Indo CBM 2014, Jakarta 
Best Practices in CBM Drilling 
Shane A. Lein, Product Manager 
Shallow Oil, Gas and CBM Drilling Equipment 
Garland, Texas
Best Practices in CBM Drilling 
 The key to a successful CBM Drilling Program is Safety, 
the Ability to “Quick Turn” the Wells, Quick Set up, 
Mobility and small Environmental Footprint 
– Safety = good reputation as a Contractor and Employer 
– More wells == mmoorree rreevveennuuee 
– Quick Set Up = more actual drilling time 
– Mobility = more actual drilling time 
– Small Environmental Footprint = “Green” Contractor, less $$ spent 
on location preparation
Best Practices in CBM Drilling 
 Drilling Method requirements are also a consideration 
– Amount of equipment required 
 Mud System 
– Mud Pits, Water Tanks, Mud Pumps, Mud Cleaning EEqquuiippmmeenntt,, MMuudd aanndd 
Mud Treatment Chemicals 
 Air System 
– Auxiliary Compressor, High Pressure Booster, A Few polymers/additives
Unconventional Rigs vs. Conventional Rigs 
 Overall Operating Cost Advantage of Unconventional Rigs 
– Less Crew 
– Fewer Loads to Move 
– Fast Rig Up-Hours, not Days 
– Reduces Non Drilling Time/Cost 
– Increases Drilling Performance 
– Higher Efficiency than Conventional Rigs designed to drill much deeper 
– Physical Size of Drilling Location 
– Less complicated to rig up providing for a safer environment
CBM DRILLING 
Safety, Speed, Mobility, Footage Production, Less 
Environmental Impact
TYPICAL CBM LOCATION 
MOBILE RIG 
DOG 
HOUSE 
MUD PUMP 
(NOT SHOWN) 
MUD TANK 
GEN 
Average Location Size 
40m x 40m or smaller 
VAC 
TRUCK 
SET 
SUB STRUCTURE PIPE TUBS  PIPE RACKS
TYPICAL CBM LOCATION 
Average Location Size 
40m x 40m or smaller 
SLUDGE 
ROLL-BACK 
TRUCK 
LOCATION 
OFFICE 
MUD 
TANK 
MUD 
PUMP 
TANK
Conventional Oilfield Land Rigs 
 Many Loads (average 15-25, costing tens of thousands of $$ per rig move) 
 More components to assemble, set and rig up 
 Larger drilling location required 
 Standard crew of 5 (per shift) x 2-12 hour shifts or 3 x 8 hour shifts 
– 10-15 Crewmembers per shift plus supervisory ppeerrssoonnnneell oonn ssiittee 
– Driller 
– Derrick Hand 
– Motor Hand 
– 2 Floor Hands 
 + Rig Supervisor/Tool Pusher
Conventional Drilling Rig Package 
Rig-MaPst,i stub, 
draw works 
BOP’s 
Choke Manifold 
Degasser 
Mud System 
Pits/Cleaning 
Large Location 
Pad 107m x 107m 
Change House 
Tool House 
Pipe Racks 
Pipe,Collars, 
Casing 
Living Quarters and 
offices 
Diesel Engines 
Gen Sets 
Water Tank 
Diesel Tank 
Mud Pumps 
Mud Mixing House 
Mud/Chemicals 
Reserve 
Pit
Unconventional Rigs, Moving on to a 
Location 
EXCELLENT MOBILITY SAVES TIME  MONEY 
 Quick rig moves from location to location
Unconventional Rigs, Moving on to a 
Location 
EXCELLENT MOBILITY SAVES TIME  MONEY 
 Quick rig moves from location to location 
 Quick rig up 
– Usually a 1-4 hour rig up, depending on drilling methods and auxiliary equipment requirements 
–– SSppuudd ssoooonneerr
Unconventional Rigs, Moving on to a 
Location 
EXCELLENT MOBILITY SAVES TIME  MONEY 
 Quick rig moves from location to location 
 Quick rig up 
– Usually a 1-4 hour rig up, depending on drilling methods and auxiliary equipment requirements 
–– SSppuudd ssoooonneerr 
 High footage production 
– Top Drive, better pipe control 
– Down Hole Hammer-Air or PDC Rotary-Water/Mud Flush 
– Less time on the well
Unconventional Rigs, Moving on to a 
Location 
EXCELLENT MOBILITY SAVES TIME  MONEY 
 Quick rig moves from location to location 
 Quick rig up 
– Usually a 1-4 hour rig up, depending on drilling methods and auxiliary equipment requirements 
–– SSppuudd ssoooonneerr 
 High footage production 
– Top Drive 
– Down Hole Hammer-Air or PDC Rotary-Water/Mud Flush 
– Less time on the well 
 Quick rig down
Unconventional Rigs, Moving on to a 
Location 
EXCELLENT MOBILITY SAVES TIME  MONEY 
 Quick rig moves from location to location 
 Quick rig up 
– Usually a 1-4 hour rig up, depending on drilling methods and auxiliary equipment requirements 
–– SSppuudd ssoooonneerr 
 High footage production 
– Top Drive 
– Down Hole Hammer-Air or PDC Rotary-Water/Mud Flush 
– Less time on the well 
 Quick rig down 
 Few loads to move 
– Saves time and money
Unconventional Rigs, Moving on to a 
Location 
EXCELLENT MOBILITY SAVES TIME  MONEY 
 Quick rig moves from location to location 
 Quick rig up 
– Usually a 1-4 hour rig up, depending on drilling methods and auxiliary equipment requirements 
– Spud sooner 
 High footage production 
–– TToopp DDrriivvee 
– Down Hole Hammer-Air or PDC Rotary-Water/Mud Flush 
– Less time on the well 
 Quick rig down 
 Few loads to move 
– Saves time and money 
– Smaller Environmental Impact-Drilling Location 
 Fewer Crewmembers 
– 3 Per shift typical 
Reduced Non Drilling Activity = More Rotating Hours
Unconventional Rigs, Moving on to a 
Location 
SAFE RIG MOVES and DRILLING OPERATIONS 
 Less complicated equipment to rig up/rig down 
– No awkward positions to pin equipment
Unconventional Rigs, Moving on to a 
Location 
SAFE RIG MOVES and DRILLING OPERATIONS 
 Less complicated equipment to rig up/rig down 
– No awkward positions to pin equipment 
 No Climbing Mast
Unconventional Rigs, Moving on to a 
Location 
SAFE RIG MOVES and DRILLING OPERATIONS 
 Less complicated equipment to rig up/rig down 
– No awkward positions to pin equipment 
 No Climbing Mast 
 NNoo HHiigghh RRiigg FFlloooorrss
Unconventional Rigs, Moving on to a 
Location 
SAFE RIG MOVES and DRILLING OPERATIONS 
 Less complicated equipment to rig up/rig down 
– No awkward positions to pin equipment 
 No Climbing Mast 
 NNoo HHiigghh RRiigg FFlloooorrss 
 Smaller scale equipment 
– More keen awareness of the Crew as to the whereabouts of others 
– Fewer Crew Members required to operate the rig
Unconventional Rigs, Moving on to a 
Location 
SAFE RIG MOVES and DRILLING OPERATIONS 
 Less complicated equipment to rig up/rig down 
– No awkward positions to pin equipment 
 No Climbing Mast 
 NNoo HHiigghh RRiigg FFlloooorrss 
 Smaller scale equipment 
– More keen awareness of the Crew as to the whereabouts of others 
– Fewer Crew Members required to operate the rig 
 Hands Free Pipe Handling 
– Safer working environment for Crew Members 
 Remain clear of Rotating Pipe
SETTING UP TO DRILL 
RAPID SET UP SAVES TIME  MONEY 
Information from Actual Rig Moves 
 AIR DRILLING - NO SUBSTRUCTURE 
5 TRAILER LOADS - 4 PEOPLE 
1/2 - 1 1/2 HR SET UP UNTIL DRILLING 
AIR ON BOARD TO BEGIN DRILLING IMMEDIATELY
SETTING UP TO DRILL 
RAPID SET UP SAVES TIME  MONEY 
Information from Actual Rig Moves 
 AIR DRILLING - NO SUBSTRUCTURE 
5 TRAILER LOADS - 4 PEOPLE 
1/2 - 1 1/2 HR SET UP UNTIL DRILLING 
AIR ON BOARD TO BEGIN DRILLING IMMEDIATELY 
 MUD DRILLING - FULL HEIGHT SUBSTRUCTURE 
7 TRAILER LOADS - 6 PEOPLE 
2 1/2 - 4 HR SET UP UNTIL DRILLING 
QUICK HOOK UP TO ON-BOARD MUD PIPING
Drilling Methods 
Mud/Air Rotary 
Down Hole Hammer
AIR VS. MUD DRILLING 
AIR 
FASTER  MORE ECONOMICAL IF 
– ROCK FORMATIONS 
MUD 
FASTER  MORE ECONOMICAL IF 
– UNCONSOLIDATED FORMATIONS 
– LESS WATER INFLUX 
– SMALLER HOLES 
– LOST CIRCULATION ZONES NOT A 
PROBLEM 
– LOW PRESSURE GAS DEPOSITS 
– LARGER WATER INFLUX 
– LARGER HOLES 
– NO LOST CIRCULATION ZONES 
– HIGH PRESSURE GAS DEPOSITS
MUD ROTARY - AIR ROTARY - DTH 
 SELECTION CRITERIA 
THE FORMATIONS TO BE DRILLED 
THE HOLE SIZES REQUIRED 
THE HYDRAULICS (WATER) IN THE FORMATIONS 
ECONOMICS
FORMATIONS - DRILLING METHODS 
FORMATION 
TYPES 
SEDIMENTARY ROCKS 
METAMORPHIC ROCKS 
MEDIUM HARD 
IGNEOUS ROCKS 
UNCONSOLIDATED 
UNCONSOLIDATED SOFT 
VERY HARD 
EXAMPLES OF SCHIST QUARTZITE 
FORMATIONS 
VERY HARD GRANITE 
MASSIVE BASALT 
SAND, CLAY, GRAVEL SOFT SHALE 
MED. LIMESTOME 
SOFT SANDSTONE 
MED. SHALE 
GNEISS 
GRANITE 
SOFT LIMESTONE 
SOFT DOLOMITE MED. SANDSTONE 
AQUIFER 
CHARACTERISTICS 
OPTIMUM 
DRILLING FOAM  
METHODS ADDITIVES 
FOAM  
ADDITIVES 
LARGE WATER INFLUX 
WHILE DRILLING 
MODERATE TO LOW 
WATER INFLUX 
DRILLING 
AIR ROTARY 
DRILLING 
MUD 
VERY LOW WATER INFLUX OR NO WATER 
WHILE DRILLING 
AIR DHD 
DRILLING 
WHILE DRILLING
HOLE SIZE 
 GENERALLY, AS HOLE SIZE INCREASES BEYOND A CERTAIN 
POINT, AIR DRILLING WILL BECOME LESS ECONOMICAL 
– CLEANING THE BIT AND HOLE BECOMES A PROBLEM 
 DRILLING SLOWS DOWN 
– ADDITIONAL AIR COMPRESSORS AARREE RREEQQUUIIRREEDD 
 COSTS GO UP
FORMATION HYDRAULICS 
WHEN FORMATIONS ARE SATURATED WITH WATER, AIR 
DRILLING WILL BECOME TOO SLOW TO BE ECONOMICAL 
– WHEN MORE WATER COMES INTO THE HOLE THAN THE AIR LIFT 
SYSTEM CAN EVACUATE, DRILLING RATE SLOWS DOWN AND 
EVENTUALLY STOPS 
– ADDING ANOTHER COMPRESSOR AND A BOOSTER 
COMPRESSOR WILL OVERCOME THE WATER PRESSURE BUT 
WILL ADD OPERATING COST
ECONOMICS 
WHEN SUB SURFACE CONDITIONS SLOW DOWN THE DRILLING RATE 
WHEN ADDITIONAL EQUIPMENT REQUIREMENTS ADD COST 
AIR DRILLING WILL NOT BE ECONOMICALLY FFEEAASSIIBBLLEE
TYPICAL AIR ROTARY 
OR DTH-PERCUSSION 
DRILLING SET UP
Mud 
Drilling
ACTUAL CASE STORIES 
RAPID SET UP SAVES TIME  MONEY 
Actual Case Example (Alberta, CA) 
 800m Depth CBM Well (Water/Bentonite Flush) 
– Move on Location and Rig Up 
 4 Hours 
– Drill 100m of 9 7/8” Surface hole and set 7” Surface Casing 
 10 Hours 
– Drill 700m of 6 1/8“ Production hole and set 4 ½” Production Casing 
 18 Hours 
– Rig Down 
 2 Hours 
 Total Well, 34 Hours (Excludes BOP Test at Rig Up and Logging Production Hole)
MUD DRILLING LOCATION, ALBERTA CANADA
ACTUAL CASE STORIES 
RAPID SET UP SAVES TIME  MONEY 
Actual Case Example (Other Areas) 
 China 
– Mud Drill 12 ¼” to 40m, set 9 5/8” casing 
– Air Drilling (DTH) to 350m set 5 ½” casing 
– Total Time-5 days
CBM Location in China
CBM Location in China
ACTUAL CASE STORIES 
RAPID SET UP SAVES TIME  MONEY 
Actual Case Example (Other Areas) 
 India - Air Drilling 
– Conductor - Drill 17 ½” to 15m, set 13 3/8” casing 
– Surface - Drill 12 ¼” to 150m, set 9 5/8” casing 
– Production - 7” to 1000 m, set 5 ½” casing 
– Total Time-5 days
Compact CBM Location in 
West Bengal, India
Compact CBM Location in 
West Bengal, India
Compact CBM Location in 
West Bengal, India
ACTUAL CASE STORIES 
RAPID SET UP SAVES TIME  MONEY 
Actual Case Example (Other Areas) 
 Australia 
– Water Flush Drill and set 9 5/8” surface casing to 120m 
– Water Flush Drill to TD at 1000m and set 8 ½” production casing 
– Total Time-3 days
CBM Location in Queensland, Australia
CBM Location in Queensland, Australia
CBM Location in Queensland, Australia
Additional Photographs of Unconventional 
Rigs in CBM Application 
Safe, Mobile Equipment, Quick Moving, Quick Rig Up/Down 
Small Environmental Footprint
CBM WELL IN WESTERN VIRGINIA
CBM WELL IN WESTERN VIRGINIA
GAS WELL LOCATION SOUTHERN ARKANSAS
FLARING OFF THE GAS – AIR DRILLING WITH LOTS OF 
WATER IN THE HOLE
GROUND LEVEL LOCATION 
AIR DRILLING - CBM - PENNSYLVANIA
MOUNTAIN TOP LOCATION 
NARROW MOUNTAIN TOP LOCATION IN VIRGINIA
CBM Location in Botswana, South Africa
Rigging up two rigs in Arkansas. 
Drilling in Fayetteville Shale
Questions? 
Thank you for your time and attention
Best Practice in CBM Drilling - ATLAS COPCO Indonesia  Presentation

More Related Content

Viewers also liked

Minerals, Geology, Earth Science Lesson PowerPoint
Minerals, Geology, Earth Science Lesson PowerPointMinerals, Geology, Earth Science Lesson PowerPoint
Minerals, Geology, Earth Science Lesson PowerPointwww.sciencepowerpoint.com
 
Hydraulic drill jumbos an overview
Hydraulic drill jumbos  an overviewHydraulic drill jumbos  an overview
Hydraulic drill jumbos an overviewPINAKI ROY
 
Properties of Minerals Earth Science Lesson PowerPoint, Lab Activity
Properties of Minerals Earth Science Lesson PowerPoint, Lab ActivityProperties of Minerals Earth Science Lesson PowerPoint, Lab Activity
Properties of Minerals Earth Science Lesson PowerPoint, Lab Activitywww.sciencepowerpoint.com
 
sosiologi tentang :Gejala gejala sosial yang terjadi di indonesia
sosiologi tentang :Gejala gejala sosial yang terjadi di indonesiasosiologi tentang :Gejala gejala sosial yang terjadi di indonesia
sosiologi tentang :Gejala gejala sosial yang terjadi di indonesiaYogi andreansyah
 
Name that Mineral Quiz, Earth Science Lesson PowerPoint, Geology, Minerals
Name that Mineral Quiz, Earth Science Lesson PowerPoint, Geology, MineralsName that Mineral Quiz, Earth Science Lesson PowerPoint, Geology, Minerals
Name that Mineral Quiz, Earth Science Lesson PowerPoint, Geology, Mineralswww.sciencepowerpoint.com
 
Gejala sosial
Gejala sosialGejala sosial
Gejala sosialsfuzaa
 
Name that Rock Quiz, Rock Cycle, Earth Science Lesson PowerPoint
Name that Rock Quiz, Rock Cycle, Earth Science Lesson PowerPointName that Rock Quiz, Rock Cycle, Earth Science Lesson PowerPoint
Name that Rock Quiz, Rock Cycle, Earth Science Lesson PowerPointwww.sciencepowerpoint.com
 
Gejala sosial kpkm (2)
Gejala sosial kpkm (2)Gejala sosial kpkm (2)
Gejala sosial kpkm (2)Jamal Ahmad
 
Metamorphic Rocks, Earth Science Lesson PowerPoint, Geology, Schist, Gneiss,
Metamorphic Rocks, Earth Science Lesson PowerPoint, Geology, Schist, Gneiss, Metamorphic Rocks, Earth Science Lesson PowerPoint, Geology, Schist, Gneiss,
Metamorphic Rocks, Earth Science Lesson PowerPoint, Geology, Schist, Gneiss, www.sciencepowerpoint.com
 
Minerals PowerPoint Quiz Game, Earth Science Lessonplan PowerPoint
Minerals PowerPoint Quiz Game, Earth Science Lessonplan PowerPointMinerals PowerPoint Quiz Game, Earth Science Lessonplan PowerPoint
Minerals PowerPoint Quiz Game, Earth Science Lessonplan PowerPointwww.sciencepowerpoint.com
 
Paleozoic Era, Earth Science Lesson PowerPoint, Geologic Events
Paleozoic Era, Earth Science Lesson PowerPoint, Geologic EventsPaleozoic Era, Earth Science Lesson PowerPoint, Geologic Events
Paleozoic Era, Earth Science Lesson PowerPoint, Geologic Eventswww.sciencepowerpoint.com
 
Masalah Sosial
Masalah SosialMasalah Sosial
Masalah SosialThomas Mon
 

Viewers also liked (19)

Minerals, Geology, Earth Science Lesson PowerPoint
Minerals, Geology, Earth Science Lesson PowerPointMinerals, Geology, Earth Science Lesson PowerPoint
Minerals, Geology, Earth Science Lesson PowerPoint
 
Hydraulic drill jumbos an overview
Hydraulic drill jumbos  an overviewHydraulic drill jumbos  an overview
Hydraulic drill jumbos an overview
 
Properties of Minerals Earth Science Lesson PowerPoint, Lab Activity
Properties of Minerals Earth Science Lesson PowerPoint, Lab ActivityProperties of Minerals Earth Science Lesson PowerPoint, Lab Activity
Properties of Minerals Earth Science Lesson PowerPoint, Lab Activity
 
Minerals
MineralsMinerals
Minerals
 
sosiologi tentang :Gejala gejala sosial yang terjadi di indonesia
sosiologi tentang :Gejala gejala sosial yang terjadi di indonesiasosiologi tentang :Gejala gejala sosial yang terjadi di indonesia
sosiologi tentang :Gejala gejala sosial yang terjadi di indonesia
 
Name that Mineral Quiz, Earth Science Lesson PowerPoint, Geology, Minerals
Name that Mineral Quiz, Earth Science Lesson PowerPoint, Geology, MineralsName that Mineral Quiz, Earth Science Lesson PowerPoint, Geology, Minerals
Name that Mineral Quiz, Earth Science Lesson PowerPoint, Geology, Minerals
 
Gejala sosial
Gejala sosialGejala sosial
Gejala sosial
 
Paleozoic
PaleozoicPaleozoic
Paleozoic
 
Name that Rock Quiz, Rock Cycle, Earth Science Lesson PowerPoint
Name that Rock Quiz, Rock Cycle, Earth Science Lesson PowerPointName that Rock Quiz, Rock Cycle, Earth Science Lesson PowerPoint
Name that Rock Quiz, Rock Cycle, Earth Science Lesson PowerPoint
 
Gejala sosial kpkm (2)
Gejala sosial kpkm (2)Gejala sosial kpkm (2)
Gejala sosial kpkm (2)
 
Metamorphic Rocks, Earth Science Lesson PowerPoint, Geology, Schist, Gneiss,
Metamorphic Rocks, Earth Science Lesson PowerPoint, Geology, Schist, Gneiss, Metamorphic Rocks, Earth Science Lesson PowerPoint, Geology, Schist, Gneiss,
Metamorphic Rocks, Earth Science Lesson PowerPoint, Geology, Schist, Gneiss,
 
Minerals PowerPoint Quiz Game, Earth Science Lessonplan PowerPoint
Minerals PowerPoint Quiz Game, Earth Science Lessonplan PowerPointMinerals PowerPoint Quiz Game, Earth Science Lessonplan PowerPoint
Minerals PowerPoint Quiz Game, Earth Science Lessonplan PowerPoint
 
Rock forming minerals
Rock forming mineralsRock forming minerals
Rock forming minerals
 
Paleozoic Era, Earth Science Lesson PowerPoint, Geologic Events
Paleozoic Era, Earth Science Lesson PowerPoint, Geologic EventsPaleozoic Era, Earth Science Lesson PowerPoint, Geologic Events
Paleozoic Era, Earth Science Lesson PowerPoint, Geologic Events
 
Masalah Sosial
Masalah SosialMasalah Sosial
Masalah Sosial
 
B31 ppt the history of life ch 14
 B31 ppt the history of life  ch 14 B31 ppt the history of life  ch 14
B31 ppt the history of life ch 14
 
cc aed aetc am&e p&p;1 minor irrigation
cc aed aetc am&e p&p;1 minor irrigationcc aed aetc am&e p&p;1 minor irrigation
cc aed aetc am&e p&p;1 minor irrigation
 
Masalah sosial remaja
Masalah sosial remajaMasalah sosial remaja
Masalah sosial remaja
 
Gejala sosial
Gejala sosialGejala sosial
Gejala sosial
 

Similar to Best Practice in CBM Drilling - ATLAS COPCO Indonesia Presentation

Bakri Final Presentation 2
Bakri Final Presentation  2Bakri Final Presentation  2
Bakri Final Presentation 2ahmadbakri991
 
PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)PaulOkafor6
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso designChieu Nguyen
 
Keep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater TreatmentKeep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater TreatmentCommunications Branding
 
Drilling Fluids- Baker.pdf
Drilling Fluids- Baker.pdfDrilling Fluids- Baker.pdf
Drilling Fluids- Baker.pdfssuserbfbf46
 
MULTI-STATION GREASE MANIFOLDS FOR FRACS AND REFRACS
MULTI-STATION GREASE MANIFOLDS FOR FRACS AND REFRACSMULTI-STATION GREASE MANIFOLDS FOR FRACS AND REFRACS
MULTI-STATION GREASE MANIFOLDS FOR FRACS AND REFRACSref-iqhub
 
Artificial-Lift-System-N production engineering.pdf
Artificial-Lift-System-N production engineering.pdfArtificial-Lift-System-N production engineering.pdf
Artificial-Lift-System-N production engineering.pdfIsmailKatun1
 
General HydropowerPresentation
General HydropowerPresentationGeneral HydropowerPresentation
General HydropowerPresentationTongai Mundiya
 
2005300054508_NIT UMM ACCESS_DEV 2023 (1).pptx
2005300054508_NIT UMM ACCESS_DEV 2023 (1).pptx2005300054508_NIT UMM ACCESS_DEV 2023 (1).pptx
2005300054508_NIT UMM ACCESS_DEV 2023 (1).pptxPranayaKishoreRaycho
 
Presentation for Lean Symposium
Presentation for Lean SymposiumPresentation for Lean Symposium
Presentation for Lean Symposiumguestecf2fd
 
Highwall Mining Technology
Highwall Mining TechnologyHighwall Mining Technology
Highwall Mining TechnologyVR M
 
Memphis Storage and Logistics for Pooled inventory
Memphis Storage and Logistics for Pooled inventoryMemphis Storage and Logistics for Pooled inventory
Memphis Storage and Logistics for Pooled inventoryJeffrey Harris
 
Application of Horizontal Directional Drilling Machine in India and worldwide
Application of Horizontal Directional Drilling Machine in India and worldwideApplication of Horizontal Directional Drilling Machine in India and worldwide
Application of Horizontal Directional Drilling Machine in India and worldwideApollo Techno Industries Pvt Ltd
 
Technical Features of Apollo HDD Machines In India and Worldwide
Technical Features of Apollo HDD Machines In India and WorldwideTechnical Features of Apollo HDD Machines In India and Worldwide
Technical Features of Apollo HDD Machines In India and WorldwideApollo Techno Industries Pvt Ltd
 
perris dam_Godwin et al AEG conf fnl(3)
perris dam_Godwin et al AEG conf fnl(3)perris dam_Godwin et al AEG conf fnl(3)
perris dam_Godwin et al AEG conf fnl(3)William Godwin
 
Maximise profit with Scheduled Oil Sampling (SOS)
Maximise profit with Scheduled Oil Sampling (SOS) Maximise profit with Scheduled Oil Sampling (SOS)
Maximise profit with Scheduled Oil Sampling (SOS) Mantrac Group
 

Similar to Best Practice in CBM Drilling - ATLAS COPCO Indonesia Presentation (20)

Bakri Final Presentation 2
Bakri Final Presentation  2Bakri Final Presentation  2
Bakri Final Presentation 2
 
PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso design
 
Keep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater TreatmentKeep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater Treatment
 
Drilling Fluids- Baker.pdf
Drilling Fluids- Baker.pdfDrilling Fluids- Baker.pdf
Drilling Fluids- Baker.pdf
 
Emma maersk
Emma  maerskEmma  maersk
Emma maersk
 
MULTI-STATION GREASE MANIFOLDS FOR FRACS AND REFRACS
MULTI-STATION GREASE MANIFOLDS FOR FRACS AND REFRACSMULTI-STATION GREASE MANIFOLDS FOR FRACS AND REFRACS
MULTI-STATION GREASE MANIFOLDS FOR FRACS AND REFRACS
 
Artificial-Lift-System-N production engineering.pdf
Artificial-Lift-System-N production engineering.pdfArtificial-Lift-System-N production engineering.pdf
Artificial-Lift-System-N production engineering.pdf
 
General HydropowerPresentation
General HydropowerPresentationGeneral HydropowerPresentation
General HydropowerPresentation
 
2005300054508_NIT UMM ACCESS_DEV 2023 (1).pptx
2005300054508_NIT UMM ACCESS_DEV 2023 (1).pptx2005300054508_NIT UMM ACCESS_DEV 2023 (1).pptx
2005300054508_NIT UMM ACCESS_DEV 2023 (1).pptx
 
Presentation for Lean Symposium
Presentation for Lean SymposiumPresentation for Lean Symposium
Presentation for Lean Symposium
 
Highwall Mining Technology
Highwall Mining TechnologyHighwall Mining Technology
Highwall Mining Technology
 
FullDrift.ppt
FullDrift.pptFullDrift.ppt
FullDrift.ppt
 
Memphis Storage and Logistics for Pooled inventory
Memphis Storage and Logistics for Pooled inventoryMemphis Storage and Logistics for Pooled inventory
Memphis Storage and Logistics for Pooled inventory
 
2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
 
Application of Horizontal Directional Drilling Machine in India and worldwide
Application of Horizontal Directional Drilling Machine in India and worldwideApplication of Horizontal Directional Drilling Machine in India and worldwide
Application of Horizontal Directional Drilling Machine in India and worldwide
 
Technical Features of Apollo HDD Machines In India and Worldwide
Technical Features of Apollo HDD Machines In India and WorldwideTechnical Features of Apollo HDD Machines In India and Worldwide
Technical Features of Apollo HDD Machines In India and Worldwide
 
Petroleum drilling fundamentals
Petroleum drilling fundamentalsPetroleum drilling fundamentals
Petroleum drilling fundamentals
 
perris dam_Godwin et al AEG conf fnl(3)
perris dam_Godwin et al AEG conf fnl(3)perris dam_Godwin et al AEG conf fnl(3)
perris dam_Godwin et al AEG conf fnl(3)
 
Maximise profit with Scheduled Oil Sampling (SOS)
Maximise profit with Scheduled Oil Sampling (SOS) Maximise profit with Scheduled Oil Sampling (SOS)
Maximise profit with Scheduled Oil Sampling (SOS)
 

Recently uploaded

(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 

Recently uploaded (20)

(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 

Best Practice in CBM Drilling - ATLAS COPCO Indonesia Presentation

  • 1. Indo CBM 2014, Jakarta Best Practices in CBM Drilling Shane A. Lein, Product Manager Shallow Oil, Gas and CBM Drilling Equipment Garland, Texas
  • 2. Best Practices in CBM Drilling The key to a successful CBM Drilling Program is Safety, the Ability to “Quick Turn” the Wells, Quick Set up, Mobility and small Environmental Footprint – Safety = good reputation as a Contractor and Employer – More wells == mmoorree rreevveennuuee – Quick Set Up = more actual drilling time – Mobility = more actual drilling time – Small Environmental Footprint = “Green” Contractor, less $$ spent on location preparation
  • 3. Best Practices in CBM Drilling Drilling Method requirements are also a consideration – Amount of equipment required Mud System – Mud Pits, Water Tanks, Mud Pumps, Mud Cleaning EEqquuiippmmeenntt,, MMuudd aanndd Mud Treatment Chemicals Air System – Auxiliary Compressor, High Pressure Booster, A Few polymers/additives
  • 4. Unconventional Rigs vs. Conventional Rigs Overall Operating Cost Advantage of Unconventional Rigs – Less Crew – Fewer Loads to Move – Fast Rig Up-Hours, not Days – Reduces Non Drilling Time/Cost – Increases Drilling Performance – Higher Efficiency than Conventional Rigs designed to drill much deeper – Physical Size of Drilling Location – Less complicated to rig up providing for a safer environment
  • 5. CBM DRILLING Safety, Speed, Mobility, Footage Production, Less Environmental Impact
  • 6. TYPICAL CBM LOCATION MOBILE RIG DOG HOUSE MUD PUMP (NOT SHOWN) MUD TANK GEN Average Location Size 40m x 40m or smaller VAC TRUCK SET SUB STRUCTURE PIPE TUBS PIPE RACKS
  • 7. TYPICAL CBM LOCATION Average Location Size 40m x 40m or smaller SLUDGE ROLL-BACK TRUCK LOCATION OFFICE MUD TANK MUD PUMP TANK
  • 8. Conventional Oilfield Land Rigs Many Loads (average 15-25, costing tens of thousands of $$ per rig move) More components to assemble, set and rig up Larger drilling location required Standard crew of 5 (per shift) x 2-12 hour shifts or 3 x 8 hour shifts – 10-15 Crewmembers per shift plus supervisory ppeerrssoonnnneell oonn ssiittee – Driller – Derrick Hand – Motor Hand – 2 Floor Hands + Rig Supervisor/Tool Pusher
  • 9. Conventional Drilling Rig Package Rig-MaPst,i stub, draw works BOP’s Choke Manifold Degasser Mud System Pits/Cleaning Large Location Pad 107m x 107m Change House Tool House Pipe Racks Pipe,Collars, Casing Living Quarters and offices Diesel Engines Gen Sets Water Tank Diesel Tank Mud Pumps Mud Mixing House Mud/Chemicals Reserve Pit
  • 10. Unconventional Rigs, Moving on to a Location EXCELLENT MOBILITY SAVES TIME MONEY Quick rig moves from location to location
  • 11. Unconventional Rigs, Moving on to a Location EXCELLENT MOBILITY SAVES TIME MONEY Quick rig moves from location to location Quick rig up – Usually a 1-4 hour rig up, depending on drilling methods and auxiliary equipment requirements –– SSppuudd ssoooonneerr
  • 12. Unconventional Rigs, Moving on to a Location EXCELLENT MOBILITY SAVES TIME MONEY Quick rig moves from location to location Quick rig up – Usually a 1-4 hour rig up, depending on drilling methods and auxiliary equipment requirements –– SSppuudd ssoooonneerr High footage production – Top Drive, better pipe control – Down Hole Hammer-Air or PDC Rotary-Water/Mud Flush – Less time on the well
  • 13. Unconventional Rigs, Moving on to a Location EXCELLENT MOBILITY SAVES TIME MONEY Quick rig moves from location to location Quick rig up – Usually a 1-4 hour rig up, depending on drilling methods and auxiliary equipment requirements –– SSppuudd ssoooonneerr High footage production – Top Drive – Down Hole Hammer-Air or PDC Rotary-Water/Mud Flush – Less time on the well Quick rig down
  • 14. Unconventional Rigs, Moving on to a Location EXCELLENT MOBILITY SAVES TIME MONEY Quick rig moves from location to location Quick rig up – Usually a 1-4 hour rig up, depending on drilling methods and auxiliary equipment requirements –– SSppuudd ssoooonneerr High footage production – Top Drive – Down Hole Hammer-Air or PDC Rotary-Water/Mud Flush – Less time on the well Quick rig down Few loads to move – Saves time and money
  • 15. Unconventional Rigs, Moving on to a Location EXCELLENT MOBILITY SAVES TIME MONEY Quick rig moves from location to location Quick rig up – Usually a 1-4 hour rig up, depending on drilling methods and auxiliary equipment requirements – Spud sooner High footage production –– TToopp DDrriivvee – Down Hole Hammer-Air or PDC Rotary-Water/Mud Flush – Less time on the well Quick rig down Few loads to move – Saves time and money – Smaller Environmental Impact-Drilling Location Fewer Crewmembers – 3 Per shift typical Reduced Non Drilling Activity = More Rotating Hours
  • 16. Unconventional Rigs, Moving on to a Location SAFE RIG MOVES and DRILLING OPERATIONS Less complicated equipment to rig up/rig down – No awkward positions to pin equipment
  • 17. Unconventional Rigs, Moving on to a Location SAFE RIG MOVES and DRILLING OPERATIONS Less complicated equipment to rig up/rig down – No awkward positions to pin equipment No Climbing Mast
  • 18. Unconventional Rigs, Moving on to a Location SAFE RIG MOVES and DRILLING OPERATIONS Less complicated equipment to rig up/rig down – No awkward positions to pin equipment No Climbing Mast NNoo HHiigghh RRiigg FFlloooorrss
  • 19. Unconventional Rigs, Moving on to a Location SAFE RIG MOVES and DRILLING OPERATIONS Less complicated equipment to rig up/rig down – No awkward positions to pin equipment No Climbing Mast NNoo HHiigghh RRiigg FFlloooorrss Smaller scale equipment – More keen awareness of the Crew as to the whereabouts of others – Fewer Crew Members required to operate the rig
  • 20. Unconventional Rigs, Moving on to a Location SAFE RIG MOVES and DRILLING OPERATIONS Less complicated equipment to rig up/rig down – No awkward positions to pin equipment No Climbing Mast NNoo HHiigghh RRiigg FFlloooorrss Smaller scale equipment – More keen awareness of the Crew as to the whereabouts of others – Fewer Crew Members required to operate the rig Hands Free Pipe Handling – Safer working environment for Crew Members Remain clear of Rotating Pipe
  • 21. SETTING UP TO DRILL RAPID SET UP SAVES TIME MONEY Information from Actual Rig Moves AIR DRILLING - NO SUBSTRUCTURE 5 TRAILER LOADS - 4 PEOPLE 1/2 - 1 1/2 HR SET UP UNTIL DRILLING AIR ON BOARD TO BEGIN DRILLING IMMEDIATELY
  • 22. SETTING UP TO DRILL RAPID SET UP SAVES TIME MONEY Information from Actual Rig Moves AIR DRILLING - NO SUBSTRUCTURE 5 TRAILER LOADS - 4 PEOPLE 1/2 - 1 1/2 HR SET UP UNTIL DRILLING AIR ON BOARD TO BEGIN DRILLING IMMEDIATELY MUD DRILLING - FULL HEIGHT SUBSTRUCTURE 7 TRAILER LOADS - 6 PEOPLE 2 1/2 - 4 HR SET UP UNTIL DRILLING QUICK HOOK UP TO ON-BOARD MUD PIPING
  • 23. Drilling Methods Mud/Air Rotary Down Hole Hammer
  • 24. AIR VS. MUD DRILLING AIR FASTER MORE ECONOMICAL IF – ROCK FORMATIONS MUD FASTER MORE ECONOMICAL IF – UNCONSOLIDATED FORMATIONS – LESS WATER INFLUX – SMALLER HOLES – LOST CIRCULATION ZONES NOT A PROBLEM – LOW PRESSURE GAS DEPOSITS – LARGER WATER INFLUX – LARGER HOLES – NO LOST CIRCULATION ZONES – HIGH PRESSURE GAS DEPOSITS
  • 25. MUD ROTARY - AIR ROTARY - DTH SELECTION CRITERIA THE FORMATIONS TO BE DRILLED THE HOLE SIZES REQUIRED THE HYDRAULICS (WATER) IN THE FORMATIONS ECONOMICS
  • 26. FORMATIONS - DRILLING METHODS FORMATION TYPES SEDIMENTARY ROCKS METAMORPHIC ROCKS MEDIUM HARD IGNEOUS ROCKS UNCONSOLIDATED UNCONSOLIDATED SOFT VERY HARD EXAMPLES OF SCHIST QUARTZITE FORMATIONS VERY HARD GRANITE MASSIVE BASALT SAND, CLAY, GRAVEL SOFT SHALE MED. LIMESTOME SOFT SANDSTONE MED. SHALE GNEISS GRANITE SOFT LIMESTONE SOFT DOLOMITE MED. SANDSTONE AQUIFER CHARACTERISTICS OPTIMUM DRILLING FOAM METHODS ADDITIVES FOAM ADDITIVES LARGE WATER INFLUX WHILE DRILLING MODERATE TO LOW WATER INFLUX DRILLING AIR ROTARY DRILLING MUD VERY LOW WATER INFLUX OR NO WATER WHILE DRILLING AIR DHD DRILLING WHILE DRILLING
  • 27. HOLE SIZE GENERALLY, AS HOLE SIZE INCREASES BEYOND A CERTAIN POINT, AIR DRILLING WILL BECOME LESS ECONOMICAL – CLEANING THE BIT AND HOLE BECOMES A PROBLEM DRILLING SLOWS DOWN – ADDITIONAL AIR COMPRESSORS AARREE RREEQQUUIIRREEDD COSTS GO UP
  • 28. FORMATION HYDRAULICS WHEN FORMATIONS ARE SATURATED WITH WATER, AIR DRILLING WILL BECOME TOO SLOW TO BE ECONOMICAL – WHEN MORE WATER COMES INTO THE HOLE THAN THE AIR LIFT SYSTEM CAN EVACUATE, DRILLING RATE SLOWS DOWN AND EVENTUALLY STOPS – ADDING ANOTHER COMPRESSOR AND A BOOSTER COMPRESSOR WILL OVERCOME THE WATER PRESSURE BUT WILL ADD OPERATING COST
  • 29. ECONOMICS WHEN SUB SURFACE CONDITIONS SLOW DOWN THE DRILLING RATE WHEN ADDITIONAL EQUIPMENT REQUIREMENTS ADD COST AIR DRILLING WILL NOT BE ECONOMICALLY FFEEAASSIIBBLLEE
  • 30. TYPICAL AIR ROTARY OR DTH-PERCUSSION DRILLING SET UP
  • 32. ACTUAL CASE STORIES RAPID SET UP SAVES TIME MONEY Actual Case Example (Alberta, CA) 800m Depth CBM Well (Water/Bentonite Flush) – Move on Location and Rig Up 4 Hours – Drill 100m of 9 7/8” Surface hole and set 7” Surface Casing 10 Hours – Drill 700m of 6 1/8“ Production hole and set 4 ½” Production Casing 18 Hours – Rig Down 2 Hours Total Well, 34 Hours (Excludes BOP Test at Rig Up and Logging Production Hole)
  • 33. MUD DRILLING LOCATION, ALBERTA CANADA
  • 34.
  • 35.
  • 36. ACTUAL CASE STORIES RAPID SET UP SAVES TIME MONEY Actual Case Example (Other Areas) China – Mud Drill 12 ¼” to 40m, set 9 5/8” casing – Air Drilling (DTH) to 350m set 5 ½” casing – Total Time-5 days
  • 39. ACTUAL CASE STORIES RAPID SET UP SAVES TIME MONEY Actual Case Example (Other Areas) India - Air Drilling – Conductor - Drill 17 ½” to 15m, set 13 3/8” casing – Surface - Drill 12 ¼” to 150m, set 9 5/8” casing – Production - 7” to 1000 m, set 5 ½” casing – Total Time-5 days
  • 40. Compact CBM Location in West Bengal, India
  • 41. Compact CBM Location in West Bengal, India
  • 42. Compact CBM Location in West Bengal, India
  • 43. ACTUAL CASE STORIES RAPID SET UP SAVES TIME MONEY Actual Case Example (Other Areas) Australia – Water Flush Drill and set 9 5/8” surface casing to 120m – Water Flush Drill to TD at 1000m and set 8 ½” production casing – Total Time-3 days
  • 44. CBM Location in Queensland, Australia
  • 45. CBM Location in Queensland, Australia
  • 46. CBM Location in Queensland, Australia
  • 47. Additional Photographs of Unconventional Rigs in CBM Application Safe, Mobile Equipment, Quick Moving, Quick Rig Up/Down Small Environmental Footprint
  • 48. CBM WELL IN WESTERN VIRGINIA
  • 49. CBM WELL IN WESTERN VIRGINIA
  • 50. GAS WELL LOCATION SOUTHERN ARKANSAS
  • 51. FLARING OFF THE GAS – AIR DRILLING WITH LOTS OF WATER IN THE HOLE
  • 52. GROUND LEVEL LOCATION AIR DRILLING - CBM - PENNSYLVANIA
  • 53. MOUNTAIN TOP LOCATION NARROW MOUNTAIN TOP LOCATION IN VIRGINIA
  • 54. CBM Location in Botswana, South Africa
  • 55. Rigging up two rigs in Arkansas. Drilling in Fayetteville Shale
  • 56. Questions? Thank you for your time and attention