SlideShare a Scribd company logo
1 of 13
Mr.Chainarong Jirapong
Assistance Engineering (Training)
Oct 2007-Feb 2008
Field Electrical Engineering
Jul 2009-Oct 2009
Technician Engineering
Oct 2009–Jun2012
SALES Engineer
Jul 2009 -Present
1.The happy family.
2.Successful in Business.
 Position :
- Assistance Engineering (Training)
 Job Detail :
- Installation Electrical Equipment of machine.
- Preventive Maintenance.
- Corrective Maintenance.
 Position :
- Field Electrical Engineering
 Job Detail :
- Wiring and Electrical System for machine.
- Wiring Pneumatic System of Machine.
- Installation Electrical Equipment of machine.
 Position :
- Technical Engineering
 Job Detail :
- Control Equipment Process
- Preventive Maintenance.
- Corrective Maintenance.
- Analyzer problem Equipment
- Decrease Problem Equipment Breakdown
- Check Plant Operating Conditions.
- Report any Abnormalities Weekly
- Recording Equipment Breakdown
- Support Preparation & tool.
- Control Cost Process Equipment and tool.
- Inspection & Test Report.
- Planning work defect Equipment & Breakdown
- Plan turnaround
 Position :
- Sales Engineer
 Job Detail :
- Searching for new clients who could benefit from SAMSON products in a designated region
- Calculating client quotations
- Negotiating tender and contract terms
- Negotiating and closing sales by agreeing terms and conditions
- Offering after-sales support services
- Travelling to visit potential clients
- Establishing new, and maintaining existing, relationships with customers
- Managing and interpreting customer requirements
- Persuading clients that a product or service will best satisfy their needs
- Co-Ordinating sales projects
- Recording and maintaining client contact data
- Meeting regular sales targets
- Preparing reports for head office
- Making technical presentations and demonstrating how a product will meet client needs
 Achievement :
- Winning Skyonic Capitol Skymine Project ( EPC : Toyo-Thai Corporation PCL.)
 Located in San Antonio, Texas, Capitol SkyMine is expected to capture 83,000 tons annually of
otherwise-emitted CO2 from the coal-fired Capitol Aggregates Cement plant, and offset another
247,000 tons of annual US CO2 emissions by shipping CO2-negative chemicals to market and
displacing CO2-intensive products. Our process also removes mercury, metals, sulfur dioxide, nitrogen
oxides and particulate – and returns clean air and clean water.
Commercially saleable by-products of hydrochloric acid, baking soda (sodium bicarbonate) and bleach
will generate annual revenue. The project is traditionally debt-financed, fixed-price, performance
bonded, and on-time and on-budget. Chemical off-take contracts guarantee the project is profitable
without an active CO2 credit market.
* Product
- Globe Control Valve  50 Sets
- Ball Control Valve  22 Sets
- Butterfly Control Valve  3 Sets
- Pressure reducing Valve  18 Sets
- Ball on Off Valve  92 Sets
- Butterfly On-Off Valve  4 Sets
- Butterfly Manual Valve  4 Sets
Total Valve 206 Sets
Amount Price 48 million Baht
Achievement :
- Winning Esterification - Emery Project ( EPC : ThyssenKrupp Industrial Solutions (Thailand) ltd. )
 Located in Malaysia , Oleochemical Plant
* Product
- Globe Control Valve  24 Sets
- Pressure reducing Valve  36 Sets
- Globe On - Off Valve  2 Sets
Total Valve 62 Sets
Amount Price 15 million Baht
 Achievement :
- Winning Ras Abu Project ( EPC : Toyo-Thai Corporation PCL.)
 Located in Qatar, REVERSE OSMOSIS PROJECT
* Product
- Globe Control Valve  5 Sets
- Pressure reducing Valve  1 Sets
Total Valve 6 Set
Amount Price 2 million Baht
 Achievement :
- Winning BANGPOO SPP & LATKRABANG SPP Project ( EPC : Toyo-
Thai Corporation PCL & ITALTHAI )
 Located in THAILAND, Coolling for Power Plant,Metering Steam
* Product
- Globe Control Valve  16 Sets
- Butterfly Control Valve  13 Sets
Total Valve 29 Set
Amount Price 12 million Baht
 Achievement :
- FUEL OIL FOR CHANA COMBINED PROJECT
- BANGCHAK Metering Oil Project
- Ratchaburi Power Plant Project
- F033 MICCO AN Project
- IRPC ABS VI Project
- IRPC EBSM Project
- BST- C5 Project
- D176 CHP II Project
- D178 CPVC RESIN PLANT PROJECT
- Rung Tawan Project
- SAN III Project
 Key Success Factor :
My Mobile:
+66 98-2509779
Email:Jirapongchainarong905@gmail.com
Chainarong
Jirapong ( Jae )
Contact Me
Thank You for your attention

More Related Content

What's hot

What's hot (12)

new 5 tanmay_CV
new 5 tanmay_CV new 5 tanmay_CV
new 5 tanmay_CV
 
Perth metro
Perth metroPerth metro
Perth metro
 
Nguyen Viet Dang _ Rotating & Package
Nguyen Viet Dang _ Rotating & PackageNguyen Viet Dang _ Rotating & Package
Nguyen Viet Dang _ Rotating & Package
 
Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117
 
Nebot Fluid Science Dynamics Tianjin
Nebot Fluid Science Dynamics TianjinNebot Fluid Science Dynamics Tianjin
Nebot Fluid Science Dynamics Tianjin
 
updated_resume
updated_resumeupdated_resume
updated_resume
 
Kalyan Chunchu Resume
Kalyan Chunchu Resume Kalyan Chunchu Resume
Kalyan Chunchu Resume
 
Kamal ahmed cv
Kamal ahmed cvKamal ahmed cv
Kamal ahmed cv
 
++++byanar cv
++++byanar cv++++byanar cv
++++byanar cv
 
Arun Goyle resume
Arun Goyle resumeArun Goyle resume
Arun Goyle resume
 
PerthMetro Case Study
PerthMetro Case StudyPerthMetro Case Study
PerthMetro Case Study
 
PerthMetro case study
PerthMetro case studyPerthMetro case study
PerthMetro case study
 

Viewers also liked

Carburetors prv
Carburetors  prvCarburetors  prv
Carburetors prvCet
 
2presentation otto-cycle-101225122612-phpapp012
2presentation otto-cycle-101225122612-phpapp0122presentation otto-cycle-101225122612-phpapp012
2presentation otto-cycle-101225122612-phpapp012akshay garg
 
Internal combustion engines Systems
Internal combustion engines SystemsInternal combustion engines Systems
Internal combustion engines SystemsRushikesh Rohamare
 
Presentation:COMBUSTION CHAMBER
Presentation:COMBUSTION CHAMBERPresentation:COMBUSTION CHAMBER
Presentation:COMBUSTION CHAMBERabsalar
 
Fuel Injection and Ignition
Fuel Injection and IgnitionFuel Injection and Ignition
Fuel Injection and Ignitionguest2c6da6
 

Viewers also liked (8)

super charger2007
super charger2007super charger2007
super charger2007
 
Carburetors prv
Carburetors  prvCarburetors  prv
Carburetors prv
 
Supercharger
SuperchargerSupercharger
Supercharger
 
Lubrication system
Lubrication systemLubrication system
Lubrication system
 
2presentation otto-cycle-101225122612-phpapp012
2presentation otto-cycle-101225122612-phpapp0122presentation otto-cycle-101225122612-phpapp012
2presentation otto-cycle-101225122612-phpapp012
 
Internal combustion engines Systems
Internal combustion engines SystemsInternal combustion engines Systems
Internal combustion engines Systems
 
Presentation:COMBUSTION CHAMBER
Presentation:COMBUSTION CHAMBERPresentation:COMBUSTION CHAMBER
Presentation:COMBUSTION CHAMBER
 
Fuel Injection and Ignition
Fuel Injection and IgnitionFuel Injection and Ignition
Fuel Injection and Ignition
 

Similar to CNJ Career Path

CV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
CV of Instrumentation Consultant_Rashesh Shah_32 years plus expCV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
CV of Instrumentation Consultant_Rashesh Shah_32 years plus expRashesh Shah
 
Suprotim dey LATEST CV
Suprotim dey  LATEST CVSuprotim dey  LATEST CV
Suprotim dey LATEST CVSuprotim Dey
 
Mec Brief 2009
Mec Brief 2009Mec Brief 2009
Mec Brief 2009Ahmed
 
JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02Jamal Jamil
 
Nidec asi capability overview for oil&gas applications
Nidec asi capability overview for oil&gas applicationsNidec asi capability overview for oil&gas applications
Nidec asi capability overview for oil&gas applicationsNidec Corporation
 
Rohm SCH2080KE SiC Transistor teardown reverse costing report by published Yo...
Rohm SCH2080KE SiC Transistor teardown reverse costing report by published Yo...Rohm SCH2080KE SiC Transistor teardown reverse costing report by published Yo...
Rohm SCH2080KE SiC Transistor teardown reverse costing report by published Yo...Yole Developpement
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerDeva Narayanan
 
8015-0151-LM11-22-320-EL-WP-0278_00
8015-0151-LM11-22-320-EL-WP-0278_008015-0151-LM11-22-320-EL-WP-0278_00
8015-0151-LM11-22-320-EL-WP-0278_00SANDIP GOSWAMI
 
Automobile pistonh
Automobile pistonhAutomobile pistonh
Automobile pistonhManoj Balla
 
Bikram Jeet (Achievements from 2006 - 2013)
Bikram Jeet (Achievements from 2006 - 2013)Bikram Jeet (Achievements from 2006 - 2013)
Bikram Jeet (Achievements from 2006 - 2013)Bikram Jeet
 
KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)Kee M
 
CURRICULUM VITAE 15112015
CURRICULUM VITAE 15112015CURRICULUM VITAE 15112015
CURRICULUM VITAE 15112015Gideon Manthorp
 
Curriculum vitae 22 07 2016 (1)
Curriculum vitae 22 07 2016 (1)Curriculum vitae 22 07 2016 (1)
Curriculum vitae 22 07 2016 (1)Gideon Manthorp
 

Similar to CNJ Career Path (20)

CV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
CV of Instrumentation Consultant_Rashesh Shah_32 years plus expCV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
CV of Instrumentation Consultant_Rashesh Shah_32 years plus exp
 
Project Presentation
Project PresentationProject Presentation
Project Presentation
 
Suprotim dey LATEST CV
Suprotim dey  LATEST CVSuprotim dey  LATEST CV
Suprotim dey LATEST CV
 
RESUME-Radheya Karmarkar
RESUME-Radheya KarmarkarRESUME-Radheya Karmarkar
RESUME-Radheya Karmarkar
 
Mec Brief 2009
Mec Brief 2009Mec Brief 2009
Mec Brief 2009
 
JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02
 
Nidec asi capability overview for oil&gas applications
Nidec asi capability overview for oil&gas applicationsNidec asi capability overview for oil&gas applications
Nidec asi capability overview for oil&gas applications
 
Rohm SCH2080KE SiC Transistor teardown reverse costing report by published Yo...
Rohm SCH2080KE SiC Transistor teardown reverse costing report by published Yo...Rohm SCH2080KE SiC Transistor teardown reverse costing report by published Yo...
Rohm SCH2080KE SiC Transistor teardown reverse costing report by published Yo...
 
Ong-Art CV 170208
Ong-Art CV 170208Ong-Art CV 170208
Ong-Art CV 170208
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
 
SISCO - Presentation SABIC
SISCO - Presentation SABICSISCO - Presentation SABIC
SISCO - Presentation SABIC
 
CV Piping Designer & Supervisor
CV Piping Designer & SupervisorCV Piping Designer & Supervisor
CV Piping Designer & Supervisor
 
8015-0151-LM11-22-320-EL-WP-0278_00
8015-0151-LM11-22-320-EL-WP-0278_008015-0151-LM11-22-320-EL-WP-0278_00
8015-0151-LM11-22-320-EL-WP-0278_00
 
Automobile pistonh
Automobile pistonhAutomobile pistonh
Automobile pistonh
 
Bikram Jeet (Achievements from 2006 - 2013)
Bikram Jeet (Achievements from 2006 - 2013)Bikram Jeet (Achievements from 2006 - 2013)
Bikram Jeet (Achievements from 2006 - 2013)
 
KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)KEE_RESUME_New_CV16 - Copy (8)
KEE_RESUME_New_CV16 - Copy (8)
 
CURRICULUM VITAE 15112015
CURRICULUM VITAE 15112015CURRICULUM VITAE 15112015
CURRICULUM VITAE 15112015
 
Curriculum vitae 22 07 2016 (1)
Curriculum vitae 22 07 2016 (1)Curriculum vitae 22 07 2016 (1)
Curriculum vitae 22 07 2016 (1)
 
Yaqoob Resume.docx 15-4-2015
Yaqoob Resume.docx 15-4-2015Yaqoob Resume.docx 15-4-2015
Yaqoob Resume.docx 15-4-2015
 

CNJ Career Path

  • 2. Assistance Engineering (Training) Oct 2007-Feb 2008 Field Electrical Engineering Jul 2009-Oct 2009 Technician Engineering Oct 2009–Jun2012 SALES Engineer Jul 2009 -Present 1.The happy family. 2.Successful in Business.
  • 3.  Position : - Assistance Engineering (Training)  Job Detail : - Installation Electrical Equipment of machine. - Preventive Maintenance. - Corrective Maintenance.
  • 4.  Position : - Field Electrical Engineering  Job Detail : - Wiring and Electrical System for machine. - Wiring Pneumatic System of Machine. - Installation Electrical Equipment of machine.
  • 5.  Position : - Technical Engineering  Job Detail : - Control Equipment Process - Preventive Maintenance. - Corrective Maintenance. - Analyzer problem Equipment - Decrease Problem Equipment Breakdown - Check Plant Operating Conditions. - Report any Abnormalities Weekly - Recording Equipment Breakdown - Support Preparation & tool. - Control Cost Process Equipment and tool. - Inspection & Test Report. - Planning work defect Equipment & Breakdown - Plan turnaround
  • 6.  Position : - Sales Engineer  Job Detail : - Searching for new clients who could benefit from SAMSON products in a designated region - Calculating client quotations - Negotiating tender and contract terms - Negotiating and closing sales by agreeing terms and conditions - Offering after-sales support services - Travelling to visit potential clients - Establishing new, and maintaining existing, relationships with customers - Managing and interpreting customer requirements - Persuading clients that a product or service will best satisfy their needs - Co-Ordinating sales projects - Recording and maintaining client contact data - Meeting regular sales targets - Preparing reports for head office - Making technical presentations and demonstrating how a product will meet client needs
  • 7.  Achievement : - Winning Skyonic Capitol Skymine Project ( EPC : Toyo-Thai Corporation PCL.)  Located in San Antonio, Texas, Capitol SkyMine is expected to capture 83,000 tons annually of otherwise-emitted CO2 from the coal-fired Capitol Aggregates Cement plant, and offset another 247,000 tons of annual US CO2 emissions by shipping CO2-negative chemicals to market and displacing CO2-intensive products. Our process also removes mercury, metals, sulfur dioxide, nitrogen oxides and particulate – and returns clean air and clean water. Commercially saleable by-products of hydrochloric acid, baking soda (sodium bicarbonate) and bleach will generate annual revenue. The project is traditionally debt-financed, fixed-price, performance bonded, and on-time and on-budget. Chemical off-take contracts guarantee the project is profitable without an active CO2 credit market. * Product - Globe Control Valve  50 Sets - Ball Control Valve  22 Sets - Butterfly Control Valve  3 Sets - Pressure reducing Valve  18 Sets - Ball on Off Valve  92 Sets - Butterfly On-Off Valve  4 Sets - Butterfly Manual Valve  4 Sets Total Valve 206 Sets Amount Price 48 million Baht
  • 8. Achievement : - Winning Esterification - Emery Project ( EPC : ThyssenKrupp Industrial Solutions (Thailand) ltd. )  Located in Malaysia , Oleochemical Plant * Product - Globe Control Valve  24 Sets - Pressure reducing Valve  36 Sets - Globe On - Off Valve  2 Sets Total Valve 62 Sets Amount Price 15 million Baht
  • 9.  Achievement : - Winning Ras Abu Project ( EPC : Toyo-Thai Corporation PCL.)  Located in Qatar, REVERSE OSMOSIS PROJECT * Product - Globe Control Valve  5 Sets - Pressure reducing Valve  1 Sets Total Valve 6 Set Amount Price 2 million Baht
  • 10.  Achievement : - Winning BANGPOO SPP & LATKRABANG SPP Project ( EPC : Toyo- Thai Corporation PCL & ITALTHAI )  Located in THAILAND, Coolling for Power Plant,Metering Steam * Product - Globe Control Valve  16 Sets - Butterfly Control Valve  13 Sets Total Valve 29 Set Amount Price 12 million Baht
  • 11.  Achievement : - FUEL OIL FOR CHANA COMBINED PROJECT - BANGCHAK Metering Oil Project - Ratchaburi Power Plant Project - F033 MICCO AN Project - IRPC ABS VI Project - IRPC EBSM Project - BST- C5 Project - D176 CHP II Project - D178 CPVC RESIN PLANT PROJECT - Rung Tawan Project - SAN III Project
  • 12.  Key Success Factor :