1. SHOUKAT ALI ZAKI
Father's Name : Muhammad Amin
Date of Birth 10-04-1989
Gender : Male
Religion : Islam
Nationality : Pakistani
Marital Status : Married
N.I.C # : 35301-2264203-5
Passpost # : AK5392031
Domicile : Okara
Mobile No. 0344-7325678
E-Mail Address : Shoukat_zaki@yahoo.com
Postal Address : Gali Muhammad Mumtaz astam farosh wali
Muhullah Daras Basirpur (Okara).
PROFESSIONAL OBJECTIVE:-
To groom my technical, managerial and interpersonal abilities by
working in a challenging and professional environment that realizes my complete potential.
QUALIFICATION:-
Degree Year Board/University Institute Marks
B-Tech (pass)
(Mechanical
Production)
2013
B.Z.U
(Multan)
G.C.T (Sahiwal) 1005/1450
D.A.E
(Mechanical)
2008
P.B.T.E
(Lahore)
G.C.T (Sahiwal) 2531/3350
Matirc
(Science)
2005
B.I.S.E
(Lahore)
Private 555/850
COMPUTER SKILLS
• Ms Excel, Ms PowerPoint, Ms Word, Internet application, typing speed 55 words per
minute.
EXPERIENCE
• Working as a QC Inspector in IKAN Engineering Services (pvt.) Limited Lahore From
1st
June to till date.
• Working as a QA/QC Supervisor in DESCON Engineering (pvt.) Limited Lahore 17th
June 2013 to 30th
January 2014.
• Working as a QC Inspector and Welding Inspector in IKAN Engineering Services (pvt.)
Limited Lahore from 10th
March 2012 to 16TH
June 2013.
• Working as a QC Inspector and Welding Inspector in IKAN Engineering Services (pvt.)
Limited Lahore from 30th
August 2008 to 05th
September 2009.
KNOLEDGE OF CODES & STANDARD:-
2. ASME SEC VIII DIV 1
ASME SEC IX
B31.1
B31.3
ASME SEC V
AWS D1.1
B16.5
ASME SEC II PART A&C.
MAJOR PROJECTS:-
Nestle Storage tanks & Structure.
HEC Oil Storage Transformer Tank.
PEL Oil Storage Transformer Tank.
Worked at knock out drum (U stamp) (MOL).
Pressure Vessels.
Fabrication and Installation of Tube bundle Assemblies of Heat Exchanger PSO
Company limited
Huawei u-fone Mono Pole & Guy Mast Telecommunication Towers.
PTCL Pakistan Television Corporation Limited Towers. .
Bus Rapid Transit System (BRTS) LHR.
PROFESSIONAL EXPERTISE:-
Responsibilities:
INPROCESS QC INSPECTOR FOR ASME DEMO VESSEL
• Worked as In-process QC Inspector for ASME DEMO VESSEL
INCOMING MATERIAL
• Incoming material inspection as per PR (Purchase Requisition), PO (Purchase
Order) and DC (Delivery Challan)
• Incoming material identification as per PR applicable Code/standard
• Reviewing MTRs/Lab test reports
WELDING
• Review WPSs (Welding Procedure Specifications)
• Review PQRs (Procedure Qualification Records)
• Carrying out Visual Welding inspections
• Taking Welders Tests for performance qualifications (WPQ)
• Ensuring Qualified welders are performing welding on job, in qualified welding
position
• Ensuring welding is being done as per approved WPS and PQR
• Checking welder stamps near the finished welding joints.
WLDING CONSUMABLE (ELECTRODE) STORAGE
• Keeping record of baking of low hydrogen electrodes- E 7018
• Keeping record of drying of low hydrogen electrodes- E 7018
• Check the temperature of electrodes E 7018 in desicators
3. VESSEL INITIAL DOCUMENTATION
• Preparing ITP (Inspection and Test Plan) or QIP (Quality Inspection Plan /
Traveler
• Preparing Dossier/IDM (Inspection Data Manual)/MDM (Manufacturing Data
Manual)
FABRICATION INSPECTION
• Checking marking for cutting of materials
• Ensuring “material hard punching transferring” on cut parts
• Checking Layout of materials
• Fit ups checking
• Giving “Go Ahead” for NDT (RT, UT, MT and PT) after visual inspection of welding
• Checking Ovality of individual shells and completed Vessel
• Performing Dimensional Check
• Checking material identification of each part of vessel etc
• Checking Hydrostatic Test
• Checking Pneumatic test of pads
• Checking Water fill Test of storage tanks
• Raising NCR (Non conformance report) if there is out of tolerance or non
compliance of materials
NDT (Non Destructive Testing)
• Arranging NDT (RT, UT and MT) Teams.
• Preparing NDT reports (RT, MT & PT)
• Performing PT (Penetrating Testing)
• Interpretation of radiographs
PWHT (Post Weld Heat Treatment)
• Preparing PWHT Specifications for vessels
• Checking PWHT Reports
• Reviewing PWHT Charts
SAND BLASTING AND PAINTING
• Checking of sand blasting to surface SA-2.5
• Checking Painting Inspection to meet required microns of different coats
NDT and DT (Non Destructive Testing and Destructive Testing)
• Checking Hardness in HB and Vickers etc
• Reviewing report of Tensile Testing (Tensile strength, yield strength, %age
Elongation and reduction of area)
• Reviewing Bend Test Reports (Side Bend, Face bend, Root bend)
• Reviewing Harness test reports
FINAL DOCUMENTATION
• Preparation of Dossier/IDM
• Reviewing IDM
• Handing over copy of IDM to Client
4. CALIBRATION
• To check calibration of measuring and test equipments.
• To prepare Calibration equipment log.
PROJECTS EXPERIENCE WITH DESCON ENGINEERING (PVT) LIMITED
1-UCH-II EXPANSION POWER PLANT (404 MW)
(From 17 June 2013 to 23 Oct 2013)
Project no. 1139
Client: URS, HET
Position: QA/QC Supervisor
RESPONSIBILITIES
To prepare punch list for TEST PACKS by walking down of piping systems.
Verification of punch list after rectification
Coordination with client inspector to resolve the issues related to test package. Review of
Test packages.
Witness / Inspection of Hydro test, Pneumatic Leak test and Flushing / Air Blowing activities.
Liaison with senior management regarding QA/QC matters.
Documentation.
Welding inspection.
2-MOL PAKISTAN OIL & GAS CO GPF KARAK (MAKORI SITE)
(From 24 Oct 2013 to 31 Jan 2014)
Project no. 1146
Client: Mol Pakistan Oil & Gas Co.B.V KARAK (MAKORI SITE).
Position: QA/QC Supervisor
RESPONSIBILITIES
To prepare punch list for TEST PACKS by walking down of piping systems
Verification of punch list after rectification
Coordination with client inspector to resolve the issues related to test package. Review of
Test packages.
Witness / Inspection of Hydro test, Pneumatic Leak test and Flushing / Air Blowing activities.
Liaison with senior management regarding QA/QC matters.
Documentation.
REFERENCES
To be furnished on demand.