SlideShare a Scribd company logo
1 of 3
Download to read offline
8.2 Year Rich Experienced MEP SUP. Engineer in Construction Industry
RAVINDRA KUMAR YADAV
Contact No .: +91124-3022256,7840841302
E-Mail: ravindra_lnt88@yahoo.com,
ravindrakumary1@gmail.com
JOB OBJECTIVE
Seeking challenging assignments in Project Execution and Installation in building Construction, Residential, Commercial
Building with a leading organization of repute, across the globe.
PROFILE SUMMARY
∑ A result-oriented professional with Almost 8.2 years of experience in:
Project Execution Installation Construction Operations
Erection & Commissioning Site Execution Team Management
∑ Presently associated with Larsen & Toubro Ltd.(India),in Experion Windchant GHP Gurgaon(HR) India as MEP Engineer
∑ Expertise in job planning and executing projects with a flair for adopting modern construction methodologies and
complying with quality standards.
∑ Proficient in proactively identifying & resolving problems, ramping-up project activities with on-time deliverables and
maximizing efficiency.
∑ Hands-on experience in installation, testing & commissioning of MEP, FIRE, HVAC, PLUMBING and PUMP HOUSE,
BOREWEL & WTP plants, etc.
∑ Adept at handling erection & commissioning activities involving resource planning, in-process inspection, team building
and coordination with internal / external departments
∑ An effective communicator with excellent analytical, problem solving and interpersonal skills
CORE COMPETENCIES
∑ Carrying out analysis and Execution of PHE, Swimming Pool, FIRE Line, HVAC, WTP Plant, Ducting in Factory
Construction Buildings and High Rise Residential Projects including selection of Technology Partner, Engineering
Consultants, etc.
∑ Overseeing preliminary project plan, site selection, Layout, preliminary & detailed engineering, equipment specification, etc.
∑ Monitoring plant efficiency and preparing monthly progress report & schedules, power and energy production cost report
∑ Handling the erection & commissioning while ensuring completion of project in minimum turnaround time and effective
resource utilization to maximize the output.
∑ Spearheading activities involving working out various requirements and monitoring overall project operations including
drawing, deployment, fabrication and erection & commissioning, for ensuring timely completion of projects
∑ Creating and sustaining a dynamic environment that fosters development opportunities and motivates high performance
amongst team members
∑ taking steps for mitigating any Managing installation & commissioning of various mechanical equipment & machines;
tracking project progress and risks
WORK EXPERIENCE
Growth Path: 24JUN2008TO US ARMY PROJECT INDIA (BOEING C-17),
DEC2015TO till date Experian Wind chat Group Housing Project Gurgaon
JULY 2014 TO DEC2015 PHE, Fire, WTP, Water supply, Irrigation System
(CI, GI, DI, Copper, HDPE, PVC, MS, SS Piping)
FEB2012 to JUNE2013 MSIL C-Line new plant
OCTO2011 to FEB2012 P&G Bhopal Site CIP5
SEPT2010 to OCTO2011 MARUTI SUZUKI INDIA LTD
JAN2010 to SEPT 2010 MAHI Cement plant Rajasthan
JUNE2008To Jan2010 HONDA SIEL CARS INDIA new plant
Since JUNE2008 MEP Engineer
8.2 Year Rich Experienced MEP SUP. Engineer in Construction Industry
Role and Responsibility:-
∑ Excuting Plumbing, FIRE, HVAC, Swimming Pool, Electrical and Interior works, Co-ordinating to civil work for the
project and completing with a grace.
∑ Execution of Complete PHE installation and WTP for the site.
∑ Managing good environment at site and execution of MEP structure & equipment esteemed site in my organization.
∑ Performing Plumbing works, firefighting System and Water system complete installation and working including pump
house, piping and Fire Alarm system.
∑ Preparing daily material & drawing inspection.
∑ Coordinating with sub- contractor & workmen as per schedule.
∑ Overseeing cement plants equipment & factory equipment installation.
∑ Generating regular reports on Equipment and Sanitary ware & parallel activities as an Independent engineer in my site.
Highlights:-
∑ Appreciation from BOEING India for the Installation of PHE,FIRE and Irrigation Pipe line and services Excellence in
Execution for the Project
∑ Appreciation letter from USACE for excellence in execution of FUEL HYDRANT PIPING 2.o km
∑ Handing over of Squadron Operations MEP PHE works successfully in April 2016 to USACE.
∑ FUEL HYDRANT PIPE line erection in USACE Project was very critical to install within +-3mm tolerance throughout the
trench.
∑ Erection was performed in heavy rainy season the trench was 6.0M below form ground level.
EDUCATION
2008 Diploma in Mechanical (Production & Engineering) from Govt. Poly., Lucknow, B.T.E. Uttar Pradesh
2005 12th from Sri Vishw Nath Inter College Kalan Sultanpur U.P. Board with75%
2003 10th from Sri Vishw Nath Inter College Kalan Sultanpur U.P. Board with 61%
TRAINING AND AWARDS
∑ Boeing Quality Excellence award in April 2016
∑ Excellent in Quality control award letter from USACE 2014
∑ Received Quality Award in 2009 and 2013 for best site in LNT
∑ Construction & Safety Training from Larsen & Toubro Ltd., Ghaziabad in Octo2013
∑ Supervisory Development Program from Larsen & Toubro Ltd., Ghaziabad in April2014
ORGANIZATIONAL PROJECTS
Title: MECHANICAL and MEP ENGINEER
Organization: C-17 Project BOING, GAZIYABAD (L&T)
Period: JUNE2008 TO TILL DATE
Responsibilities:
∑ PHE work for the High Rise and Factory building including piping, Toilets, geyser, Sunk, Shower, Internal Drainage etc.
∑ MEP Site Execution as a Fire Protection system Installation for the project including piping, pump work ,valves, sprinklers,
Fire cylinders, Flushing and testing –commissioning etc.
∑ HVAC Works Ducting Flexible and Rigid, Dampers, Plenum, MVCD, FCU, HFCU, AHU, Split AC.
∑ Installation of WTP Plant and testing and commissioning of the same.
∑ JET BLAST DEFLECTOR Installation with BDI. USA
∑ Fuel Hydrant system SS pipe for boing C-17
∑ Prepared & ensured group risk assessment for each and every activity and all critical jobs
∑ Conducted all site activity & schedule and update it according to the finish time.
∑ Organized mechanical activity and cost related issues to Senior management to run activity in smooth way .
∑ Searching different speedy systems at work site to speed up .
∑ Handled factory construction work, execution of structural fabrication and erection of firefighting system, hydrant,
sprinkler, water monitor installation and propane & ammonia tank areas work
IT SKILLS
8.2 Year Rich Experienced MEP SUP. Engineer in Construction Industry
∑ Well operating experience in Excel, MS Word, Power point and Auto Cad.
∑ Well versed with scheduling in Excel
∑ Well versed with MS Office and Internet Applications.
PERSONAL DETAILS
Date of Birth: 1st April, 1988
Spouse Detail: Pratibha Yadav
Marital status: Married
Passport: LK5012656, Ex-oct2023
Languages Known: English and Hindi
Contact Address: S/o Sri Sitaram Yadav, Vill.-Imali Mahua, Post-Ramapur, Dist. Azamgarh (223225), Uttar Pradesh
Ravindra Kumar Yadav

More Related Content

What's hot (20)

Saquib Resume
Saquib ResumeSaquib Resume
Saquib Resume
 
Vijai CV
Vijai CVVijai CV
Vijai CV
 
Piping Engineer CV
Piping Engineer CVPiping Engineer CV
Piping Engineer CV
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
 
cv for Project Engineer
cv for Project Engineercv for Project Engineer
cv for Project Engineer
 
CV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-CivilCV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-Civil
 
JEFFIN K JOSE CV
JEFFIN K JOSE CVJEFFIN K JOSE CV
JEFFIN K JOSE CV
 
G.N Engineering
G.N EngineeringG.N Engineering
G.N Engineering
 
Shoaib Resume
Shoaib ResumeShoaib Resume
Shoaib Resume
 
renjith piping engineer
renjith piping engineerrenjith piping engineer
renjith piping engineer
 
DKSHAH RESUME
DKSHAH RESUMEDKSHAH RESUME
DKSHAH RESUME
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
Resume-up-Aug-16
Resume-up-Aug-16Resume-up-Aug-16
Resume-up-Aug-16
 
SANDEEP (4)
SANDEEP (4)SANDEEP (4)
SANDEEP (4)
 
Sr. Ammonia Process Engineer's CV
Sr. Ammonia Process Engineer's CVSr. Ammonia Process Engineer's CV
Sr. Ammonia Process Engineer's CV
 
Vijayendra CV
Vijayendra CVVijayendra CV
Vijayendra CV
 
BIO DATA
BIO DATABIO DATA
BIO DATA
 
sanjay sharan CV2015
sanjay sharan CV2015sanjay sharan CV2015
sanjay sharan CV2015
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 
aravind ..
aravind ..aravind ..
aravind ..
 

Similar to MEPpdf.PDF

Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
Anas Khalifa
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
Anas Khalifa
 
Mantena Neeladri varma_original
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_original
Neeladri varma
 
ASLim CV1
ASLim CV1ASLim CV1
ASLim CV1
Lim Soo
 
Latest CV Engr. Zubair
Latest CV Engr. ZubairLatest CV Engr. Zubair
Latest CV Engr. Zubair
Zubair Noor
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
Manish Sabane
 

Similar to MEPpdf.PDF (20)

Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Ranjith_Kumar R - CV
Ranjith_Kumar R - CVRanjith_Kumar R - CV
Ranjith_Kumar R - CV
 
Mantena Neeladri varma_original
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_original
 
paramasivam resume
paramasivam resume paramasivam resume
paramasivam resume
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
My Resume.1
My Resume.1My Resume.1
My Resume.1
 
cv@sanjaychaubey REV
cv@sanjaychaubey REVcv@sanjaychaubey REV
cv@sanjaychaubey REV
 
cv@sanjaychaubey REV
cv@sanjaychaubey REVcv@sanjaychaubey REV
cv@sanjaychaubey REV
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 
Hvac engineer
Hvac engineerHvac engineer
Hvac engineer
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
 
updated cv of indrasen
updated cv of indrasenupdated cv of indrasen
updated cv of indrasen
 
STEPHEN HESKETH
STEPHEN HESKETHSTEPHEN HESKETH
STEPHEN HESKETH
 
ASLim CV1
ASLim CV1ASLim CV1
ASLim CV1
 
Latest CV Engr. Zubair
Latest CV Engr. ZubairLatest CV Engr. Zubair
Latest CV Engr. Zubair
 
Latest cv engr. zubair
Latest cv engr. zubairLatest cv engr. zubair
Latest cv engr. zubair
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
 
Rezume ongky
Rezume ongkyRezume ongky
Rezume ongky
 

MEPpdf.PDF

  • 1. 8.2 Year Rich Experienced MEP SUP. Engineer in Construction Industry RAVINDRA KUMAR YADAV Contact No .: +91124-3022256,7840841302 E-Mail: ravindra_lnt88@yahoo.com, ravindrakumary1@gmail.com JOB OBJECTIVE Seeking challenging assignments in Project Execution and Installation in building Construction, Residential, Commercial Building with a leading organization of repute, across the globe. PROFILE SUMMARY ∑ A result-oriented professional with Almost 8.2 years of experience in: Project Execution Installation Construction Operations Erection & Commissioning Site Execution Team Management ∑ Presently associated with Larsen & Toubro Ltd.(India),in Experion Windchant GHP Gurgaon(HR) India as MEP Engineer ∑ Expertise in job planning and executing projects with a flair for adopting modern construction methodologies and complying with quality standards. ∑ Proficient in proactively identifying & resolving problems, ramping-up project activities with on-time deliverables and maximizing efficiency. ∑ Hands-on experience in installation, testing & commissioning of MEP, FIRE, HVAC, PLUMBING and PUMP HOUSE, BOREWEL & WTP plants, etc. ∑ Adept at handling erection & commissioning activities involving resource planning, in-process inspection, team building and coordination with internal / external departments ∑ An effective communicator with excellent analytical, problem solving and interpersonal skills CORE COMPETENCIES ∑ Carrying out analysis and Execution of PHE, Swimming Pool, FIRE Line, HVAC, WTP Plant, Ducting in Factory Construction Buildings and High Rise Residential Projects including selection of Technology Partner, Engineering Consultants, etc. ∑ Overseeing preliminary project plan, site selection, Layout, preliminary & detailed engineering, equipment specification, etc. ∑ Monitoring plant efficiency and preparing monthly progress report & schedules, power and energy production cost report ∑ Handling the erection & commissioning while ensuring completion of project in minimum turnaround time and effective resource utilization to maximize the output. ∑ Spearheading activities involving working out various requirements and monitoring overall project operations including drawing, deployment, fabrication and erection & commissioning, for ensuring timely completion of projects ∑ Creating and sustaining a dynamic environment that fosters development opportunities and motivates high performance amongst team members ∑ taking steps for mitigating any Managing installation & commissioning of various mechanical equipment & machines; tracking project progress and risks WORK EXPERIENCE Growth Path: 24JUN2008TO US ARMY PROJECT INDIA (BOEING C-17), DEC2015TO till date Experian Wind chat Group Housing Project Gurgaon JULY 2014 TO DEC2015 PHE, Fire, WTP, Water supply, Irrigation System (CI, GI, DI, Copper, HDPE, PVC, MS, SS Piping) FEB2012 to JUNE2013 MSIL C-Line new plant OCTO2011 to FEB2012 P&G Bhopal Site CIP5 SEPT2010 to OCTO2011 MARUTI SUZUKI INDIA LTD JAN2010 to SEPT 2010 MAHI Cement plant Rajasthan JUNE2008To Jan2010 HONDA SIEL CARS INDIA new plant Since JUNE2008 MEP Engineer
  • 2. 8.2 Year Rich Experienced MEP SUP. Engineer in Construction Industry Role and Responsibility:- ∑ Excuting Plumbing, FIRE, HVAC, Swimming Pool, Electrical and Interior works, Co-ordinating to civil work for the project and completing with a grace. ∑ Execution of Complete PHE installation and WTP for the site. ∑ Managing good environment at site and execution of MEP structure & equipment esteemed site in my organization. ∑ Performing Plumbing works, firefighting System and Water system complete installation and working including pump house, piping and Fire Alarm system. ∑ Preparing daily material & drawing inspection. ∑ Coordinating with sub- contractor & workmen as per schedule. ∑ Overseeing cement plants equipment & factory equipment installation. ∑ Generating regular reports on Equipment and Sanitary ware & parallel activities as an Independent engineer in my site. Highlights:- ∑ Appreciation from BOEING India for the Installation of PHE,FIRE and Irrigation Pipe line and services Excellence in Execution for the Project ∑ Appreciation letter from USACE for excellence in execution of FUEL HYDRANT PIPING 2.o km ∑ Handing over of Squadron Operations MEP PHE works successfully in April 2016 to USACE. ∑ FUEL HYDRANT PIPE line erection in USACE Project was very critical to install within +-3mm tolerance throughout the trench. ∑ Erection was performed in heavy rainy season the trench was 6.0M below form ground level. EDUCATION 2008 Diploma in Mechanical (Production & Engineering) from Govt. Poly., Lucknow, B.T.E. Uttar Pradesh 2005 12th from Sri Vishw Nath Inter College Kalan Sultanpur U.P. Board with75% 2003 10th from Sri Vishw Nath Inter College Kalan Sultanpur U.P. Board with 61% TRAINING AND AWARDS ∑ Boeing Quality Excellence award in April 2016 ∑ Excellent in Quality control award letter from USACE 2014 ∑ Received Quality Award in 2009 and 2013 for best site in LNT ∑ Construction & Safety Training from Larsen & Toubro Ltd., Ghaziabad in Octo2013 ∑ Supervisory Development Program from Larsen & Toubro Ltd., Ghaziabad in April2014 ORGANIZATIONAL PROJECTS Title: MECHANICAL and MEP ENGINEER Organization: C-17 Project BOING, GAZIYABAD (L&T) Period: JUNE2008 TO TILL DATE Responsibilities: ∑ PHE work for the High Rise and Factory building including piping, Toilets, geyser, Sunk, Shower, Internal Drainage etc. ∑ MEP Site Execution as a Fire Protection system Installation for the project including piping, pump work ,valves, sprinklers, Fire cylinders, Flushing and testing –commissioning etc. ∑ HVAC Works Ducting Flexible and Rigid, Dampers, Plenum, MVCD, FCU, HFCU, AHU, Split AC. ∑ Installation of WTP Plant and testing and commissioning of the same. ∑ JET BLAST DEFLECTOR Installation with BDI. USA ∑ Fuel Hydrant system SS pipe for boing C-17 ∑ Prepared & ensured group risk assessment for each and every activity and all critical jobs ∑ Conducted all site activity & schedule and update it according to the finish time. ∑ Organized mechanical activity and cost related issues to Senior management to run activity in smooth way . ∑ Searching different speedy systems at work site to speed up . ∑ Handled factory construction work, execution of structural fabrication and erection of firefighting system, hydrant, sprinkler, water monitor installation and propane & ammonia tank areas work IT SKILLS
  • 3. 8.2 Year Rich Experienced MEP SUP. Engineer in Construction Industry ∑ Well operating experience in Excel, MS Word, Power point and Auto Cad. ∑ Well versed with scheduling in Excel ∑ Well versed with MS Office and Internet Applications. PERSONAL DETAILS Date of Birth: 1st April, 1988 Spouse Detail: Pratibha Yadav Marital status: Married Passport: LK5012656, Ex-oct2023 Languages Known: English and Hindi Contact Address: S/o Sri Sitaram Yadav, Vill.-Imali Mahua, Post-Ramapur, Dist. Azamgarh (223225), Uttar Pradesh Ravindra Kumar Yadav