2. Challenges facing the industry
• Time and Money - $$$- COST
• Enhance safety and minimize employee
exposure to red zone hazards
• Shortage of skilled labor
• Increase demand for Frac Horsepower
• Increase in wells waiting to fracked
3. Having exceeded 7,000 wells waiting to be completed late last year well over
historical average
Even near an all time high in frac horsepower it is not offsetting drilling
Growing percentage of horizontal vs vertical
DUC WELL COUNT
U.S.ENERGY INFORMATION ADMINISTRATION
Dec 2013 2,500
Dec 2014 4,400
Dec 2015 5,600
Dec 2016 4,900
April 2018 7,677
Wells drilled but Uncompleted
5. TRADITIONAL GREASE UNIT
Dual 120# drums
Small 10k pump
Light and compact
Single 55 gallon drum
Heavy Duty 20k pump
Designed for mobility
Grease flow rate and
Pressure directly related
to air pressure
6. TRADITIONAL GREASE UNIT
Dual 120# drums
Small 10k pump
Light and compact
Single 55 gallon drum
Heavy Duty 20k pump
Designed for mobility
Grease flow rate and
Pressure directly related
to air pressure
Slow transfer time
Frequent drum changes Single drum – increased
time for drum change
Small Compressor
No way to measure
flow
7. TRADITIONAL TWO MAN GREASE OPERATION
Man lift required
for multiple fittings
Operator in red zone
for extended time
Multiple pressure hazards
Operator to control
Grease pumps
10. • Hose reels to reduce tripping hazards,
simplify rig up
• Needle valve as emergency secondary
barrier
• Spring retract
• Individual valves for each grease
port
• Built in pressure gauge
• Designed to be rigged up for the
duration of the Frac
MULTI-STATION GREASING MANIFOLD SYSTEM
12. HIGH FLOW GREASE UNIT
• High capacity storage tanks and large compressor
• Dual 20k pumps
• Remote pendent
• Pressure gauge
13. HIGH FLOW GREASE UNIT
• High capacity storage tanks and large compressor
• Dual 20k pumps
• Remote pendent
• Pressure gauge
• Little or no Down Time
• No pump changes
• Ease of operation
14. • Stores data even in
powered down state
• Reset button for ease
of use
• Available for Lincoln
Power master as well
as many other pumps
• Digital display reads in
pounds, can be
configured for kg,
gallons, or other units
LUBRICATION FLOW METER
15. Remote Operated Grease Manifold
• Freestanding remote
• 12 volt electric over air
• Manifold can be set in
or out of red zone
• 12 volt electric over air
• Dedicated transport
trailer
16. RIG UP
WAIT TIME
UNDER GREASING
OVER GREASING
PERSONNEL
SAFETY
TRADITIONAL METERED GREASE MANIFOLD
CONTINUOUS
18 X PER FRAC
2 TO 3 TIMES PER DAY
WEATHER / WIND
MANLIFT AVAILABILITY
EXCESSIVE VALVE WEAR
DOWN TIME
SUB-OPTIMAL FRAC
TWO MAN OPERATION
LENGTHY RED ZONE EXPOSURE
EXPOSURE TO HIGH PRESSURE
FALL RISK
MINIMIZED
CONCENTRATED TO INITIAL RIG-UP
ELIMINATED
PROPER GREASING
ON SCHEDULE
OPTIMAL FRAC
ONE MAN OPERATION
RARELY IN RED ZONE
17. BENEFIT SUMMARY
ONE WELL MULTI WELL MULTI WELL CONCURRENT
Reduces grease time by 50%
to 70% or more
Reduce or eliminate time in
red zone
Allows for one man
operation
Reduces grease time by 50%
to 70% or more
Reduce or eliminate time in
red zone
Allows for one man
operation
Reduces grease time by 50%
to 70% or more
Eliminate time in red zone
With hydraulic stack configuration
Allows for one man
operation
Eliminates requirement to
disconnect hoses under
pressure
Eliminates requirement to
disconnect hoses under
pressure
Eliminates requirement to
disconnect hoses under
pressure
Maximum ROI by running
simultaneous operations