I had worked before with well-known Egyptian and Saudi companies.I have over 5 years experience 3 months worked for
AMOC company ,6 months worked for NSGB bank ,6 months worked for Egyptian Educational Buildings
Authority.In Saudi Arabia i had worked for the Ministry of the Interior ,Saudi electricity company,Committee for the
Command of Virtue and the Prevention of Vice, AL Ahly bank , I had worked with one of the biggest companies in
the middle east "Orascom Constructions" for one ofthe biggest project in Egypt "Mall of Egypt project" with a budget of
500 million dollars, and now working with one of the biggest companies in Egypt and Middle East for power system
projects ELSEWEDY ELECTRIC for on of the famous power system project in Egypt 500/220KV GIS-SIEMENS-
ELSEWEDY-ELECTRIC project JV with Siemens company as QC Civil Engineer.
Responsibilities: Execution of entire civil construction works which includes to supervise construction of
abovestructures: Building Lay out with the surveyors, earth excavation & Back fill, , form work planning, concreting
work,Block work, Anchor Bolt Setting,Water Proofing works (Bitumen Primer, Bituminous membrane,Bitu stick),
Paintingworks.Organize manpower and equipment allocation based on site schedule to comply with the
requirement,Optimizes manpower, equipment and materials allocation and ensures no materials are wasted on assigned
site.Follow up the Review drawings and monitor site progress,Ensures construction work of assigned project is
implemented within budgeted time, cost and quality standards onassigned site.Co-ordination with the QA/QC Department
for inspection and Testing.Report to the site Manager in relation to the Health, Safety and Environmental protection
activities.Maintain the quality of workmanship at site.Lead a group of Building sub-contractors, Labors and local
Suppliers.Preparing of Monthly Progress Report and Materials statement to client and senior management.
Work experience
Senior QC Civil Engineer
Working as Senior QC Civil Engineer at the project of 6x500/220KV GIS-SIEMENS-ELSEWEDY-ELECTRIC S/S Itay
ELBaroud Substation.
Coordination with Site Engineers and Site Supervisors in day to day works.
Coordination with Consultant QA/QC for the field-testing and obtain approvals.
Preparation of Inspection Test Plans (ITP), Technical queries (TQ), Method of Statements and Inspection
Requests.
Deficiencies on the construction to rectify immediately.
Review of as built drawings.
Coordinating with Quality Assurance/Quality Control department for daily inspections as per Inspection and Test
Plan and as per contract conditions including issuance of requests for inspection and coordination and
management of all the site inspection and test at work.
Coordination with Subcontractor’s site staff for all related activities.
Coordinating with supplier for material requirement as per delivery schedule.Monitoring the Civil & Structural
scope of works for conformance with the provisions of the contract documents and the procedures manual.
Reviewing the contractor’s project record documents relevant to their discipline.
Follow-up CARs. Internal, External NCRs trend analysis.
Signing off on completed Civil & Structural works with completed documentation.
Mohammed Fathy Mohammed ALSaadany 1
2. Orascom Construction Industries. Aug-2014 — Oct-2015
ALHEILB company for trading and
construction .
Mar-2012 — Jun-2014
Perform all other duties given by Project Director & QA/QC Manager.
The preparation of the Company QA manual control and supervision of all amendments and revisions Control and
the distribution of all the companies quality documentation
Monitor all quality related activities on the project.
Perform all internal and external audits on behalf of the company’s management.
Verify Clint Quality requirements are specified to vendors and contractor documentation submittals.
Attend all pre-bid meetings and coordinate all project requirements with the project bidders.
Attend client quality management meetings.
The preparation and control of project quality system management documentation prior to project
commencement.
Monitor the progress and effectiveness of the project quality management system. Recommend and implement
improvements when required.
Owner: EETC
JV: with Siemens
Site Civil Engineer
Work as Site Civil Engineer in the project of construction of Mall of Egypt at 6 of October city With budget of 500
million dollars.
My duties was to review drawings and coordinate with the technical office with the RFIs then review the drawings with
my foremen and supervision civil works such as sending IRs to QC Engineers to inspect and handing over columns of
level 06 and the roof slap for level 08 zone 08 after that i worked in constructing welcome gate for the mall from level 04
to level 09 by supervise and inspect PC and RC foundations columns and two flat slap roof at level 06 and level 09 and
slap on grade between M09 and M08 after that i worked in finishing and inspection for the corridors and shops in zone
M11 and M12 like block work first course and foll height repairing by emaco and grout,installing door frames and the
doors, plastering electrical rooms ,repairing electrical closet and the mechanical risers ,installing precast stairs,screed
floor, epoxy painting for flooring and wall ruling safety instructions in my area and attend safety meetings every
Monday(my area wins the area of the month for august 2014 for safety ) and i get a safety certification from the HSE
department.
Owner: "Majid AL Futtiam."
Consultant: "rmc & David Longdon." J.V: with "Besix."
Site Civil Engineer
ALAHLY bank Shaqra branch,Samba bank at king saud university in Riyadh KSA.
Dispensary public security forces at Arar KSA Dispensary public security forces at Arar KSA my duties was to
make surveying work like making the border for the project and butting axes ,after that making the excavation for
the foundations and the under ground water tank ,supervise the form work for pc footing and inspect the form
work, reinforcement for the RC footing , Isolation , back filling , Steel structure work ,making the main wall for the
building, asphalt , sidewalk , finishing work like Porcelain ,ceramic tiles , block work , plastering ,painting
,doors,windows and ceiling.
Services Building for Saudi Electricity Company at Jeila KSA my duties was to make surveying work like
making the border for the project and butting axes ,after that making the excavation for the foundations and the
under ground water tank ,supervise the form work for PC footing and inspect the form work , reinforcement for the
RC footing , Isolation , back filling ,making the main wall for the building, asphalt , sidewalk , finishing work like
Porcelain ,ceramic tiles , block work ,plastering ,painting ,doors ,windows ceiling and handover to the owner
before the project time by 2 months.
Project of Information Center Of the Ministry of interior at the city of Arar KSA Project of excavation of
Information Center Of the Ministry of interior at the city of Arar KSA my duties was to make surveying work
like making the border for the project and butting axes ,after that making the excavation for the foundations and
the under ground water tank ,supervise the form work for PC footing and inspect the form work , reinforcement for
the RC footing , Isolation , back filling , making the main wall for the building, asphalt , sidewalk , finishing work
like Porcelain ,ceramic tiles , block work , plastering ,painting ,doors ,windows ceiling.
The Committee for the Promotion of Virtue and the Prevention of Vice station at Fisalia Arar KSA.
Mohammed Fathy Mohammed ALSaadany 2
3. Noah For Constructions. Mar-2011 — Mar-2012
International company of projects
"TARRADCO".
Sep-2010 — Jan-2011
Civil engineering. 1-Oct-2004 — 1-July-2010
Site Civil Engineer.
Construction of NSGB bank Alex. Branch at Mahram bk.
Owner: "NSGB Bank."
Consultant:"ACE Moharram Bakhoum"
Site Civil Engineer Commissioner from Engineering Authority for armed forces to the project ramping and
expansion of Atef Ebaid primary school in Agami/Alexandria.
Owner: "Egyptian Educational Buildings Authority."
Site Civil Engineer.
TRADDCO International main contractor for Alexandria Mineral Oils Co. (AMOC) Project of Fabrication of soft
water network at AMOC company.
Owner: "Alexandria Mineral Oils Co. (AMOC)."
Qualifications
1- Language Skills:
Arabic Mother tongue
English Very Good
2- Computer Skills:
Ms office
Auto- CAD
Ms Project
Photoshop
Internet
3- Soft Skills:
Building a trusty communication with Expats
Excellent reporting skills
Being drug free
Working under Safety manner
Ability to read and follow instructions
Commitment to continued training and learning.
4-Driving License Saudi & Egyptian License.
Education
Faculty of engineering Alexandria university 2010.
Graduation Projects: surveying with grade very good.
References
References available upon request.
Mohammed Fathy Mohammed ALSaadany 3