1. 1
CURRICULUM VITAE
MUHAMMAD ASLAM
CARRIER OBJECTIVES.
Enthusiastically seeking a carrier, which provides an opportunity to apply my knowledge, skills and experience to a
challenging environment leading to growth and development of organization and personal carrier advancement.
ACADEMICS:-
BAHAUDDIN ZAKARIYA UNIVERSITY MULTAN 2000
Graduation
Govt. College of Technology Multan (PBTE LAHORE) 1995
(D.A.E ––Civil Engineering)
Govt. High School Muzaffargarh, Pakistan D G Khan Board 1992
Matric (SCIENCE)
EMPLOYMENT HISTORY:-
Working in the field of civil and construction industry from 1995- todate
ENGINEERING SKILLS.
More than 20 Years’ Experience in Following Major ConstructionFields
Oil and Gas Plants.
Thermal Power Plant.
Building construction Projects.
Canal Project.
Road Projects.
Fertilizer Plant.
Live Plants. (Maintenance jobs)
Cement Plant.
2. 2
EXPERIENCE PROFILE.
(20 Years)
In-charge Civil
Client : RAS GAS RasLaffan Qatar (Live Plant)
Main Contractor : Chiyoda Almana.
Employer : Descon Engineering Qatar LLC.
Project : CEMS ENHANCE CONTINUOUS EMISSION MONITORING SYSTEM
Status : From Nov.2014 to date.
Responsibilities:-
Construction of new Analyzers Foundations for 37 nos. of Stacks
In Utility and Process Area Train 1, 2,3,4,5 andAKG-1
Construction of PDB foundations in Utilityarea.
Construction of pipe supports foundations in utility area,
Opening of existing cable trenches 3.2 KM direct buriedand concrete trenches.
Pulling of electrical cables from sub-stations to PDB and from DB to Analyzers.
Back filling of all opened cable trenches.
Removal of cover slabs of existing cable trenches and re-instatement.
Cutting of existing pavements and reinstatement.
Grouting for Analyzers.
New pavements for access walkways.
In-charge Civil
Client : Dolphin Energy RasLaffan Qatar (Live Plant)
Project : Task Order 1, 6 and 9.
Employer : Descon Engineering Qatar LLC.
Status : From 11 April. 2014 to 20 Oct. 2014
Responsibilities:-
Construction of Rich caustic filter foundations in Stream-1 and Stream-2 including dewatering as per requirement.
Construction of pipe supports foundations in stream-1and Stream-2.
Construction of 3 nos. new Muster Points two in noneprocess Area and one in process area for plant emergency mustering.
Opening of existing cable trenches 2.0 km for cable layingand power up to muster points.
Back filling of opened cable trenches.
Continuous dewatering during construction as per RLC and Dolphin procedures.
Site in-charge
Client : QNCC DUKHAN. (Live Plant)
Main contractor : FCB FIVES (France)
Project : Replacement of Reducer of cement Mill.
Employer : Descon Engineering Qatar LLC.
Status : March 1, 2014 to April 10, 2014.
Responsibilities:-
Demolition of existing concrete foundation with wire cutting method.
Division of foundation in 10 pieces and lifting with overhead crane by fixing lifting lugs with HILTY-HIT-HY-RE 500. After 24 hours. Every piece
having 10 tone weighted-construction of foundation as per modified design.
Fabrication and installation of steel structure around the foundation for walking platform
Erection of reducer of cement mill on modifiedfoundation.
3. 3
In-charge Civil
Client : QAFAC Mesaieed industrial city Qatar. (Live Plant)
Pre-Shut Down, Shut Down and Post Shut Down.
Project : Replacement of Methanol converter.
Main Contractor : Chiyoda Almana.
Employer : Descon Engineering Qatar LLC.
Status : Jan 1, 2014 to Feb 28, 2014.
Responsibilities:-
Construction of pipe supports foundations in side plant. Construction of structures foundations in side plant.
Cutting of existing pavements and excavation.
Back filling and compaction around and under foundations.
Re-instatement of paving.
Site-In charge
Client : RLOC (RAS LAFFAN OLEFIN COMPANY)
Live Plant.
Project : Nitrogen Line tie in to Gasal.
Employer : Descon Engineering Qatar LLC.
Status : Sept. 2013 to December, 2013.
Responsibilities:-
Pre-casting of Pipe sleeper foundations and installation as per site lay out plan.
Cast in situ Foundations for road cross steel structurebridges. Excavation and back filling for foundations.
Fabrication, painting and installation of steel structurefor road cross bridges and supports.
Fabrication, painting and laying of 8 inch dia pipe lineon sleepers 800 meter in length.
Laying of cables in cable trays to provide power to tie inpoint Gasal skid.
Tie in with live line by hot tapping.
Area In-charge Civil.
Project. : Barzan on shore Gas Plant.
RasLaffan Qatar.
Client. : RAS GAS
Main Contractor. : GJC Corporation
Employer. : Descon Engineer Qatar LLC.
Status. : From Sept.2011 to Aug. 2013.
Responsibilities:-
PRE-CASTING OF CONCRETE ELEMENTS UNDER AND ABOVE GROUND OVER ALL PROJECT.
Pre-Casting of catch basins for the area B200, C200, and C300.
Pre-Casting of man holes for the area B200, C200, C300.
Pre-Casting of CJB for V & U-ditches B200, C200, and C300.
Pre-Casting of CFS (Fire Box) of U-Ditch.
Pre-Casting of sump box for the area B200, C200, C300.
Pre-casting of valve pits for the area B200, C200, and C300.
Pre-Casting of road crossing for area B200, C200, C300.
Pre-Casting of U-Ditch for the area B200, C200, and C300.
Pre-Casting of Fire Proofing for steel structures elements for pipe racks and equipment’s for the area B200, C200, C300.
Pre-Casting of concrete cable trenches B200, C200, C300.
Pre-Casting of pipe supports for the area B200, C200, and C300.
4. 4
CAST IN SITU CONCRETE WORKS.
Construction of Pipe Rack foundations for the area B200.
Construction of equipment foundations for the area B200.
Construction of tank foundations for the area B200.
Construction of RCC Dyke walls around the tanks B200.
Construction of compressors foundations for the area B200. Fire proofing concrete for steel structures of Pipe Racks.
Racks and equipment’s for the areaB200.
Construction of U-Ditches, V-Ditches for the area B200.
Construction of concrete Cable trenches for the area B200.
Construction of Duct Banks E&I for the area B200.
Construction of Pump pits for the area B200.
EARTH WORKS.
Initial Back Fill and Back fill in the area B200, C200, C300 Approx. Quantity 500000 M3. (Five hundred thousand cubic meter)
Equipment used for transportation laying loading offloading spreading watering mixing of soil for FDT TEST.
Water Tankers. 10 nos.
Graders 06 nos.
Vibratory rollers 04 nos.
Shovels 04 nos.
Dump trucks 15 no’s
JCB. 01 no’s.
Dozer 01 no’s.
EXCAVATION FOR PONDS, FOUNDATIONS, PIPE LINES AND UNDER GROUND PIPING.
Excavation in hard rocks. For filtration pond, cooling water lines, sea water lines foundations and underground piping. Including sand bedding for
pipe lines and underground piping Quantity aprox500000M3 (Five Hundred thousand m3).
Equipment Used For Excavation.
Rock Breakers excavators 5 nos.
Dump trucks. 20 nos.
Shovels. 02 nos.
JCB. 04 nos.
Bob Cats. 10 nos.
SCREEING OF EXCAVATED MATERIAL.
Screening of excavated material on stock piles. Approx. 200,000 m3 type A and type B.
Equipment and Tools Required for Screening of material.
Shovel 02 nos.
Screen 50 mm 02 nos.
Screen 150 mm 02 nos.
CRUSHING OF EXCEVATED MATERIAL.
Approx. 300,000 m3 material was crushed with crushing Plants.
Tools and Equipment’s required for Crushing.
Crushing Plants. 02 nos.
Shovels. 04 nos.
In-charge Civil.
Client : QATAR GAS RAS LAFFAN (Live Plant)
Project : Expansion of Qatar Gas Train 4, 5, 6&7 Main
Contractor : CTJV (CHIYODA Technip JV)
Employer : DESCON Engineering Qatar LLC. QATAR
Duration : November 2010 to sept.2011.
5. 5
Responsibilities:-
To complete the warranty and maintenance jobs at Qatar Gas Train-4, 5, 6 and 7
Area In-charge Civil.
Project : EnVen-1.3 Expansion Project Engro Chemical Daharki
Pakistan Clients : ENGRO Chemical Fertilizer Limited Pakistan.
Consultant : Snamprogetti
Employer : DESCON Engineering Limited
PAKISTAN Duration : September 2007 to November 2010.
Responsibilities:-
PILLING WORK.
Pilling work for world largest and tallest Prilling Tower.
Pilling work for Pipe Racks bucket foundations.
Pilling work for Equipment foundations.
Pilling work for cooling tower basin.
CAST IN SITU CONCRETE WORKS.
Construction of equipment foundations like heat exchangers compressors, pumps.
Construction of Prilling tower foundation having 1500 m3 concrete.
Construction of pipe rack bucket foundations.
Construction of underground pits.
Construction of wind brace structures in pipe racks.
Concrete Pavement works heavy duty and light duty in different areas.
CONCRETE PRE-CAST WORKS.
Pre-casting of pipe rack columns, cooling tower columns, compressor house columns.
Pre-casting of underground pits.
Pre-casting of cooling tower roof panels.
Pre-casting of cooling tower louvers panels.
Pre-casting of pipe rack beams.
SLIP FORMING OF WORLD LARGEST AND TALLEST PRILL TOWER.
Execution of Prilling Tower by slip forming having dia 28 m and height 125 m silo and 139 m stair
case.
Fixing of embedded items during slip form.
Fixing of stair steps, landings and connection plate forms during slip forms.
Construction of hopper slab in side Prilling Tower. Construction prill bucket having weight 561
tons on ground and lifted it up at height 120 m with hydraulic jacks.
Internal concrete protective coating with sky climbers. Fixing of anti-acid tiles on ground floor top
of hopper slab and in side of Prill Bucket.
Fixing of louvers over hopper slab and prill bucket. Construction of sun shade in outer side over
louvers.
ERECTION OF STEEL STRUCTURE.
Erection of steel structures 200 tons for trusses of prill Tower Bucket.
6. 6
Erection of steel structures 1100 tons for conveyor from Prilling Tower to Bagging Building.
Sr. Structure Engineer
Project : Kachhi Canal Project KC05
Clients : Wapda
Consultants : Kachhi Canal Consultants.
Employer : Habib Rafiq Pvt.Ltd.
Duration : From, Aug 2006 to Sep 2007
Responsibilities:-
Hydraulic structures like canal siphons, super passages, bridges & canal lining.
Casting of bridge piles with percussion method and conducting pile load test.
Pre casting of bridge pre stressed post tensiongirder Construction of abutments, piers, bottom slabs, approach slabs, trough slabs, through walls,
transition walls, cut off walls of canal syphon, super passages and bridges.
Canal concrete lining with lining machine.
Site In-charge
Project : Hatchery, Control sheds,Feed Mill, Farma Lab.
Clients : Big Bird , Poultries international Schazo zaka
Pharma. Employer Thaheem Construction Co.
Duration : From, Dec 2004 to Aug 2006
Responsibilities:-
Construction of Hatchery building of Big Bird at Multan Basti Malook.Consruction of 8 nos.
Control shed double story frame structure of Poultries international At Vehari.
Construction of Schazo zaka pharma. Lab at Lahore kalal wala.
Site Engineer
Project : Parco (Housing)
Clients : Parco
Consultants : Nes Pak
Employer : Abdul Sattar & co.
Duration : From, 1997 to 1998.
Responsibilities:-
Construction of Boundary wall of Parco more than 8 km.
Construction of bangloes load bearing for family accommodations.
Construction of watch towers and security posts. For a mega Housing complex.
Site Engineer.
Project : AES, Lal Pir Thermal Power Plant Pakistan
Client : AES
Duration : 1998 to 2002.
Responsibilities:-
Maintenance jobs in Live Plant.
Shut down activities in live plant.
Cleaning of different ponds. Partition retaining wall in sludge pond.
Civil works of social responsibilities for local persons. Housing extension
works.
7. 7
Site Engineer.
Project : Parco (white oil pipe Project)
Client : PARCO.
Consultant : Nespak
Employer : Abdul Sattar & CO
Duration : Oct.2002 to Oct.2004.
Responsibilities:-
Construction of infrastructures, ware house, Station building .bachelor accommodations, Station
Roads, Drainagesystems.
Apartments for a mega housingcomplex.
Asst. Engineer.
Project : On Road Project N5 from Multan to Bahawalpur.
Clients : NHA.
Consultants : ACE
Employer : Hasnain Construction Co.
Duration : Aug 1995 to March 1997.
Responsibilities:-
Construction of bridges, culverts retaining walls, and road barriers.
Preparation of sub grade, sub base, base course for main highway.
INTEREST AND ACTIVITIES
Hockey, football and badminton. Reading
Newspapers, watching television.
PERSONAL INFORMATION.
Father’s Name : Nazar Hussain
Date of Birth : 01 March 1977
Contact Qatar. : +974 3398 2113, +974 3016 2028
Contact Pak. : +92 33 1878 8340
Home Address : Mohallah Qayyum Nagar Muzaffar Garh Pakistan.
Religion : Islam
National ID # : 32304-1621783-3
Passport : DM1807832
E-mail Address : malikaslam786@gmail.com
Nationality : Pakistani
Marital Status : Married.
Languages : English, Urdu, Punjabi, Saraiki
Availability : One month.
Expected salary : Negotiable