Mohamed Behiry is seeking a position as a Mechanical & Piping Engineer that allows for career growth. He has 10 years of experience in construction of power plants, water desalination plants, and pipelines. His most recent role was as a Senior Piping & Mechanical Engineer for Hyundai Heavy Industries where he oversaw piping installation and testing for a large electrical power and desalination plant. He has extensive experience in engineering, construction, and commissioning of various mechanical systems and piping networks.
1. 1 of 6
Objective
To acquire a suitable position in the Organization that can offer me a Career related to Mechanical
& piping Engineer which will allow growth for organization and my personal development Innovative
and Flexible.
Personal Data
Date of Birth: 12th
May, 1984
Nationality: Egyptian.
Marital Status: Married.
Passport No: A11429205
Kuwait Society of Engineers Membership No: (20863)
Kuwait Oil Company Approved Contract No: (KOC-36081)
Kuwait Fire Service Directorate (KFD) License.
Educational Data
Qualification: B.Sc of Mechanical Engineering. (5 years)
Department: Power Mechanical Dep. (1002 to 2006)
Faculty Name: Faculty of Engineering (Mansoura University) - Egypt.
Project Name: Petroleum Engineering - Liquefied Petroleum Gas, (L.P.G).
Project Grade: Excellent.
My Job History
I have 10 years of Experience as Mechanical & piping Engineer, especially in
Construction of power plants & water desalination Plants and pipe lines.
Job Title: Senior Piping & Mechanical Engineer. (Jan 2014 till now)
Company: HYUNDAI Heavy Industries CO.LTD.
Working as Piping & Mechanical Engineer with (HHI) one of the biggest Construction
companies in the world specialists in Heavy Industries, ships building and Electrical
power & Desalination plants engineering and construction.
From Jan 2014 till now:
Project title: Supply, erection, operation and maintenance of Az-Zour North Phase 1 – IWPP
Electrical power & water desalination plant
Owner: Shamal Az-Zour Al-Oula K.S.C.
Consultant: FICHTNER
EPC Contractor: HYUNDAI Heavy Industries & SIDEM
Name: MOHAMED DESSOUKY BEHIRY
Profession: Mechanical & Piping Engineer.
Address: Salmiya, KUWAIT.
Mobile: +965/90050567
E-mail: moh.behiry@gmail.com
2. 2 of 6
Project Description: This project includes but is not limited to:
Engineering & Construction and Commissioning of 1550 MW with dual fuel module (fuel
gas/ gas oil) and water desalination plant Consisting of :
- GTG : 228 MW × 5 units. (Supplying by GE)
- STG : 255 MW × 2 units. (Supplying by GE)
- HRSG : 489 T/H × 5 units. (Supplying by HHI)
- Water capacity : 107 MIGD ( MED type) (Supplying by SIDEM)
Engineering & Construction of 10 MED water distillation units (Total production of 107
million IMGD)
Engineering & Construction of Co2 generation plant with two Co2 storage tanks.
Engineering & Construction and Commissioning of all mechanical supporting systems
like CCW system & sea water supplying lines & reject brine water lines and water
degasifier system.
Job Responsibility:
Full responsibility of GRP & GRE piping system material ordering & installation & Hydro
test & water flashing and commissioning.(Dia 25 mm up to 3000 mm)
Responsible for all offshore piping work installation & hydro test and back filling.
Erection of Water distillation units Multiple-effect distillation type (MED)
Installation and Testing of all underground pipe lines (GRP & GRE & DIP & IA & SW & PW
& FF & Co2 lines)
Erection of 20 No of limestone water filters with its piping system and back wash system.
------------------------------------------------------------------------------------------------------------------------------------------
Job Title: Senior Mechanical and Piping Engineer. (May 2010 to Jan 2014)
Company: Al-Ghanim International General Trading & Construction Co.
Working as Mechanical & piping Engineer with (AGI) one of the leading Construction
companies specialists in mechanical and Electrical works (Electrical power plants and
Desalination plants) and related infrastructures with MEW - MPW - KOC - KNPC, etc.
From May 2013 Jan 2014:
Project title: Supply, erection, operation and maintenance of two gas turbines to upgrade
Power capacity at sabiya power plant.
Owner: Ministry of electrical and water (MEW) Kuwait
Project Description: This project includes but is not limited to:
Engineering & Construction and Commissioning of two gas turbines 250 MW supplying
by (SIEMENS) with dual fuel module (fuel gas/ gas oil).
Engineering & Construction of one gas oil storage tank (capacity 9000 m3)
Engineering & Construction of two service water storage tanks (capacity 1220 m3 each)
Engineering & Construction of two demineralized water storage tanks (capacity 1220 m3
each)
Engineering & Construction of general auxiliary building with (fuel gas coolers, gas oil
treatment plant and DM system).
3. 3 of 6
Job Responsibility:
Fabrication and erection of Fuel gas, gas oil service water, DM water and firefighting piping
networks.
Construction and Testing of underground and aboveground pipe lines.
Responsible for erection work of air intake system.
Follow A.P.I-650 & ASME-B31.3 standers in mechanical and tanks erection activities.
Planning piping site activity and coordinate with client engineer.
-------------------------------------------------------------------------------------------------------------------------------------
From Jun 2012 till May 2013:
Project title: Az-Zour South RO desalination plant with Recarbonation system.
Production of (30 MIGD) per day Desalinate water
Owner: Ministry of Electrical and Water (MEW) --- Kuwait
Project Description: This project includes but is not limited to:
Engineering & Construction and Commissioning of Dual Media Gravity Filter building
(DMGF) with backwash system.
Engineering & Construction and Commissioning of 12 cartage filters and 12 L.P pumps
Engineering & Construction and Commissioning of 10 water desalination skids Reverse
Osmosis type (RO) with 10 ERD skids and H.P pumps.
Construction of 10 Limestone filters & its recovery system and its backwash system.
Construction of CO2 plant and Degasifier tank for Recarbonation system.
Job Responsibility:
Responsible for all GRP pipe installation and lamination dia (25 to 1800) mm.
Have good knowledge in CS & SS and SDX pipe fit up and welding.
Study the contract documents, design drawings and specifications provided by MWE
Material inspection like pipes, pipe fitting, valves, self-clean filters, cartage filters
Construction and Testing of different Dia of pipe lines with different material (SDX – GRP
– HDPE – S.S 316 – UPVC – CPVC – CS –
Follow A.P.I & ASTE standers in all mechanical activities
Planning piping site activity and work shop activity
------------------------------------------------------------------------------------------------------------------------------------
From May 2010 till Jun 2012:
Project title: Sabiya Closed Cycle Gas Turbine ( CCGT) Electrical Power Station
Owner: Ministry of Electrical and Water (MEW) Kuwait
Project Description: This project includes but is not limited to:
Engineering & Construction and Commissioning of 6 gas turbines and 3 switchgear
buildings
Engineering & Construction and Commissioning of 6 HRSG & 3 Steam turbines and 3
Cooling towers with total Electrical power productions of 2000 MW.
Job Responsibility:
Full responsibility for underground and aboveground GRP piping network dia (500 mm to
2000 mm) excavation & fit up & lamination & hydro testing and backfilling.
Erection and installation and testing of underground ductile network dia (100 to 800)mm
Study the contract documents, design drawings and specifications provided by MWE
Material inspection like pipes, pipe fitting, valves, etc.
Construction & Testing and flashing of underground pipe lines.
Coordination with main contractor (HHI) and client for handover the work.
4. 4 of 6
Job Title: Piping & Mechanical Engineer. (Jan 2008 till May 2010)
Company: United Gulf Construction Company W.L.L, (Kuwait).
Working as Mechanical Engineer with (UGCC) one of the leading Construction
companies specialists in oil & gas field, upstream, downstream, petrochemicals and
related infrastructures
With KOC – KNPC – J.O – MEW – MPW, etc.
From Jan. 2008 till May 2010:
Project title: Laying of a new 30” Dia. High Pressure Gas Transmission Pipeline from
(BS-140) to Manifold (GCMB).
Owner: Kuwait Oil Company (KOC) Contract NO: (KOC-35055).
Project Description: This project includes but is not limited to:
Laying of 30” Dia. High Pressure Gas Transmission Pipeline from BS-140 to Manifold
GCMB area in borgan filed.
Installation, Testing and commissioning of (2) Pig Launcher/Receivers Station size 30” x
34” one in BS-140, and the other one in M/F GCMB.
Job Responsibility:
Study the contract documents, design drawings and specifications provided by KOC.
Material take-off from P & ID and Tender drawings to Bills of Quantities (PQ).
Material inspection like pipes, pipe fitting, valves, painting material etc.
Construction, Testing, Pre-commissioning, and Commissioning of Mechanical Facilities.
Apply QA /QC rolls in welding joints and all mechanicals activities.
Hydrostatic testing & Commissioning for the pipe line.
Follow A.P.I & ASME standers in all mechanical activities.
-------------------------------------------------------------------------------------------------------------------------------------
Project title: General Services for Operating and Maintenance of Umm AL-Hyman Sewage
Treatment Plant (S.T.P)
Owner: Ministry of Public Works-(MPW) Contract NO: (SE/S/117)
Project Description: Sewage Treatment Plant contains of:
Headwork building with Grit Trap Mechanism- Grit Pumps - pinch valves & 3-way valves-
Bar Screen- Grit Classifier- Odor Control Unit (OCU) and Odor Control Fan.
Oxidation Ditch - Secondary Clarifier – Return Sludge Pumping Station.
Sand Filter house - Recycle Pumping Station – Storage Tank.
Chlorination System - U.V Channel - Effluent Pumping Station.
Gravity Thickener - Sludge Drying Beds.
Job Responsibility:
Day to day site supervision for all mechanical activities.
Follow daily schedule for mechanical preventive maintenance.
Arranging with M.P.W engineer for internal work order (Corrective maintenance &
Replacement Parts).
Report all activities and progress to M.P.W engineer.
Inspection and Repair of Mechanical Equipments.
Apply safety & HSE rolls during all site activates.
5. 5 of 6
Project title: Construction, Completion, Operation and Maintenance of three Pumping
Stations at Sulaibiya (DMC), KABAD and WAFRA.
Owner: Ministry of Public Works-(MPW) Contract NO: (SE-97)
Consultant: Gulf Consult.
Project Description:
Pump Station Facility (3 Nos.)
Main Transmission Pumps, Control System, Motorized Plug, Gate, Butterfly Valves, etc.
Pipe work Connections (GRP, DIP, CS, HDPE, UPVC, CPVC, Copper pipes).
Install Waste Water Treatment Plant (W.W.T.P)
Air Compressors, Expansion Pressure vessels, Booster Pumps, Sump Pumps, Automatic
Backwash Strainer, Sluice Gates with Actuators.
Service Reservoirs (170,000 m3
), Administration Building, Laboratory Building.
Chlorination Facility with Chlorine Vapor Scrubber System.
Job Responsibility:
Fully responsible for all aspects of the construction, management, planning and follow up
necessary to achieve efficient and timely completion of the project handing over.
Handling procurement activities relating to contract and subcontracts in accordance with
Company Procedures and Procurement department activities.
Review and evaluate technical submittals and shop drawings prior to submission to
consultant and client according to required project standards.
Day to day site supervision for all site activities.
Coordination with client and Consultant Representative.
Reporting all activities and progress to project manager.
Plan for best use of resources (Equipment, labors, materials and subcontractors).
--------------------------------------------------------------------------------------------------------------------------------------
Job Title: Piping & Mechanical Engineer. (Oct. 2006 till Nov. 2007)
Company: Gulf of Suez Petroleum Company (GUPCO) Egypt
Working as site Mechanical Engineer with (GUPCO) one of the leading construction
companies In Petroleum & Gas services, Petrochemicals technical support
Job responsibility:
Pumps installation: centrifugal, vacuum, fan, volumetric, multistage, air stream and
condensate, submerged, high pressure pumps.
Pipeline fabrication: pipe fittings, valves (all types).
Maintenance of Hydraulic & Pneumatic cylinders & pumps & accumulators & valves of
different manufacturer (Mather & Platt - AVM - PARKER ...…etc.)
Mounting and dismounting (bearing, mechanical seal).
Pump/Motor Alignment by dials gauges.
Inspection and Maintenance of Mechanical Facilities.
6. 6 of 6
Training and Engineering Courses
1- TCB ( CQIP) ( TCB- Certified Quality Inspection Professional )
This course includes welding and painting process and their application on various product forms
such as pressure vessels, Heat exchangers, tanks, Pipes etc including manufacturing process,
governing codes and standards and inspection requirement and basic NDT.
2- Heavy Machinery Training Center (HMTC)
Six months training in maintenance of heavy machines under supervision of
Germany staff in Electro hydraulic systems and diesel engines.
Course contains:
1- Electro hydraulic systems design and maintenance.
2- Diesel engines& Undercarriage maintenance.
3- Electronic and electrical panel maintenance.
3- Digital Electronic Control (P.L.C -S7200)
Three months training in P.L.C -S7200 system design and control in Italian
Institute (DON BOSCO) and its manufacturing applications.
4- Refrigerating & Air conditioning (HVAC.
Three months training in maintenance of Refrigerating and split air conditions
And its electrical panel in Italian institute (DON BOSCO).
5- Basic Business Skills Acquisition program (B.B.S.A)
Sponsored by (AMIDEST) Egypt & American University in Cairo.
Course contains:
Developed language and computer skills.
Enhanced Presentation &Project development skills.
Acquired basic business skills including (marketing - sales - accounting -
Business correspondence - report writing - Projects Management).
Worked as team leader.
6- AutoCAD course
Finished AutoCAD 2D course in scientific center (Cairo University) in designing
and mechanical drawing.
General Skills
Very motivated to learn other skills.
Dynamic personality.
Ability to work under pressure.
Computer Skills
Microsoft office 2007 (Word – Excel – Access – PowerPoint).
AutoCAD 2007.
Languages
English very good in speaking and writing skills.
Arabic is native language.
Mohamed Behiry