Project Management Templates
Gantt Chart for Excel
http://spreadsheetml.com/projectmanagement/ganttchart.shtml
Copyright (c) 2009-2010, ConnectCode
All Rights Reserved.
ConnectCode accepts no responsibility for any adverse affect that may result from undertaking our
training.
Microsoft and Microsoft Excel are registered trademarks of Microsoft Corporation. All other product
names are trademarks, registered trademarks, or service marks of their respective owners
Pg ii
Gantt Chart
Version 1.0
Table of Contents
1. Gantt Chart ............................................................................................................................1-1
1.1 Background................................................................................................................1-1
2. Gantt Chart Spreadsheet......................................................................................................2-2
2.1 Overview ....................................................................................................................2-2
2.2 Gantt Chart Inputs......................................................................................................2-2
2.3 Holiday Inputs ............................................................................................................2-3
2.3.1 Weekends .....................................................................................................2-3
2.3.2 Holidays ........................................................................................................2-3
2.4 Gantt Chart Outputs...................................................................................................2-4
2.5 Printing .......................................................................................................................2-5
2.6 Extending the Gantt Chart spreadsheet. ...................................................................2-5
2.6.1 Extending Items/Tasks..................................................................................2-5
2.6.2 Extending the schedule period beyond 12 months.......................................2-5
Pg iii
Gantt Chart
Version 1.0
ConnectCode’s Project Management Templates
Have you thought about how many times you use or reuse your project management models?
Everyday, day after day, model after model and project after project. We definitely have. That is
why we build all our project management templates to be reusable, customizable and easy to
understand. We also test our templates with different scenarios vigorously, so that you know you
can be assured of their accuracy and quality and that you can save significant amount of time by
reusing them. We have also provided comprehensive documentation on the templates so that you
do not need to guess or figure out how we implemented the models.
All our template models are only in black and white color. We believe this is how a professional
project management template should look like and also that this is the easiest way for you to
understand and use the templates. All the input fields are marked with the ‘*’ symbol for you to
identify them easily.
Whether you are a project manager, restaurant owner or human resource personnel. Or whether
you are a student aspiring to join the project management world or an entrepreneur needing to
manage projects, we hope that you will find this package useful as we have spent our best effort
and a lot of time in developing them.
ConnectCode
Pg 1-1
Gantt Chart
Version 1.0
1. Gantt Chart
1.1 Background
A Gantt Chart is a type of bar chart that is useful for showing the scheduled and actual progress of
a project. Developed by Henry Gantt in the 1917, the Gantt Chart is now regarded as the standard
project management charting technique. Its simplicity allows it to be easily understood by many
people and with the use of a computer software, a Gantt Chart can be generated and modified
very quickly and easily.
Pg 2-2
Gantt Chart
Version 1.0
2. Gantt Chart Spreadsheet
2.1 Overview
This spreadsheet provides a flexible and extensible Gantt Chart on a 12-months schedule. It is
very simple to use. The user simply keys in a few inputs like task name, start date, duration in
days and percent completed, after which, a Gantt Chart will be generated automatically for
tracking the project. The spreadsheet is arranged in a manner to be printed easily in Landscape
mode or it can be saved to a PDF file using Excel to be emailed to the relevant parties. The
diagram below shows a sample of the spreadsheet Gantt Chart.
2.2 Gantt Chart Inputs
All the worksheets that require inputs to generate the Gantt Charts are marked with the word
“(Input)”. On the worksheet, fields that require inputs are marked with “*” for easy identification.
The diagram above shows the input worksheet “Month 1 (Input)”. All the input fields required are
marked with “*” and described below.
 Project Start Date* - The start date of the project. The spreadsheet will be generating 12
output worksheets for tracking a project over a 12 months period. The start date allows
the spreadsheet to determine which month to start generating the schedule.
 ID* - A two digit number for identifying the item/task of the project.
 Items* - The names of the items or tasks of the project.
 Start Date* - The start date of the specific item/task. The date is in MM/DD/YY format.
 DY* - The duration of the item/task in days. The start date and duration will be used to
calculate the End Date as shown in the diagram above. It is important to note that the
Pg 2-3
Gantt Chart
Version 1.0
calculation of the End Date takes into account weekends and holidays like Christmas and
New Year. Holidays can be defined in the “Holidays (Input)” worksheet.
 DID* - The predecessor's ID. The predecessor item needs to be completed before the start
of this item. In this spreadsheet, the DID is used for the user’s own tracking purposes. The
spreadsheet does not enforce the dependency.
 PCT* - Percent Completed. The spreadsheet will use this field to determine the actual
progress to be displayed on the Gantt Chart. The amount of work that is completed is
shown as a darker shade of black while the work in progress is shown a lighter shade of
black.
2.3 Holiday Inputs
The Gantt Chart spreadsheet allows weekend and holidays to be defined and encompassed into the
schedules. Weekend and holidays are defined in the “Holidays (Input)” worksheet.
2.3.1 Weekend
In the diagram below, the first section shows the definition of weekend. A “Y” will indicate the
particular day of week is a weekend holiday.
2.3.2 Holidays
The second section allows holidays to be defined. It is important to define all the holidays within
the 12-months schedule period. This will allow the Gantt Chart to incorporate all the holidays and
generate an accurate schedule. The holiday’s date is in “MM/DD/YY” format. The second column is
used for describing the holidays and is optional. A maximum of 40 dates are supported, beyond
which the holidays will be ignored.
Pg 2-4
Gantt Chart
Version 1.0
2.4 Gantt Chart Outputs
This spreadsheet outputs a 12-months schedule in 12 different worksheets. Each worksheet
displays the schedule for a particular month. The worksheets are named “Month 1”, “Month 2” and
“Month 3” etc. In each of the worksheet, a Gantt Chart is included to show the progress of the
project.
The diagram above shows the Gantt Chart generated in one of the output worksheets. The top left
hand corner displays the month of this Gantt Chart. Each worksheet contains a unique month over
a 12-months period. The next two rows show the days of week and days of the month of the Gantt
Chart.
The darker shade of black shows work that are completed and the lighter shade of black shows
work that is still in-progress. The “x” shows the holidays defined in the “Holidays (Input)”
worksheet.
Pg 2-5
Gantt Chart
Version 1.0
2.5 Printing
These spreadsheets can be printed quickly and easily in Landscape mode in Microsoft Excel.
Simply set the “% to normal size” option to include all the fields in the worksheets.
To print several worksheets at once, simply click the tab for the first sheet in Excel, then hold
down CTRL while you click the tabs of the other sheets that you want to select.
2.6 Extending the Gantt Chart spreadsheet.
The spreadsheet can be easily extended to support a longer period and more number of
items/tasks.
2.6.1 Extending Items/Tasks
To support more items/tasks in each of the months, simply copy the cells in each of the output
worksheets from column A to column AL in row 34 to the next. The row to be copied is shown in
the diagram below. The rows for each of the worksheets named “Month 1..12” needs to copied.
2.6.2 Extending the schedule period beyond 12 months
To support a longer schedule period, simply copy and paste the “Month 12” worksheet and rename
the new worksheet to be “Month 13”. Only the cell in H2 needs to be modified. The original and
new formula in this cell is shown below. Simply add 1 to the “months” field below.
Original
=DATE(YEAR(C2),MONTH(C2)+11,1)
Modified
=DATE(YEAR(C2),MONTH(C2)+12,1)
The change allows the new worksheet to generate the Gantt Chart for the 13th
month of the
project. Repeat the steps above to modify the schedule period to the one that is required.

More Related Content

What's hot

Gantt chart cpm
Gantt chart cpmGantt chart cpm
Gantt chart cpm
Mimin Adam
 
Benchmarking and Gantt chart
Benchmarking and Gantt chartBenchmarking and Gantt chart
Benchmarking and Gantt chart
Abhijeet Malkar
 
The gantt Chart
The gantt Chart The gantt Chart
The gantt Chart
Nicola2903
 
Modelingprogramstructure
ModelingprogramstructureModelingprogramstructure
Modelingprogramstructure
learnt
 

What's hot (20)

Gantt
GanttGantt
Gantt
 
Gantt chart
Gantt chartGantt chart
Gantt chart
 
Apps4.Pro Planner Gantt chart (Chrome extension)
Apps4.Pro Planner Gantt chart (Chrome extension)Apps4.Pro Planner Gantt chart (Chrome extension)
Apps4.Pro Planner Gantt chart (Chrome extension)
 
Gantt Charts
Gantt ChartsGantt Charts
Gantt Charts
 
Gantt chart cpm
Gantt chart cpmGantt chart cpm
Gantt chart cpm
 
Gantt and PERT chart
Gantt and PERT chartGantt and PERT chart
Gantt and PERT chart
 
Lec 12 gantt chart
Lec 12 gantt chartLec 12 gantt chart
Lec 12 gantt chart
 
Ghant chart
Ghant chartGhant chart
Ghant chart
 
Benchmarking and Gantt chart
Benchmarking and Gantt chartBenchmarking and Gantt chart
Benchmarking and Gantt chart
 
Gantt Chart Templates by Creately
Gantt Chart Templates by CreatelyGantt Chart Templates by Creately
Gantt Chart Templates by Creately
 
Mba ii pmom_unit-4.3 scheduling-gantt chart a
Mba ii pmom_unit-4.3 scheduling-gantt chart aMba ii pmom_unit-4.3 scheduling-gantt chart a
Mba ii pmom_unit-4.3 scheduling-gantt chart a
 
The gantt Chart
The gantt Chart The gantt Chart
The gantt Chart
 
Modelingprogramstructure
ModelingprogramstructureModelingprogramstructure
Modelingprogramstructure
 
Lecture5---Gantt Chart
Lecture5---Gantt ChartLecture5---Gantt Chart
Lecture5---Gantt Chart
 
Gantt charts
Gantt chartsGantt charts
Gantt charts
 
Pert and gantt chart
Pert and gantt chartPert and gantt chart
Pert and gantt chart
 
Lab 2 create a gantt chart and pert chart using ms project
Lab 2 create a gantt chart and pert chart using ms projectLab 2 create a gantt chart and pert chart using ms project
Lab 2 create a gantt chart and pert chart using ms project
 
Software project management tools
Software project management toolsSoftware project management tools
Software project management tools
 
PERT & Gantt Chart
PERT & Gantt Chart PERT & Gantt Chart
PERT & Gantt Chart
 
Are Gantt charts your worst nightmares well, not anymore!
Are Gantt charts your worst nightmares well, not anymore!Are Gantt charts your worst nightmares well, not anymore!
Are Gantt charts your worst nightmares well, not anymore!
 

Similar to Gantt chart discuss 3

TID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft ProjectTID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft Project
WanBK Leo
 
MS Project - Lesson #1A - Basics of Project Scheduling - Part 1O.docx
MS Project - Lesson #1A - Basics of Project Scheduling - Part 1O.docxMS Project - Lesson #1A - Basics of Project Scheduling - Part 1O.docx
MS Project - Lesson #1A - Basics of Project Scheduling - Part 1O.docx
rosemarybdodson23141
 
GanttChartGantt Chart© 2008 Vertex42 LLC0HELP[Project Name][Compan.docx
GanttChartGantt Chart© 2008 Vertex42 LLC0HELP[Project Name][Compan.docxGanttChartGantt Chart© 2008 Vertex42 LLC0HELP[Project Name][Compan.docx
GanttChartGantt Chart© 2008 Vertex42 LLC0HELP[Project Name][Compan.docx
hanneloremccaffery
 
GanttChartGantt ChartVersion 1.7.3© 2006-2014 Vertex42 LLC0HELP[Pr.docx
GanttChartGantt ChartVersion 1.7.3© 2006-2014 Vertex42 LLC0HELP[Pr.docxGanttChartGantt ChartVersion 1.7.3© 2006-2014 Vertex42 LLC0HELP[Pr.docx
GanttChartGantt ChartVersion 1.7.3© 2006-2014 Vertex42 LLC0HELP[Pr.docx
hanneloremccaffery
 

Similar to Gantt chart discuss 3 (20)

What is a Gantt chart
What is a Gantt chartWhat is a Gantt chart
What is a Gantt chart
 
Brief tutorial on gantt charts
Brief tutorial on gantt chartsBrief tutorial on gantt charts
Brief tutorial on gantt charts
 
TID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft ProjectTID Chapter 6 Introduction To Microsoft Project
TID Chapter 6 Introduction To Microsoft Project
 
Gantt excel
Gantt excelGantt excel
Gantt excel
 
iMindQ User Manual for Project Management
iMindQ User Manual for Project ManagementiMindQ User Manual for Project Management
iMindQ User Manual for Project Management
 
#@123ganttchart-240304175359-d9a26905.pptx
#@123ganttchart-240304175359-d9a26905.pptx#@123ganttchart-240304175359-d9a26905.pptx
#@123ganttchart-240304175359-d9a26905.pptx
 
MS Project - Lesson #1A - Basics of Project Scheduling - Part 1O.docx
MS Project - Lesson #1A - Basics of Project Scheduling - Part 1O.docxMS Project - Lesson #1A - Basics of Project Scheduling - Part 1O.docx
MS Project - Lesson #1A - Basics of Project Scheduling - Part 1O.docx
 
BhadaniS Microsoft Project Manual Training
BhadaniS Microsoft Project Manual TrainingBhadaniS Microsoft Project Manual Training
BhadaniS Microsoft Project Manual Training
 
Programmes of work for Core Unit 2002
Programmes of work for Core Unit 2002Programmes of work for Core Unit 2002
Programmes of work for Core Unit 2002
 
An Introduction to Gantt Charts
An Introduction to Gantt Charts An Introduction to Gantt Charts
An Introduction to Gantt Charts
 
Gantt Chart Description
Gantt Chart DescriptionGantt Chart Description
Gantt Chart Description
 
Ms project tutorial
Ms project tutorialMs project tutorial
Ms project tutorial
 
sMs project tutorial_iit
sMs project tutorial_iitsMs project tutorial_iit
sMs project tutorial_iit
 
GanttChartGantt Chart© 2008 Vertex42 LLC0HELP[Project Name][Compan.docx
GanttChartGantt Chart© 2008 Vertex42 LLC0HELP[Project Name][Compan.docxGanttChartGantt Chart© 2008 Vertex42 LLC0HELP[Project Name][Compan.docx
GanttChartGantt Chart© 2008 Vertex42 LLC0HELP[Project Name][Compan.docx
 
Project Share Feature List - MS Project Services
Project Share Feature List - MS Project ServicesProject Share Feature List - MS Project Services
Project Share Feature List - MS Project Services
 
MS Project Guide.pdf
MS Project Guide.pdfMS Project Guide.pdf
MS Project Guide.pdf
 
Project 2007 full handout
Project 2007 full handoutProject 2007 full handout
Project 2007 full handout
 
GanttChartGantt ChartVersion 1.7.3© 2006-2014 Vertex42 LLC0HELP[Pr.docx
GanttChartGantt ChartVersion 1.7.3© 2006-2014 Vertex42 LLC0HELP[Pr.docxGanttChartGantt ChartVersion 1.7.3© 2006-2014 Vertex42 LLC0HELP[Pr.docx
GanttChartGantt ChartVersion 1.7.3© 2006-2014 Vertex42 LLC0HELP[Pr.docx
 
Events Planning - Midterm 2 quiz.docx
Events Planning - Midterm 2 quiz.docxEvents Planning - Midterm 2 quiz.docx
Events Planning - Midterm 2 quiz.docx
 
How to Manage Projects with SmartDraw
How to Manage Projects with SmartDrawHow to Manage Projects with SmartDraw
How to Manage Projects with SmartDraw
 

More from Makati Science High School

More from Makati Science High School (20)

Writing a Scientific Paper
Writing a Scientific PaperWriting a Scientific Paper
Writing a Scientific Paper
 
Research Paper Rubrics 2020
Research Paper Rubrics 2020Research Paper Rubrics 2020
Research Paper Rubrics 2020
 
Statistical test discuss 5
Statistical test discuss 5Statistical test discuss 5
Statistical test discuss 5
 
Measures of variation discuss 2.1
Measures of variation discuss  2.1Measures of variation discuss  2.1
Measures of variation discuss 2.1
 
Measures of dispersion discuss 2.2
Measures of dispersion discuss 2.2Measures of dispersion discuss 2.2
Measures of dispersion discuss 2.2
 
Materials and methods discuss
Materials and methods  discussMaterials and methods  discuss
Materials and methods discuss
 
Inferential stat tests samples discuss 4
Inferential stat tests samples discuss 4Inferential stat tests samples discuss 4
Inferential stat tests samples discuss 4
 
Ds vs Is discuss 3.1
Ds vs Is discuss 3.1Ds vs Is discuss 3.1
Ds vs Is discuss 3.1
 
Descriptive inferential-discuss 1
Descriptive  inferential-discuss 1Descriptive  inferential-discuss 1
Descriptive inferential-discuss 1
 
Central tendency m,m,m 1.2
Central tendency m,m,m 1.2Central tendency m,m,m 1.2
Central tendency m,m,m 1.2
 
Central tendency discuss 2
Central tendency  discuss 2Central tendency  discuss 2
Central tendency discuss 2
 
Types of graphs and charts and their uses with examples and pics
Types of graphs and charts and their uses  with examples and picsTypes of graphs and charts and their uses  with examples and pics
Types of graphs and charts and their uses with examples and pics
 
Levels of measurement discuss
Levels of measurement   discussLevels of measurement   discuss
Levels of measurement discuss
 
Research Designs -9 experimental Designs
Research Designs -9 experimental DesignsResearch Designs -9 experimental Designs
Research Designs -9 experimental Designs
 
Research designs Pt 1
Research designs Pt 1Research designs Pt 1
Research designs Pt 1
 
Identifying variables
Identifying variablesIdentifying variables
Identifying variables
 
Kinds and classifications of research
Kinds and classifications of researchKinds and classifications of research
Kinds and classifications of research
 
Research Ethical Issues
Research Ethical IssuesResearch Ethical Issues
Research Ethical Issues
 
BSR I Course Outline 2019-2020
BSR I Course Outline 2019-2020BSR I Course Outline 2019-2020
BSR I Course Outline 2019-2020
 
Research Ethics
Research EthicsResearch Ethics
Research Ethics
 

Recently uploaded

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lessonQUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
httgc7rh9c
 

Recently uploaded (20)

Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Model Attribute _rec_name in the Odoo 17
Model Attribute _rec_name in the Odoo 17Model Attribute _rec_name in the Odoo 17
Model Attribute _rec_name in the Odoo 17
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
 
Play hard learn harder: The Serious Business of Play
Play hard learn harder:  The Serious Business of PlayPlay hard learn harder:  The Serious Business of Play
Play hard learn harder: The Serious Business of Play
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
AIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptAIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.ppt
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
What is 3 Way Matching Process in Odoo 17.pptx
What is 3 Way Matching Process in Odoo 17.pptxWhat is 3 Way Matching Process in Odoo 17.pptx
What is 3 Way Matching Process in Odoo 17.pptx
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lessonQUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
QUATER-1-PE-HEALTH-LC2- this is just a sample of unpacked lesson
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 

Gantt chart discuss 3

  • 1. Project Management Templates Gantt Chart for Excel http://spreadsheetml.com/projectmanagement/ganttchart.shtml Copyright (c) 2009-2010, ConnectCode All Rights Reserved. ConnectCode accepts no responsibility for any adverse affect that may result from undertaking our training. Microsoft and Microsoft Excel are registered trademarks of Microsoft Corporation. All other product names are trademarks, registered trademarks, or service marks of their respective owners
  • 2. Pg ii Gantt Chart Version 1.0 Table of Contents 1. Gantt Chart ............................................................................................................................1-1 1.1 Background................................................................................................................1-1 2. Gantt Chart Spreadsheet......................................................................................................2-2 2.1 Overview ....................................................................................................................2-2 2.2 Gantt Chart Inputs......................................................................................................2-2 2.3 Holiday Inputs ............................................................................................................2-3 2.3.1 Weekends .....................................................................................................2-3 2.3.2 Holidays ........................................................................................................2-3 2.4 Gantt Chart Outputs...................................................................................................2-4 2.5 Printing .......................................................................................................................2-5 2.6 Extending the Gantt Chart spreadsheet. ...................................................................2-5 2.6.1 Extending Items/Tasks..................................................................................2-5 2.6.2 Extending the schedule period beyond 12 months.......................................2-5
  • 3. Pg iii Gantt Chart Version 1.0 ConnectCode’s Project Management Templates Have you thought about how many times you use or reuse your project management models? Everyday, day after day, model after model and project after project. We definitely have. That is why we build all our project management templates to be reusable, customizable and easy to understand. We also test our templates with different scenarios vigorously, so that you know you can be assured of their accuracy and quality and that you can save significant amount of time by reusing them. We have also provided comprehensive documentation on the templates so that you do not need to guess or figure out how we implemented the models. All our template models are only in black and white color. We believe this is how a professional project management template should look like and also that this is the easiest way for you to understand and use the templates. All the input fields are marked with the ‘*’ symbol for you to identify them easily. Whether you are a project manager, restaurant owner or human resource personnel. Or whether you are a student aspiring to join the project management world or an entrepreneur needing to manage projects, we hope that you will find this package useful as we have spent our best effort and a lot of time in developing them. ConnectCode
  • 4. Pg 1-1 Gantt Chart Version 1.0 1. Gantt Chart 1.1 Background A Gantt Chart is a type of bar chart that is useful for showing the scheduled and actual progress of a project. Developed by Henry Gantt in the 1917, the Gantt Chart is now regarded as the standard project management charting technique. Its simplicity allows it to be easily understood by many people and with the use of a computer software, a Gantt Chart can be generated and modified very quickly and easily.
  • 5. Pg 2-2 Gantt Chart Version 1.0 2. Gantt Chart Spreadsheet 2.1 Overview This spreadsheet provides a flexible and extensible Gantt Chart on a 12-months schedule. It is very simple to use. The user simply keys in a few inputs like task name, start date, duration in days and percent completed, after which, a Gantt Chart will be generated automatically for tracking the project. The spreadsheet is arranged in a manner to be printed easily in Landscape mode or it can be saved to a PDF file using Excel to be emailed to the relevant parties. The diagram below shows a sample of the spreadsheet Gantt Chart. 2.2 Gantt Chart Inputs All the worksheets that require inputs to generate the Gantt Charts are marked with the word “(Input)”. On the worksheet, fields that require inputs are marked with “*” for easy identification. The diagram above shows the input worksheet “Month 1 (Input)”. All the input fields required are marked with “*” and described below.  Project Start Date* - The start date of the project. The spreadsheet will be generating 12 output worksheets for tracking a project over a 12 months period. The start date allows the spreadsheet to determine which month to start generating the schedule.  ID* - A two digit number for identifying the item/task of the project.  Items* - The names of the items or tasks of the project.  Start Date* - The start date of the specific item/task. The date is in MM/DD/YY format.  DY* - The duration of the item/task in days. The start date and duration will be used to calculate the End Date as shown in the diagram above. It is important to note that the
  • 6. Pg 2-3 Gantt Chart Version 1.0 calculation of the End Date takes into account weekends and holidays like Christmas and New Year. Holidays can be defined in the “Holidays (Input)” worksheet.  DID* - The predecessor's ID. The predecessor item needs to be completed before the start of this item. In this spreadsheet, the DID is used for the user’s own tracking purposes. The spreadsheet does not enforce the dependency.  PCT* - Percent Completed. The spreadsheet will use this field to determine the actual progress to be displayed on the Gantt Chart. The amount of work that is completed is shown as a darker shade of black while the work in progress is shown a lighter shade of black. 2.3 Holiday Inputs The Gantt Chart spreadsheet allows weekend and holidays to be defined and encompassed into the schedules. Weekend and holidays are defined in the “Holidays (Input)” worksheet. 2.3.1 Weekend In the diagram below, the first section shows the definition of weekend. A “Y” will indicate the particular day of week is a weekend holiday. 2.3.2 Holidays The second section allows holidays to be defined. It is important to define all the holidays within the 12-months schedule period. This will allow the Gantt Chart to incorporate all the holidays and generate an accurate schedule. The holiday’s date is in “MM/DD/YY” format. The second column is used for describing the holidays and is optional. A maximum of 40 dates are supported, beyond which the holidays will be ignored.
  • 7. Pg 2-4 Gantt Chart Version 1.0 2.4 Gantt Chart Outputs This spreadsheet outputs a 12-months schedule in 12 different worksheets. Each worksheet displays the schedule for a particular month. The worksheets are named “Month 1”, “Month 2” and “Month 3” etc. In each of the worksheet, a Gantt Chart is included to show the progress of the project. The diagram above shows the Gantt Chart generated in one of the output worksheets. The top left hand corner displays the month of this Gantt Chart. Each worksheet contains a unique month over a 12-months period. The next two rows show the days of week and days of the month of the Gantt Chart. The darker shade of black shows work that are completed and the lighter shade of black shows work that is still in-progress. The “x” shows the holidays defined in the “Holidays (Input)” worksheet.
  • 8. Pg 2-5 Gantt Chart Version 1.0 2.5 Printing These spreadsheets can be printed quickly and easily in Landscape mode in Microsoft Excel. Simply set the “% to normal size” option to include all the fields in the worksheets. To print several worksheets at once, simply click the tab for the first sheet in Excel, then hold down CTRL while you click the tabs of the other sheets that you want to select. 2.6 Extending the Gantt Chart spreadsheet. The spreadsheet can be easily extended to support a longer period and more number of items/tasks. 2.6.1 Extending Items/Tasks To support more items/tasks in each of the months, simply copy the cells in each of the output worksheets from column A to column AL in row 34 to the next. The row to be copied is shown in the diagram below. The rows for each of the worksheets named “Month 1..12” needs to copied. 2.6.2 Extending the schedule period beyond 12 months To support a longer schedule period, simply copy and paste the “Month 12” worksheet and rename the new worksheet to be “Month 13”. Only the cell in H2 needs to be modified. The original and new formula in this cell is shown below. Simply add 1 to the “months” field below. Original =DATE(YEAR(C2),MONTH(C2)+11,1) Modified =DATE(YEAR(C2),MONTH(C2)+12,1) The change allows the new worksheet to generate the Gantt Chart for the 13th month of the project. Repeat the steps above to modify the schedule period to the one that is required.