2603201426 as bank_website_26032014
26 as bank_website_26032014
 
Workshop Proceedings - Agricultural Water Management Platform (Latest version)
Workshop Proceedings - Agricultural Water Management Platform (Latest version)Workshop Proceedings - Agricultural Water Management Platform (Latest version)
Workshop Proceedings - Agricultural Water Management Platform (Latest version)
 
S2 work2m33no19
S2 work2m33no19S2 work2m33no19
S2 work2m33no19
 
Sample
SampleSample
Sample
 
Web Trends 2015
Web Trends 2015Web Trends 2015
Web Trends 2015
 
Climate change in egypt
Climate change in egyptClimate change in egypt
Climate change in egypt
 
สื่อใหม่พิพิธภัณฑ์ญี่ปุ่น
สื่อใหม่พิพิธภัณฑ์ญี่ปุ่นสื่อใหม่พิพิธภัณฑ์ญี่ปุ่น
สื่อใหม่พิพิธภัณฑ์ญี่ปุ่น
 
Estu Astiningtyas_Tugas 4_Rumah Type
Estu Astiningtyas_Tugas 4_Rumah TypeEstu Astiningtyas_Tugas 4_Rumah Type
Estu Astiningtyas_Tugas 4_Rumah Type
 
Graphene
GrapheneGraphene
Graphene
 
Musum กับความหมายที่เคลื่อนไป
Musum กับความหมายที่เคลื่อนไปMusum กับความหมายที่เคลื่อนไป
Musum กับความหมายที่เคลื่อนไป
 
Treatment resistant schizophrenia
Treatment resistant schizophreniaTreatment resistant schizophrenia
Treatment resistant schizophrenia
 
Why bother about Ocean Sustainability
Why bother about Ocean SustainabilityWhy bother about Ocean Sustainability
Why bother about Ocean Sustainability
 
2015 perancangan strategik moral
2015 perancangan strategik   moral2015 perancangan strategik   moral
2015 perancangan strategik moral
 
Vishal P. Desai
Vishal P. DesaiVishal P. Desai
Vishal P. Desai
 

Similar to Manish_Sagar 4 Year (20)

d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)
 
Koneru_Raj_kumar_2
Koneru_Raj_kumar_2Koneru_Raj_kumar_2
Koneru_Raj_kumar_2
 
ajay cv new (3)
ajay cv new (3)ajay cv new (3)
ajay cv new (3)
 
AK+CV
AK+CVAK+CV
AK+CV
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15
 
Nitin_Technical
Nitin_TechnicalNitin_Technical
Nitin_Technical
 
Suresh Profile
Suresh ProfileSuresh Profile
Suresh Profile
 
ASHWIN A_Senior planning Engineer_
ASHWIN A_Senior planning Engineer_ASHWIN A_Senior planning Engineer_
ASHWIN A_Senior planning Engineer_
 
harpreet cv purchase
harpreet  cv purchaseharpreet  cv purchase
harpreet cv purchase
 
Resume 15 hvac
Resume 15 hvacResume 15 hvac
Resume 15 hvac
 
Updated_CV
Updated_CVUpdated_CV
Updated_CV
 
jose varun-Technical - Assistant Facility Manager- resume
jose varun-Technical - Assistant Facility Manager- resumejose varun-Technical - Assistant Facility Manager- resume
jose varun-Technical - Assistant Facility Manager- resume
 
Shiva-CV
Shiva-CVShiva-CV
Shiva-CV
 
Resume_Ravindra
Resume_RavindraResume_Ravindra
Resume_Ravindra
 
Resume ravindra
Resume ravindraResume ravindra
Resume ravindra
 
Nizami cv
Nizami cvNizami cv
Nizami cv
 
DIPAS GANGULY -RESUME
DIPAS GANGULY -RESUMEDIPAS GANGULY -RESUME
DIPAS GANGULY -RESUME
 
Resume_Kailash Kumar Jain
Resume_Kailash Kumar JainResume_Kailash Kumar Jain
Resume_Kailash Kumar Jain
 
Madhankumar 1984..
Madhankumar 1984..Madhankumar 1984..
Madhankumar 1984..
 
Resume
ResumeResume
Resume
 

Manish_Sagar 4 Year

  • 1. MANISH SAGAR Email Id: manishsagar31@gmail.com Male M. No: 8800118373, 8489913415 OVERVIEW  A competent professional with nearly 4 Years & above experience in Power Plant Project Management / Engineering /Planning & Scheduling /Erection/ Operation & Maintenance.  Presently Working as Project Engineer on 2X150 MW Nagai Thermal Power Project, Nagapattinam (T. N.).  Worked as Shift Engineer on 63 MW SV Power Pvt Ltd (Korba, CG). Mainly the Control room desk operation.  B.TECH in Mechanical Engg and PGDC in Thermal Power Plant from NPTI (Badarpur, N.D.).  An effective communicator with analytical and interpersonal skills .  Willingness to learn and manage the changes. Area of Expertise Project Management, Engineering and Planning  Monitoring project activities and coordinating with various agencies to maintain targeted schedules.  Engineering drawings and P&ID’s review for PF Boiler, Steam Turbine and Thermal cycle and also check the implementation of comments.  Design reviews for Piping layout, Equipment layout and also checks the implementation of comments.  Reviewed the(Basic and Detail Engineering) Design Basis Report, P&ID’s and Technical Specification of BOP packages – Air Cooled Condenser, Plant Water System, Coal Handling System, Ash Handling System, Mill Reject System, Cooling Tower and check the implementation of Comments.  Working knowledge of Primavera P6 and MS Project software for Planning and scheduling.  Maintain project schedule, Progress and MIS Report.  Prepare project summary & frame in technical reports. Project Erection  Supervision for erection of Boiler structure, Pressure parts, ESP and Rotating Equipments –ID, FD & PA Fans and Air Cooled Condenser structure.  Handling site preparations, mobilization of contractors for carrying out erection activities . Operation & Maintenance  Worked as a shift Engineer to take care of shift operation. Operations of the steam turbine, boiler, generator. Mainly the control room desk operations.  During long shut down take care of preservation of Boiler, Steam Turbine and rotating equipment’s like PA fan, FD fan , ID fan and BFP. Work Experience (52 Months) From Jan’13 to till date with 2X150 MW Nagai Power Project, Nagapattinam (T.N.) as Engineer Projects. Responsibilities  Supervise the Erection of Boiler structure, Pressure Parts, ESP Structure and Rotating Equipments - ID, FD and PA Fans & its alignment and Air cooled condenser. From Mar’11 to Dec’12 with 2X150 MW Nagai power Project (KVK Energy) Hyedrabad as Engineer Projects (Mechanical).  Review the Basic and Detail drawings in BTG – Boiler P&ID’s, Turbine, Generator, Piping and other equipment’s coming Inside the Power House Building and in BOP -Air Cooled Condenser, Plant Water system, Coal Handling Plant and Ash Handling Plant  Co-ordination between our Engineering team, EPC contractor, Turbine vendor & sub vendor, Air cooled condenser vendor and our consultant for resolving engineering issues.  Maintain project schedule, Progress and MIS Report.  Technical follow-ups with the vendors for all related drawings.  Follow up with vendors regarding material delivery / manufacturing Status.  Leading Weekly Progress meetings with all departments (Civil, Mechanical, Electrical and C&I) to monitor their progress and recording it in MS Excel and circulating to everyone involved with the Project.  Frame Monthly Progress Report for Lender’s Engineer.  Involved in review meetings held by Top Management with vendors on Monthly Basis.
  • 2.  Preparing MOMs of the meetings and circulating it to everyone involved in meeting.  To review and make comments on draft of Monthly progress report received from EPC contractor.  Certify the bill of exchange raised by EPC contractor and sub vendors . Achievements  Actively involved from initial stage of Project .  Successfully did an assignment on Water Balance Diagram to reduce the consumption of water.  Project Management for IPP.  Developed good relations with vendors, which has given immense benefit to the company in terms of spares and service. From Aug’10 to Feb’11 on 63 MW Thermal Power Plant as Shift Engineer (MECH). Responsibilities  Control room Desk Operation for Boiler, Turbine and Generator.  Cost calculation of Generation.  During shutdown Preservation of Boiler, Turbine and rotating equipment’s .. Practical Exposure /Industrial Training Organization: NTPC, Badarpur September ‘09 – August’10  One year industrial training in NTPC-BADARPUR, O&M of 210MW LMW turbine and 684 tons P.F. Boiler, (under the PGDC course of NPTI(PETS) is duly recognized by AICTE and Central Electricity Authority).Also, it authorizes the engineer to operate or undertake the maintenance of 100MW or above capacity power plant.  Completed scheme tracing modules for various steam, water, coal cycles for the 210MW (Unit -5).  Completed rotational on job trainings (operation & maintenance) for an entire 45 days period. Organization: National Power Training Institute (PETS), New Delhi and Faridabad Feb’10 (20 Days)  Completed four week training in Fossil Fuel Fired Power Plant Simulator 500MW and 210MW. Organization: NTPC, Dadri June’07(15 Days)  Undertaken summer training in Ash Handling Plant. Academic Background 2010 PGDC (Thermal Power Plant) from National Power Training Institute, Badarpur, secured 73%. 2008 B.Tech. (Mechanical) from AKGEC, Ghaziabad under UPTU, Lucknow secured 61%. 2003 B.SC-1st Year (PCM) from Govt. National College,Sirsa (HR). 2002 XII (Science) from Central Senior Secondary School, Sirsa (HR) secured 55.8%. 1999 X from Anupam Senior High School,Sirsa (HR), secured 76.5%. Academic Achievements  Distinction in 10th Standard. IT Tool Awareness  Primavera P6, MS Project  Auto CAD, Pro-Engineer Wildfire  MS Office (Word, Excel and PowerPoint)  Windows (2000, XP,7,8) Extra-Curricular Activities  Won Second Prize in Robonoid in tech fest08 at college level in 2008.  Won Third Prize in Beat The Weight in tech fest08 at college level in 2008.  Participated in Play Glani in cultural fest at college level in 2007.  Head of discipline committee Personal Dossier Date of Birth : 31October’1984 Permanent Address : H. NO-B 3, HSDC Colony Hissar Raod, Sirsa Haryana -125055 Contact Address : No 11, 1st Floor,2nd cross, Bharathidasan Nagar, Karaikal (UT-Pondicheery). Linguistic Abilities : Hindi, English, Haryanvi and Punjabi.