SlideShare a Scribd company logo
1 of 6
Download to read offline
1 of 6
Objective
To acquire a suitable position in the Organization that can offer me a Career related to Mechanical
& piping Engineer which will allow growth for organization and my personal development Innovative
and Flexible.
Personal Data
Date of Birth: 12th
May, 1984
Nationality: Egyptian.
Marital Status: Married.
Passport No: A11429205
Kuwait Society of Engineers Membership No: (20863)
Kuwait Oil Company Approved Contract No: (KOC-36081)
Kuwait Fire Service Directorate (KFD) License.
Educational Data
Qualification: B.Sc of Mechanical Engineering. (5 years)
Department: Power Mechanical Dep. (1002 to 2006)
Faculty Name: Faculty of Engineering (Mansoura University) - Egypt.
Project Name: Petroleum Engineering - Liquefied Petroleum Gas, (L.P.G).
Project Grade: Excellent.
My Job History
I have 10 years of Experience as Mechanical & piping Engineer, especially in
Construction of power plants & water desalination Plants and pipe lines.
 Job Title: Senior Piping & Mechanical Engineer. (Jan 2014 till now)
Company: HYUNDAI Heavy Industries CO.LTD.
Working as Piping & Mechanical Engineer with (HHI) one of the biggest Construction
companies in the world specialists in Heavy Industries, ships building and Electrical
power & Desalination plants engineering and construction.
From Jan 2014 till now:
 Project title: Supply, erection, operation and maintenance of Az-Zour North Phase 1 – IWPP
Electrical power & water desalination plant
 Owner: Shamal Az-Zour Al-Oula K.S.C.
 Consultant: FICHTNER
 EPC Contractor: HYUNDAI Heavy Industries & SIDEM
Name: MOHAMED DESSOUKY BEHIRY
Profession: Mechanical & Piping Engineer.
Address: Salmiya, KUWAIT.
Mobile: +965/90050567
E-mail: moh.behiry@gmail.com
2 of 6
Project Description: This project includes but is not limited to:
 Engineering & Construction and Commissioning of 1550 MW with dual fuel module (fuel
gas/ gas oil) and water desalination plant Consisting of :
- GTG : 228 MW × 5 units. (Supplying by GE)
- STG : 255 MW × 2 units. (Supplying by GE)
- HRSG : 489 T/H × 5 units. (Supplying by HHI)
- Water capacity : 107 MIGD ( MED type) (Supplying by SIDEM)
 Engineering & Construction of 10 MED water distillation units (Total production of 107
million IMGD)
 Engineering & Construction of Co2 generation plant with two Co2 storage tanks.
 Engineering & Construction and Commissioning of all mechanical supporting systems
like CCW system & sea water supplying lines & reject brine water lines and water
degasifier system.
Job Responsibility:
 Full responsibility of GRP & GRE piping system material ordering & installation & Hydro
test & water flashing and commissioning.(Dia 25 mm up to 3000 mm)
 Responsible for all offshore piping work installation & hydro test and back filling.
 Erection of Water distillation units Multiple-effect distillation type (MED)
 Installation and Testing of all underground pipe lines (GRP & GRE & DIP & IA & SW & PW
& FF & Co2 lines)
 Erection of 20 No of limestone water filters with its piping system and back wash system.
------------------------------------------------------------------------------------------------------------------------------------------
 Job Title: Senior Mechanical and Piping Engineer. (May 2010 to Jan 2014)
Company: Al-Ghanim International General Trading & Construction Co.
Working as Mechanical & piping Engineer with (AGI) one of the leading Construction
companies specialists in mechanical and Electrical works (Electrical power plants and
Desalination plants) and related infrastructures with MEW - MPW - KOC - KNPC, etc.
From May 2013 Jan 2014:
 Project title: Supply, erection, operation and maintenance of two gas turbines to upgrade
Power capacity at sabiya power plant.
 Owner: Ministry of electrical and water (MEW) Kuwait
Project Description: This project includes but is not limited to:
 Engineering & Construction and Commissioning of two gas turbines 250 MW supplying
by (SIEMENS) with dual fuel module (fuel gas/ gas oil).
 Engineering & Construction of one gas oil storage tank (capacity 9000 m3)
 Engineering & Construction of two service water storage tanks (capacity 1220 m3 each)
 Engineering & Construction of two demineralized water storage tanks (capacity 1220 m3
each)
 Engineering & Construction of general auxiliary building with (fuel gas coolers, gas oil
treatment plant and DM system).
3 of 6
Job Responsibility:
 Fabrication and erection of Fuel gas, gas oil service water, DM water and firefighting piping
networks.
 Construction and Testing of underground and aboveground pipe lines.
 Responsible for erection work of air intake system.
 Follow A.P.I-650 & ASME-B31.3 standers in mechanical and tanks erection activities.
 Planning piping site activity and coordinate with client engineer.
-------------------------------------------------------------------------------------------------------------------------------------
From Jun 2012 till May 2013:
 Project title: Az-Zour South RO desalination plant with Recarbonation system.
Production of (30 MIGD) per day Desalinate water
 Owner: Ministry of Electrical and Water (MEW) --- Kuwait
Project Description: This project includes but is not limited to:
 Engineering & Construction and Commissioning of Dual Media Gravity Filter building
(DMGF) with backwash system.
 Engineering & Construction and Commissioning of 12 cartage filters and 12 L.P pumps
 Engineering & Construction and Commissioning of 10 water desalination skids Reverse
Osmosis type (RO) with 10 ERD skids and H.P pumps.
 Construction of 10 Limestone filters & its recovery system and its backwash system.
 Construction of CO2 plant and Degasifier tank for Recarbonation system.
Job Responsibility:
 Responsible for all GRP pipe installation and lamination dia (25 to 1800) mm.
 Have good knowledge in CS & SS and SDX pipe fit up and welding.
 Study the contract documents, design drawings and specifications provided by MWE
Material inspection like pipes, pipe fitting, valves, self-clean filters, cartage filters
 Construction and Testing of different Dia of pipe lines with different material (SDX – GRP
– HDPE – S.S 316 – UPVC – CPVC – CS –
 Follow A.P.I & ASTE standers in all mechanical activities
 Planning piping site activity and work shop activity
------------------------------------------------------------------------------------------------------------------------------------
From May 2010 till Jun 2012:
 Project title: Sabiya Closed Cycle Gas Turbine ( CCGT) Electrical Power Station
 Owner: Ministry of Electrical and Water (MEW) Kuwait
Project Description: This project includes but is not limited to:
 Engineering & Construction and Commissioning of 6 gas turbines and 3 switchgear
buildings
 Engineering & Construction and Commissioning of 6 HRSG & 3 Steam turbines and 3
Cooling towers with total Electrical power productions of 2000 MW.
Job Responsibility:
 Full responsibility for underground and aboveground GRP piping network dia (500 mm to
2000 mm) excavation & fit up & lamination & hydro testing and backfilling.
 Erection and installation and testing of underground ductile network dia (100 to 800)mm
 Study the contract documents, design drawings and specifications provided by MWE
 Material inspection like pipes, pipe fitting, valves, etc.
 Construction & Testing and flashing of underground pipe lines.
 Coordination with main contractor (HHI) and client for handover the work.
4 of 6
 Job Title: Piping & Mechanical Engineer. (Jan 2008 till May 2010)
Company: United Gulf Construction Company W.L.L, (Kuwait).
Working as Mechanical Engineer with (UGCC) one of the leading Construction
companies specialists in oil & gas field, upstream, downstream, petrochemicals and
related infrastructures
With KOC – KNPC – J.O – MEW – MPW, etc.
From Jan. 2008 till May 2010:
 Project title: Laying of a new 30” Dia. High Pressure Gas Transmission Pipeline from
(BS-140) to Manifold (GCMB).
 Owner: Kuwait Oil Company (KOC) Contract NO: (KOC-35055).
Project Description: This project includes but is not limited to:
 Laying of 30” Dia. High Pressure Gas Transmission Pipeline from BS-140 to Manifold
GCMB area in borgan filed.
 Installation, Testing and commissioning of (2) Pig Launcher/Receivers Station size 30” x
34” one in BS-140, and the other one in M/F GCMB.
Job Responsibility:
 Study the contract documents, design drawings and specifications provided by KOC.
 Material take-off from P & ID and Tender drawings to Bills of Quantities (PQ).
 Material inspection like pipes, pipe fitting, valves, painting material etc.
 Construction, Testing, Pre-commissioning, and Commissioning of Mechanical Facilities.
 Apply QA /QC rolls in welding joints and all mechanicals activities.
 Hydrostatic testing & Commissioning for the pipe line.
 Follow A.P.I & ASME standers in all mechanical activities.
-------------------------------------------------------------------------------------------------------------------------------------
 Project title: General Services for Operating and Maintenance of Umm AL-Hyman Sewage
Treatment Plant (S.T.P)
 Owner: Ministry of Public Works-(MPW) Contract NO: (SE/S/117)
Project Description: Sewage Treatment Plant contains of:
 Headwork building with Grit Trap Mechanism- Grit Pumps - pinch valves & 3-way valves-
Bar Screen- Grit Classifier- Odor Control Unit (OCU) and Odor Control Fan.
 Oxidation Ditch - Secondary Clarifier – Return Sludge Pumping Station.
 Sand Filter house - Recycle Pumping Station – Storage Tank.
 Chlorination System - U.V Channel - Effluent Pumping Station.
 Gravity Thickener - Sludge Drying Beds.
Job Responsibility:
 Day to day site supervision for all mechanical activities.
 Follow daily schedule for mechanical preventive maintenance.
 Arranging with M.P.W engineer for internal work order (Corrective maintenance &
Replacement Parts).
 Report all activities and progress to M.P.W engineer.
 Inspection and Repair of Mechanical Equipments.
 Apply safety & HSE rolls during all site activates.
5 of 6
 Project title: Construction, Completion, Operation and Maintenance of three Pumping
Stations at Sulaibiya (DMC), KABAD and WAFRA.
 Owner: Ministry of Public Works-(MPW) Contract NO: (SE-97)
 Consultant: Gulf Consult.
Project Description:
 Pump Station Facility (3 Nos.)
 Main Transmission Pumps, Control System, Motorized Plug, Gate, Butterfly Valves, etc.
 Pipe work Connections (GRP, DIP, CS, HDPE, UPVC, CPVC, Copper pipes).
 Install Waste Water Treatment Plant (W.W.T.P)
 Air Compressors, Expansion Pressure vessels, Booster Pumps, Sump Pumps, Automatic
Backwash Strainer, Sluice Gates with Actuators.
 Service Reservoirs (170,000 m3
), Administration Building, Laboratory Building.
 Chlorination Facility with Chlorine Vapor Scrubber System.
Job Responsibility:
 Fully responsible for all aspects of the construction, management, planning and follow up
necessary to achieve efficient and timely completion of the project handing over.
 Handling procurement activities relating to contract and subcontracts in accordance with
Company Procedures and Procurement department activities.
 Review and evaluate technical submittals and shop drawings prior to submission to
consultant and client according to required project standards.
 Day to day site supervision for all site activities.
 Coordination with client and Consultant Representative.
 Reporting all activities and progress to project manager.
 Plan for best use of resources (Equipment, labors, materials and subcontractors).
--------------------------------------------------------------------------------------------------------------------------------------
 Job Title: Piping & Mechanical Engineer. (Oct. 2006 till Nov. 2007)
Company: Gulf of Suez Petroleum Company (GUPCO) Egypt
Working as site Mechanical Engineer with (GUPCO) one of the leading construction
companies In Petroleum & Gas services, Petrochemicals technical support
Job responsibility:
 Pumps installation: centrifugal, vacuum, fan, volumetric, multistage, air stream and
condensate, submerged, high pressure pumps.
 Pipeline fabrication: pipe fittings, valves (all types).
 Maintenance of Hydraulic & Pneumatic cylinders & pumps & accumulators & valves of
different manufacturer (Mather & Platt - AVM - PARKER ...…etc.)
 Mounting and dismounting (bearing, mechanical seal).
 Pump/Motor Alignment by dials gauges.
 Inspection and Maintenance of Mechanical Facilities.
6 of 6
 Training and Engineering Courses
1- TCB ( CQIP) ( TCB- Certified Quality Inspection Professional )
This course includes welding and painting process and their application on various product forms
such as pressure vessels, Heat exchangers, tanks, Pipes etc including manufacturing process,
governing codes and standards and inspection requirement and basic NDT.
2- Heavy Machinery Training Center (HMTC)
Six months training in maintenance of heavy machines under supervision of
Germany staff in Electro hydraulic systems and diesel engines.
Course contains:
1- Electro hydraulic systems design and maintenance.
2- Diesel engines& Undercarriage maintenance.
3- Electronic and electrical panel maintenance.
3- Digital Electronic Control (P.L.C -S7200)
Three months training in P.L.C -S7200 system design and control in Italian
Institute (DON BOSCO) and its manufacturing applications.
4- Refrigerating & Air conditioning (HVAC.
Three months training in maintenance of Refrigerating and split air conditions
And its electrical panel in Italian institute (DON BOSCO).
5- Basic Business Skills Acquisition program (B.B.S.A)
Sponsored by (AMIDEST) Egypt & American University in Cairo.
Course contains:
 Developed language and computer skills.
 Enhanced Presentation &Project development skills.
 Acquired basic business skills including (marketing - sales - accounting -
Business correspondence - report writing - Projects Management).
 Worked as team leader.
6- AutoCAD course
Finished AutoCAD 2D course in scientific center (Cairo University) in designing
and mechanical drawing.
General Skills
 Very motivated to learn other skills.
 Dynamic personality.
 Ability to work under pressure.
Computer Skills
 Microsoft office 2007 (Word – Excel – Access – PowerPoint).
 AutoCAD 2007.
Languages
 English very good in speaking and writing skills.
 Arabic is native language.
Mohamed Behiry

More Related Content

What's hot

Rajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.DesignerRajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.Designer
Rajasekar ramamurthy
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016
Subhash Dhiman
 
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_new
vasanth morais
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
Rolando Garcia
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016
Ali Issa
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
Hesham Fathy, PMP
 
Cofely Fabricom Brochure OilGas 2015
Cofely Fabricom Brochure OilGas 2015Cofely Fabricom Brochure OilGas 2015
Cofely Fabricom Brochure OilGas 2015
Jailton Rodrigues
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
amr mahrous
 
CV John Raugstad Woodgroup
CV John Raugstad WoodgroupCV John Raugstad Woodgroup
CV John Raugstad Woodgroup
John Raugstad
 
Mohamed Ahmed (2008)
Mohamed Ahmed  (2008)Mohamed Ahmed  (2008)
Mohamed Ahmed (2008)
Mohamed Ahmed
 
Structural Engineer_Duong Quoc Huan_2015
Structural Engineer_Duong Quoc Huan_2015Structural Engineer_Duong Quoc Huan_2015
Structural Engineer_Duong Quoc Huan_2015
Huan Duong Quoc
 

What's hot (20)

Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15
 
Rajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.DesignerRajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.Designer
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016
 
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_new
 
RAMESH PIPING STRESS ENGINEER
RAMESH PIPING STRESS ENGINEERRAMESH PIPING STRESS ENGINEER
RAMESH PIPING STRESS ENGINEER
 
Zane P Engelbrecht CV-1
Zane P Engelbrecht CV-1Zane P Engelbrecht CV-1
Zane P Engelbrecht CV-1
 
Ranjith cv
Ranjith cvRanjith cv
Ranjith cv
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016
 
Muhammad_Aslam_CV
Muhammad_Aslam_CVMuhammad_Aslam_CV
Muhammad_Aslam_CV
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
 
Cofely Fabricom Brochure OilGas 2015
Cofely Fabricom Brochure OilGas 2015Cofely Fabricom Brochure OilGas 2015
Cofely Fabricom Brochure OilGas 2015
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
 
GEC presentation
GEC  presentationGEC  presentation
GEC presentation
 
Robin dargavel consutant mechanical - facilities engineer
Robin dargavel   consutant mechanical - facilities engineerRobin dargavel   consutant mechanical - facilities engineer
Robin dargavel consutant mechanical - facilities engineer
 
CV John Raugstad Woodgroup
CV John Raugstad WoodgroupCV John Raugstad Woodgroup
CV John Raugstad Woodgroup
 
CV Jalaj Verma
CV Jalaj VermaCV Jalaj Verma
CV Jalaj Verma
 
Mohamed Ahmed (2008)
Mohamed Ahmed  (2008)Mohamed Ahmed  (2008)
Mohamed Ahmed (2008)
 
Structural Engineer_Duong Quoc Huan_2015
Structural Engineer_Duong Quoc Huan_2015Structural Engineer_Duong Quoc Huan_2015
Structural Engineer_Duong Quoc Huan_2015
 
R.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docR.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.doc
 

Similar to Mohamed Behiry CV

Similar to Mohamed Behiry CV (20)

Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project Engineer
 
Eng.mamdouh azab.
Eng.mamdouh azab.Eng.mamdouh azab.
Eng.mamdouh azab.
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
 
Project Mechanical Engineer C.V
Project Mechanical Engineer C.VProject Mechanical Engineer C.V
Project Mechanical Engineer C.V
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al Obaidy
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cv
 
CV Yasin
CV YasinCV Yasin
CV Yasin
 
updated Cv 04-01-2017 (1)
updated Cv 04-01-2017 (1)updated Cv 04-01-2017 (1)
updated Cv 04-01-2017 (1)
 
Cv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas TulabotCv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas Tulabot
 
Ahmed el gohary cv
Ahmed el gohary cvAhmed el gohary cv
Ahmed el gohary cv
 
E&I Farukh
E&I FarukhE&I Farukh
E&I Farukh
 
Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017
 
Eslam cv final 2016
Eslam cv final 2016Eslam cv final 2016
Eslam cv final 2016
 
MANOJ RESUME
MANOJ RESUMEMANOJ RESUME
MANOJ RESUME
 
Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali CV (Final)
Rajib Ali CV (Final)
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
 
Ahmed10
Ahmed10Ahmed10
Ahmed10
 
Amended CV of Eng. Ibrahim A.A. march 2015
Amended CV of Eng. Ibrahim A.A.   march 2015Amended CV of Eng. Ibrahim A.A.   march 2015
Amended CV of Eng. Ibrahim A.A. march 2015
 
Sean Mason CV 2016
Sean Mason  CV  2016Sean Mason  CV  2016
Sean Mason CV 2016
 

Mohamed Behiry CV

  • 1. 1 of 6 Objective To acquire a suitable position in the Organization that can offer me a Career related to Mechanical & piping Engineer which will allow growth for organization and my personal development Innovative and Flexible. Personal Data Date of Birth: 12th May, 1984 Nationality: Egyptian. Marital Status: Married. Passport No: A11429205 Kuwait Society of Engineers Membership No: (20863) Kuwait Oil Company Approved Contract No: (KOC-36081) Kuwait Fire Service Directorate (KFD) License. Educational Data Qualification: B.Sc of Mechanical Engineering. (5 years) Department: Power Mechanical Dep. (1002 to 2006) Faculty Name: Faculty of Engineering (Mansoura University) - Egypt. Project Name: Petroleum Engineering - Liquefied Petroleum Gas, (L.P.G). Project Grade: Excellent. My Job History I have 10 years of Experience as Mechanical & piping Engineer, especially in Construction of power plants & water desalination Plants and pipe lines.  Job Title: Senior Piping & Mechanical Engineer. (Jan 2014 till now) Company: HYUNDAI Heavy Industries CO.LTD. Working as Piping & Mechanical Engineer with (HHI) one of the biggest Construction companies in the world specialists in Heavy Industries, ships building and Electrical power & Desalination plants engineering and construction. From Jan 2014 till now:  Project title: Supply, erection, operation and maintenance of Az-Zour North Phase 1 – IWPP Electrical power & water desalination plant  Owner: Shamal Az-Zour Al-Oula K.S.C.  Consultant: FICHTNER  EPC Contractor: HYUNDAI Heavy Industries & SIDEM Name: MOHAMED DESSOUKY BEHIRY Profession: Mechanical & Piping Engineer. Address: Salmiya, KUWAIT. Mobile: +965/90050567 E-mail: moh.behiry@gmail.com
  • 2. 2 of 6 Project Description: This project includes but is not limited to:  Engineering & Construction and Commissioning of 1550 MW with dual fuel module (fuel gas/ gas oil) and water desalination plant Consisting of : - GTG : 228 MW × 5 units. (Supplying by GE) - STG : 255 MW × 2 units. (Supplying by GE) - HRSG : 489 T/H × 5 units. (Supplying by HHI) - Water capacity : 107 MIGD ( MED type) (Supplying by SIDEM)  Engineering & Construction of 10 MED water distillation units (Total production of 107 million IMGD)  Engineering & Construction of Co2 generation plant with two Co2 storage tanks.  Engineering & Construction and Commissioning of all mechanical supporting systems like CCW system & sea water supplying lines & reject brine water lines and water degasifier system. Job Responsibility:  Full responsibility of GRP & GRE piping system material ordering & installation & Hydro test & water flashing and commissioning.(Dia 25 mm up to 3000 mm)  Responsible for all offshore piping work installation & hydro test and back filling.  Erection of Water distillation units Multiple-effect distillation type (MED)  Installation and Testing of all underground pipe lines (GRP & GRE & DIP & IA & SW & PW & FF & Co2 lines)  Erection of 20 No of limestone water filters with its piping system and back wash system. ------------------------------------------------------------------------------------------------------------------------------------------  Job Title: Senior Mechanical and Piping Engineer. (May 2010 to Jan 2014) Company: Al-Ghanim International General Trading & Construction Co. Working as Mechanical & piping Engineer with (AGI) one of the leading Construction companies specialists in mechanical and Electrical works (Electrical power plants and Desalination plants) and related infrastructures with MEW - MPW - KOC - KNPC, etc. From May 2013 Jan 2014:  Project title: Supply, erection, operation and maintenance of two gas turbines to upgrade Power capacity at sabiya power plant.  Owner: Ministry of electrical and water (MEW) Kuwait Project Description: This project includes but is not limited to:  Engineering & Construction and Commissioning of two gas turbines 250 MW supplying by (SIEMENS) with dual fuel module (fuel gas/ gas oil).  Engineering & Construction of one gas oil storage tank (capacity 9000 m3)  Engineering & Construction of two service water storage tanks (capacity 1220 m3 each)  Engineering & Construction of two demineralized water storage tanks (capacity 1220 m3 each)  Engineering & Construction of general auxiliary building with (fuel gas coolers, gas oil treatment plant and DM system).
  • 3. 3 of 6 Job Responsibility:  Fabrication and erection of Fuel gas, gas oil service water, DM water and firefighting piping networks.  Construction and Testing of underground and aboveground pipe lines.  Responsible for erection work of air intake system.  Follow A.P.I-650 & ASME-B31.3 standers in mechanical and tanks erection activities.  Planning piping site activity and coordinate with client engineer. ------------------------------------------------------------------------------------------------------------------------------------- From Jun 2012 till May 2013:  Project title: Az-Zour South RO desalination plant with Recarbonation system. Production of (30 MIGD) per day Desalinate water  Owner: Ministry of Electrical and Water (MEW) --- Kuwait Project Description: This project includes but is not limited to:  Engineering & Construction and Commissioning of Dual Media Gravity Filter building (DMGF) with backwash system.  Engineering & Construction and Commissioning of 12 cartage filters and 12 L.P pumps  Engineering & Construction and Commissioning of 10 water desalination skids Reverse Osmosis type (RO) with 10 ERD skids and H.P pumps.  Construction of 10 Limestone filters & its recovery system and its backwash system.  Construction of CO2 plant and Degasifier tank for Recarbonation system. Job Responsibility:  Responsible for all GRP pipe installation and lamination dia (25 to 1800) mm.  Have good knowledge in CS & SS and SDX pipe fit up and welding.  Study the contract documents, design drawings and specifications provided by MWE Material inspection like pipes, pipe fitting, valves, self-clean filters, cartage filters  Construction and Testing of different Dia of pipe lines with different material (SDX – GRP – HDPE – S.S 316 – UPVC – CPVC – CS –  Follow A.P.I & ASTE standers in all mechanical activities  Planning piping site activity and work shop activity ------------------------------------------------------------------------------------------------------------------------------------ From May 2010 till Jun 2012:  Project title: Sabiya Closed Cycle Gas Turbine ( CCGT) Electrical Power Station  Owner: Ministry of Electrical and Water (MEW) Kuwait Project Description: This project includes but is not limited to:  Engineering & Construction and Commissioning of 6 gas turbines and 3 switchgear buildings  Engineering & Construction and Commissioning of 6 HRSG & 3 Steam turbines and 3 Cooling towers with total Electrical power productions of 2000 MW. Job Responsibility:  Full responsibility for underground and aboveground GRP piping network dia (500 mm to 2000 mm) excavation & fit up & lamination & hydro testing and backfilling.  Erection and installation and testing of underground ductile network dia (100 to 800)mm  Study the contract documents, design drawings and specifications provided by MWE  Material inspection like pipes, pipe fitting, valves, etc.  Construction & Testing and flashing of underground pipe lines.  Coordination with main contractor (HHI) and client for handover the work.
  • 4. 4 of 6  Job Title: Piping & Mechanical Engineer. (Jan 2008 till May 2010) Company: United Gulf Construction Company W.L.L, (Kuwait). Working as Mechanical Engineer with (UGCC) one of the leading Construction companies specialists in oil & gas field, upstream, downstream, petrochemicals and related infrastructures With KOC – KNPC – J.O – MEW – MPW, etc. From Jan. 2008 till May 2010:  Project title: Laying of a new 30” Dia. High Pressure Gas Transmission Pipeline from (BS-140) to Manifold (GCMB).  Owner: Kuwait Oil Company (KOC) Contract NO: (KOC-35055). Project Description: This project includes but is not limited to:  Laying of 30” Dia. High Pressure Gas Transmission Pipeline from BS-140 to Manifold GCMB area in borgan filed.  Installation, Testing and commissioning of (2) Pig Launcher/Receivers Station size 30” x 34” one in BS-140, and the other one in M/F GCMB. Job Responsibility:  Study the contract documents, design drawings and specifications provided by KOC.  Material take-off from P & ID and Tender drawings to Bills of Quantities (PQ).  Material inspection like pipes, pipe fitting, valves, painting material etc.  Construction, Testing, Pre-commissioning, and Commissioning of Mechanical Facilities.  Apply QA /QC rolls in welding joints and all mechanicals activities.  Hydrostatic testing & Commissioning for the pipe line.  Follow A.P.I & ASME standers in all mechanical activities. -------------------------------------------------------------------------------------------------------------------------------------  Project title: General Services for Operating and Maintenance of Umm AL-Hyman Sewage Treatment Plant (S.T.P)  Owner: Ministry of Public Works-(MPW) Contract NO: (SE/S/117) Project Description: Sewage Treatment Plant contains of:  Headwork building with Grit Trap Mechanism- Grit Pumps - pinch valves & 3-way valves- Bar Screen- Grit Classifier- Odor Control Unit (OCU) and Odor Control Fan.  Oxidation Ditch - Secondary Clarifier – Return Sludge Pumping Station.  Sand Filter house - Recycle Pumping Station – Storage Tank.  Chlorination System - U.V Channel - Effluent Pumping Station.  Gravity Thickener - Sludge Drying Beds. Job Responsibility:  Day to day site supervision for all mechanical activities.  Follow daily schedule for mechanical preventive maintenance.  Arranging with M.P.W engineer for internal work order (Corrective maintenance & Replacement Parts).  Report all activities and progress to M.P.W engineer.  Inspection and Repair of Mechanical Equipments.  Apply safety & HSE rolls during all site activates.
  • 5. 5 of 6  Project title: Construction, Completion, Operation and Maintenance of three Pumping Stations at Sulaibiya (DMC), KABAD and WAFRA.  Owner: Ministry of Public Works-(MPW) Contract NO: (SE-97)  Consultant: Gulf Consult. Project Description:  Pump Station Facility (3 Nos.)  Main Transmission Pumps, Control System, Motorized Plug, Gate, Butterfly Valves, etc.  Pipe work Connections (GRP, DIP, CS, HDPE, UPVC, CPVC, Copper pipes).  Install Waste Water Treatment Plant (W.W.T.P)  Air Compressors, Expansion Pressure vessels, Booster Pumps, Sump Pumps, Automatic Backwash Strainer, Sluice Gates with Actuators.  Service Reservoirs (170,000 m3 ), Administration Building, Laboratory Building.  Chlorination Facility with Chlorine Vapor Scrubber System. Job Responsibility:  Fully responsible for all aspects of the construction, management, planning and follow up necessary to achieve efficient and timely completion of the project handing over.  Handling procurement activities relating to contract and subcontracts in accordance with Company Procedures and Procurement department activities.  Review and evaluate technical submittals and shop drawings prior to submission to consultant and client according to required project standards.  Day to day site supervision for all site activities.  Coordination with client and Consultant Representative.  Reporting all activities and progress to project manager.  Plan for best use of resources (Equipment, labors, materials and subcontractors). --------------------------------------------------------------------------------------------------------------------------------------  Job Title: Piping & Mechanical Engineer. (Oct. 2006 till Nov. 2007) Company: Gulf of Suez Petroleum Company (GUPCO) Egypt Working as site Mechanical Engineer with (GUPCO) one of the leading construction companies In Petroleum & Gas services, Petrochemicals technical support Job responsibility:  Pumps installation: centrifugal, vacuum, fan, volumetric, multistage, air stream and condensate, submerged, high pressure pumps.  Pipeline fabrication: pipe fittings, valves (all types).  Maintenance of Hydraulic & Pneumatic cylinders & pumps & accumulators & valves of different manufacturer (Mather & Platt - AVM - PARKER ...…etc.)  Mounting and dismounting (bearing, mechanical seal).  Pump/Motor Alignment by dials gauges.  Inspection and Maintenance of Mechanical Facilities.
  • 6. 6 of 6  Training and Engineering Courses 1- TCB ( CQIP) ( TCB- Certified Quality Inspection Professional ) This course includes welding and painting process and their application on various product forms such as pressure vessels, Heat exchangers, tanks, Pipes etc including manufacturing process, governing codes and standards and inspection requirement and basic NDT. 2- Heavy Machinery Training Center (HMTC) Six months training in maintenance of heavy machines under supervision of Germany staff in Electro hydraulic systems and diesel engines. Course contains: 1- Electro hydraulic systems design and maintenance. 2- Diesel engines& Undercarriage maintenance. 3- Electronic and electrical panel maintenance. 3- Digital Electronic Control (P.L.C -S7200) Three months training in P.L.C -S7200 system design and control in Italian Institute (DON BOSCO) and its manufacturing applications. 4- Refrigerating & Air conditioning (HVAC. Three months training in maintenance of Refrigerating and split air conditions And its electrical panel in Italian institute (DON BOSCO). 5- Basic Business Skills Acquisition program (B.B.S.A) Sponsored by (AMIDEST) Egypt & American University in Cairo. Course contains:  Developed language and computer skills.  Enhanced Presentation &Project development skills.  Acquired basic business skills including (marketing - sales - accounting - Business correspondence - report writing - Projects Management).  Worked as team leader. 6- AutoCAD course Finished AutoCAD 2D course in scientific center (Cairo University) in designing and mechanical drawing. General Skills  Very motivated to learn other skills.  Dynamic personality.  Ability to work under pressure. Computer Skills  Microsoft office 2007 (Word – Excel – Access – PowerPoint).  AutoCAD 2007. Languages  English very good in speaking and writing skills.  Arabic is native language. Mohamed Behiry