1. Curriculum Vitae
Date: August 28, 2015 Page: 1 of 7
Name John Raugstad
Date of Birth 01.03.1959
Nationality Norwegian
Profession Senior Engineer, Piping & Arrangement
Education State College of Engineering-84, Mechanical Engineering
Languages Scandinavian, English
Computer skills Excel, Word, Lotus Notes, some Microstation,STID, PROCOSYS
Career Summary:
1984-present Wood Group Mustang Norway AS (WGMN)
(formerly Agility Projects AS)
Discipline Manager for upgrade projects on offshore installations.
Design and detail engineering, responsible for process modification
projects in rebuilding project for petrochemical plant, petrochemical
refinery and offshore installation.
System engineer, evaluation and conceptual design. Process design,
pipe stress calculations for petrochemical plant and offshore projects.
Key Qualifications:
Extensive experience within detail engineering of piping systems for petrochemical plants and
refinery, utilising European and American codes and standards.
Qualified to evaluate and establish piping specifications including material selection.
Experience within conceptual studies and detailed engineering of piping systems for high
pressure piping manifolding for oil and gas, and utility systems on Rig and Offshore vessels.
Experienced in cost estimation and project planning.
Management for the piping discipline in major offshore projects.
2. Curriculum Vitae
Date: August 28, 2015 Page: 2 of 7
Experience:
1984-present
Wood Group Mustang Norway AS (WGMN)
(formerly Agility Projects AS)
Discipline Lead Engineer, Piping and Arrangement Department
2013-2015 Project: GG10113521 Snorre A
Client: Statoil
Title: Discipline Lead Piping/Mechanical
Duties: Responsible for demolition scope of work for hydraulic
control system for 4 turbines. Follow up installation of new gas fuel
skid and new diesel fuel skid for turbines on 3 generators and new
gas fuel skid for turbine on 1 compressor.
2012-2013 Project: GG10113467 Sleipner A
Client: Statoil
Title: Discipline Lead Mechanical
Duties: Responsible for demolition scope of work for hydraulic
control system on 3 turbines and 5 compressors. Follow up
installation of new gas meetering valves and new diesel fuel skids on
3 off turbines for generators .
2011-2012 Project: GG10113422 CREEM
Client: Grenland Group Technology
Title: Senior piping engineer
Duties: Responsible for implementing piping and layout discipline
activities and deliverables to GG`s new Quality Management System.
2010-2011 Project: GG10113279 Åsgard A Swivel Replacement
Client: Statoil
Title: Discipline Lead Piping (tot. 10.000 eng.hour piping)
Duties: Responsible for design and layout for process and utility
piping and jumpers connected to new 150 ton production swivel.
2007-2010 Project: GG10112986 Oseberg Low Pressure Production
Client: Statoil
Title: Discipline Lead Piping (tot. 40.000 eng.hour piping)
Duties: Responsible for piping design and layout for 9 off Field
Check Packages and 60 off Engineering Work Packages.
2006-2007 Project: GF112686 Fire Water upgrading, Statfjord Late Life Project
Client: Aker Kværner
Title: Discipline Lead Piping (tot. 10.000 eng.hour piping)
Duties: Piping for replacement of existing fire water deluge system in
process modules on Statfjord B and C platform.
2005-2006 Project: GF112665/KA205030
Client: Bergesen
Title: Discipline Lead Piping (tot. 15.000 eng.hour piping)
Duties: Responsible for piping design and layout for Oil Separation,
3. Curriculum Vitae
Date: August 28, 2015 Page: 3 of 7
Gas Compression and Fuel Gas Module, placed on Bergesen FPSO.
2005-2006 Project: Omacor 2004
Client: Pronova Biocare AS
Title: Senior Project Engineer
Duties: Responsible for Mecanical Completion regarding extension
of pharmaceutical plant.
2002-2005 Client: Statoil
Title: Discipline Lead Piping (tot. 30.000 eng.hour piping)
Duties: Piping for replacement of existing fire water deluge system in
process modules on Statfjord A, B, C platform. I.e. for replacing the
deluge piping and equipment in more than 40 modules with approx.
15.000 m piping. The project were performed in alliance with OIS at
Sola.
2001 Client: Pronova Biocare AS
Title: Senior Project Engineer
Duties: Responsible for piping completion regarding extension of
pharmaceutical plant.
2000 Client: Reichhold AS
Title: Project Manager
Duties: Realization of new building and extension of cleaning area
for gelcoat production plant.
1999 Client: Reichhold AS
Title: Senior Project Engineer
Duties: Development of Reichhold Piping Standard.
1999 Senior Project Engineer – Utsira High Drilling Facilities
Conceptual design of drilling facilities for bid.
Client: Heerema Tønsberg AS/ABBOS AS/Esso Norge AS
1999 Senior Project Engineer – Conceptual design of drilling
support/mud facilities for monohull and fixed platform.
1998-1999 Senior Project Engineer - NAVIS EXPLORER I Drilling Facilities,
Ultra Deepwater Drillship, system engineering for topsides.
Responsible for P&ID development up to IFC.
Client: Navis ASA
1997-1998 Senior Piping Engineer - study for new distillation Plan for Omega
3 fabrication.
Client: Pronova Biocare AS
4. Curriculum Vitae
Date: August 28, 2015 Page: 4 of 7
1996 Project Manager - responsible for several modification project in
VCM and Ethylene Plant. Supervision of modification installation in
maintenance interval.
Client: Norsk Hydro AS, Rafnes
1995 Project Manager - Modification of Flare system of Ethylene Plant.
Relocation of new Warm Blowdown Drum ( 220 m3), new pipe
bridge, piping and equipment related.
Client: Norsk Hydro AS, Rafnes
1994 Senior Piping Engineer - piping flexibility and stress calculation of
stream piping for new flue gas treatment plant at Statoil Mongstad.
Client: Kværner Engineering a.s, Miljø, Sandefjord.
Senior Piping Engineer - detail engineering, piping flexibility
analyser and stress calculation in connection to installation of new
Freon R500 compressor at the VCM plant.
Client: Norsk Hydro AS, Rafnes
Senior Piping Engineer - detail engineering, modification in the
biological waste water treatment plant at Fritzøe Fiber AS. Tender
work regarding several new biological waste water treatment plant
for Norwegian Pulp and Paper Industry.
Client: Kværner Engineering a.s, Miljø, Sandefjord
1993 Senior Piping Engineer - piping design of high pressure steam
piping and stress calculation of pipeline for new destillation plant for
Omega 3 fabrication.
Client: Pronova Biocare AS, Sandefjord.
Senior Piping Engineer - design and detailed engineering of piping
and tanks for new purifying plan of drinking water. (Skullerud
Vannrenseanlegg).
Client: Pindsle Mek. Verksted A/S, Sandefjord
1992 Senior Piping Engineer - piping design and isometric drawings and
stress calculation pipelines for Biox project.
Client: Esso Norge a.s, Tønsberg.
1992 Project Engineer - stress calculation and design verification for high
pressure gas piping to Sleipner A platform.
Client: Oljedirektoratet, Stavanger. (Norwegian Petroleum
Directorate).
1990-1991 Project Engineer - modification responsible, design, detailed
engineering and following up in the plant for several larger and minor
5. Curriculum Vitae
Date: August 28, 2015 Page: 5 of 7
modification project in VCM and Etylene plant, regarding piping,
structure and process equipment.
Client: Norsk Hydro a.s, Rafnes.
Senior Piping Engineer - conseptual study for turret design for Troll
Phase II application. Riser termination and high pressure piping
manifolding for oil and gas.
Client: Norsk Hydro a.s
Senior Piping Engineer - design and detailed engineering for turret
design for Petrojarl II. Riser termination and high pressure piping
manifolding for oil and gas.
Client: Norsk Hydro a.s
1990 Piping Design Engineer - design and detailed engineering for
process piping to Petrojarl I. Modification of produced water system.
Client: Golar Nor Offshore a.s
Project Engineer - conseptual study for modification of ventilation
system for mg.plant at Herøya.
Client: Hydro Porsgrunn.
1989 Piping Design Engineer - design and detailed engineering, pipe
stress calculation, piping arrangement and isometric in rebuilding
project VCM plant.
1988 Piping Design Engineer - piping arrangement and isometric in
fertilizer storage (55000 m³).
Client: Norsk Hydro A/S.
Piping Design Engineer - piping arrangement and isometric in
fertilizer plant modification work FGJ.3.
Client: Norsk Hydro A/S.
1985-1987 Piping Design Engineer - piping arrangement and isometric in
fertilizer plant NPK-84. Following up piping installation and
commisioning.
Client: Norsk Hydro A/S.
1985 QA/QC Engineer - Procurement and testing assistant for testing of
lifting appliances on semisubmersible Dyvi Stena.
Client: Dyvi Offshore a.s, Oslo.
1984 Piping Design - Isometric detailing and piping arrangements for
boilerinstallation in waste recirculation plant.
6. Curriculum Vitae
Date: August 28, 2015 Page: 6 of 7
Client: Fjeldstad A/S, Melsomvik.
Draftsman - Agitator vessel detailing, appr. 10 and 5 m³.
Client: Jotun A/S, Sandefjord.
Draftsman - Redrawing of safety-plan, piping and walkway detailing
for the jack up floatel Dyvi Gamma regarding a extension project.
Client: Dyvi Offshore A/S, Oslo
Education:
1984 Agder Ingeniør- og distriktshøgskole. (B.Sc., State College of
Engineering). (One-year post graduate course in offshore
technologies at Grimstad Technical College of Engineering).
1983 Horten Ingeniørhøgskole,(B.Sc. State College of Engineering).
1981 Horten Tekniske Fagskole, (Technical College).
1978 Examen Artium, Sandefjord. (Senior Secondary School).
Supplementary Courses:
2012 MAERSK training, Introduction to Drilling
2009 PED-course/seminar,arr.by DNV
2009 NMU HSE Basic training
2007 Vibration in piping systems.
2000 CE-marking of Machinery
1997 NORSOK, information seminar for use of standards.
1991 Triflex user course.
1991 MicroStation user course.
1986 Course in pipedesign/stressrelief on EDP program, SIKOB-PIPE '85.
1984 Offshore course (Leiro part 1, 2 and 3).
1983 Pneumatic systems and equipment.
Pre-Educational Experiences:
Scaffold fitter onshore and offshore, 8 months. Fjeldstad A/S,
Melsomvik.