SlideShare a Scribd company logo
1 of 28
Presented by
Morteza Shahmoradi
Summary
• EPC Disciplines
• Engineering Deliverables
• CAD History
• Most popular CAD
• Q&A
EPC ENGINEERING
DISCIPLINES
EPC Engineering Disciplines
• Process
• Mechanical
• Civil
• Plant Layout
• Piping
• Electrical
• Instrumentation and Controls
EPC Challenges
Execute EPC “mega-projects” within budget
and on schedule
Minimize construction delays due to lagging
information, material or equipment.
Track progress and maintain contingency
plans to stay on schedule.
Document project progress in terms of
installed quantities.
EPC Projects
By Robert N. Fox
The Challenge
• Intelligently apply IT/CAD to the EPC
environment.
• Overcome conservative mind-set of builders.
• Push progression of 2D to 3D, 4D and even 5D.
• Apply IT/CAD tools to the advantage of
constructors and their clients. Better
productivity leads to better gross margins.
EPC Projects
By Robert N. Fox
ENGINEERING
DELIVERABLES
General
• Operation & Maintenance Manual (Data)
• Recommended Spare Parts List (Data)
• Training Manual (Data)
Process
• Process Calculations (Data)
• Process Fl ow Diagram (PFD) (2D)
• Piping & Instrumentation Diagram (P&ID) (2D)
• Battery Limit Table (Data)
• Utilities Requirements Summary (Data)
Civil/ Structural/ Architectural
• Foundation Loading & Anchoring Diagrams (3D)
• Structural Layouts(3D)
• Structural Details(3D)
• Building Drawings (3D)
• Structural Calculations (Data) & (3D)
• Lifting Study (Data) & (3D)
Mechanical
• Equipment List (Data)
• Equipment Data Sheets (Data)
• Sub-vendor Equipment Drawings (3D)
• Lubrication Schedule (Data)
• Storage & Preservation Schedule (Data)
• Mechanical Installation Details (3D)
Piping & Layout
• Plot Plan / Elevation (General Arrangement) (3D)
• Piping General Arrangement (3D)
• Piping Isometrics (2D)
• Pipe Support Drawings (3D)
• Line Designation Table (Data)
• Valve List (Data)
• Special Piping Items List (Data)
• 3D Plant Model
Electrical Engineering
• Electrical Load List (Data)
• Electrical Equipment List
(Data)
• Electrical Data Sheets
(Data)
• Single Line Diagram (2D)
• Electrical Schematics (2D)
• Lighting Panel Schedule
(2D)
• Lighting Study (Data)
• Lighting Layout (3D)
• Electrical Equipment Layout
(3D)
• Electrical Installation Details
(3D)
• MCC Layout (3D)
• Grounding Layout (2D)
• Cable Tray Layout (3D)
• Cable Schedule (Data)
• EHT Isometric Drawings
(3D)
• Area Classification Drawing
(2D)
Instrumentation & Controls
• Instrument Index (Data)
• Instrument Block Diagram
(Data)
• Instrument Data Sheets (Data)
• Instrument Sizing Calculations
(Data)
• Control System Architecture
Diagram (2D)
• Logic Diagrams (2D)
• Alarm & Setpoint List (Data)
• Instrument Location Drawings
(3D)
• Instrument Installation Details
(3D)
• Instrument Loop Diagrams
(2D)
• Junction Box Layouts (2D)
• Wiring Diagrams (2D)
• Cause & Effect Diagrams (2D)
• Control Narrative (Data)
• Local Panel Layouts
• PLC/HMI Program (Data)
• Input-Output List (Data)
• HMI Screens (3D)
Types of documentation
Electrical Equipment Location
Instrument Installation Details
Electrical Block Diagrams
Electrical Equipment List
Electrical Panel Layouts
Instrument Data Sheets
Installation Operation &
Maintenance Manual s
Electrical Schematics
Motor Data Sheets
Instrument Index
Loop Diagrams
Motor List
HMI Program
Cable Schedule
Spare Parts List
Weld Procedures
Control Narratives
Shut Down Program
PLC Logic Diagrams
Manufacturers Record Book
Instrument Location Drawings
Document Index / Drawing List
Piping Arrangement Drawings
Equipment Data Sheets
Structural Calculations
General Arrangements
Inspection Test Plans
Anchor Bolt Layout
Catalog Cut Sheets
Foundation Loads
Project Schedule
Equipment List P&ID?s
I/O List
Valve List
Line List
Lifting Diagram
Quality Data Book
Structural Drawings
Assembly Drawings
Fabrication Drawings
Piping Spool Drawings
Surface Prep & Painting
Long Term Storage & Preservation
Instructions
CAD HISTORY
Levels of Modelling
• (Data) Custom made forms
• 2D Drawings and Sketches (E)
• 3D CAD Model with data attribute links (E)
• 4D Construction Simulation Model (EC)
– 4Dc –Construction Planning & Sequencing
– 4Dr – Resource Management (and Lift Plans)
– 4Ds – Construction Status
• 5D Cost Tracking Model (EPC)
– 5Dm: material costs
– 5Dr: resource costs
EPC Projects
By Robert N. Fox
2D Drawings and Sketches
• Traditional format
• Inter-drawing design coordination subject to error
• Change management requires rigorous document
control process.
• 2D CAD used for nearly 30 years aids in drawing
format consistency as well as storage and
management of drawing files.
EPC Projects
By Robert N. Fox
“Intelligent” 3D CAD Model
• Used for EPC over the past 20+ years (3DM, PDS,
PDMS, Smart-Plant, Plant-Space)
• Requires changes to traditional work processes
• Component attribute data is the “intelligence”
• Clash Checking
• Automatic Drawing Creation
• Material Take-Off Reports
• Data Consistency Reports EPC Projects
By Robert N. Fox
4D Construction Simulation Model
• Links 3D model components with P3
schedule
• Assigns temporal dimension to each
“widget” in the 3D model
• Facilitates Construction Operations:
• Construction Sequencing
• Resource Management Planning
• Constructability Assessment
• Lift Plan Verification
• Visualization EPC Projects
By Robert N. Fox
5D Cost Tracking Model
• Material Cost Model
• Resource Distribution Model
• Expended Cost Tracking Model
• . . . Others yet to be defined
EPC Projects
By Robert N. Fox
Popular Companies
• Intergraph
• Aveva
• Aucotec
• EPLAN
• All EPC Disciplines
• Intergraph Smart Yard
• SmartPlant Enterprise for Owner Operators
• SmartPlant Instrumentation
• CADWorx®
• SmartPlant P&ID
• SmartPlant FreeView®
• View All Products
• All EPC Disciplines
• AVEVA Diagrams™
• Easy creation of P&IDs, PFDs and other schematics that integrate with
engineering and 3D design
• AVEVA Electrical™
• Electrical engineering, design, documentation and management for the entire
project lifecycle
• AVEVA Engineering™
• Manage the evolving multi-discipline engineering data for tagged items such as
lines and equipment
• AVEVA Initial Design™
• Powerful 3D vessel design, with advanced hydrostatics and hydrodynamics
• AVEVA Instrumentation™
• Instrumentation and Control systems engineering, design,
documentation and management software
• AVEVA P&ID™
• An intelligent, AutoCAD-based P&ID design application
• AVEVA Schematic 3D Integrator™
• Managed development and consistency of schematic and 3D data
• AVEVA Space Management™
• Create and manage the automatic subdivision of a ship into spaces.
• Most EPC Disciplines
• Engineering Base is the innovative tool for electro engineering: it can
be used for every job and is adaptable to every workflow. Furthermore
it is quick and flexible in case of modifications.
• ELCAD is designed to create circuit documentation for electrical
engineering in every form. Its range of performances includes open
integration solutions for the company-specific workflow and technical
specialisation, including hydraulic and pneumatic systems.
• RUPLAN, with its extraordinary potential for automation, is the basis
for highly integrated solutions for industry sectors. This is proven by
its successful use in large power supply companies and in the
automotive industry.
• AUCOPLAN supports our customers in planning and operating
process control systems. Many known large-scale projects in the
domain of measurement and control engineering and plant
construction were performed by means of AUCOPLAN.
EPLAN
• Electrical and instrumentation
• Small projects
• Efficient for factory Automation
AECOsim Building Designer
• Design, analyze, document, and visualize buildings of any
size, form, and complexity with multi-discipline building
application for architects and engineers.
• Electrical Engineer
• Mechanical Engineer
• Piping Engineer
• Structural Engineer

More Related Content

What's hot

Resume - RAVI PRAKASH
Resume - RAVI PRAKASHResume - RAVI PRAKASH
Resume - RAVI PRAKASHRavi Prakash
 
Second edition epc project rule of credit and progress measurement promo
Second edition epc project rule of credit and progress measurement promoSecond edition epc project rule of credit and progress measurement promo
Second edition epc project rule of credit and progress measurement promoignitetribes
 
Epc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promoEpc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promoignitetribes
 
Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement ignitetribes
 
oil gas engineering-41-phpapp02
oil gas engineering-41-phpapp02oil gas engineering-41-phpapp02
oil gas engineering-41-phpapp02Mario Fonseca
 
Sample wbs for_upstream_epcic_project
Sample wbs for_upstream_epcic_projectSample wbs for_upstream_epcic_project
Sample wbs for_upstream_epcic_projectignitetribes
 
MEP Engineer with Revit Certification
MEP Engineer with Revit CertificationMEP Engineer with Revit Certification
MEP Engineer with Revit CertificationVishnuprasad P
 
edwin cv for QA-QC Engineer
edwin cv for QA-QC Engineeredwin cv for QA-QC Engineer
edwin cv for QA-QC EngineerEdwin Aguinaldo
 
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)amr gamal
 
Quality Engineer CV
Quality Engineer CVQuality Engineer CV
Quality Engineer CVSam Olaprath
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume Arun Das
 
Iftekhar Civil Engineer CV
Iftekhar Civil Engineer CVIftekhar Civil Engineer CV
Iftekhar Civil Engineer CViftekhar Ahmad Baig
 
Curriculum vitae contractor civil engineer -
Curriculum vitae contractor   civil engineer - Curriculum vitae contractor   civil engineer -
Curriculum vitae contractor civil engineer - Amir Mohammed
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikMOHAMAD ANWAR MALIK
 
Oil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanOil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanDavid H Moloney
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping SupervisorDelfim Moreira
 
Project control plan_draft
Project control plan_draftProject control plan_draft
Project control plan_draftignitetribes
 

What's hot (20)

Senior Planning Engineer.
Senior Planning Engineer.Senior Planning Engineer.
Senior Planning Engineer.
 
Resume - RAVI PRAKASH
Resume - RAVI PRAKASHResume - RAVI PRAKASH
Resume - RAVI PRAKASH
 
Second edition epc project rule of credit and progress measurement promo
Second edition epc project rule of credit and progress measurement promoSecond edition epc project rule of credit and progress measurement promo
Second edition epc project rule of credit and progress measurement promo
 
Epc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promoEpc project interdepency and Work Flow- promo
Epc project interdepency and Work Flow- promo
 
Eot claims hr__may2012
Eot claims hr__may2012Eot claims hr__may2012
Eot claims hr__may2012
 
Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement
 
oil gas engineering-41-phpapp02
oil gas engineering-41-phpapp02oil gas engineering-41-phpapp02
oil gas engineering-41-phpapp02
 
Sample wbs for_upstream_epcic_project
Sample wbs for_upstream_epcic_projectSample wbs for_upstream_epcic_project
Sample wbs for_upstream_epcic_project
 
MEP Engineer with Revit Certification
MEP Engineer with Revit CertificationMEP Engineer with Revit Certification
MEP Engineer with Revit Certification
 
edwin cv for QA-QC Engineer
edwin cv for QA-QC Engineeredwin cv for QA-QC Engineer
edwin cv for QA-QC Engineer
 
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)
 
Quality Engineer CV
Quality Engineer CVQuality Engineer CV
Quality Engineer CV
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume
 
Iftekhar Civil Engineer CV
Iftekhar Civil Engineer CVIftekhar Civil Engineer CV
Iftekhar Civil Engineer CV
 
CIVIL SITE ENGINEER
CIVIL SITE ENGINEERCIVIL SITE ENGINEER
CIVIL SITE ENGINEER
 
Curriculum vitae contractor civil engineer -
Curriculum vitae contractor   civil engineer - Curriculum vitae contractor   civil engineer -
Curriculum vitae contractor civil engineer -
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
Oil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution PlanOil & Gas Plant Construction, Project Execution Plan
Oil & Gas Plant Construction, Project Execution Plan
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping Supervisor
 
Project control plan_draft
Project control plan_draftProject control plan_draft
Project control plan_draft
 

Viewers also liked

Ranvir amol sit lowsize
Ranvir amol sit lowsizeRanvir amol sit lowsize
Ranvir amol sit lowsizeAmol Dudhate
 
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...Mark Mitchell
 
Student Development Presentation
Student Development PresentationStudent Development Presentation
Student Development PresentationBonner Foundation
 
Site Inspection Guidelines and Protocol
Site Inspection Guidelines and ProtocolSite Inspection Guidelines and Protocol
Site Inspection Guidelines and ProtocolJose Agustin Gonzalez
 
Piping components, materials, codes and standards part 1- pipe
Piping components, materials, codes and standards   part 1- pipePiping components, materials, codes and standards   part 1- pipe
Piping components, materials, codes and standards part 1- pipeAlireza Niakani
 
Visual Design with Data
Visual Design with DataVisual Design with Data
Visual Design with DataSeth Familian
 
3 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 20173 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 2017Drift
 

Viewers also liked (9)

EPC Quality Process Rev.00
EPC Quality Process Rev.00EPC Quality Process Rev.00
EPC Quality Process Rev.00
 
COMOS Overview
COMOS OverviewCOMOS Overview
COMOS Overview
 
Ranvir amol sit lowsize
Ranvir amol sit lowsizeRanvir amol sit lowsize
Ranvir amol sit lowsize
 
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
 
Student Development Presentation
Student Development PresentationStudent Development Presentation
Student Development Presentation
 
Site Inspection Guidelines and Protocol
Site Inspection Guidelines and ProtocolSite Inspection Guidelines and Protocol
Site Inspection Guidelines and Protocol
 
Piping components, materials, codes and standards part 1- pipe
Piping components, materials, codes and standards   part 1- pipePiping components, materials, codes and standards   part 1- pipe
Piping components, materials, codes and standards part 1- pipe
 
Visual Design with Data
Visual Design with DataVisual Design with Data
Visual Design with Data
 
3 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 20173 Things Every Sales Team Needs to Be Thinking About in 2017
3 Things Every Sales Team Needs to Be Thinking About in 2017
 

Similar to EPC Engineering Deliverables Guide

Cgc general profile
Cgc general profileCgc general profile
Cgc general profilePaul Timola
 
RESUME AS MODIFIED 21 Apr 2014
RESUME AS MODIFIED 21 Apr 2014RESUME AS MODIFIED 21 Apr 2014
RESUME AS MODIFIED 21 Apr 2014Jim Prendergast
 
Epc presentation robert foxpresentation
Epc presentation robert foxpresentationEpc presentation robert foxpresentation
Epc presentation robert foxpresentationraghunathan janarthanan
 
Cadison electric-designer
Cadison  electric-designerCadison  electric-designer
Cadison electric-designerCADISON
 
Cadison electric-designer
Cadison  electric-designerCadison  electric-designer
Cadison electric-designerCADISON
 
Creo Cabling Solution
Creo Cabling SolutionCreo Cabling Solution
Creo Cabling SolutionCadplatsen AB
 
John BishopResume Controls Engineer(6-11-15)
John BishopResume Controls Engineer(6-11-15)John BishopResume Controls Engineer(6-11-15)
John BishopResume Controls Engineer(6-11-15)John Bishop
 
Unit 1 INTRODUCTION (COMPUTER AIDED DESIGN AND MANUFACTURING )
Unit 1 INTRODUCTION (COMPUTER AIDED DESIGN AND MANUFACTURING )Unit 1 INTRODUCTION (COMPUTER AIDED DESIGN AND MANUFACTURING )
Unit 1 INTRODUCTION (COMPUTER AIDED DESIGN AND MANUFACTURING )ravis205084
 
Cadison electric-designer
Cadison  electric-designerCadison  electric-designer
Cadison electric-designerCADISON
 
Presentation Cable Project Cad Adc
Presentation Cable Project Cad AdcPresentation Cable Project Cad Adc
Presentation Cable Project Cad Adcglbarker
 
XYNTECH SOLUTIONS (P) LIMITED
XYNTECH SOLUTIONS (P) LIMITEDXYNTECH SOLUTIONS (P) LIMITED
XYNTECH SOLUTIONS (P) LIMITEDGautam Vadnere
 
Spencer_Rex_Resume 6-4-2015
Spencer_Rex_Resume 6-4-2015Spencer_Rex_Resume 6-4-2015
Spencer_Rex_Resume 6-4-2015Rex Spencer
 
Rishabh Engineering Services
Rishabh Engineering ServicesRishabh Engineering Services
Rishabh Engineering ServicesRishabh Software
 
Krishnakumar signalling
Krishnakumar signallingKrishnakumar signalling
Krishnakumar signallingKrishna Kumar
 
Multidiscipline CAD Usage .ppt
Multidiscipline CAD Usage .pptMultidiscipline CAD Usage .ppt
Multidiscipline CAD Usage .pptJeremyJones987899
 
Byron CV 2016v5
Byron CV 2016v5Byron CV 2016v5
Byron CV 2016v5Byron Correia
 

Similar to EPC Engineering Deliverables Guide (20)

Cgc general profile
Cgc general profileCgc general profile
Cgc general profile
 
RESUME AS MODIFIED 21 Apr 2014
RESUME AS MODIFIED 21 Apr 2014RESUME AS MODIFIED 21 Apr 2014
RESUME AS MODIFIED 21 Apr 2014
 
Epc presentation robert foxpresentation
Epc presentation robert foxpresentationEpc presentation robert foxpresentation
Epc presentation robert foxpresentation
 
yash.pptx
yash.pptxyash.pptx
yash.pptx
 
Cadison electric-designer
Cadison  electric-designerCadison  electric-designer
Cadison electric-designer
 
Cadison electric-designer
Cadison  electric-designerCadison  electric-designer
Cadison electric-designer
 
Creo Cabling Solution
Creo Cabling SolutionCreo Cabling Solution
Creo Cabling Solution
 
John BishopResume Controls Engineer(6-11-15)
John BishopResume Controls Engineer(6-11-15)John BishopResume Controls Engineer(6-11-15)
John BishopResume Controls Engineer(6-11-15)
 
Brochure_Design_Final_11x17_wbleed._Revise
Brochure_Design_Final_11x17_wbleed._ReviseBrochure_Design_Final_11x17_wbleed._Revise
Brochure_Design_Final_11x17_wbleed._Revise
 
3D Modeling by GIS
3D Modeling by GIS3D Modeling by GIS
3D Modeling by GIS
 
Unit 1 INTRODUCTION (COMPUTER AIDED DESIGN AND MANUFACTURING )
Unit 1 INTRODUCTION (COMPUTER AIDED DESIGN AND MANUFACTURING )Unit 1 INTRODUCTION (COMPUTER AIDED DESIGN AND MANUFACTURING )
Unit 1 INTRODUCTION (COMPUTER AIDED DESIGN AND MANUFACTURING )
 
Cadison electric-designer
Cadison  electric-designerCadison  electric-designer
Cadison electric-designer
 
Presentation Cable Project Cad Adc
Presentation Cable Project Cad AdcPresentation Cable Project Cad Adc
Presentation Cable Project Cad Adc
 
XYNTECH SOLUTIONS (P) LIMITED
XYNTECH SOLUTIONS (P) LIMITEDXYNTECH SOLUTIONS (P) LIMITED
XYNTECH SOLUTIONS (P) LIMITED
 
Spencer_Rex_Resume 6-4-2015
Spencer_Rex_Resume 6-4-2015Spencer_Rex_Resume 6-4-2015
Spencer_Rex_Resume 6-4-2015
 
AutoCAD Electrical
AutoCAD ElectricalAutoCAD Electrical
AutoCAD Electrical
 
Rishabh Engineering Services
Rishabh Engineering ServicesRishabh Engineering Services
Rishabh Engineering Services
 
Krishnakumar signalling
Krishnakumar signallingKrishnakumar signalling
Krishnakumar signalling
 
Multidiscipline CAD Usage .ppt
Multidiscipline CAD Usage .pptMultidiscipline CAD Usage .ppt
Multidiscipline CAD Usage .ppt
 
Byron CV 2016v5
Byron CV 2016v5Byron CV 2016v5
Byron CV 2016v5
 

Recently uploaded

Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIkoyaldeepu123
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage examplePragyanshuParadkar1
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixingviprabot1
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 

Recently uploaded (20)

Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AI
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage example
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixing
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 

EPC Engineering Deliverables Guide

  • 2. Summary • EPC Disciplines • Engineering Deliverables • CAD History • Most popular CAD • Q&A
  • 4. EPC Engineering Disciplines • Process • Mechanical • Civil • Plant Layout • Piping • Electrical • Instrumentation and Controls
  • 5. EPC Challenges Execute EPC “mega-projects” within budget and on schedule Minimize construction delays due to lagging information, material or equipment. Track progress and maintain contingency plans to stay on schedule. Document project progress in terms of installed quantities. EPC Projects By Robert N. Fox
  • 6. The Challenge • Intelligently apply IT/CAD to the EPC environment. • Overcome conservative mind-set of builders. • Push progression of 2D to 3D, 4D and even 5D. • Apply IT/CAD tools to the advantage of constructors and their clients. Better productivity leads to better gross margins. EPC Projects By Robert N. Fox
  • 8. General • Operation & Maintenance Manual (Data) • Recommended Spare Parts List (Data) • Training Manual (Data)
  • 9. Process • Process Calculations (Data) • Process Fl ow Diagram (PFD) (2D) • Piping & Instrumentation Diagram (P&ID) (2D) • Battery Limit Table (Data) • Utilities Requirements Summary (Data)
  • 10. Civil/ Structural/ Architectural • Foundation Loading & Anchoring Diagrams (3D) • Structural Layouts(3D) • Structural Details(3D) • Building Drawings (3D) • Structural Calculations (Data) & (3D) • Lifting Study (Data) & (3D)
  • 11. Mechanical • Equipment List (Data) • Equipment Data Sheets (Data) • Sub-vendor Equipment Drawings (3D) • Lubrication Schedule (Data) • Storage & Preservation Schedule (Data) • Mechanical Installation Details (3D)
  • 12. Piping & Layout • Plot Plan / Elevation (General Arrangement) (3D) • Piping General Arrangement (3D) • Piping Isometrics (2D) • Pipe Support Drawings (3D) • Line Designation Table (Data) • Valve List (Data) • Special Piping Items List (Data) • 3D Plant Model
  • 13. Electrical Engineering • Electrical Load List (Data) • Electrical Equipment List (Data) • Electrical Data Sheets (Data) • Single Line Diagram (2D) • Electrical Schematics (2D) • Lighting Panel Schedule (2D) • Lighting Study (Data) • Lighting Layout (3D) • Electrical Equipment Layout (3D) • Electrical Installation Details (3D) • MCC Layout (3D) • Grounding Layout (2D) • Cable Tray Layout (3D) • Cable Schedule (Data) • EHT Isometric Drawings (3D) • Area Classification Drawing (2D)
  • 14. Instrumentation & Controls • Instrument Index (Data) • Instrument Block Diagram (Data) • Instrument Data Sheets (Data) • Instrument Sizing Calculations (Data) • Control System Architecture Diagram (2D) • Logic Diagrams (2D) • Alarm & Setpoint List (Data) • Instrument Location Drawings (3D) • Instrument Installation Details (3D) • Instrument Loop Diagrams (2D) • Junction Box Layouts (2D) • Wiring Diagrams (2D) • Cause & Effect Diagrams (2D) • Control Narrative (Data) • Local Panel Layouts • PLC/HMI Program (Data) • Input-Output List (Data) • HMI Screens (3D)
  • 15. Types of documentation Electrical Equipment Location Instrument Installation Details Electrical Block Diagrams Electrical Equipment List Electrical Panel Layouts Instrument Data Sheets Installation Operation & Maintenance Manual s Electrical Schematics Motor Data Sheets Instrument Index Loop Diagrams Motor List HMI Program Cable Schedule Spare Parts List Weld Procedures Control Narratives Shut Down Program PLC Logic Diagrams Manufacturers Record Book Instrument Location Drawings Document Index / Drawing List Piping Arrangement Drawings Equipment Data Sheets Structural Calculations General Arrangements Inspection Test Plans Anchor Bolt Layout Catalog Cut Sheets Foundation Loads Project Schedule Equipment List P&ID?s I/O List Valve List Line List Lifting Diagram Quality Data Book Structural Drawings Assembly Drawings Fabrication Drawings Piping Spool Drawings Surface Prep & Painting Long Term Storage & Preservation Instructions
  • 17. Levels of Modelling • (Data) Custom made forms • 2D Drawings and Sketches (E) • 3D CAD Model with data attribute links (E) • 4D Construction Simulation Model (EC) – 4Dc –Construction Planning & Sequencing – 4Dr – Resource Management (and Lift Plans) – 4Ds – Construction Status • 5D Cost Tracking Model (EPC) – 5Dm: material costs – 5Dr: resource costs EPC Projects By Robert N. Fox
  • 18. 2D Drawings and Sketches • Traditional format • Inter-drawing design coordination subject to error • Change management requires rigorous document control process. • 2D CAD used for nearly 30 years aids in drawing format consistency as well as storage and management of drawing files. EPC Projects By Robert N. Fox
  • 19. “Intelligent” 3D CAD Model • Used for EPC over the past 20+ years (3DM, PDS, PDMS, Smart-Plant, Plant-Space) • Requires changes to traditional work processes • Component attribute data is the “intelligence” • Clash Checking • Automatic Drawing Creation • Material Take-Off Reports • Data Consistency Reports EPC Projects By Robert N. Fox
  • 20. 4D Construction Simulation Model • Links 3D model components with P3 schedule • Assigns temporal dimension to each “widget” in the 3D model • Facilitates Construction Operations: • Construction Sequencing • Resource Management Planning • Constructability Assessment • Lift Plan Verification • Visualization EPC Projects By Robert N. Fox
  • 21. 5D Cost Tracking Model • Material Cost Model • Resource Distribution Model • Expended Cost Tracking Model • . . . Others yet to be defined EPC Projects By Robert N. Fox
  • 22. Popular Companies • Intergraph • Aveva • Aucotec • EPLAN
  • 23. • All EPC Disciplines • Intergraph Smart Yard • SmartPlant Enterprise for Owner Operators • SmartPlant Instrumentation • CADWorxÂŽ • SmartPlant P&ID • SmartPlant FreeViewÂŽ • View All Products
  • 24. • All EPC Disciplines • AVEVA Diagrams™ • Easy creation of P&IDs, PFDs and other schematics that integrate with engineering and 3D design • AVEVA Electrical™ • Electrical engineering, design, documentation and management for the entire project lifecycle • AVEVA Engineering™ • Manage the evolving multi-discipline engineering data for tagged items such as lines and equipment • AVEVA Initial Design™ • Powerful 3D vessel design, with advanced hydrostatics and hydrodynamics
  • 25. • AVEVA Instrumentation™ • Instrumentation and Control systems engineering, design, documentation and management software • AVEVA P&ID™ • An intelligent, AutoCAD-based P&ID design application • AVEVA Schematic 3D Integrator™ • Managed development and consistency of schematic and 3D data • AVEVA Space Management™ • Create and manage the automatic subdivision of a ship into spaces.
  • 26. • Most EPC Disciplines • Engineering Base is the innovative tool for electro engineering: it can be used for every job and is adaptable to every workflow. Furthermore it is quick and flexible in case of modifications. • ELCAD is designed to create circuit documentation for electrical engineering in every form. Its range of performances includes open integration solutions for the company-specific workflow and technical specialisation, including hydraulic and pneumatic systems. • RUPLAN, with its extraordinary potential for automation, is the basis for highly integrated solutions for industry sectors. This is proven by its successful use in large power supply companies and in the automotive industry. • AUCOPLAN supports our customers in planning and operating process control systems. Many known large-scale projects in the domain of measurement and control engineering and plant construction were performed by means of AUCOPLAN.
  • 27. EPLAN • Electrical and instrumentation • Small projects • Efficient for factory Automation
  • 28. AECOsim Building Designer • Design, analyze, document, and visualize buildings of any size, form, and complexity with multi-discipline building application for architects and engineers. • Electrical Engineer • Mechanical Engineer • Piping Engineer • Structural Engineer