SlideShare a Scribd company logo
1 of 13
Download to read offline
T.Y. LIN
INTERNATIONAL SDN BHD
Civil & Structural Engineers
Dr. Lim Yeow Beng
The Principal of
the company
Introduction of Construction Industry
October 2014
school
interview
02
Content
Boon Yi Fung 0318300
Chong Zhao Lun 0320408
Khoo Zer Kai 0320500
Deong Khai Keat 0320055
Teh Qing Da 0318590
Foo Zhi Fung
03
04
06
08
10
11
Profile
Company Background
Project 1
Project 2
Organizational
Chart
Advise for
future C&S
Engineer
Group Members
Ir. Dr. LimYeow Beng, is a
registered Professional Engineer
with more than 28 years of
practical experience, graduated
with Honours in 1984 from the
National University of Singapore.
In the years 1984 to 1989, he
works at Singapore after he
graduated from National
University of Singapore.While
working in consultancy office, he
obtained the Degree of Master of
Science from the National
University of Singapore in 1987. In
1989, he enrolled in the
University of Illinois at Urbana-
Champagne where he graduated
with the Degree of Doctor of
Philosophy (PhD) in 1994. In the
years 1994 to 1995, he came back
to Malaysia and work as a Design
Engineer in the Protek Engineers
Sdn. Bhd. He has been with T.Y.
Lin International Sdn. Bhd. since
1995 and is currently holding the
position of Principal in the
company. He is involved
substantially in the design of Civil
and Structural works. He has
successfully completed more than
twenty projects such as
condominiums, hotels, office
towers, renovation and
strengthening of existing buildings
and retail malls.	

03
DR.
LIM
YEOW
BENG
T.Y.LIN have established itself as a
leading consulting practice which offers
a complete spectrum of
professional services ranging
from feasibility studies, cost
estimate, contract
documentation, design and
contract management to
supervision.T.Y.LIN have
established a notable track
record in the design of long span
and high-rise structures.Their
design in prestressed and precast
concrete and structural steel
have also gained particular
renown.	

It affiliation with T.Y.LIN
international and other regional
offices allow it to draw from the
accumulated pool of experience
covering the entire range of
engineering expertise. Of
particular interest,T.Y.LIN International
has among other innovation, pioneered
the application of prestressing technique
on steel girders to increase their
efficiency.
T.Y. LIN IN
04
pavilion, kl
berjaya times
square, kl
!
!
!
!
!
!
!
!
!
!
T.Y.LIN
are fully equipped with up-
to-date computer softwares
for both design and
drafting.
T.Y.LIN INTERNATIONAL
Sdn Bhd (TYLI) is a civil and
structural consulting practice
and a member of the T.Y.Lin
International Group based in San
Francisco, California, USA.	

!
Established in 1980 in Johor
Bahru, Malaysia,T.Y.LIN
subsequently relocated to Kuala
Lumpur in the early eighties
prompted by a resurgence in the
property market in Malaysia
capital. In T.Y.LIN International
Sdn Bhd has 150 workers in his
company.There are many T.Y.Lin
international offices in overseas.
For example; United States,
Singapore,Taiwan, Indonesia,
Beijing , Dalian, Chongqing,
Shanghai and Guangzhou.
TERNATIONAL
SDN. BHD.
05
KL Ecocity
Shah Alam
Stadium
Regency
Condominium
&
G-Hotel
Persiaran Gurney,
Penang
!
(1995 - 2000)
!
Regacy Condominium is
located at Persiaran Gurney,
Penang.The Regacy
Condominium is a 39
storey condominium
consisting of reinforced
concrete construction with
pre-cast concrete piles
foundation. It is 1 block of
37-storey of luxury
condominium with two
level of basement parking.
There have 100 units in this
condominium. It had three
units in each storey and each
unit has around 4000 to 5000
square feet.	

The G Hotel is located in
along the Gurney drive and
also next to the Gurney mall.
The G Hotel is a 19 storey
hotel consists of shear wall
construction.This building is
supported by pre-cast
concrete piles foundation. It
is a 14 storey high storey
high tower of 304
rooms,hotel facilities and 2
basement parking.
06
Ir. Dr. Lim acted as a Project
Manager in this project. He
work with a partner for this
project. He also face problem
that is didn’t coordinate well
with other professions. He tried
to extend the time for work,
work more harder and
communicate with other
professions. During 2004, there
was a Tsunami in Penang. Many
buildings has been affected by
the Tsunami included the G
Hotels.The G Hotel has some
crack lines on the wall.The
warranty of the building had
been expired, but Dr. Lim want
to responsible to his own
project that he done before. He
went to the Penang and had a
maintenance service for the
building. However, they still
need to pay for Dr. Lim for the
service check.
‘My role in G Hotel project is a
Project Manager.The first
project we start is just only 2
people including me.We are
doing all the drawings of the
structure plan of the building
and the other stuff by
ourselves.We gave advise to
the owner on what type of the
structure that suitable for the
building. I am also the one who
design this building. For
example, I designed the
foundation and the position of
the column and beam put in
the building.
What role are
you involved in
this projects?
07
Nu Sentral
Mall
& Office
(Lot G),
Kuala Lumpur
Sentral,
Kuala Lumpur
(2008-2013)
!
Nu Sentral Mall is
located in Kl Sentral,
Brickfields. Nu Sentral
is part of the RM1.4
billion investment by
Malaysian Resources
Corporation Berhad
(MRCB) and Pelaburan
Hartanah Berhad
(PHB).This
development consists
of a 7 storey retail mall
and a 33 storey office
block with 4 levels of
basement car parks.
The retail mall is
supported by raft slab
while the office block is
on bored piles
foundation.The retail
and office block are
constructed using post
tensioned and
reinforced concrete
structures.There is
substantial structural
steel roof on the retail
block due to long span
requirements.
08
Ir. Dr. Lim acted as a Project
Principal in this project. He
work with 6 engineers and he
just provide the ideas and guide
to them.This project had been
delay for one year due to didn’t
coordinate well. For example, in
every project they will go
through this kind of problem
such as they come out the
drawing and the contractor
need to do a lot to it. So they
have to solving the problem and
as their responsible to done
this project with overcome it.
He tried to make the project
done as soon as possible and
luckily this was an in house
project.The contractor
completed this project in 2010.
If this project can't finish on
time, they must pay for the loss
of the owner.
What role are
you involved in
this projects?
“My role in Nu Sentral Mall is a
Project Principal. I have 6
engineers that work with me in
this project. Some of our
people are doing for the
structural steel and some of
them doing for the concrete
block.The foundation and all
the concept of the building are
provided by me. I just provide
the idea of drawing. For
example, I done a simple sketch
for the building then I will pass
it to the draftsmen to draw and
convert it into AutoCAD. And
also I will guide the contractor
to ensure that the building was
safe.
09
Organizational Chart
10
Managing
Director
WONG LOO MIN
B.Sc.(Civil),
MIEM,,MIES,
MACEM, PEng
Before construct, we
advice architect and
developers.We
analysis see whether
the design fit with
their requirements.
We also prepare C&S
drawing (columns and
beams) and tender
documents (steel,
concrete, doors,
windows).We also
need to specify the
correct way to do.
During construct, make sure
they understand and happy with
the price.We engage a
residence engineer to do site
inspection and make sure
whatever drawn in the drawing
and material the contractor use
it. Every two weeks we must
have a site meeting for checking
and monitor the progress.We
need to estimate whether can
achieve it on time or not, I f
cannot achieve, try to came out
with other solution.
After construct, make sure it is
completely done by inspect
with contractor and authorities
to sign Certificate of Practical
Completion (CPC).After that,
sign for the Certificate of
Completion and Compliments
(CCC).There are six form for
C&S Engineer to sign include
earth work, foundation work,
drainage work, water work,
sewer work, structure work.
They warranty the building for
12 – 18 months.	

What does a C&S Engineer do in construction industry?	
DIRECTOR
CHIN LEE LENG
B.Sc., M.Eng,
MIEM, MASCE,
MIE(Aust),
MACEM, PEng
DIRECTOR
KEN LIM
B.Eng.(Hons),
MIEM, MASCE,
MACEM, PEng
PRINCIPAL
LEE KIAN AN
B.Eng.(Hons),
PE, MIEM,
MIES,
MIE(Aust),
CPEng
PRINCIPAL
DR. LIM YEOW
BENG
B.Eng.(Hons),
M.Sc., PhD,
MIEM, PEng
PRINCIPAL
DR. SYED
MANSUR
B. Sc(Hons).,
M. Sc., Ph.
D., MIEM.,
MICE., PEng.
What’s your advice for future C&S Engineer?
!
“A lot C&S Engineer not good in basic knowledge, so wish you all can
put in more effort to understand on design concept.Although many
people nowadays based on computer, but still need to knew the basic
knowledge or else you can’t handle it while needed it.”	

Dr. Lim Yeow Beng
11
Civil &
Structural
Engineer
ICI project 2 (1).pdf

More Related Content

Viewers also liked

enbefinalprojectproposal-141130045858-conversion-gate01.pdf
enbefinalprojectproposal-141130045858-conversion-gate01.pdfenbefinalprojectproposal-141130045858-conversion-gate01.pdf
enbefinalprojectproposal-141130045858-conversion-gate01.pdfFoo Zhi Fung
 
essay question August2014.doc
essay question August2014.docessay question August2014.doc
essay question August2014.docFoo Zhi Fung
 
1Bici - updated (1).pdf
1Bici - updated (1).pdf1Bici - updated (1).pdf
1Bici - updated (1).pdfFoo Zhi Fung
 
PLJ Article - Holding Over
PLJ Article - Holding OverPLJ Article - Holding Over
PLJ Article - Holding OverNerissa Hatcher
 
Project03 (Final Project)_Briefing.pdf
Project03 (Final Project)_Briefing.pdfProject03 (Final Project)_Briefing.pdf
Project03 (Final Project)_Briefing.pdfFoo Zhi Fung
 
structuralengeeniring63-141128233958-conversion-gate02.ppt
structuralengeeniring63-141128233958-conversion-gate02.pptstructuralengeeniring63-141128233958-conversion-gate02.ppt
structuralengeeniring63-141128233958-conversion-gate02.pptFoo Zhi Fung
 
scsi_residentialpropertyreview_2014
scsi_residentialpropertyreview_2014scsi_residentialpropertyreview_2014
scsi_residentialpropertyreview_2014Orla Deasy
 
CL Project02_Briefing.pdf
CL Project02_Briefing.pdfCL Project02_Briefing.pdf
CL Project02_Briefing.pdfFoo Zhi Fung
 
tj3brief-140618055558-phpapp02-141208075913-conversion-gate02 (1).pdf
tj3brief-140618055558-phpapp02-141208075913-conversion-gate02 (1).pdftj3brief-140618055558-phpapp02-141208075913-conversion-gate02 (1).pdf
tj3brief-140618055558-phpapp02-141208075913-conversion-gate02 (1).pdfFoo Zhi Fung
 
Jake Horaist resume
Jake Horaist resumeJake Horaist resume
Jake Horaist resumeJake Horaist
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdfFoo Zhi Fung
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdfFoo Zhi Fung
 
Metropolitan park.pdf
Metropolitan park.pdfMetropolitan park.pdf
Metropolitan park.pdfFoo Zhi Fung
 
Metropolitan park.pdf
Metropolitan park.pdfMetropolitan park.pdf
Metropolitan park.pdfFoo Zhi Fung
 
Africans: Tracing your root by Anthony claret
Africans: Tracing your root by Anthony claretAfricans: Tracing your root by Anthony claret
Africans: Tracing your root by Anthony claretAnthony-Claret Onwutalobi
 
Vivir's ACFI financial modelling_January 2017
Vivir's ACFI financial modelling_January 2017Vivir's ACFI financial modelling_January 2017
Vivir's ACFI financial modelling_January 2017Jenny Mowatt
 
Grammar book by Alejandra Green
Grammar book by Alejandra Green Grammar book by Alejandra Green
Grammar book by Alejandra Green alexandra2green
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdfFoo Zhi Fung
 
Music magazine plan
Music magazine plan Music magazine plan
Music magazine plan lydiaharding
 

Viewers also liked (20)

enbefinalprojectproposal-141130045858-conversion-gate01.pdf
enbefinalprojectproposal-141130045858-conversion-gate01.pdfenbefinalprojectproposal-141130045858-conversion-gate01.pdf
enbefinalprojectproposal-141130045858-conversion-gate01.pdf
 
essay question August2014.doc
essay question August2014.docessay question August2014.doc
essay question August2014.doc
 
1Bici - updated (1).pdf
1Bici - updated (1).pdf1Bici - updated (1).pdf
1Bici - updated (1).pdf
 
PLJ Article - Holding Over
PLJ Article - Holding OverPLJ Article - Holding Over
PLJ Article - Holding Over
 
Project03 (Final Project)_Briefing.pdf
Project03 (Final Project)_Briefing.pdfProject03 (Final Project)_Briefing.pdf
Project03 (Final Project)_Briefing.pdf
 
structuralengeeniring63-141128233958-conversion-gate02.ppt
structuralengeeniring63-141128233958-conversion-gate02.pptstructuralengeeniring63-141128233958-conversion-gate02.ppt
structuralengeeniring63-141128233958-conversion-gate02.ppt
 
scsi_residentialpropertyreview_2014
scsi_residentialpropertyreview_2014scsi_residentialpropertyreview_2014
scsi_residentialpropertyreview_2014
 
CL Project02_Briefing.pdf
CL Project02_Briefing.pdfCL Project02_Briefing.pdf
CL Project02_Briefing.pdf
 
PPT CPD
PPT CPDPPT CPD
PPT CPD
 
tj3brief-140618055558-phpapp02-141208075913-conversion-gate02 (1).pdf
tj3brief-140618055558-phpapp02-141208075913-conversion-gate02 (1).pdftj3brief-140618055558-phpapp02-141208075913-conversion-gate02 (1).pdf
tj3brief-140618055558-phpapp02-141208075913-conversion-gate02 (1).pdf
 
Jake Horaist resume
Jake Horaist resumeJake Horaist resume
Jake Horaist resume
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdf
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdf
 
Metropolitan park.pdf
Metropolitan park.pdfMetropolitan park.pdf
Metropolitan park.pdf
 
Metropolitan park.pdf
Metropolitan park.pdfMetropolitan park.pdf
Metropolitan park.pdf
 
Africans: Tracing your root by Anthony claret
Africans: Tracing your root by Anthony claretAfricans: Tracing your root by Anthony claret
Africans: Tracing your root by Anthony claret
 
Vivir's ACFI financial modelling_January 2017
Vivir's ACFI financial modelling_January 2017Vivir's ACFI financial modelling_January 2017
Vivir's ACFI financial modelling_January 2017
 
Grammar book by Alejandra Green
Grammar book by Alejandra Green Grammar book by Alejandra Green
Grammar book by Alejandra Green
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdf
 
Music magazine plan
Music magazine plan Music magazine plan
Music magazine plan
 

Similar to ICI project 2 (1).pdf

ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdfFoo Zhi Fung
 
ICI Project 2
ICI Project 2 ICI Project 2
ICI Project 2 khaikeat16
 
ICI_P2_MAGAZINE
ICI_P2_MAGAZINEICI_P2_MAGAZINE
ICI_P2_MAGAZINEMao Hua
 
Magazine
MagazineMagazine
MagazineLam Yu
 
3806da 060ba18c363c4011a2d5a975cb6a7324
3806da 060ba18c363c4011a2d5a975cb6a73243806da 060ba18c363c4011a2d5a975cb6a7324
3806da 060ba18c363c4011a2d5a975cb6a7324Ong Ke Qi
 
Ici magazine-c21
Ici magazine-c21Ici magazine-c21
Ici magazine-c21jiyann
 
Ici magazine-c21 (1)
Ici magazine-c21 (1)Ici magazine-c21 (1)
Ici magazine-c21 (1)liszee
 
Ici ben stress
Ici ben stressIci ben stress
Ici ben stressdhirazain
 
Internship Report Nadia Othman
Internship Report Nadia OthmanInternship Report Nadia Othman
Internship Report Nadia Othmannadiacbass
 
Ici final magazine22
Ici final magazine22Ici final magazine22
Ici final magazine22Jia San Oljs
 
Recreation Blocks Project Management Report
Recreation Blocks Project Management ReportRecreation Blocks Project Management Report
Recreation Blocks Project Management Reportdouglasloon
 
SEMESTER 1 Introduction to Construction Industry Project 2 - Building Team : ...
SEMESTER 1 Introduction to Construction Industry Project 2 - Building Team : ...SEMESTER 1 Introduction to Construction Industry Project 2 - Building Team : ...
SEMESTER 1 Introduction to Construction Industry Project 2 - Building Team : ...University of Nottingham
 
2016 Dec_CV_Angel Lee
2016 Dec_CV_Angel Lee2016 Dec_CV_Angel Lee
2016 Dec_CV_Angel LeeAngel LEE
 
Magazine of Civil Engineering
Magazine of Civil Engineering Magazine of Civil Engineering
Magazine of Civil Engineering Eric Teo
 
Thomas Yong Project Show Case (May 2015)
Thomas Yong Project Show Case (May 2015)Thomas Yong Project Show Case (May 2015)
Thomas Yong Project Show Case (May 2015)Thomas Yong
 

Similar to ICI project 2 (1).pdf (20)

Ici project 2
Ici project 2Ici project 2
Ici project 2
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdf
 
ICI Project 2
ICI Project 2 ICI Project 2
ICI Project 2
 
Magazine
Magazine Magazine
Magazine
 
Ici magazine
Ici magazineIci magazine
Ici magazine
 
ICI_P2_MAGAZINE
ICI_P2_MAGAZINEICI_P2_MAGAZINE
ICI_P2_MAGAZINE
 
Magazine 061
Magazine 061Magazine 061
Magazine 061
 
Magazine
MagazineMagazine
Magazine
 
3806da 060ba18c363c4011a2d5a975cb6a7324
3806da 060ba18c363c4011a2d5a975cb6a73243806da 060ba18c363c4011a2d5a975cb6a7324
3806da 060ba18c363c4011a2d5a975cb6a7324
 
Ici magazine-c21
Ici magazine-c21Ici magazine-c21
Ici magazine-c21
 
Ici magazine-c21 (1)
Ici magazine-c21 (1)Ici magazine-c21 (1)
Ici magazine-c21 (1)
 
Ici ben stress
Ici ben stressIci ben stress
Ici ben stress
 
Internship Report Nadia Othman
Internship Report Nadia OthmanInternship Report Nadia Othman
Internship Report Nadia Othman
 
Ici final magazine22
Ici final magazine22Ici final magazine22
Ici final magazine22
 
Recreation Blocks Project Management Report
Recreation Blocks Project Management ReportRecreation Blocks Project Management Report
Recreation Blocks Project Management Report
 
SEMESTER 1 Introduction to Construction Industry Project 2 - Building Team : ...
SEMESTER 1 Introduction to Construction Industry Project 2 - Building Team : ...SEMESTER 1 Introduction to Construction Industry Project 2 - Building Team : ...
SEMESTER 1 Introduction to Construction Industry Project 2 - Building Team : ...
 
2016 Dec_CV_Angel Lee
2016 Dec_CV_Angel Lee2016 Dec_CV_Angel Lee
2016 Dec_CV_Angel Lee
 
VISANITY MAGAZINE
VISANITY MAGAZINEVISANITY MAGAZINE
VISANITY MAGAZINE
 
Magazine of Civil Engineering
Magazine of Civil Engineering Magazine of Civil Engineering
Magazine of Civil Engineering
 
Thomas Yong Project Show Case (May 2015)
Thomas Yong Project Show Case (May 2015)Thomas Yong Project Show Case (May 2015)
Thomas Yong Project Show Case (May 2015)
 

More from Foo Zhi Fung

ICI Final Project.docx
ICI Final Project.docxICI Final Project.docx
ICI Final Project.docxFoo Zhi Fung
 
1Bici - updated (2).pdf
1Bici - updated (2).pdf1Bici - updated (2).pdf
1Bici - updated (2).pdfFoo Zhi Fung
 
1Bici - updated (2).pdf
1Bici - updated (2).pdf1Bici - updated (2).pdf
1Bici - updated (2).pdfFoo Zhi Fung
 
Project03 (Final Project)_Briefing.pdf
Project03 (Final Project)_Briefing.pdfProject03 (Final Project)_Briefing.pdf
Project03 (Final Project)_Briefing.pdfFoo Zhi Fung
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdfFoo Zhi Fung
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdfFoo Zhi Fung
 
Project03 (Final Project)_Briefing.pdf
Project03 (Final Project)_Briefing.pdfProject03 (Final Project)_Briefing.pdf
Project03 (Final Project)_Briefing.pdfFoo Zhi Fung
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdfFoo Zhi Fung
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdfFoo Zhi Fung
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdfFoo Zhi Fung
 
CL Project02_Briefing.pdf
CL Project02_Briefing.pdfCL Project02_Briefing.pdf
CL Project02_Briefing.pdfFoo Zhi Fung
 
CL Project02_Briefing.pdf
CL Project02_Briefing.pdfCL Project02_Briefing.pdf
CL Project02_Briefing.pdfFoo Zhi Fung
 
Project 1_Experiential Landscape.pdf
Project 1_Experiential Landscape.pdfProject 1_Experiential Landscape.pdf
Project 1_Experiential Landscape.pdfFoo Zhi Fung
 
Project 1_Experiential Landscape.pdf
Project 1_Experiential Landscape.pdfProject 1_Experiential Landscape.pdf
Project 1_Experiential Landscape.pdfFoo Zhi Fung
 

More from Foo Zhi Fung (15)

Doc4.docx
Doc4.docxDoc4.docx
Doc4.docx
 
ICI Final Project.docx
ICI Final Project.docxICI Final Project.docx
ICI Final Project.docx
 
1Bici - updated (2).pdf
1Bici - updated (2).pdf1Bici - updated (2).pdf
1Bici - updated (2).pdf
 
1Bici - updated (2).pdf
1Bici - updated (2).pdf1Bici - updated (2).pdf
1Bici - updated (2).pdf
 
Project03 (Final Project)_Briefing.pdf
Project03 (Final Project)_Briefing.pdfProject03 (Final Project)_Briefing.pdf
Project03 (Final Project)_Briefing.pdf
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdf
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdf
 
Project03 (Final Project)_Briefing.pdf
Project03 (Final Project)_Briefing.pdfProject03 (Final Project)_Briefing.pdf
Project03 (Final Project)_Briefing.pdf
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdf
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdf
 
Project 2_Design Process_Research Analysis.pdf
Project 2_Design Process_Research  Analysis.pdfProject 2_Design Process_Research  Analysis.pdf
Project 2_Design Process_Research Analysis.pdf
 
CL Project02_Briefing.pdf
CL Project02_Briefing.pdfCL Project02_Briefing.pdf
CL Project02_Briefing.pdf
 
CL Project02_Briefing.pdf
CL Project02_Briefing.pdfCL Project02_Briefing.pdf
CL Project02_Briefing.pdf
 
Project 1_Experiential Landscape.pdf
Project 1_Experiential Landscape.pdfProject 1_Experiential Landscape.pdf
Project 1_Experiential Landscape.pdf
 
Project 1_Experiential Landscape.pdf
Project 1_Experiential Landscape.pdfProject 1_Experiential Landscape.pdf
Project 1_Experiential Landscape.pdf
 

ICI project 2 (1).pdf

  • 1. T.Y. LIN INTERNATIONAL SDN BHD Civil & Structural Engineers Dr. Lim Yeow Beng The Principal of the company Introduction of Construction Industry October 2014 school interview
  • 2. 02 Content Boon Yi Fung 0318300 Chong Zhao Lun 0320408 Khoo Zer Kai 0320500 Deong Khai Keat 0320055 Teh Qing Da 0318590 Foo Zhi Fung 03 04 06 08 10 11 Profile Company Background Project 1 Project 2 Organizational Chart Advise for future C&S Engineer Group Members
  • 3. Ir. Dr. LimYeow Beng, is a registered Professional Engineer with more than 28 years of practical experience, graduated with Honours in 1984 from the National University of Singapore. In the years 1984 to 1989, he works at Singapore after he graduated from National University of Singapore.While working in consultancy office, he obtained the Degree of Master of Science from the National University of Singapore in 1987. In 1989, he enrolled in the University of Illinois at Urbana- Champagne where he graduated with the Degree of Doctor of Philosophy (PhD) in 1994. In the years 1994 to 1995, he came back to Malaysia and work as a Design Engineer in the Protek Engineers Sdn. Bhd. He has been with T.Y. Lin International Sdn. Bhd. since 1995 and is currently holding the position of Principal in the company. He is involved substantially in the design of Civil and Structural works. He has successfully completed more than twenty projects such as condominiums, hotels, office towers, renovation and strengthening of existing buildings and retail malls. 03 DR. LIM YEOW BENG
  • 4. T.Y.LIN have established itself as a leading consulting practice which offers a complete spectrum of professional services ranging from feasibility studies, cost estimate, contract documentation, design and contract management to supervision.T.Y.LIN have established a notable track record in the design of long span and high-rise structures.Their design in prestressed and precast concrete and structural steel have also gained particular renown. It affiliation with T.Y.LIN international and other regional offices allow it to draw from the accumulated pool of experience covering the entire range of engineering expertise. Of particular interest,T.Y.LIN International has among other innovation, pioneered the application of prestressing technique on steel girders to increase their efficiency. T.Y. LIN IN 04 pavilion, kl berjaya times square, kl
  • 5. ! ! ! ! ! ! ! ! ! ! T.Y.LIN are fully equipped with up- to-date computer softwares for both design and drafting. T.Y.LIN INTERNATIONAL Sdn Bhd (TYLI) is a civil and structural consulting practice and a member of the T.Y.Lin International Group based in San Francisco, California, USA. ! Established in 1980 in Johor Bahru, Malaysia,T.Y.LIN subsequently relocated to Kuala Lumpur in the early eighties prompted by a resurgence in the property market in Malaysia capital. In T.Y.LIN International Sdn Bhd has 150 workers in his company.There are many T.Y.Lin international offices in overseas. For example; United States, Singapore,Taiwan, Indonesia, Beijing , Dalian, Chongqing, Shanghai and Guangzhou. TERNATIONAL SDN. BHD. 05 KL Ecocity Shah Alam Stadium
  • 6. Regency Condominium & G-Hotel Persiaran Gurney, Penang ! (1995 - 2000) ! Regacy Condominium is located at Persiaran Gurney, Penang.The Regacy Condominium is a 39 storey condominium consisting of reinforced concrete construction with pre-cast concrete piles foundation. It is 1 block of 37-storey of luxury condominium with two level of basement parking. There have 100 units in this condominium. It had three units in each storey and each unit has around 4000 to 5000 square feet. The G Hotel is located in along the Gurney drive and also next to the Gurney mall. The G Hotel is a 19 storey hotel consists of shear wall construction.This building is supported by pre-cast concrete piles foundation. It is a 14 storey high storey high tower of 304 rooms,hotel facilities and 2 basement parking. 06
  • 7. Ir. Dr. Lim acted as a Project Manager in this project. He work with a partner for this project. He also face problem that is didn’t coordinate well with other professions. He tried to extend the time for work, work more harder and communicate with other professions. During 2004, there was a Tsunami in Penang. Many buildings has been affected by the Tsunami included the G Hotels.The G Hotel has some crack lines on the wall.The warranty of the building had been expired, but Dr. Lim want to responsible to his own project that he done before. He went to the Penang and had a maintenance service for the building. However, they still need to pay for Dr. Lim for the service check. ‘My role in G Hotel project is a Project Manager.The first project we start is just only 2 people including me.We are doing all the drawings of the structure plan of the building and the other stuff by ourselves.We gave advise to the owner on what type of the structure that suitable for the building. I am also the one who design this building. For example, I designed the foundation and the position of the column and beam put in the building. What role are you involved in this projects? 07
  • 8. Nu Sentral Mall & Office (Lot G), Kuala Lumpur Sentral, Kuala Lumpur (2008-2013) ! Nu Sentral Mall is located in Kl Sentral, Brickfields. Nu Sentral is part of the RM1.4 billion investment by Malaysian Resources Corporation Berhad (MRCB) and Pelaburan Hartanah Berhad (PHB).This development consists of a 7 storey retail mall and a 33 storey office block with 4 levels of basement car parks. The retail mall is supported by raft slab while the office block is on bored piles foundation.The retail and office block are constructed using post tensioned and reinforced concrete structures.There is substantial structural steel roof on the retail block due to long span requirements. 08
  • 9. Ir. Dr. Lim acted as a Project Principal in this project. He work with 6 engineers and he just provide the ideas and guide to them.This project had been delay for one year due to didn’t coordinate well. For example, in every project they will go through this kind of problem such as they come out the drawing and the contractor need to do a lot to it. So they have to solving the problem and as their responsible to done this project with overcome it. He tried to make the project done as soon as possible and luckily this was an in house project.The contractor completed this project in 2010. If this project can't finish on time, they must pay for the loss of the owner. What role are you involved in this projects? “My role in Nu Sentral Mall is a Project Principal. I have 6 engineers that work with me in this project. Some of our people are doing for the structural steel and some of them doing for the concrete block.The foundation and all the concept of the building are provided by me. I just provide the idea of drawing. For example, I done a simple sketch for the building then I will pass it to the draftsmen to draw and convert it into AutoCAD. And also I will guide the contractor to ensure that the building was safe. 09
  • 10. Organizational Chart 10 Managing Director WONG LOO MIN B.Sc.(Civil), MIEM,,MIES, MACEM, PEng Before construct, we advice architect and developers.We analysis see whether the design fit with their requirements. We also prepare C&S drawing (columns and beams) and tender documents (steel, concrete, doors, windows).We also need to specify the correct way to do. During construct, make sure they understand and happy with the price.We engage a residence engineer to do site inspection and make sure whatever drawn in the drawing and material the contractor use it. Every two weeks we must have a site meeting for checking and monitor the progress.We need to estimate whether can achieve it on time or not, I f cannot achieve, try to came out with other solution. After construct, make sure it is completely done by inspect with contractor and authorities to sign Certificate of Practical Completion (CPC).After that, sign for the Certificate of Completion and Compliments (CCC).There are six form for C&S Engineer to sign include earth work, foundation work, drainage work, water work, sewer work, structure work. They warranty the building for 12 – 18 months. What does a C&S Engineer do in construction industry? DIRECTOR CHIN LEE LENG B.Sc., M.Eng, MIEM, MASCE, MIE(Aust), MACEM, PEng DIRECTOR KEN LIM B.Eng.(Hons), MIEM, MASCE, MACEM, PEng PRINCIPAL LEE KIAN AN B.Eng.(Hons), PE, MIEM, MIES, MIE(Aust), CPEng PRINCIPAL DR. LIM YEOW BENG B.Eng.(Hons), M.Sc., PhD, MIEM, PEng PRINCIPAL DR. SYED MANSUR B. Sc(Hons)., M. Sc., Ph. D., MIEM., MICE., PEng.
  • 11. What’s your advice for future C&S Engineer? ! “A lot C&S Engineer not good in basic knowledge, so wish you all can put in more effort to understand on design concept.Although many people nowadays based on computer, but still need to knew the basic knowledge or else you can’t handle it while needed it.” Dr. Lim Yeow Beng 11