Transformers Design
Automation
By SARA Consultants,
A transformer people since
Three Decades
Visit us at: saraconsultants.com
Need for Automation
 Request for a quotation Or Tender for transformers can
come at any time of an year.
 Time available for replying can be from one hour to few
days only.
 Simultaneous demands from different customers at the
same time is possible.
 The design and Cost estimation people are over pressed to
meet the targets in spite of their regular involvements with
manufacturing / testing departments.
 Possibility of mistakes, changes in design requirements,
convincing task of customers are not ruled out.
 All quotations may not realize in to Work Order but nothing
to be neglected.
Efforts from SARA consultants
• Since 1995 we were associated with
many manufacturers in establishing
manufacturing and testing facility and
offering design support to many firms.
• Felt the urgency in Design and costing
submissions.
• Visualized that PCs would help ( PCs were
costly in those days) and attempted on it.
Attempts on Automation
• Developed Software based assistance on Core
cutting arrangement which was taking more time
and repetitive calculations. – Found remarkable
accuracy and time savings.
• Encouraged by this, started putting efforts on
Design calculations. – At that time XL based
calculations were used by many people.
• Observed weak points in XL system. So
concentrated on programming techniques.
Achievements
• Numerous software modules have been developed in collaboration
with actual users.
• Advantages observed:
• Formulae and limits are not exposed / non editable.
• Impedance and Load loss can be tuned Automatically.
• Many designs can be generated by varying various factors
to know the costing economics without loosing quality and
Specs.
• Multiple types of Print outs are possible.
• Interlinking of outputs to other software like drawing,
Simulation tests, guidance values for test field, Re-
designing in case of changes in parameters or pricing
indexes.
• Drawings to scale can be generated within few minutes
and later on can be edited easily for manufacturing.
• Quicker Submission of tenders.
Varieties in software upto 132kv 60MVA by
SARAConsultants
 2 Winding Power and Distribution transformers with
AutoCAD Interface.
 3 winding Wind Mill and Furnace transformers
 5 winding Separate Coarse, Fine, & Edge Winding Tapping
Transformers for OLTC.
 Rectangle core Small transformers with multiple windings.
 Core cutting schedules.
 Dry type VPI and Cast Resin type Designs.
 Test field software to generate test certificate.
 Reverse Design from an existing Transformer under
Repair – Using Core frame as input data
Tender Spec Sheet
Electrical Design Software
OptionalFittingsData
Costing Sheet
GTPdat.CSV
GA-Input.xls
Drawing Software BOM Files
(Consolidated BOM.csv)
Weights
General Technical
Particulars (GTP.Doc)
Electrical Design Sheet
(GtpIS.Doc)
(DesPrt.Doc)
GA
Tank
Lid
Consolidated
Accessories
GA Drawings
Fab. Drawings
(IndividualDraw.dwg)
Accessories & Fittings
Data Base
DWG - Interface
Manual Entry
The Input data file can be :
a. Tender Spec Sheet
b. TrialsList.csv OR
c. GA-Input.xls
OptionalFittings
Data
Rates
ListofMaterials
Elec.Design
Data
Other Files
(Auto CAD)
(GA.dwg)
Tender Stage
Design Stage
Drawing Stage
Flow Chart of Design Automation
Screen Shots of 2 WDG Software
Screen Shots of Multi Winding Transformers
Screen Shot of Repair-Design. Core Frame size as Input
Screen shot of 2Wdg with separate Tap winding
Details and Printout Samples
Print Out
Samples
2 Winding
MULTI
Winding
Design3Wdg
Detailed PDF files
2wdg-Details.pdf ACAD-3D-Details
Demo-Videos Folder 66MB
https://www.dropbox.com/sh/jj26
mey1ajzakh0/kgAUJA2U3w

More Related Content

What's hot

Gas Turbine Training Power Point -Sample
Gas Turbine Training Power Point -SampleGas Turbine Training Power Point -Sample
Gas Turbine Training Power Point -Sample
Ali Rafiei
 
Thermodynamic cycl
Thermodynamic cyclThermodynamic cycl
Thermodynamic cycl
MidoOoz
 
168 w1a0352 intern ppt
168 w1a0352 intern ppt168 w1a0352 intern ppt
168 w1a0352 intern ppt
Ashok Mannava
 
Transformer_Cooling 2015 Doble LOAT Conference
Transformer_Cooling 2015 Doble LOAT ConferenceTransformer_Cooling 2015 Doble LOAT Conference
Transformer_Cooling 2015 Doble LOAT Conference
Kevin Riley
 
Performance optimization of Forced Draft Fan of BBGS Unit # 1
Performance optimization of Forced Draft Fan of BBGS Unit # 1Performance optimization of Forced Draft Fan of BBGS Unit # 1
Performance optimization of Forced Draft Fan of BBGS Unit # 1
Saikat Halder
 

What's hot (20)

Turbo expander compressor
Turbo expander compressorTurbo expander compressor
Turbo expander compressor
 
2NH- GT SHOW
2NH- GT SHOW2NH- GT SHOW
2NH- GT SHOW
 
THE CARNOT THEOREM Shivani rajput BSC I 2018
THE CARNOT THEOREM Shivani rajput BSC I 2018THE CARNOT THEOREM Shivani rajput BSC I 2018
THE CARNOT THEOREM Shivani rajput BSC I 2018
 
High Ethane Fuel Gas_ Combustors
High Ethane Fuel Gas_ CombustorsHigh Ethane Fuel Gas_ Combustors
High Ethane Fuel Gas_ Combustors
 
Atkinson Cycle, Ericsson Cycle And Stirling Cycle
Atkinson Cycle, Ericsson Cycle And Stirling CycleAtkinson Cycle, Ericsson Cycle And Stirling Cycle
Atkinson Cycle, Ericsson Cycle And Stirling Cycle
 
Gas Turbine Training Power Point -Sample
Gas Turbine Training Power Point -SampleGas Turbine Training Power Point -Sample
Gas Turbine Training Power Point -Sample
 
Thermodynamic cycl
Thermodynamic cyclThermodynamic cycl
Thermodynamic cycl
 
Cycles
CyclesCycles
Cycles
 
Compressors
CompressorsCompressors
Compressors
 
Compressor final
Compressor finalCompressor final
Compressor final
 
Steam engine
Steam engineSteam engine
Steam engine
 
Thermodynamic cycles
Thermodynamic cycles Thermodynamic cycles
Thermodynamic cycles
 
carnotcycle
carnotcyclecarnotcycle
carnotcycle
 
168 w1a0352 intern ppt
168 w1a0352 intern ppt168 w1a0352 intern ppt
168 w1a0352 intern ppt
 
Transformer_Cooling 2015 Doble LOAT Conference
Transformer_Cooling 2015 Doble LOAT ConferenceTransformer_Cooling 2015 Doble LOAT Conference
Transformer_Cooling 2015 Doble LOAT Conference
 
Vapour power cycles
Vapour power cyclesVapour power cycles
Vapour power cycles
 
Turbocor compressor
Turbocor compressorTurbocor compressor
Turbocor compressor
 
5 carnot engine
5 carnot engine5 carnot engine
5 carnot engine
 
Performance optimization of Forced Draft Fan of BBGS Unit # 1
Performance optimization of Forced Draft Fan of BBGS Unit # 1Performance optimization of Forced Draft Fan of BBGS Unit # 1
Performance optimization of Forced Draft Fan of BBGS Unit # 1
 
Cooling and long transformer-life -
Cooling   and  long      transformer-life - Cooling   and  long      transformer-life -
Cooling and long transformer-life -
 

Viewers also liked

Fuente conmutada-pc-tipo-atx
Fuente conmutada-pc-tipo-atxFuente conmutada-pc-tipo-atx
Fuente conmutada-pc-tipo-atx
Jose Beltran
 
Transformer design
Transformer designTransformer design
Transformer design
sulaim_qais
 
Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protection
ashwin fcc
 
POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION
moiz89
 

Viewers also liked (12)

Increasing Transformer Reliability by Smart Bushing
Increasing Transformer Reliability by Smart BushingIncreasing Transformer Reliability by Smart Bushing
Increasing Transformer Reliability by Smart Bushing
 
Fuente conmutada-pc-tipo-atx
Fuente conmutada-pc-tipo-atxFuente conmutada-pc-tipo-atx
Fuente conmutada-pc-tipo-atx
 
Instrument transformer CT & PT
Instrument transformer CT & PTInstrument transformer CT & PT
Instrument transformer CT & PT
 
BASIC TRANSFORMER CALCULATIONS
BASIC TRANSFORMER CALCULATIONSBASIC TRANSFORMER CALCULATIONS
BASIC TRANSFORMER CALCULATIONS
 
Transformer design
Transformer designTransformer design
Transformer design
 
Transformer Designing
Transformer Designing Transformer Designing
Transformer Designing
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protection
 
instrument transformer
instrument transformerinstrument transformer
instrument transformer
 
Transformer
TransformerTransformer
Transformer
 
POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION
 

Similar to Design Automation by Sara

DesignTech Systems - DCS presentation Oct 2017
DesignTech Systems - DCS presentation Oct 2017DesignTech Systems - DCS presentation Oct 2017
DesignTech Systems - DCS presentation Oct 2017
DesignTech Systems Ltd.
 
RESUME RANDALL V TOINTON 2016
RESUME RANDALL V TOINTON 2016RESUME RANDALL V TOINTON 2016
RESUME RANDALL V TOINTON 2016
Randall Tointon
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1
Dave Thompson
 

Similar to Design Automation by Sara (20)

Mark Mazanec resume
Mark Mazanec resumeMark Mazanec resume
Mark Mazanec resume
 
Valve CPQ challenges & solutions
Valve CPQ challenges & solutionsValve CPQ challenges & solutions
Valve CPQ challenges & solutions
 
Crane Design and quote automation , design optimization .
Crane Design and quote automation , design optimization .Crane Design and quote automation , design optimization .
Crane Design and quote automation , design optimization .
 
Crane design automation .
Crane design automation .Crane design automation .
Crane design automation .
 
Zenithar Presentation Transformer Consultancy 2022
Zenithar Presentation Transformer Consultancy 2022Zenithar Presentation Transformer Consultancy 2022
Zenithar Presentation Transformer Consultancy 2022
 
3D Models for Construction Estimating
3D Models for Construction Estimating3D Models for Construction Estimating
3D Models for Construction Estimating
 
Autodesk CAM Portfolio – Russ Adams PartMaker
Autodesk CAM Portfolio – Russ Adams PartMakerAutodesk CAM Portfolio – Russ Adams PartMaker
Autodesk CAM Portfolio – Russ Adams PartMaker
 
DesignTech Systems - DCS presentation Oct 2017
DesignTech Systems - DCS presentation Oct 2017DesignTech Systems - DCS presentation Oct 2017
DesignTech Systems - DCS presentation Oct 2017
 
SNM CV NEW-1
SNM CV NEW-1SNM CV NEW-1
SNM CV NEW-1
 
Introduction to CAD-CAM.pptx
Introduction to CAD-CAM.pptxIntroduction to CAD-CAM.pptx
Introduction to CAD-CAM.pptx
 
RESUME RANDALL V TOINTON 2016
RESUME RANDALL V TOINTON 2016RESUME RANDALL V TOINTON 2016
RESUME RANDALL V TOINTON 2016
 
Selection software for cranes
Selection software for cranesSelection software for cranes
Selection software for cranes
 
What Is Your PLM Challenge - Decrease downtime and minimize production problems
What Is Your PLM Challenge - Decrease downtime and minimize production problemsWhat Is Your PLM Challenge - Decrease downtime and minimize production problems
What Is Your PLM Challenge - Decrease downtime and minimize production problems
 
CADCAM CAE Notes
CADCAM CAE NotesCADCAM CAE Notes
CADCAM CAE Notes
 
Commercial vehicles configuration software
Commercial vehicles configuration softwareCommercial vehicles configuration software
Commercial vehicles configuration software
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1
 
VFD’s & Servo Motors – sizing & selection software
VFD’s & Servo Motors – sizing & selection software VFD’s & Servo Motors – sizing & selection software
VFD’s & Servo Motors – sizing & selection software
 
SPUWELD Presentation
SPUWELD PresentationSPUWELD Presentation
SPUWELD Presentation
 
Industrial fans & blowers selection software
Industrial fans & blowers selection softwareIndustrial fans & blowers selection software
Industrial fans & blowers selection software
 
Using Design Automation to Reduce Costs and Increase Profitability
Using Design Automation to Reduce Costs and Increase ProfitabilityUsing Design Automation to Reduce Costs and Increase Profitability
Using Design Automation to Reduce Costs and Increase Profitability
 

More from ProSIM R & D Pvt. Ltd.

ProSIM engineering consultancy offerings to nuclear power sector
ProSIM engineering consultancy offerings to nuclear power sectorProSIM engineering consultancy offerings to nuclear power sector
ProSIM engineering consultancy offerings to nuclear power sector
ProSIM R & D Pvt. Ltd.
 
INTEGRITY REQUIREMENTS OF SHIELDING FLASK FOR TRANSPORTATION THROUGH PUBLIC D...
INTEGRITY REQUIREMENTS OF SHIELDING FLASK FOR TRANSPORTATION THROUGH PUBLIC D...INTEGRITY REQUIREMENTS OF SHIELDING FLASK FOR TRANSPORTATION THROUGH PUBLIC D...
INTEGRITY REQUIREMENTS OF SHIELDING FLASK FOR TRANSPORTATION THROUGH PUBLIC D...
ProSIM R & D Pvt. Ltd.
 
Business opportunities in PHWR and technical preparedness from vendors Philip...
Business opportunities in PHWR and technical preparedness from vendors Philip...Business opportunities in PHWR and technical preparedness from vendors Philip...
Business opportunities in PHWR and technical preparedness from vendors Philip...
ProSIM R & D Pvt. Ltd.
 
Business Opportunity in LWR program and technical preparedness for Indian Ven...
Business Opportunity in LWR program and technical preparedness for Indian Ven...Business Opportunity in LWR program and technical preparedness for Indian Ven...
Business Opportunity in LWR program and technical preparedness for Indian Ven...
ProSIM R & D Pvt. Ltd.
 
Overview of structural Integrity Requirements for SSCs of Nuclear Power plant...
Overview of structural Integrity Requirements for SSCs of Nuclear Power plant...Overview of structural Integrity Requirements for SSCs of Nuclear Power plant...
Overview of structural Integrity Requirements for SSCs of Nuclear Power plant...
ProSIM R & D Pvt. Ltd.
 

More from ProSIM R & D Pvt. Ltd. (20)

Pro sim nuclear offerings engineering design-siesmic-qualification
Pro sim nuclear offerings engineering design-siesmic-qualificationPro sim nuclear offerings engineering design-siesmic-qualification
Pro sim nuclear offerings engineering design-siesmic-qualification
 
ProSIM engineering consultancy offerings to nuclear power sector
ProSIM engineering consultancy offerings to nuclear power sectorProSIM engineering consultancy offerings to nuclear power sector
ProSIM engineering consultancy offerings to nuclear power sector
 
Seismic evaluation of nuclear power plants - ICNPG - 2018 - Invited lecture b...
Seismic evaluation of nuclear power plants - ICNPG - 2018 - Invited lecture b...Seismic evaluation of nuclear power plants - ICNPG - 2018 - Invited lecture b...
Seismic evaluation of nuclear power plants - ICNPG - 2018 - Invited lecture b...
 
Siesmic Evaluation for Structural Integrity Assessment of Nuclear Power Plants
Siesmic Evaluation for Structural Integrity Assessment of Nuclear Power PlantsSiesmic Evaluation for Structural Integrity Assessment of Nuclear Power Plants
Siesmic Evaluation for Structural Integrity Assessment of Nuclear Power Plants
 
Overview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _VhoraOverview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _Vhora
 
Fracture mechanics&amp_Sundar R
Fracture mechanics&amp_Sundar RFracture mechanics&amp_Sundar R
Fracture mechanics&amp_Sundar R
 
Flow Induced Vibration of tubes and tube tanks- Kanwar Prateek
Flow Induced Vibration of tubes and tube tanks- Kanwar PrateekFlow Induced Vibration of tubes and tube tanks- Kanwar Prateek
Flow Induced Vibration of tubes and tube tanks- Kanwar Prateek
 
INTEGRITY REQUIREMENTS OF SHIELDING FLASK FOR TRANSPORTATION THROUGH PUBLIC D...
INTEGRITY REQUIREMENTS OF SHIELDING FLASK FOR TRANSPORTATION THROUGH PUBLIC D...INTEGRITY REQUIREMENTS OF SHIELDING FLASK FOR TRANSPORTATION THROUGH PUBLIC D...
INTEGRITY REQUIREMENTS OF SHIELDING FLASK FOR TRANSPORTATION THROUGH PUBLIC D...
 
Qualification under hypothetical accident conditions during transport-R Pal
Qualification under hypothetical accident conditions during transport-R PalQualification under hypothetical accident conditions during transport-R Pal
Qualification under hypothetical accident conditions during transport-R Pal
 
Simulation and Analysis of Nuclear Power plant Equipments sandhya
Simulation and Analysis of Nuclear Power plant Equipments sandhyaSimulation and Analysis of Nuclear Power plant Equipments sandhya
Simulation and Analysis of Nuclear Power plant Equipments sandhya
 
Seismic qualification using ASME/PNAE codes santhosh
Seismic qualification using ASME/PNAE codes santhoshSeismic qualification using ASME/PNAE codes santhosh
Seismic qualification using ASME/PNAE codes santhosh
 
Business opportunities in PHWR and technical preparedness from vendors Philip...
Business opportunities in PHWR and technical preparedness from vendors Philip...Business opportunities in PHWR and technical preparedness from vendors Philip...
Business opportunities in PHWR and technical preparedness from vendors Philip...
 
Seismic analysis as per PNAE- Mohammad salman
Seismic analysis as per PNAE- Mohammad salman Seismic analysis as per PNAE- Mohammad salman
Seismic analysis as per PNAE- Mohammad salman
 
Role of Materials and Corrosion -Vivekanand Kain
Role of Materials and Corrosion -Vivekanand Kain Role of Materials and Corrosion -Vivekanand Kain
Role of Materials and Corrosion -Vivekanand Kain
 
Business Opportunity in LWR program and technical preparedness for Indian Ven...
Business Opportunity in LWR program and technical preparedness for Indian Ven...Business Opportunity in LWR program and technical preparedness for Indian Ven...
Business Opportunity in LWR program and technical preparedness for Indian Ven...
 
Seismic qualification of equipment by testing-Bhavsar
Seismic qualification of equipment by testing-Bhavsar Seismic qualification of equipment by testing-Bhavsar
Seismic qualification of equipment by testing-Bhavsar
 
Safety and Criticality of Nuclear Systems-Regulatory perspectives-Bhardwaj
Safety and Criticality of Nuclear Systems-Regulatory perspectives-Bhardwaj Safety and Criticality of Nuclear Systems-Regulatory perspectives-Bhardwaj
Safety and Criticality of Nuclear Systems-Regulatory perspectives-Bhardwaj
 
Overview of structural Integrity Requirements for SSCs of Nuclear Power plant...
Overview of structural Integrity Requirements for SSCs of Nuclear Power plant...Overview of structural Integrity Requirements for SSCs of Nuclear Power plant...
Overview of structural Integrity Requirements for SSCs of Nuclear Power plant...
 
Earthquake resistant design of nuclear power plant- S.m.ingole
Earthquake resistant design of nuclear power plant- S.m.ingole Earthquake resistant design of nuclear power plant- S.m.ingole
Earthquake resistant design of nuclear power plant- S.m.ingole
 
Z-set introduction presentation
Z-set introduction presentationZ-set introduction presentation
Z-set introduction presentation
 

Recently uploaded

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 

Recently uploaded (20)

A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 

Design Automation by Sara

  • 1. Transformers Design Automation By SARA Consultants, A transformer people since Three Decades Visit us at: saraconsultants.com
  • 2. Need for Automation  Request for a quotation Or Tender for transformers can come at any time of an year.  Time available for replying can be from one hour to few days only.  Simultaneous demands from different customers at the same time is possible.  The design and Cost estimation people are over pressed to meet the targets in spite of their regular involvements with manufacturing / testing departments.  Possibility of mistakes, changes in design requirements, convincing task of customers are not ruled out.  All quotations may not realize in to Work Order but nothing to be neglected.
  • 3. Efforts from SARA consultants • Since 1995 we were associated with many manufacturers in establishing manufacturing and testing facility and offering design support to many firms. • Felt the urgency in Design and costing submissions. • Visualized that PCs would help ( PCs were costly in those days) and attempted on it.
  • 4. Attempts on Automation • Developed Software based assistance on Core cutting arrangement which was taking more time and repetitive calculations. – Found remarkable accuracy and time savings. • Encouraged by this, started putting efforts on Design calculations. – At that time XL based calculations were used by many people. • Observed weak points in XL system. So concentrated on programming techniques.
  • 5. Achievements • Numerous software modules have been developed in collaboration with actual users. • Advantages observed: • Formulae and limits are not exposed / non editable. • Impedance and Load loss can be tuned Automatically. • Many designs can be generated by varying various factors to know the costing economics without loosing quality and Specs. • Multiple types of Print outs are possible. • Interlinking of outputs to other software like drawing, Simulation tests, guidance values for test field, Re- designing in case of changes in parameters or pricing indexes. • Drawings to scale can be generated within few minutes and later on can be edited easily for manufacturing. • Quicker Submission of tenders.
  • 6. Varieties in software upto 132kv 60MVA by SARAConsultants  2 Winding Power and Distribution transformers with AutoCAD Interface.  3 winding Wind Mill and Furnace transformers  5 winding Separate Coarse, Fine, & Edge Winding Tapping Transformers for OLTC.  Rectangle core Small transformers with multiple windings.  Core cutting schedules.  Dry type VPI and Cast Resin type Designs.  Test field software to generate test certificate.  Reverse Design from an existing Transformer under Repair – Using Core frame as input data
  • 7. Tender Spec Sheet Electrical Design Software OptionalFittingsData Costing Sheet GTPdat.CSV GA-Input.xls Drawing Software BOM Files (Consolidated BOM.csv) Weights General Technical Particulars (GTP.Doc) Electrical Design Sheet (GtpIS.Doc) (DesPrt.Doc) GA Tank Lid Consolidated Accessories GA Drawings Fab. Drawings (IndividualDraw.dwg) Accessories & Fittings Data Base DWG - Interface Manual Entry The Input data file can be : a. Tender Spec Sheet b. TrialsList.csv OR c. GA-Input.xls OptionalFittings Data Rates ListofMaterials Elec.Design Data Other Files (Auto CAD) (GA.dwg) Tender Stage Design Stage Drawing Stage Flow Chart of Design Automation
  • 8. Screen Shots of 2 WDG Software
  • 9. Screen Shots of Multi Winding Transformers
  • 10. Screen Shot of Repair-Design. Core Frame size as Input
  • 11. Screen shot of 2Wdg with separate Tap winding
  • 12. Details and Printout Samples Print Out Samples 2 Winding MULTI Winding Design3Wdg Detailed PDF files 2wdg-Details.pdf ACAD-3D-Details Demo-Videos Folder 66MB https://www.dropbox.com/sh/jj26 mey1ajzakh0/kgAUJA2U3w