4. TRUONG PHU PRE- ENGINEERED STEEL BUILDINGS
Truong Phu Construction & Steel Structure J.S.C. is a growing organization established in
the year 2002.
Over the years we have achieved a strong foothold over the market by designing,
manufacturing and implementation of pre-fabricated steel structures or range of products
with includes 10-180 meters in wide offering free consultant, design and technical support.
Established in 2002,
Offer Free Consultant, Design, Technical Support and Site Supervision
OUR VALUE
Truong Phu has developed rapidly, creating a solid share market, while receiving an ever
growing trust from its clients.
Our products had appeared in almost industrial zones in Ho Chi Minh City, Bình Dương,
Đồng Nai, Bà Rịa Vũng Tàu and other provinces in the west and central of Vietnam.
Moreover, our customers have come from a list of multi –national backgrounds: Vietnam,
China, Taiwan, Korea, Japan, Malaysia, Singapore, US, Swiss, French, Canada, and
Denmark.
5. TRUONG PHU PRE- ENGINEERED STEEL BUILDINGS
l OUR PEOPLE
Our qualified staff engineers, designers, civil engineers, the architects apply high
technology using main frame structure and specialized software of design and
calculation to provide you solution for your project, including quotation, proposal
drawings to help customer save cost.
Established in 2002,
Offer Free Consultant, Design, Technical Support and Site Supervision
drawings to help customer save cost.
In addition to our in –house team, we have developed relationships with a number of
experienced sub- contractors who can be deployed as required.
Truong Phu is constantly improving its professional skills;
our products become high quality, quality assurance efficient and satisfy all strictly
requirements, and receive great appreciation and high praise from investors
6. TRUONG PHU PRE- ENGINEERED STEEL BUILDINGS
WHO WE ARE ?
We are an ISO 9001:2008 certified professionally managed units engaged in
manufacturing many products in pre-fabricated segments.
Every Truong Phu contract taken by us handle by a team of projects managers of parEvery Truong Phu contract taken by us handle by a team of projects managers of par
excellence and we have many team for a diverse industry segments.
We have designed and constructed many types of pre - engineered steel structures
such as warehouses, workshops, showroom, supermarkets, technical towers, and
steel structure office buildings in catering domestic and oversea clients.
7. TRUONG PHU PRE- ENGINEERED STEEL BUILDINGS
OUR COMMITMENTS
Truong Phu Steel is committed to be the most experiences enterprise in designing,
manufacturing and implementation of pre-fabricated steel buildings. Being an ISO 9001:2008
We make sure that we all try to provide high level satisfaction to our clients.
3. Entrepreneurship
5. Integrity
2. Teamwork
4. Passion for Quality
1. Empowerment
12. TRUONG PHU PRE- ENGINEERED STEEL BUILDINGS
WHAT WE DO?
l Design and Build Pre-engineered Steel Buildings.
l Industrial and Civil Construction.
l Import and export Steel Material.
13. TRUONG PHU PRE- ENGINEERED STEEL BUILDINGS
PRODUCTS OF:
Industrial – manufacturing warehouses and Cold storages
Commercial – office/shop complexes, automotive dealerships,
Fuel Station Canopy and Large Retail Outlet
14. TRUONG PHU PRE- ENGINEERED STEEL BUILDINGS
OUR STRENGES
Strongest of Truong Phu are:
Ø Clear spans up to 100 meters without internal columns
Ø Flexibility in building dimension
Ø ISO 9001 quality accreditation
Ø Fixed deadlines and costsFixed deadlines and costs
Ø Weather- tight roof and wall coverings with accessories for long maintenance
free exteriors.
15. TRUONG PHU PRE- ENGINEERED STEEL BUILDINGS
Advantages of Truong Phu are:
Ø Single source responsibility
Ø Low initial cost
Ø Engineering flexibility
Excellence in Customer Services
Ø Engineering flexibility
Ø Faster overall project completion
Ø Fast modular expandability
Ø Low maintenance
Truong Phu Customer Care Team was set up to always meet every request
from customers and settle quickly to solve all problems arising to ensure
customers are always satisfied with Truong Phu Steel. Customer feels secure
as choosing Truong Phu
16. Our Team
Project Management
Mr. Trần Văn Đoàn Tụ, Engineer
Founder, Managing Director
Email: tutvd@truongphusteel.com.vn
Tran Van Doan Tu graduated from HCMC University of Polytechnics in 1993. Throughout
14 years working, with devotion and infinite love for his job, Mr. Tụ has opportunity to use
his designing and management talent in his projects including Industrial – manufacturing
warehouses and Cold storages, Commercial – office/shop complexes, automotive
dealerships, Fuel Station Canopy and Large Retail Outlet such as Petec Warehouse
Logistics, Megastar Media, Hoang Lai Cold Warehouse, PV Engineering's, C.T Group King
Post Projects, Posco Vietnam, Seah Pipe Steel Factory, SMC Steel Factory, and many
other prestigious Vietnamese companies like Baconco Production Factory, Hoang Gia
Ceramics.
Projects undertaken by Mr. Tụ won completed satisfaction from the customers thanks to a
modern style, efficient space utilization, reasonable costs and professional implementation.
Mr. Tụ is a member of the Vietnamese Association of Engineer,
17. Our Team
Project Management
Mr. Trần Văn Hoàng, Engineer
Founder, General Director
Email: hoangtv@truongphusteel.com.vn
Tran Van Hoang graduated from HCMC University of Polytechnics in 1997, and completed
his master degree in 2003. During 10 years working experiences, Hoang has accumulated
much experience through various projects which is appointed as Chief Engineer and
Factory Production Manager in charge of production, executive producer of components,
items of steel works, direct the construction of steel works, industrial building, structure or
apartment, prepare tender documents, making payment records steel works; Namely here
some projects undertaken by him: design of the cross rhythm K60m and K50m aperture,
the plug 3 is also phase 1 and phase 2 in Phu My Industrial Park, SMC Steel Factory in Ba
Ria Vung Tau, Posco- VHPC, Seah; U&I warehouses, Megastar Seating Flat form System
and dozens of other high profile, prestigious projects.
18. Our Team
Project Management
Mr. Hồ Tùng Lâm, Engineer
Project Director
Email: lamht@truongphusteel.com.vn
More than 15 years workings experiences with tireless effort and high responsibility, Mr.
Lâm has been trustingly assigned to be the site construction manager and project manager
of many big projects including Thanh Cong Cold Warehouse -Binh Chanh District, HCMC;
Cement Ha Tien Factory, Kien Luong, Kien Giang; Ha Tien 2 Cement Factory, Kien Luong,
Kien Giang; Truong Thanh Furniture Company, Binh Duong; Company WEC Saigon, Cu
Chi, Ho Chi Minh City; Markets Hoc Mon, Ho Chi Minh City; FULLIN company, Dong An
Industrial Park; Refinery reclaimed rubber, Ben Cat District, Binh Duong Province; May XK
Long An, Tan An, Long An.;Long An Import Export, LAFUCO.
.
Lam graduated Civil Construction & Industrial from Ho Chi Minh University of Architecture .
Beside, he also holds another two degree about Supervision on construction quality and
Safety management in construction. Currently, he is Project Director of Truong Phu
Construction & Steel Structure Joint Stock Company.
19. Our Team
Project Management
Mr. Lê Minh Nghĩa, Engineer
Founder, Project Director
Email: nghialm@truongphusteel.vn
Graduated from Ho Chi Minh Polytechnic University, Major : Civil Construction & Industrial
in 1993, Nghia has accumulated a lot of experiences during his working life with many
companies as different jobs. He used to be Supervisor Engineer of Defico Company, Vice
Director of Mai Linh Real Estate Corporation. Since 2004, Mr. Nghia joined Truong Phu
Pre-engineered Steel Building and appointed as Vice Director. Nghia had taken part in
designing and supervising the construction of dozens of prestigious projects such as Free
Trend 1-9 workshops at Linh Trung Industrial Zone, Columbia Hospital, Workshops IDC
New Port, White feather’s Mỹ Phước Industrial Zone, Bình Dương, Ánh Bình Minh Factory
production at Tam Phước Industrial Zone, Đồng Nai. He also holds another two degree
about Fulbright Economics Teaching programs, Co-designing practice certificate.
Training Selling Skills Faculty Certificate.
Currently, he is Project Director of Truong Phu Construction & Steel Structure Joint Stock
Company.
20. Our Team
Project Management
Mr. Trần Vĩnh Phú, Engineer
Manufactory Director
Email: phutv@truongphusteel.vn
Phu completed his bachelor degree in 2006 respectively in Ho Chi Minh City University of
Polytechnic. During 6 working years experience, Phu was appointed to hold important role
as Factory Director of Truong Phu Construction & Steel Structure Joint Stock Company.
Phu was set up the factory in scientific way and gain a lot of valuable experience in
production, executive producer of components, items of steel works. Direct the construction
of steel works, industrial building, prepare tender documents, making records steel work,
contact, counseling, keep relationships with customers
21. Our Team
Project Management
Mr. Vũ Hữu Trí, Engineer
Project Director
Email: trivh@truongphusteel.vn
Starting his career by joining BlueScope Building, an Australian group specialized in
construction and materials, Tri was able to gather a lot of valuable experiences on projects
management and modern design techniques as a factory manager/ site owner. He
managed and be responsible for production, maintenance warehouse, stock quality and
safety, security of site owner. After working here for more than 9 years, Tri had taken part
in project management of Truong Phu pre-engineered steel buildings. Mr. Tri has been
trustingly assigned to be site construction manager and project Director of many big
projects including in oversea market such as Laos, Myanmar, Cambodia and India.
Tri finished bachelor of Civil Engineering from Polytechnics University of Ho Chi Minh City,
Bachelors of Economics Diploma, Quality Management for construction projects and
professional selling Skills and other international training programmed.
22. Our Team
Project Management
Mr. Le Tung Quan, Architecture
Senior Project Executive
Email: quanlt@truongphusteel.vn
Graduating from Ho Chi Minh University of Architecture, after 6 year working with
Bluescope Steel Buildings , he has participated in Truong Phu Steel Bulidngs and have
done for many various big projects such as Factory of Kim Khí Sài Gòn Thép (Việt Thành
Steel), Factory of Thong Nhat Flat Steel; Factory of SMC Steel, Restaurant Steel Building
at 526 Điện Biên Phủ, Bình Thạnh District; HCM City, Workshop of Đức Toàn Company;
ICD New Port ;SeAH Steel; Hoàng Gia Ceramics; Ethanol Bình Phước; Kỳ Nam Steel, Đại
Nam Factory.
With enthusiasm and whole hearted, Quan always tried to improve his technical skill.
Besides, his civil engineering degree, he has another two graduated degree from University
of Economics major in Business Management and Construction quality supervision.
23. Our Team
Project Management
Ms. Trương Thu Huyên, Bachelor
Chief Accountant
Operation Manager
Email: huyentt@truongphusteel.vn
Truong Thu Huyen was hold two degree from Economics University, and Law University
of Ho Chi Minh. After 10 year working experiences, Huyen has done great of excellence job
in corporate financial management, accounting and compliance with laws and relevant
business requirements of the company, implementation, effective asset management
capital of the company. She is the key person whom coordinate and support departments
to complete assigned tasks.
On behalf of Director, she independence works with tax authorities, banks and
customers.Beside these activities, she also handle in management activities of the
accounting department.
24. Our Team
Project Management
Ms. Trần Thị Thanh Bình, Bachelor
Purchasing and Procurement Manager
Email: binhttt@truongphusteel.vn
Graduating in Ho Chi Minh, University of Economics, Finance Department. Bình has
participating in estimating, providing all main kind materials including steel structures,
Panel insulation for almost projects of Truong Phu pre-engineered Steel Buildings.
With enthusiasm and whole hearted, Binh always tried to improve her abilities and skills to
provide best materials and company services to customer. Beside, she also in charge of
advising the board of directors in corporate financial management, periodical reports
financial situation, accurate to the board of directors, Contact the bank is the procedure of
disbursement, payment, recovery of debt, plan to pay debts to customers, plan to purchase
materials, Materials for each project, coordinate and support departments to complete
assigned tasks, managing all the financial activities of the company.
25. Our Team
Project Management
Ms. Nguyễn Thị Kim Linh, Bachelor
Marketing and Business Development Manager
Email: linhntk@truongphusteel.vn
Linh has over 07 years experience working in foreign-related businesses in HCMC and is
graduated from University of Economics. Her experience specializes in marketing,
business administration with a background with Ministry of Education and Training of
HCMC. Since becoming Marketing and Business Development Manager, Linh has focus on
using her experiences to raise the marketing campaigns and constantly improve the
customer services to bring the professional services to investors. She understand the value
of product and brand activation to clients through creative solutions.
.
28. OUR FACTORY
All our machines and accessories are fabricated at our highly sophisticated
manufacturing unit that is equipped with manufacturing machines, base on latest
technology.
Production : Zone 7, Uyen Hung Town, Tan Uyen Dist., Binh Duong Provinces, Vietnam
Tel: +84 650 247 5575 - +846502475576 - Fax: +84 650 364 2232
29. OUR FACTORY
We follow strict quality measures that confirm to all quality parameters of ISO
standard. Machinery system for manufacturing pre-fabricated steel structures such
as Hydraulic Cutting, CNC Cutting Machine, Automatic Welding System, Auto beam
straightening machine, Blasting Machines which is capable to produce more than
20,000 tons per year.
Production : Zone 7, Uyen Hung Town, Tan Uyen Dist., Binh Duong Pro.
30. OUR FACTORY
Blasting Machines which is capable to produce more than 20,000 tons per year.
Production : Zone 7, Uyen Hung Town, Tan Uyen Dist., Binh Duong Pro.
31. OUR FACTORY – PRODUCTION PROCESS
Factory productiveness per month: 1,200 tonsFactory productiveness per month: 1,200 tons..
Raw materials must be tested
by Tensile test before put in to
production
Raw materials
Tensile Test Machine
32. OUR FACTORY
Land area: 20,000 m2, plants (indoor): 13.000m2.Land area: 20,000 m2, plants (indoor): 13.000m2.
Hydraulic Cutting: 16lyx6.2m, 01 machine Screw Cutting: 16lyx3.2m, 01 machine
Stage 1: Initial Cutting
The first phase of produces plate steel, known as initial cutting.
This stage, technician will check the thickness of the steel plates and the quality controller will conduct the final inspection.
Use the automatic Hydraulic cutting machine - cutting machine
33. OUR FACTORY
Factory productiveness per month: 1,200 tonsFactory productiveness per month: 1,200 tons..
Combine Beam H HG-1500III automatic machine
Stage 2: Mounting I
The combination of abdominal wing can be done by hand or by machine.
Ensure proper structural shape, deviation, flatness, angle of the structures ...components.
Combination by beam mounting automatic machine, also known as mounting machine I
Combine beams by vertical
34. OUR FACTORY
Number of units: 07 units; wide per unit: 2000 square meter
Built in February 2007 and have been using since October of 2007.
Stage 3: Weld Structural
Components are welded by both turtle-welds and welded gates. The quality of welding is in accordance with design.
Before welding, the preparation of welds should be matched to the welding process, scrub cleaned, and sanitary weld at both sides.
The method of visual inspection and measuring equipment must be inspected during welding by the engineering department.
Technical controller: 02 engineers follow up and check
Workers clean the slot before welding
Automatic Welding System
35. OUR FACTORY
Number of units: 07 units; wide per unit: 2000 square meter
Built in February 2007 and have been using since October of 2007.
Stage 4: Beam Straighten I
To avoid the phenomenon of curving due to thermal distortion,
the process of fitting I and transportation between the space components, structures were put into bending by automatically beam
bending machine to ensure technical accuracy, after installation, matching in tolerance processing.
Technical controller: 02 engineers follow up and check
Auto beam straightened machine
36. OUR FACTORY
Number of units: 07 units; wide per unit: 2000 square meter
Built in February 2007 and have been using since October of 2007.
Stage 5: Mounting Details.
§ This phase, components is classified into the bit cut adjustment, eight links, ribs reinforcement and other extra details
37. OUR FACTORY
Number of units: 07 units; wide per unit: 2000 square meter
Built in February 2007 and have been using since October of 2007.
Stage 7: Hole Drilling
We drill the hole with eight links associated and the other details side by drill hole machine, ensuring the geometric
dimensions of the hole does not affect the mechanical properties of steel.
The drill holes are made parallel with the production of components.
Technical controller: 01 engineer follow up and examination
38. OUR FACTORY
Number of units: 07 units; wide per unit: 2000 square meter
Built in February 2007 and have been using since October of 2007.
Stage 8: Blasting
Clean the components with automatic ball sprayer (eight jets) with small steel balls, and big power sprayer to clean
the surface of structural steel components.
Technical controller: 01 engineer
Expert Installation: Technical expert at factory
Automatic Blasting machine (08 blasting)
39. OUR FACTORY
Number of units: 07 units; wide per unit: 2000 square meter
Built in February 2007 and have been using since October of 2007.
Stage 9: Paint Completing.
Modern American painting machine, make sure the paint thickness is 35-38 μm / 01 paint.
Before painting, the surface components are cleaned by wire brush or grinder
Process of painting as follow:
Paint 01 layer stainless.
Paint 02 layer completing.
40. Test surface and the thickness of the paint have the technical personnel in charge to
ensure the product meets the high aesthetic.
43. Our Customer Projects
Project Name: VIJA GAS Factory_ Stage2 (Japan)
Investor: Japan Vietnam Co., Ltd.
Location: Phú Mỹ I, Tân Thành, Bà Rịa - Vũng Tàu
44. Our Customer Projects
Project Name: TAZMO VIETNAM Factory (Japan)
Investor: TAZMO VIETNAM CO., LTD.
Location: Lot H.09, Road 01, Long Hau I.P., Long Hau, Can Giuoc, Long An
45. Project Name: TAZMO VIETNAM Factory (Japan)
Investor: TAZMO VIETNAM CO., LTD.
Location: Lot H.09, Road 01, Long Hau I.P., Long Hau, Can Giuoc, Long An
46. Our Customer Projects
Project Name: OHNOSEIKO VIETNAM Factory (Japan)
Investor: OHNOSEIKO VIETNAM CO., LTD.
Location: Lot S-2, Road 7, Long Hau I.P., Long Hau, Can Giuoc, Long An
47. Project Name: OHNO SEIKO VIETNAM Factory (Japan)
Investor: OHNOSEIKO VIETNAM CO., LTD.
Location: Lot S-2, Road 7, Long Hau I.P., Long Hau, Can Giuoc, Long An
48. Our Customer Projects
Project Name: NANKAI KINZOKU Factory (Japan)
Investor: NANKAI KINZOKU Corporation.
Location: Nhon Trach III I.P., Road 25B., Hiep Phuoc Ward, Nhon Trach – Dong Nai Province
49. Our Customer Projects
Project Name: NANKAI KINZOKU Factory (Japan)
Investor: NANKAI KINZOKU Corporation.
Location: Nhon Trach III I.P., Road 25B., Hiep Phuoc Ward, Nhon Trach – Dong Nai Province
50. Our Customer Projects
Project Name: NANKAI KINZOKU Factory (Japan)
Investor: NANKAI KINZOKU Corporation.
Location: Nhon Trach III I.P., Road 25B., Hiep Phuoc Ward, Nhon Trach – Dong Nai Province
51. Project Name: NANKAI KINZOKU Factory (Japan)
Investor: NANKAI KINZOKU Corporation.
Location: Nhon Trach III I.P., Road 25B., Hiep Phuoc Ward, Nhon Trach – Dong Nai Province
52. Our Customer Projects
Project Name: Soltec Industrial JSC (Japan)
Investor: Soltec factory - Phase
Area: 20,800 m2
Location: II located at Nhon Trach II Industrial Zone, Dong Nai province
53. Project Name: Soltec Industrial JSC (Japan)
Investor: Soltec factory - Phase
Area: 20,800 m2
Location: II located at Nhon Trach II Industrial Zone, Dong Nai province
54. Project Name: Soltec Industrial JSC (Japan)
Investor: Soltec factory - Phase
Area: 20,800 m2
Location: II located at Nhon Trach II Industrial Zone, Dong Nai province
55. Installation
Project Name: Soltec Industrial JSC (Japan)
Investor: Soltec factory - Phase
Area: 20,800 m2
Location: II located at Nhon Trach II Industrial Zone, Dong Nai province
56. Project Name: Nanshin Seiki Vietnam(Japan)
Investor: Nanshin Seiki Viet Nam Company Limited.
Area: 11,950 m2
Location: Lot B_1E_CN Road NE4A, My Phuoc 3
Industrial Park, Binh Duong Province
57. Project Name: Temco Vietnam Factory(Japan)
Investor: Temco Viet Nam Company Limited.
Location: Lot B-6D10-CN Road NE4A, My Phuoc 3
Industrial Park, Binh Duong Province
58. INDUSTRIALS STEEL BUILDINGS PROJECTS
1. Ánh Bình Minh Metal Packaging Factory
2. SMC Steel Mechanic Factory
3. IBS Granite Long An Factory - Workshop 1, 2, 3
4. Tien Nga Factory
5. Yue De Việt Nam Shoes Production Factory
6. Etanol Binh Phuoc Production Factory
7. Baconco Bonded Warehouse7. Baconco Bonded Warehouse
8. Thanh Binh Paint Brush Production Factory
9. Carian Wooden Factory
10.Far Eastern Factory
11.Megastar Cineplex at Pandora Building
12.Vina Australia Factory
13.Shyange Paint Factory
14.Petec Logistics
15.Posco – VHPC Factory
16.Dai Nam Steel Factory
17.Seah Factory
18.Saigon Metal Workshop
19.Thong Nhat Cold-rolled Steel Factory.
20.ICD Long Binh Warehouse.
59. Our Customer Projects
Project Name: Ánh Bình Minh Metal Packaging Factory
Investor: Anh Binh Minh Corporation
Area: 18 084 m2 “ K36x134m; K102x130
Location: Tam Phuoc Industrial Zone, Dong Nai
61. Our Customer Projects
Project Name: IBS Granite Long An Factory - Workshop 1, 2, 3
Investor: IBS Corporation
Area: 4.320 m2, 5.664 m2 , 4.886 m2
Location: Nhựt Chánh I.Z, Long An
62. Our Customer Projects
Project Name: Tien Nga Factory
Investor: Tien Nga Trading and Manufacturing Co. Ltd.
Area: 23.400 m2
Location: Long Bình, Biên Hòa, Đồng Nai
63. Our Customer Projects
Project Name: Yue De Việt Nam Shoes Production Factory
Investor: Pou Yuen Việt Nam Co. Ltd.,
Area: 4.560 m2
Location: Tân Hương I.P, Tiền Giang
68. Our Customer Projects
Project Name: Far Eastern Factory
Investor: Apparel Far Eastern Vietnam Co. Ltd.
Area: 7.573,5 m2
Location: VSIP 1 I.P, Bình Dương
69. Our Customer Projects
Project Name: Megastar Cineplex at Pandora Building
Investor: Megastar Media Company
Area: 8 cinemas
Location: Tan Phu District, HCM City
70. Our Customer Projects
Project Name: Vina Australia Factory
Investor: Vina Australia Package Co. Ltd.
Area: - 6.336 m2 -"K52x88+K20x88m"
Location: Tam Phuoc Industrial Zone, Dong Nai
71. Our Customer Projects
Project Name: AVA Food Factory
Investor: AVA Food Industry Co. Ltd.
Area: - 18.600 m2- "K60x200m+K40x165m "
Location: Tam Phuoc Industrial Zone, Dong Nai
Project Name: Shyange Paint Factory
Investor: Shyange Paint Co., Ltd.
Area: - 7308 m2 - K66x78m K30x72m
Location: Tam Phuoc Industrial Zone, Dong Nai
74. Our Customer Projects
Project Name: Dai Nam Steel Factory
Investor: Dai Nam Steel Corporation
Area: 3960 m2 – K48x82.5 m
Location: Tan Tao I.Z., Binh Tan
Project Name: Mainetti Factory
Investor: Mainetti Vietnam Co., Ltd.
Area: 14,500 m2 – K90x100m+K50x110m
Location: Long Thanh I.Z., Dong Nai
75. Our Customer Projects
Project Name: Seah Factory
Investor: Seah Vietnam Steel Co. Ltd.
Area: 8,757 m2– K62.5x125+BK15x18+K18x37.5m
Location: Bien Hoa I.Z., Dong Nai
76. Our Customer Projects
Project Name: Saigon Metal Workshop
Investor: Saigon Metal Corporation.
Area: 7,272 m2
Location: Ben Luc, Long An
77. Our Customer Projects
Project Name: Thong Nhat Cold-rolled Steel Factory.
Investor: Thong Nhat Flat Steel Corporation
Area: 12.636 m2
Location: Phu My I Industrial Zone, Tan Thanh, Ba Ria - Vung Tau
78. Our Customer Projects
Project Name: Processing and storage of agricultural export products Factory
Investor: Long Hai- Binh Phuoc Corporation
Area: 12.744 m2
Location: Đồng Tiến, Đồng Phú, Bình Phước
79. Our Customer Projects
Project Name: ICD Long Binh Warehouse.
Investor: ICD New Port – Long Binh Corporation.
Area: 18.000 m2
Location: Long Bình, Biên Hòa, Đồng Nai
81. Our Customer Projects
Project Name: Soltec Industrial JSC (Japan)
Investor: Soltec factory - Phase
Area: 20,800 m2
Location: II located at Nhon Trach II Industrial Zone, Dong Nai province
Project Name: Southern C.T- Nguyen Dinh Chieu
Investor: Southern CT - Member of C.T Group
Items: Kingpost
Location: 117, Nguyen Dinh Chieu St., District 3, Ho Chi Minh City
82. Project Name: Southern C.T- Nguyen Dinh Chieu
Investor: Southern CT - Member of C.T Group
Items: Kingpost
Location: 117, Nguyen Dinh Chieu St., District 3, Ho Chi Minh City
83.
84. Project Name: Viet Thang Fiber Factory
Project Name: Viet Thang Fiber Factory
Investor: Viet Thang Corporation
Area: 13,000 m2
Location: 127 Lê Văn Chí, P. Linh Trung, Q. Thủ Đức, TP. HCM
85. Project Name: CHING LUH Shoes Factory
Investor: Ching Luh Shoes Co.,Ltd
Area: 11.000 m2
Location: Thuan Dao, Ben Luc, Long An
87. Project Name: Sai Gon Beer Warehouse
Investor: Sabeco Corporation
Area: 33.656m2
Location: Ward Trung Mỹ Tây – District 12- Hồ Chí Minh City.
88.
89. DÖÏ AÙN TIEÂU BIEÅU
Project Name: Factory NTPM Việt Nam
Investor: Cty TNHH NTPM
Items: Factory Sản Xuất
Location: VSIP II A, Tỉnh Bình Dương
90. Project Name: Vina Kraft Paper
Investor: Kraft Vinna Paper Company
Items: Factory Production
Location: Mỹ Phước 3 Industrial Zone, Bến Cát Bình Dương
91. Project name: NTPM Việt Nam Factory
Investor: NTPM Viet Nam Company Limited
Items: Factory Production
Location: VSIP II A, Tỉnh Bình Dương
92. Project Name: Factory NTPM Việt Nam
Investor: Cty TNHH NTPM
Items: Factory Sản Xuất
Location: VSIP II A, Tỉnh Bình Dương
97. ISO 9001:2008 CERTIFICATE
TRUONG PHU STEEL has been awarded the ISO
9001:2008 certificate by TÜV SUD ASIA PACIFIC
TUV SUD GROUP.
To be able to acquire this certificate we have
been working very hard in managing our dailybeen working very hard in managing our daily
operations by focusing on quality control and
continual improvement in all aspects of our
business.