Career summary:
Twelve years’ experience in the field of welding inspection. Familiar with
construction of high rise building structural works, Oil & Gas projects (onshore and offshore
and shutdown), power (boiler) projects such as pressure parts, process piping and pipe line.
Also familiar in NDT activities, Destructive tests, Hydro-Tests & Air leak tests, bolt torque
testing, heat treatments processes as per customer requirements, project’s specifications,
codes and standards.
Supplementary Qualification:
AWS/CWI (AMERICAN WELDING SOCIETY)
Certificate No: 08112051 Date of issue: NOVEMBER-2008
CSWIP-3.1- Certificate No: 56730 Date of issue: JULY-2011
ASNT LEVEL – II (American Society for Non- Destructive Test) in
Penetrant testing
Magnetic Particle testing
Radiographic testing
Ultrasonic testing
Visual Inspection
Educational Qualification:
Diploma in Mechanical Engineering, First Class with Honors (90.5%)
Professional Experience
1) Name & Address of industry : TÜV Rheinland Middle East L.L.C.
Office no. 2702, Shining Towers
Mubarak Bin Mohammed St., Khalidiyah
P.O.Box 27483, Abu Dhabi
United Arab Emirates
Duration : June-2014 to Till date.
Position : QC Welding Inspector – ADCO Representative.
In Facility Integrity(FID) Division
Terminal Piping Operation (TPO) Department
PROJECTS : CDS AND RDS IN HABSHAN, BUHASA, ASSAB FIELD.
Job Responsibility :
• We are doing survey on the complete pipe line and making drawing.
• Witnessing of hydro test in-service pipe lines(old pipe lines) if any failure on
the pipe line during hydro test we are given recommendation based on the
pressure on the pipe line and condition of the pipe lines and life of the pipe lines
and service of the pipe lines.
• During service of the pipe lines any leak is happen we will do survey on the
complete pipe line and given recommendation.
• Witnessing of WPS and WQT and reviewing of material certificate and WPS
and Welder certificates, equipment certificates, consumable certificates.
• Monitoring and witnessing of stage inspection (before welding, during
welding and after welding) and witnessing of NDT Activities( MPI, LPI, UT AND RT)
• Reviewing of final test packs and pipe lines to be released on operation for
further service.
2) Name & Address of industry : M/s.Reliance Industries Limited.
Nagothane Manufacturing Division,
Raigad(Distick), Maharashtra, India.
Duration : February2014 to May2014.
Position : QC Welding Inspection Engineer – Reliance Representative.
PROJECTS : EO/EG DBN (shutdown)
Job Responsibility : we are reviewing the test packs, ensure the P & ID and
ISO drawings, check the line walks and prepare the punch list, and ensure the
punch list, release the hydro test, and check the hydro test.
3) Name & Address of industry : M/s.Germanischer Lloyd(GL).
Muasker Al Nahyan, Building No.4,
P.O.Box: 36941, Street No.13,
Abu Dhabi, U.A.E.
Duration : April 2013 to October 2013
• Germanischer Lloyd(GL).Description : GL Noble Denton is a world class
technical service provider for the oil and gas industry. We help to design, build,
install and operate oil and gas onshore, maritime and offshore assets to ensure
safety, sustainability and superior value.
Position : Third Party Inspector / Welding Inspector – ADMA
Representative.
Duration : April 2013 to July 2013
PROJECTS : 1) UMM LULU & AL NASR PHASE-I FIELD DEVELOPMENT
PROJECT. INSTALLATION 12’’ CRUDE PIPE LINE FROM
Position : Third Party Inspector / Welding Inspector – ADMA Representative.
Duration : AUGUST 2013 to OCTOBER 2013
PROJECTS : 2) REPLACEMENT OF ONE WATER INJECTION LINE FROM
ZK-110 TO ZK-43A IN ZAKUM FIELD.14’’ WATER
INJECTION PIPE LINE
CLIENTS : ADMA – OPCD
Job Responsibility:
• Reviewing P&ID, Project Drawings and scope
• Reviewing Revision Drawings Index and site queries
• Monitoring and witnessing spools received from onshore fabrication free
from damages, verifying identification & reviewing material certificates of receiving
spools and fittings
• Witnessing fit up – verified joint preparation, alignment and groove angle as
per WPS
• Witnessing Gaskets, Valve visual inspection as per drawing
• Reviewing consumables batch certificates and auditing consumable’s store
• Reviewing calibration control log for all gauges, Master instruments and
equipment’s
• Reviewing weekly welder’s performance reports, Reviewing weld audit report
and monitoring weld parameters checking
• Inspection of all Quality Control activities like Surveillance of day to day
welding and erection of piping and structural
• Monitoring NDE of welds & reviewing NDE reports, Review the radiographic
film interpretation, release note for further activities
• Preparing weekly and monthly reports of welding activities
• Monitoring &Witnessing PWHT activities and reviewing calibration records &
chart
• Reviewing Test Packs and releasing for Hydro test
• Witnessing Hydro test, Line walk through and Reinstatement Inspection
• Witnessing preliminary alignment and final alignment of all Rotary
Equipments
• Co- ordinate with ADMA-Operation Pre-commissioning and Commissioning
Inspection
4) Name & Address of industry: M/s. Topaz Engineering (ADYARD).
P.O.Box: 7604, Abu Dhabi, U.A.E.
Duration : August 2012 to March 2013
Designation : S.r Q.C Inspector
Topaz Engineering (ADYARD) Description : Topaz’s subsidiary
companies- Adyard Abu Dhabi form the foundation upon which the engineering
division continues to grow and produce excellent results for the company. these
engineering businesses has established capabilities in marine repair, ship-building,
and both onshore and offshore fabrication.
PROJECTS: ENSCO RIG-54 - RIG REPAIR WORK.
RIG WAVE SIERRA – RIG REPAIR WORK.
HEATER COILS – GASCO AT RUWAIS (shutdown)
NDC RIG DIYANA
CLIENTS : ABS, DNV, PETROFAC,GASCO,NDC.
5)Name & Address of industry : M/s. Mech Tech Projects.
133-A Sidco Industrial Estate,
Ambattur, Chennai-98.
Duration : June 2011 to July 2012
Designation : Inspection Engineer
Mech-tech Description Mech-Tech Group has diversified interests in
Engineering, manufacturing and construction activities, in India and abroad. ISO 9001-
2008 certificated for Design & Engineering of Process Plants covering Mechanical, Piping,
Electrical, Instrumentation, and Civil & Structural and for manufacture of Heat
Exchangers, Pressure Vessels, Agitators & Screw Conveyors.
PROJECTS: M/S.J.K .Paper, Raigada, Orissa
Job Responsibility: we are working as client representative in GB
ENGINEERING ENTERPRISES PVT LTD- TRICHY. We are involved all stage inspection as
per quality plan and we checked final inspection. We are looked at boiler components such
as water wall panels, roof panels, economizer, boiler banks, floor panels, super heater
coils and steam drum internals, silencer, connecting (flow) piping.
6) Name & Address of industry : M/s. Gulf Piping Company W. L. L.
P.O.Box: 2739, Abu Dhabi, U.A.E.
Duration : March 2009 to June 2011
Designation : Sr.Inspector
Gulf Piping Company W. L. L. (GPC) : GPC is one of the largest
industry in UAE, and has extensive Fabrication and Erection facilities with substantial
workshops for both structural components and pipe spool manufacture. Numerous
medium and heavy lift Crawler Cranes provide services for construction of large Offshore
structures such as, Semi-submersible / Jack-up Drill Rigs, Offshore Platforms
including Jackets & Topsides (Process, Drilling, and Water Injection etc.),
Process & Pipe Rack Modules, FPSO Turrets & Calm Buoys and many other heavy
structures. GPC has now diversified its Fabrication Facilities for the construction
of ‘Semi-submersible Drilling Rigs’ like LONESTAR, DELBA-III &Process Units like
PANUKE (ENCANA).
PROJECTS:
 DYNAMICALLY POSITIONED SEMI-SUBMERSIBLE DRILLING RIG
LONESTAR (Rig-I)
 DYNAMICALLY POSITIONED SEMI-SUBMERSIBLE DRILLING RIG NORBE-
VI (Rig-II)
 DYNAMICALLY POSITIONED SEMI-SUBMERSIBLE DRILLING RIG DELBA-
(Rig-III)
 DEEP PANUKE FIELD DEVELOPMENT ENCANA
 PORT OF SOHAR – BULK JETTY SAIPEM S.A.
7) Name & Address of industry : M/s. Eversendai Engineering,
Hamriyah Free Zone, Sharjah,
P.O. No.: 42531-United Arab Emirates.
Duration : August’2006 to Feb 2009
Designation : Engineer
Industry Description
Fabrication and Erection of Various Structural steel working in
the world huge commercial tower like…petronaus tower, Dubai mall, Burj khalifah tower,
New Doha International Airport, Dubai festival city, China Tower, Rose Rotana tower, Al
Shams Tower & Ananthara Tower
6) Name & Address of industry : M/s. Tool Fab Engineering
Industries,
Thuvakudi, Thiruchirapalli,
P.O. No: 620015,
Tamilnadu, India.
Duration : January’05 to August’06
Designation : Engineer
Industry Description
Fabrication of Boiler main column (‘+’ Type weight160 MT), Box
column, I Beams, Box Column Assemblies and also Tubular Towers in Suzlon Energy LTD
(For Wind-Mill Towers) etc…
7)Name & Address of industry : M/s. Pre Engineered Buildings
Thuvakudi, Thiruchirapalli,
P.O. No: 620015,
Tamilnadu, India.
Duration : October’03 to January’05
Designation : Supervisor
Job Responsibilities
 Studying the scope of work, contract, company specifications, and standards & perform
the work incompliance to the specified requirements.
 Performing total quality control activities related to Structural and Piping work as per
approved quality assurance plan (QAP) and Quality Control Plan (QCP).
 Ensuring that:
o Weld inspection, examination and test are carried out and documented in
accordance with the Quality Control Plan for site activities, verifying the inspection
records and validating the relevant results.
o Mechanical & Welding works are executed in an efficient manner & specified quality
requirements are met.
 Raising technical queries & non-compliance clarifications with the engineering.
 Reviewing mill certificates, consumable test certificates and calibration certificates of
equipments.
 Resolving problems encountered during construction, identify the root cause for the
problem and notify the course of action through the Project Management Team.
 Studying structural, piping drawings (GA’s, P & ID's, and Isometric, etc.) and initiating
necessary drawing changes as required at site.
 Witnessed performance qualification test on Welding Operators & Welder’s.
 Monitoring & witnesses of WPS/PQR & WQT’s/MPI/PT/HT.
 Checking all welding activities is in compliance with the applicable code, standards and
specification.
 Co-ordinating with:
o NDT team for carrying out the required NDT as per the project scope of work.
o Third party inspection ABS (American Bureau of Shipping), LLOYD’S
REGISTER and client inspection SBM (SINGLE BUOY MOORINGS INC), SAIPEM
and BAUER.
o Co-ordinates with clients (DMJV, SOJV & MH) & Third Parties (TUV, Moodi
International, APTS & Inspec) and ensures that the materials are released without
any delay and within the project requirements.
 Witness & review the PWHT, Hardness reports.
 Performing Evaluation and Interpretation of Radiographic Film of Weld Joints.
 Monitoring the performance of welder’s (welder audit).
 Preparing Punch List Items and forward the same to the Project Management Team for
further course of Action. Follow up & provide inputs to Construction on the closing of
items required to be completed prior to hydrostatic test.
 Preparing hydro pressure test packages and carrying out hydro test checks and
pneumatic test.
 Witness Hydrostatic Test. Verify for the Compliance of Testing equipment like Testing
Manifolds, Pressure gauges, Test recorders, Relief valve, Testing Blinds, Test Pump and
Approved Test fluid.
 Witness & Monitor post-hydro activities that include reinstatement, lay-up and Painting.
 Review and approve the final as built drawings.
 Signing off Mechanical Completion Certificate.
 Releasing the Tested Piping to the Commissioning team for further activities.
 Monitoring the insulation and fire proofing on vessels, piping and structure.
 Involvement in pre-commissioning activities like final reinstates/ Mechanical clearances of
the Piping, vessels. Storage Tanks and offshore pipe lines.
 Reviewing documents for shipment (Load-Out Manifest).
 Filling out inspection check sheets for all random inspections performed.
Personal Details:
Proficiency of Language : English & Tamil, Hindi
Nationality : Indian
Date of Birth : 27.03.1983
Marital Status : Married
Passport No. : F 3331693 valid till 2015.
Software Exposure:
AutoCAD / CAM
MS Office
Declaration:
The above-furnished information is true and correct to the best of my knowledge.
(N.SRINIVASAN)
Dt:

More Related Content

What's hot

RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATIONRESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATIONMaypray Guimbarda
 
HASSAN AWAN QC Welding Inspector CV
HASSAN AWAN QC Welding Inspector CVHASSAN AWAN QC Welding Inspector CV
HASSAN AWAN QC Welding Inspector CVGhulam Hassan
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipelineUDAYAKUMAR P C PANICKER
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Chandra ABS IV
 
QA-QC WELDING & NDT Inspector for poland updated
QA-QC WELDING &  NDT Inspector for poland updatedQA-QC WELDING &  NDT Inspector for poland updated
QA-QC WELDING & NDT Inspector for poland updatedSantosh Gurajada
 
QA QC Engineer Mechanical
QA QC Engineer MechanicalQA QC Engineer Mechanical
QA QC Engineer MechanicalFaizan Raza
 
MANOJ PS-Welding Engineer Resume
MANOJ PS-Welding Engineer ResumeMANOJ PS-Welding Engineer Resume
MANOJ PS-Welding Engineer ResumeManoj Ps
 
Saleem Malik Painting / Coating, Insulation and Fire proofing inspector
Saleem Malik Painting / Coating, Insulation and Fire proofing inspectorSaleem Malik Painting / Coating, Insulation and Fire proofing inspector
Saleem Malik Painting / Coating, Insulation and Fire proofing inspectorsalimmalic
 
Mohamed farouk portfolio
Mohamed farouk portfolioMohamed farouk portfolio
Mohamed farouk portfolioMohamed Farouk
 
Mechanical Engineer – QAQC
Mechanical Engineer – QAQCMechanical Engineer – QAQC
Mechanical Engineer – QAQCvignesh k
 
QA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceQA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceSimon Lawrence
 
Resume-Welding inspector
Resume-Welding inspectorResume-Welding inspector
Resume-Welding inspectorLatchanna Akula
 

What's hot (20)

RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATIONRESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
 
kiruba new resume
kiruba new resumekiruba new resume
kiruba new resume
 
Manohar CV QA-QC
Manohar CV QA-QCManohar CV QA-QC
Manohar CV QA-QC
 
HASSAN AWAN QC Welding Inspector CV
HASSAN AWAN QC Welding Inspector CVHASSAN AWAN QC Welding Inspector CV
HASSAN AWAN QC Welding Inspector CV
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
 
Welding_Inspector_Resume-Muruganandam_(1) (1)
Welding_Inspector_Resume-Muruganandam_(1) (1)Welding_Inspector_Resume-Muruganandam_(1) (1)
Welding_Inspector_Resume-Muruganandam_(1) (1)
 
QA-QC WELDING & NDT Inspector for poland updated
QA-QC WELDING &  NDT Inspector for poland updatedQA-QC WELDING &  NDT Inspector for poland updated
QA-QC WELDING & NDT Inspector for poland updated
 
Resume - NATARAJAN SIVASUBRAMANI
Resume - NATARAJAN  SIVASUBRAMANIResume - NATARAJAN  SIVASUBRAMANI
Resume - NATARAJAN SIVASUBRAMANI
 
QA QC Inspector.doc 1
QA QC Inspector.doc 1QA QC Inspector.doc 1
QA QC Inspector.doc 1
 
QA QC Engineer Mechanical
QA QC Engineer MechanicalQA QC Engineer Mechanical
QA QC Engineer Mechanical
 
MANOJ PS-Welding Engineer Resume
MANOJ PS-Welding Engineer ResumeMANOJ PS-Welding Engineer Resume
MANOJ PS-Welding Engineer Resume
 
Saleem Malik Painting / Coating, Insulation and Fire proofing inspector
Saleem Malik Painting / Coating, Insulation and Fire proofing inspectorSaleem Malik Painting / Coating, Insulation and Fire proofing inspector
Saleem Malik Painting / Coating, Insulation and Fire proofing inspector
 
Mohamed farouk portfolio
Mohamed farouk portfolioMohamed farouk portfolio
Mohamed farouk portfolio
 
Mechanical Engineer – QAQC
Mechanical Engineer – QAQCMechanical Engineer – QAQC
Mechanical Engineer – QAQC
 
QA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceQA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrence
 
Resume-Welding inspector
Resume-Welding inspectorResume-Welding inspector
Resume-Welding inspector
 
Antony_Joy_CV.DOC
Antony_Joy_CV.DOCAntony_Joy_CV.DOC
Antony_Joy_CV.DOC
 
Updated Moh. C.V.
Updated Moh. C.V.Updated Moh. C.V.
Updated Moh. C.V.
 
Prakesh Welding Foreman CV
Prakesh Welding Foreman CVPrakesh Welding Foreman CV
Prakesh Welding Foreman CV
 

Similar to srini cv latest

Similar to srini cv latest (20)

LINGAM
LINGAMLINGAM
LINGAM
 
QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.
 
Resume
ResumeResume
Resume
 
Venkat-CV
Venkat-CVVenkat-CV
Venkat-CV
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-Welding
 
CV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdfCV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdf
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDF
 
Kumar.R Multi Inspector cv -5 - Copy
Kumar.R   Multi Inspector cv   -5 - CopyKumar.R   Multi Inspector cv   -5 - Copy
Kumar.R Multi Inspector cv -5 - Copy
 
Resume_ Arunkumar
Resume_ Arunkumar  Resume_ Arunkumar
Resume_ Arunkumar
 
A.H.K.C.V.NEW (2)
A.H.K.C.V.NEW (2)A.H.K.C.V.NEW (2)
A.H.K.C.V.NEW (2)
 
sam ekom resume 1
sam ekom resume 1sam ekom resume 1
sam ekom resume 1
 
CV_Sa-nga Last Revision
CV_Sa-nga Last RevisionCV_Sa-nga Last Revision
CV_Sa-nga Last Revision
 
Vijay Anand Cv-2016
Vijay Anand Cv-2016Vijay Anand Cv-2016
Vijay Anand Cv-2016
 
R.Krishna Raj Sr. QC_Inspector-19-04-16
R.Krishna Raj Sr. QC_Inspector-19-04-16R.Krishna Raj Sr. QC_Inspector-19-04-16
R.Krishna Raj Sr. QC_Inspector-19-04-16
 
BALAJI RESUME. UPDATED
BALAJI RESUME. UPDATEDBALAJI RESUME. UPDATED
BALAJI RESUME. UPDATED
 
Venugopal revised Cv
Venugopal revised CvVenugopal revised Cv
Venugopal revised Cv
 
SUSHIL (2)
SUSHIL (2)SUSHIL (2)
SUSHIL (2)
 
CV FOR N.R.IYER
CV FOR N.R.IYERCV FOR N.R.IYER
CV FOR N.R.IYER
 
Venugopal revised cv
Venugopal revised cvVenugopal revised cv
Venugopal revised cv
 
shan resume 2015.1.1
shan resume 2015.1.1shan resume 2015.1.1
shan resume 2015.1.1
 

srini cv latest

  • 1. CURRICULAM VITAE N.SRINIVASAN 5/165A,E.B.COLONY CHATRAREDDIAPATTI VIRUDHUNAGAR TAMIL NADU, INDIA. Email-nsrinivasan27@gmail.com MOBILE NO: 0091-8807513436 0091-9994895727 Career summary: Twelve years’ experience in the field of welding inspection. Familiar with construction of high rise building structural works, Oil & Gas projects (onshore and offshore and shutdown), power (boiler) projects such as pressure parts, process piping and pipe line. Also familiar in NDT activities, Destructive tests, Hydro-Tests & Air leak tests, bolt torque testing, heat treatments processes as per customer requirements, project’s specifications, codes and standards. Supplementary Qualification: AWS/CWI (AMERICAN WELDING SOCIETY) Certificate No: 08112051 Date of issue: NOVEMBER-2008 CSWIP-3.1- Certificate No: 56730 Date of issue: JULY-2011 ASNT LEVEL – II (American Society for Non- Destructive Test) in Penetrant testing Magnetic Particle testing Radiographic testing Ultrasonic testing Visual Inspection Educational Qualification: Diploma in Mechanical Engineering, First Class with Honors (90.5%) Professional Experience 1) Name & Address of industry : TÜV Rheinland Middle East L.L.C. Office no. 2702, Shining Towers Mubarak Bin Mohammed St., Khalidiyah P.O.Box 27483, Abu Dhabi United Arab Emirates Duration : June-2014 to Till date.
  • 2. Position : QC Welding Inspector – ADCO Representative. In Facility Integrity(FID) Division Terminal Piping Operation (TPO) Department PROJECTS : CDS AND RDS IN HABSHAN, BUHASA, ASSAB FIELD. Job Responsibility : • We are doing survey on the complete pipe line and making drawing. • Witnessing of hydro test in-service pipe lines(old pipe lines) if any failure on the pipe line during hydro test we are given recommendation based on the pressure on the pipe line and condition of the pipe lines and life of the pipe lines and service of the pipe lines. • During service of the pipe lines any leak is happen we will do survey on the complete pipe line and given recommendation. • Witnessing of WPS and WQT and reviewing of material certificate and WPS and Welder certificates, equipment certificates, consumable certificates. • Monitoring and witnessing of stage inspection (before welding, during welding and after welding) and witnessing of NDT Activities( MPI, LPI, UT AND RT) • Reviewing of final test packs and pipe lines to be released on operation for further service. 2) Name & Address of industry : M/s.Reliance Industries Limited. Nagothane Manufacturing Division, Raigad(Distick), Maharashtra, India. Duration : February2014 to May2014. Position : QC Welding Inspection Engineer – Reliance Representative. PROJECTS : EO/EG DBN (shutdown) Job Responsibility : we are reviewing the test packs, ensure the P & ID and ISO drawings, check the line walks and prepare the punch list, and ensure the punch list, release the hydro test, and check the hydro test. 3) Name & Address of industry : M/s.Germanischer Lloyd(GL). Muasker Al Nahyan, Building No.4, P.O.Box: 36941, Street No.13, Abu Dhabi, U.A.E. Duration : April 2013 to October 2013
  • 3. • Germanischer Lloyd(GL).Description : GL Noble Denton is a world class technical service provider for the oil and gas industry. We help to design, build, install and operate oil and gas onshore, maritime and offshore assets to ensure safety, sustainability and superior value. Position : Third Party Inspector / Welding Inspector – ADMA Representative. Duration : April 2013 to July 2013 PROJECTS : 1) UMM LULU & AL NASR PHASE-I FIELD DEVELOPMENT PROJECT. INSTALLATION 12’’ CRUDE PIPE LINE FROM Position : Third Party Inspector / Welding Inspector – ADMA Representative. Duration : AUGUST 2013 to OCTOBER 2013 PROJECTS : 2) REPLACEMENT OF ONE WATER INJECTION LINE FROM ZK-110 TO ZK-43A IN ZAKUM FIELD.14’’ WATER INJECTION PIPE LINE CLIENTS : ADMA – OPCD Job Responsibility: • Reviewing P&ID, Project Drawings and scope • Reviewing Revision Drawings Index and site queries • Monitoring and witnessing spools received from onshore fabrication free from damages, verifying identification & reviewing material certificates of receiving spools and fittings • Witnessing fit up – verified joint preparation, alignment and groove angle as per WPS • Witnessing Gaskets, Valve visual inspection as per drawing • Reviewing consumables batch certificates and auditing consumable’s store • Reviewing calibration control log for all gauges, Master instruments and equipment’s • Reviewing weekly welder’s performance reports, Reviewing weld audit report and monitoring weld parameters checking • Inspection of all Quality Control activities like Surveillance of day to day welding and erection of piping and structural • Monitoring NDE of welds & reviewing NDE reports, Review the radiographic film interpretation, release note for further activities • Preparing weekly and monthly reports of welding activities • Monitoring &Witnessing PWHT activities and reviewing calibration records & chart • Reviewing Test Packs and releasing for Hydro test • Witnessing Hydro test, Line walk through and Reinstatement Inspection
  • 4. • Witnessing preliminary alignment and final alignment of all Rotary Equipments • Co- ordinate with ADMA-Operation Pre-commissioning and Commissioning Inspection 4) Name & Address of industry: M/s. Topaz Engineering (ADYARD). P.O.Box: 7604, Abu Dhabi, U.A.E. Duration : August 2012 to March 2013 Designation : S.r Q.C Inspector Topaz Engineering (ADYARD) Description : Topaz’s subsidiary companies- Adyard Abu Dhabi form the foundation upon which the engineering division continues to grow and produce excellent results for the company. these engineering businesses has established capabilities in marine repair, ship-building, and both onshore and offshore fabrication. PROJECTS: ENSCO RIG-54 - RIG REPAIR WORK. RIG WAVE SIERRA – RIG REPAIR WORK. HEATER COILS – GASCO AT RUWAIS (shutdown) NDC RIG DIYANA CLIENTS : ABS, DNV, PETROFAC,GASCO,NDC. 5)Name & Address of industry : M/s. Mech Tech Projects. 133-A Sidco Industrial Estate, Ambattur, Chennai-98. Duration : June 2011 to July 2012 Designation : Inspection Engineer Mech-tech Description Mech-Tech Group has diversified interests in Engineering, manufacturing and construction activities, in India and abroad. ISO 9001- 2008 certificated for Design & Engineering of Process Plants covering Mechanical, Piping, Electrical, Instrumentation, and Civil & Structural and for manufacture of Heat Exchangers, Pressure Vessels, Agitators & Screw Conveyors. PROJECTS: M/S.J.K .Paper, Raigada, Orissa Job Responsibility: we are working as client representative in GB ENGINEERING ENTERPRISES PVT LTD- TRICHY. We are involved all stage inspection as per quality plan and we checked final inspection. We are looked at boiler components such as water wall panels, roof panels, economizer, boiler banks, floor panels, super heater coils and steam drum internals, silencer, connecting (flow) piping. 6) Name & Address of industry : M/s. Gulf Piping Company W. L. L. P.O.Box: 2739, Abu Dhabi, U.A.E. Duration : March 2009 to June 2011 Designation : Sr.Inspector Gulf Piping Company W. L. L. (GPC) : GPC is one of the largest industry in UAE, and has extensive Fabrication and Erection facilities with substantial
  • 5. workshops for both structural components and pipe spool manufacture. Numerous medium and heavy lift Crawler Cranes provide services for construction of large Offshore structures such as, Semi-submersible / Jack-up Drill Rigs, Offshore Platforms including Jackets & Topsides (Process, Drilling, and Water Injection etc.), Process & Pipe Rack Modules, FPSO Turrets & Calm Buoys and many other heavy structures. GPC has now diversified its Fabrication Facilities for the construction of ‘Semi-submersible Drilling Rigs’ like LONESTAR, DELBA-III &Process Units like PANUKE (ENCANA). PROJECTS:  DYNAMICALLY POSITIONED SEMI-SUBMERSIBLE DRILLING RIG LONESTAR (Rig-I)  DYNAMICALLY POSITIONED SEMI-SUBMERSIBLE DRILLING RIG NORBE- VI (Rig-II)  DYNAMICALLY POSITIONED SEMI-SUBMERSIBLE DRILLING RIG DELBA- (Rig-III)  DEEP PANUKE FIELD DEVELOPMENT ENCANA  PORT OF SOHAR – BULK JETTY SAIPEM S.A. 7) Name & Address of industry : M/s. Eversendai Engineering, Hamriyah Free Zone, Sharjah, P.O. No.: 42531-United Arab Emirates. Duration : August’2006 to Feb 2009 Designation : Engineer Industry Description Fabrication and Erection of Various Structural steel working in the world huge commercial tower like…petronaus tower, Dubai mall, Burj khalifah tower, New Doha International Airport, Dubai festival city, China Tower, Rose Rotana tower, Al Shams Tower & Ananthara Tower 6) Name & Address of industry : M/s. Tool Fab Engineering Industries, Thuvakudi, Thiruchirapalli, P.O. No: 620015, Tamilnadu, India. Duration : January’05 to August’06 Designation : Engineer Industry Description Fabrication of Boiler main column (‘+’ Type weight160 MT), Box column, I Beams, Box Column Assemblies and also Tubular Towers in Suzlon Energy LTD (For Wind-Mill Towers) etc…
  • 6. 7)Name & Address of industry : M/s. Pre Engineered Buildings Thuvakudi, Thiruchirapalli, P.O. No: 620015, Tamilnadu, India. Duration : October’03 to January’05 Designation : Supervisor Job Responsibilities  Studying the scope of work, contract, company specifications, and standards & perform the work incompliance to the specified requirements.  Performing total quality control activities related to Structural and Piping work as per approved quality assurance plan (QAP) and Quality Control Plan (QCP).  Ensuring that: o Weld inspection, examination and test are carried out and documented in accordance with the Quality Control Plan for site activities, verifying the inspection records and validating the relevant results. o Mechanical & Welding works are executed in an efficient manner & specified quality requirements are met.  Raising technical queries & non-compliance clarifications with the engineering.  Reviewing mill certificates, consumable test certificates and calibration certificates of equipments.  Resolving problems encountered during construction, identify the root cause for the problem and notify the course of action through the Project Management Team.  Studying structural, piping drawings (GA’s, P & ID's, and Isometric, etc.) and initiating necessary drawing changes as required at site.  Witnessed performance qualification test on Welding Operators & Welder’s.  Monitoring & witnesses of WPS/PQR & WQT’s/MPI/PT/HT.  Checking all welding activities is in compliance with the applicable code, standards and specification.  Co-ordinating with: o NDT team for carrying out the required NDT as per the project scope of work. o Third party inspection ABS (American Bureau of Shipping), LLOYD’S REGISTER and client inspection SBM (SINGLE BUOY MOORINGS INC), SAIPEM and BAUER. o Co-ordinates with clients (DMJV, SOJV & MH) & Third Parties (TUV, Moodi International, APTS & Inspec) and ensures that the materials are released without any delay and within the project requirements.
  • 7.  Witness & review the PWHT, Hardness reports.  Performing Evaluation and Interpretation of Radiographic Film of Weld Joints.  Monitoring the performance of welder’s (welder audit).  Preparing Punch List Items and forward the same to the Project Management Team for further course of Action. Follow up & provide inputs to Construction on the closing of items required to be completed prior to hydrostatic test.  Preparing hydro pressure test packages and carrying out hydro test checks and pneumatic test.  Witness Hydrostatic Test. Verify for the Compliance of Testing equipment like Testing Manifolds, Pressure gauges, Test recorders, Relief valve, Testing Blinds, Test Pump and Approved Test fluid.  Witness & Monitor post-hydro activities that include reinstatement, lay-up and Painting.  Review and approve the final as built drawings.  Signing off Mechanical Completion Certificate.  Releasing the Tested Piping to the Commissioning team for further activities.  Monitoring the insulation and fire proofing on vessels, piping and structure.  Involvement in pre-commissioning activities like final reinstates/ Mechanical clearances of the Piping, vessels. Storage Tanks and offshore pipe lines.  Reviewing documents for shipment (Load-Out Manifest).  Filling out inspection check sheets for all random inspections performed. Personal Details: Proficiency of Language : English & Tamil, Hindi Nationality : Indian Date of Birth : 27.03.1983 Marital Status : Married Passport No. : F 3331693 valid till 2015. Software Exposure: AutoCAD / CAM MS Office Declaration: The above-furnished information is true and correct to the best of my knowledge.