SlideShare a Scribd company logo
1 of 19
Download to read offline
KUMPULAN TABEL MIL-STD-105E
Ir. Budi Nurtama, M.Agr.
2008
Program Studi Supervisor Jaminan Mutu Pangan
PROGRAM DIPLOMA
Institut Pertanian Bogor
i
Tables for MIL-STD-105E *)
Page
Table I. Sample-Size Code Letters. 1
Table II-A. Single Sampling Plans for Normal Inspection (Master Table). 2
Table II-B. Single Sampling Plans for Tightened Inspection (Master Table). 3
Table II-C. Single Sampling Plans for Reduced Inspection (Master Table). 4
Table III-A. Double Sampling Plans for Normal Inspection (Master Table). 5
Table III-B. Double Sampling Plans for Tightened Inspection (Master Table). 6
Table III-C. Double Sampling Plans for Reduced Inspection (Master Table). 7
Table IV-A. Multiple Sampling Plans for Normal Inspection (Master Table). 8
Table IV-A.(continued) 9
Table IV-B. Multiple Sampling Plans for Tightened Inspection (Master Table). 10
Table IV-B.(continued). 11
Table IV-C. Multiple Sampling Plans for Reduced Inspection (Master Table). 12
Table IV-C.(continued). 13
Table V-A. Average Outgoing Quality Limit Factors for Normal Inspection (Single Sampling). 14
Table V-A. Average Outgoing Quality Limit Factors for Tightened Inspection (Single Sampling). 15
Table VIII. Limit Numbers for Reduced Inspection. 16
*)
Farnum, Nicholas R. 1994. Modern Statistical Quality Control and Improvement. Wadsworth, Inc., California.
ii
Tahapan Implementasi MIL-STD-105E
1. Tentukan AQL (Acceptable Quality Level) berdasarkan perjanjian produsen dan pelanggan.
2. Tetapkan modus dan tingkat inspeksi (jika tidak, gunakan Normal Inspection, Level II ).
3. Tentukan ukuran lot (lot size).
4. Gunakan tabel Sample Size Code Letters untuk memilih huruf kode yang sesuai.
5. Tetapkan tipe prosedur pengambilan sampel : single, double, atau multiple sampling.
6. Gunakan tabel yang berkaitan dengan prosedur pengambilan sampel terpilih (tahap 5) dan modus/tingkat inspeksi (tahap 2) untuk mendapatkan ukuran sampel
dan angka penerimaan (Ac) serta angka penolakan (Re). Dalam kasus dimana suatu rancangan tidak ada untuk ukuran lot dan AQL-nya, hati-hati mengikuti
tanda panah dalam tabel ke rancangan terdekat yang ada.
7. Mulailah gunakan rancangan tersebut dan catat penerimaan dan penolakan sehingga switching rule dapat diterapkan. Jika switching dilakukan, tentukan modus
dan tingkat dan ulangi tahap 4-6 untuk mendapatkan rancangan pengambilan sampel yang baru.
SWITCHING RULE for MIL-STD-105E
• Dari Normal ke Tightened Inspection : setelah 2 lot ditolak dari 2, 3, 4, atau 5 lot berurutan
• Dari Tightened ke Normal Inspection : setelah 5 lot berurutan diterima
• Dari Normal ke Reduced Inspection : jika (i) 10 lot berurutan diterima, dan (ii) jumlah total nonconforming items dalam 10 lot tersebut tidak melebihi batas
pada Table VIII. Limit Numbers for Reduced Inspection., dan (iii) produksi stabil/mantap, dan (iv) disetujui oleh otoritas
yang bertanggungjawab.
• Dari Reduced ke Normal Inspection : jika (i) suatu lot tunggal ditolak, atau (ii) suatu lot hanya sebagian dapat diterima (dhi. jumlah nonconforming items
diantara angka diterima dan ditolak), atau (iii) produksi menjadi tidak stabil, atau (iv) kondisi-kondisi lain yang
menjamin bahwa inspeksi Normal dapat dilakukan.
1
Table I. Sample-Size Code Letters.
Lot or batch size
Special Inspection Levels General Inspection Levels
S-1 S-2 S-3 S-4 I II III
2 to 8
9 to 15
16 to 25
A
A
A
A
A
A
A
A
B
A
A
B
A
A
B
A
B
C
B
C
D
26 to 50
51 to 90
91 to 150
A
B
B
B
B
B
B
C
C
C
C
D
C
C
D
D
E
F
E
F
G
151 to 280
281 to 500
501 to 1,200
B
B
C
C
C
C
D
D
E
E
E
F
E
F
G
G
H
J
H
J
K
1,201 to 3,200
3,201 to 10,000
10,001 to 35,000
C
C
C
D
D
D
E
F
F
G
G
H
H
J
K
K
L
M
L
M
N
35,001 to 150,000
150,001 to 500,000
500,001 and over
D
D
D
E
E
E
G
G
H
J
J
K
L
M
N
N
P
Q
P
Q
R
2
Table II - A. Single Sampling Plans for Normal Inspection (Master Table).
Sample
size
code
letter
Sample
size
Acceptable Quality Levels (normal inspection)
0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000
Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re
A
B
C
2
3
5 0 1
0 1
0 1
1 2
1 2
2 3
1 2
2 3
3 4
2 3
3 4
5 6
3 4
5 6
7 8
5 6
7 8
10 11
7 8
10 11
14 15
10 11
14 15
21 22
14 15
21 22
30 31
21 22
30 31
44 45
30 31
44 45
D
E
F
8
13
20 0 1
0 1
0 1
1 2
1 2
2 3
1 2
2 3
3 4
2 3
3 4
5 6
3 4
5 6
7 8
5 6
7 8
10 11
7 8
10 11
14 15
10 11
14 15
21 22
14 15
21 22
21 22
30 31
30 31
44 45
44 45
G
H
J
32
50
80 0 1
0 1
0 1
1 2
1 2
2 3
1 2
2 3
3 4
2 3
3 4
5 6
3 4
5 6
7 8
5 6
7 8
10 11
7 8
10 11
14 15
10 11
14 15
21 22
14 15
21 22
21 22
K
L
M
125
200
315 0 1
0 1
0 1
1 2
1 2
2 3
1 2
2 3
3 4
2 3
3 4
5 6
3 4
5 6
7 8
5 6
7 8
10 11
7 8
10 11
14 15
10 11
14 15
21 22
14 15
21 22
21 22
N
P
Q
500
800
1250 0 1
0 1
0 1
1 2
1 2
2 3
1 2
2 3
3 4
2 3
3 4
5 6
3 4
5 6
7 8
5 6
7 8
10 11
7 8
10 11
14 15
10 11
14 15
21 22
14 15
21 22
21 22
R 2000 1 2 2 3 3 4 5 6 7 8 10 11 14 15 21 22
= Use first sampling plan below arrow. If sample size equals or exceeds lot or batch size, do 100 percent inspection. Ac = Acceptance number.
= Use first sampling plan above arrow. Re = Rejection number.
3
Table II - B. Single Sampling Plans for Tightened Inspection (Master Table).
Sample
size
code
letter
Sample
size
Acceptable Quality Levels (tightened inspection)
0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000
Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re
A
B
C
2
3
5 0 1
0 1
1 2
1 2
2 3
1 2
2 3
3 4
2 3
3 4
5 6
3 4
5 6
8 9
5 6
8 9
12 13
8 9
12 13
18 19
12 13
18 19
27 28
18 19
27 28
41 42
27 28
41 42
D
E
F
8
13
20 0 1
0 1
0 1
1 2
1 2
2 3
1 2
2 3
3 4
2 3
3 4
5 6
3 4
5 6
8 9
5 6
8 9
12 13
8 9
12 13
18 19
12 13
18 19
18 19
27 28
27 28
41 42
41 42
G
H
J
32
50
80 0 1
0 1
0 1
1 2
1 2
2 3
1 2
2 3
3 4
2 3
3 4
5 6
3 4
5 6
8 9
5 6
8 9
12 13
8 9
12 13
18 19
12 13
18 19
18 19
K
L
M
125
200
315 0 1
0 1
0 1
1 2
1 2
2 3
1 2
2 3
3 4
2 3
3 4
5 6
3 4
5 6
8 9
5 6
8 9
12 13
8 9
12 13
18 19
12 13
18 19
18 19
N
P
Q
500
800
1250 0 1
0 1
0 1
1 2
1 2
2 3
1 2
2 3
3 4
2 3
3 4
5 6
3 4
5 6
8 9
5 6
8 9
12 13
8 9
12 13
18 19
12 13
18 19
18 19
R
S
2000
3150
0 1
1 2
1 2 2 3 3 4 5 6 8 9 12 13 18 19
= Use first sampling plan below arrow. If sample size equals or exceeds lot or batch size, do 100 percent inspection. Ac = Acceptance number.
= Use first sampling plan above arrow. Re = Rejection number.
4
Table II - C. Single Sampling Plans for Reduced Inspection (Master Table).
Sample
size
code
letter
Sample
size
Acceptable Quality Levels (reduced inspection)
0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000
Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re
A
B
C
2
2
2 0 1
0 1
0 1
0 2
0 2
1 3
1 2
1 3
1 4
2 3
2 4
2 5
3 4
3 5
3 6
5 6
5 6
5 8
7 8
7 8
7 10
10 11
10 11
10 13
14 15
14 15
14 17
21 22
21 22
21 24
30 31
30 31
D
E
F
3
5
8 0 1
0 1
0 1
0 2
0 2
1 3
0 2
1 3
1 4
1 3
1 4
2 5
1 4
2 5
3 6
2 5
3 6
5 8
3 6
5 8
7 10
5 8
7 10
10 13
7 10
10 13
10 13
14 17
14 17
21 24
21 24
G
H
J
13
20
32 0 1
0 1
0 1
0 2
0 2
1 3
0 2
1 3
1 4
1 3
1 4
2 5
1 4
2 5
3 6
2 5
3 6
5 8
3 6
5 8
7 10
5 8
7 10
10 13
7 10
10 13
10 13
K
L
M
50
80
125 0 1
0 1
0 1
0 2
0 2
1 3
0 2
1 3
1 4
1 3
1 4
2 5
1 4
2 5
3 6
2 5
3 6
5 8
3 6
5 8
7 10
5 8
7 10
10 13
7 10
10 13
10 13
N
P
Q
200
315
500 0 1
0 1
0 1
0 2
0 2
1 3
0 2
1 3
1 4
1 3
1 4
2 5
1 4
2 5
3 6
2 5
3 6
5 8
3 6
5 8
7 10
5 8
7 10
10 13
7 10
10 13
10 13
R 800 0 2 1 3 1 4 2 5 3 6 5 8 7 10 10 13
= Use first sampling plan below arrow. If sample size equals or exceeds lot or batch size, do 100 percent inspection. Ac = Acceptance number.
= Use first sampling plan above arrow. Re = Rejection number.
= If the acceptance number has been exceeded, but the rejection number has not been reached; accept the lot, but reinstate normal inspection.
5
Table III - A. Double Sampling Plans for Normal Inspection (Master Table).
Sample
size
code
letter
Sample
Sample
size
Cumula
tive
sample
size
Acceptable Quality Levels (normal inspection)
0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000
Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re
A
B First
Second
2
2
2
4
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
8 9
5 9
12 13
7 11
18 19
11 16
26 27
17 22
37 38
25 31
56 57
C First
Second
3
3
3
6
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
8 9
5 9
12 13
7 11
18 19
11 16
26 27
17 22
37 38
25 31
56 57
D First
Second
5
5
5
10
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
8 9
5 9
12 13
7 11
18 19
11 16
26 27
17 22
37 38
25 31
56 57
E First
Second
8
8
8
16
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
8 9
5 9
12 13
7 11
18 19
11 16
26 27
17 22
37 38
25 31
56 57
F First
Second
13
13
13
26
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
8 9
5 9
12 13
7 11
18 19
11 16
26 27
G First
Second
20
20
20
40
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
8 9
5 9
12 13
7 11
18 19
11 16
26 27
H First
Second
32
32
32
64
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
8 9
5 9
12 13
7 11
18 19
11 16
26 27
J First
Second
50
50
50
100
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
8 9
5 9
12 13
7 11
18 19
11 16
26 27
K First
Second
80
80
80
160
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
8 9
5 9
12 13
7 11
18 19
11 16
26 27
L First
Second
125
125
125
250
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
8 9
5 9
12 13
7 11
18 19
11 16
26 27
M First
Second
200
200
200
400
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
8 9
5 9
12 13
7 11
18 19
11 16
26 27
N First
Second
315
315
315
630
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
8 9
5 9
12 13
7 11
18 19
11 16
26 27
P First
Second
500
500
500
1000
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
8 9
5 9
12 13
7 11
18 19
11 16
26 27
Q First
Second
800
800
800
1600
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
8 9
5 9
12 13
7 11
18 19
11 16
26 27
R First
Second
1250
1250
1250
2500
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
8 9
5 9
12 13
7 11
18 19
11 16
26 27
= Use first sampling plan below arrow. If sample size equals or exceeds lot or batch size, do 100 percent inspection. Ac = Acceptance number.
= Use first sampling plan above arrow. Re = Rejection number.
= Use corresponding single sampling plan (or alternatively, use double sampling plan below, where available).
6
Table III - B. Double Sampling Plans for Tightened Inspection (Master Table).
Sample
size
code
letter
Sample
Sample
size
Cumula
tive
sample
size
Acceptable Quality Levels (normal inspection)
0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000
Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re
A
B First
Second
2
2
2
4
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
11 12
6 10
15 16
9 14
23 24
15 20
34 35
23 29
52 53
C First
Second
3
3
3
6
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
11 12
6 10
15 16
9 14
23 24
15 20
34 35
23 29
52 53
D First
Second
5
5
5
10
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
11 12
6 10
15 16
9 14
23 24
15 20
34 35
23 29
52 53
E First
Second
8
8
8
16
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
11 12
6 10
15 16
9 14
23 24
15 20
34 35
23 29
52 53
F First
Second
13
13
13
26
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
11 12
6 10
15 16
9 14
23 24
G First
Second
20
20
20
40
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
11 12
6 10
15 16
9 14
23 24
H First
Second
32
32
32
64
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
11 12
6 10
15 16
9 14
23 24
J First
Second
50
50
50
100
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
11 12
6 10
15 16
9 14
23 24
K First
Second
80
80
80
160
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
11 12
6 10
15 16
9 14
23 24
L First
Second
125
125
125
250
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
11 12
6 10
15 16
9 14
23 24
M First
Second
200
200
200
400
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
11 12
6 10
15 16
9 14
23 24
N First
Second
315
315
315
630
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
11 12
6 10
15 16
9 14
23 24
P First
Second
500
500
500
1000
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
11 12
6 10
15 16
9 14
23 24
Q First
Second
800
800
800
1600
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
11 12
6 10
15 16
9 14
23 24
R First
Second
1250
1250
1250
2500
0 2
1 2
0 3
3 4
1 4
4 5
2 5
6 7
3 7
11 12
6 10
15 16
9 14
23 24
S First
Second
2000
2000
2000
4000
0 2
1 2
= Use first sampling plan below arrow. If sample size equals or exceeds lot or batch size, do 100 percent inspection. Ac = Acceptance number.
= Use first sampling plan above arrow. Re = Rejection number.
= Use corresponding single sampling plan (or alternatively, use double sampling plan below, where available).
7
Table III - C. Double Sampling Plans for Reduced Inspection (Master Table).
Sample
size
code
letter
Sample
Sample
size
Cumula
tive
sample
size
Acceptable Quality Levels (reduced inspection)
0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000
Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re
A
B
C
D First
Second
2
2
2
4
0 2
0 2
0 3
0 4
0 4
1 5
0 4
3 6
1 5
4 7
2 7
6 9
3 8
8 12
5 10
12 16
7 12
18 22
11 17
26 30
E First
Second
3
3
3
6
0 2
0 2
0 3
0 4
0 4
1 5
0 4
3 6
1 5
4 7
2 7
6 9
3 8
8 12
5 10
12 16
7 12
18 22
11 17
26 30
F First
Second
5
5
5
10
0 2
0 2
0 3
0 4
0 4
1 5
0 4
3 6
1 5
4 7
2 7
6 9
3 8
8 12
5 10
12 16
G First
Second
8
8
8
16
0 2
0 2
0 3
0 4
0 4
1 5
0 4
3 6
1 5
4 7
2 7
6 9
3 8
8 12
5 10
12 16
H First
Second
13
13
13
26
0 2
0 2
0 3
0 4
0 4
1 5
0 4
3 6
1 5
4 7
2 7
6 9
3 8
8 12
5 10
12 16
J First
Second
20
20
20
40
0 2
0 2
0 3
0 4
0 4
1 5
0 4
3 6
1 5
4 7
2 7
6 9
3 8
8 12
5 10
12 16
K First
Second
32
32
32
64
0 2
0 2
0 3
0 4
0 4
1 5
0 4
3 6
1 5
4 7
2 7
6 9
3 8
8 12
5 10
12 16
L First
Second
50
50
50
100
0 2
0 2
0 3
0 4
0 4
1 5
0 4
3 6
1 5
4 7
2 7
6 9
3 8
8 12
5 10
12 16
M First
Second
80
80
80
160
0 2
0 2
0 3
0 4
0 4
1 5
0 4
3 6
1 5
4 7
2 7
6 9
3 8
8 12
5 10
12 16
N First
Second
125
125
125
250
0 2
0 2
0 3
0 4
0 4
1 5
0 4
3 6
1 5
4 7
2 7
6 9
3 8
8 12
5 10
12 16
P First
Second
200
200
200
400
0 2
0 2
0 3
0 4
0 4
1 5
0 4
3 6
1 5
4 7
2 7
6 9
3 8
8 12
5 10
12 16
Q First
Second
315
315
315
630
0 2
0 2
0 3
0 4
0 4
1 5
0 4
3 6
1 5
4 7
2 7
6 9
3 8
8 12
5 10
12 16
R First
Second
500
500
500
1000
0 2
0 2
0 3
0 4
0 4
1 5
0 4
3 6
1 5
4 7
2 7
6 9
3 8
8 12
5 10
12 16
= Use first sampling plan below arrow. If sample size equals or exceeds lot or batch size, do 100 percent inspection.
= Use first sampling plan above arrow.
Ac = Acceptance number.
Re = Rejection number.
= Use corresponding single sampling plan (or alternatively, use double sampling plan below, where available).
= If, after the second sample, the acceptance number has been exceeded, but the rejection number has not been reached, accept the lot, but reinstate normal inspection.
8
Table IV - A. Multiple Sampling Plans for Normal Inspection (Master Table).
Sample
size
code
letter
Sample
Sample
size
Cumula
tive
sample
size
Acceptable Quality Levels (normal inspection)
0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000
Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re
A
B
C ++
++
++
++
++
++
++
++
++
++
++
++
++
++
++
++
++
++
++
++
D First
Second
Third
Fourth
Fifth
Sixth
Seventh
2
2
2
2
2
2
2
2
4
6
8
10
12
14
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 3
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
1 6
3 8
5 10
7 11
10 12
13 14
0 5
3 8
6 10
8 13
11 15
14 17
18 19
1 7
4 10
8 13
12 17
17 20
21 23
25 26
2 9
7 14
13 19
19 25
25 29
31 33
37 38
4 12
11 19
19 27
27 34
36 40
45 47
53 54
6 16
17 27
29 39
40 49
53 58
65 68
77 78
E First
Second
Third
Fourth
Fifth
Sixth
Seventh
3
3
3
3
3
3
3
3
6
9
12
15
18
21
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 3
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
1 6
3 8
5 10
7 11
10 12
13 14
0 5
3 8
6 10
8 13
11 15
14 17
18 19
1 7
4 10
8 13
12 17
17 20
21 23
25 26
2 9
7 14
13 19
19 25
25 29
31 33
37 38
4 12
11 19
19 27
27 34
36 40
45 47
53 54
6 16
17 27
29 39
40 49
53 58
65 68
77 78
F First
Second
Third
Fourth
Fifth
Sixth
Seventh
5
5
5
5
5
5
5
5
10
15
20
25
30
35
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 3
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
1 6
3 8
5 10
7 11
10 12
13 14
0 5
3 8
6 10
8 13
11 15
14 17
18 19
1 7
4 10
8 13
12 17
17 20
21 23
25 26
2 9
7 14
13 19
19 25
25 29
31 33
37 38
G First
Second
Third
Fourth
Fifth
Sixth
Seventh
8
8
8
8
8
8
8
8
16
24
32
40
48
56
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 3
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
1 6
3 8
5 10
7 11
10 12
13 14
0 5
3 8
6 10
8 13
11 15
14 17
18 19
1 7
4 10
8 13
12 17
17 20
21 23
25 26
2 9
7 14
13 19
19 25
25 29
31 33
37 38
H First
Second
Third
Fourth
Fifth
Sixth
Seventh
13
13
13
13
13
13
13
13
26
39
52
65
78
91
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 3
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
1 6
3 8
5 10
7 11
10 12
13 14
0 5
3 8
6 10
8 13
11 15
14 17
18 19
1 7
4 10
8 13
12 17
17 20
21 23
25 26
2 9
7 14
13 19
19 25
25 29
31 33
37 38
J First
Second
Third
Fourth
Fifth
Sixth
Seventh
20
20
20
20
20
20
20
20
40
60
80
100
120
140
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 3
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
1 6
3 8
5 10
7 11
10 12
13 14
0 5
3 8
6 10
8 13
11 15
14 17
18 19
1 7
4 10
8 13
12 17
17 20
21 23
25 26
2 9
7 14
13 19
19 25
25 29
31 33
37 38
= Use first sampling plan below arrow (refer to continuation of table on following page, when necessary). If sample size equals or exceeds lot or batch size, do 100 percent inspection. = Use first sampling plan above arrow.
= Use corresponding single sampling plan (or alternatively, use double sampling plan below, where available). Ac = Acceptance number. Re = Rejection number.
++ = Use corresponding double sampling plan (or alternatively, use multiple sampling plan below, where available). # = Acceptance not permitted at this sample size.
Table IV - A. (continued).
Sample
size
code
letter
Sample
Sample
size
Cumula
tive
sample
size
Acceptable Quality Levels (normal inspection
0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10
Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re
K First
Second
Third
Fourth
Fifth
Sixth
Seventh
32
32
32
32
32
32
32
32
64
96
128
160
192
224
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 3
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
1 6
3 8
5 10
7 11
10 12
13 14
0 5
3 8
6 10
8 13
11 15
14 17
18 19
1 7
4 10
8 13
12 17
17 20
21 23
25 26
2 9
7 14
13 19
19 25
25 29
31 33
37 38
L First
Second
Third
Fourth
Fifth
Sixth
Seventh
50
50
50
50
50
50
50
50
100
150
200
250
300
350
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 3
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
1 6
3 8
5 10
7 11
10 12
13 14
0 5
3 8
6 10
8 13
11 15
14 17
18 19
1 7
4 10
8 13
12 17
17 20
21 23
25 26
2 9
7 14
13 19
19 25
25 29
31 33
37 38
M First
Second
Third
Fourth
Fifth
Sixth
Seventh
80
80
80
80
80
80
80
80
160
240
320
400
480
560
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 3
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
1 6
3 8
5 10
7 11
10 12
13 14
0 5
3 8
6 10
8 13
11 15
14 17
18 19
1 7
4 10
8 13
12 17
17 20
21 23
25 26
2 9
7 14
13 19
19 25
25 29
31 33
37 38
N First
Second
Third
Fourth
Fifth
Sixth
Seventh
125
125
125
125
125
125
125
125
250
375
500
625
750
875
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 3
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
1 6
3 8
5 10
7 11
10 12
13 14
0 5
3 8
6 10
8 13
11 15
14 17
18 19
1 7
4 10
8 13
12 17
17 20
21 23
25 26
2 9
7 14
13 19
19 25
25 29
31 33
37 38
P First
Second
Third
Fourth
Fifth
Sixth
Seventh
200
200
200
200
200
200
200
200
400
600
800
1000
1200
1400
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 3
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
1 6
3 8
5 10
7 11
10 12
13 14
0 5
3 8
6 10
8 13
11 15
14 17
18 19
1 7
4 10
8 13
12 17
17 20
21 23
25 26
2 9
7 14
13 19
19 25
25 29
31 33
37 38
Q First
Second
Third
Fourth
Fifth
Sixth
Seventh
315
315
315
315
315
315
315
315
630
945
1260
1575
1890
2205
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 3
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
1 6
3 8
5 10
7 11
10 12
13 14
0 5
3 8
6 10
8 13
11 15
14 17
18 19
1 7
4 10
8 13
12 17
17 20
21 23
25 26
2 9
7 14
13 19
19 25
25 29
31 33
37 38
R First
Second
Third
Fourth
Fifth
Sixth
Seventh
500
500
500
500
500
500
500
500
1000
1500
2000
2500
3000
3500
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 3
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
1 6
3 8
5 10
7 11
10 12
13 14
0 5
3 8
6 10
8 13
11 15
14 17
18 19
1 7
4 10
8 13
12 17
17 20
21 23
25 26
2 9
7 14
13 19
19 25
25 29
31 33
37 38
= Use first sampling plan below arrow (refer to continuation of table on following page, when necessary). If sample size equals or exceeds lot or batch size, do 1
= Use corresponding single sampling plan (or alternatively, use double sampling plan below, where available). Ac = Acceptance number.
++ = Use corresponding double sampling plan (or alternatively, use multiple sampling plan below, where available). # = Acceptance not permitte
10
Table IV - B. Multiple Sampling Plans for Tightened Inspection (Master Table).
Sample
size
code
letter
Sample
Sample
size
Cumula
tive
sample
size
Acceptable Quality Levels (tightened inspection)
0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000
Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re
A
B
C ++
++
++
++
++
++
++
++
++
++
++
++
++
++
++
++
++
++
D First
Second
Third
Fourth
Fifth
Sixth
Seventh
2
2
2
2
2
2
2
2
4
6
8
10
12
14
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 3
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
2 7
4 9
6 11
9 12
12 14
14 15
0 6
3 9
7 12
10 15
14 17
18 20
21 22
1 8
6 12
11 17
16 22
22 25
27 29
32 33
3 10
10 17
17 24
24 31
32 37
40 43
48 49
6 15
16 25
26 36
37 46
49 55
61 64
72 73
E First
Second
Third
Fourth
Fifth
Sixth
Seventh
3
3
3
3
3
3
3
3
6
9
12
15
18
21
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 3
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
2 7
4 9
6 11
9 12
12 14
14 15
0 6
3 9
7 12
10 15
14 17
18 20
21 22
1 8
6 12
11 17
16 22
22 25
27 29
32 33
3 10
10 17
17 24
24 31
32 37
40 43
48 49
6 15
16 25
26 36
37 46
49 55
61 64
72 73
F First
Second
Third
Fourth
Fifth
Sixth
Seventh
5
5
5
5
5
5
5
5
10
15
20
25
30
35
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 4
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
2 7
4 9
6 11
9 12
12 14
14 15
0 6
3 9
7 12
10 15
14 17
18 20
21 22
1 8
6 12
11 17
16 22
22 25
27 29
32 33
G First
Second
Third
Fourth
Fifth
Sixth
Seventh
8
8
8
8
8
8
8
8
16
24
32
40
48
56
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 4
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
2 7
4 9
6 11
9 12
12 14
14 15
0 6
3 9
7 12
10 15
14 17
18 20
21 22
1 8
6 12
11 17
16 22
22 25
27 29
32 33
H First
Second
Third
Fourth
Fifth
Sixth
Seventh
13
13
13
13
13
13
13
13
26
39
52
65
78
91
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 4
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
2 7
4 9
6 11
9 12
12 14
14 15
0 6
3 9
7 12
10 15
14 17
18 20
21 22
1 8
6 12
11 17
16 22
22 25
27 29
32 33
J First
Second
Third
Fourth
Fifth
Sixth
Seventh
20
20
20
20
20
20
20
20
40
60
80
100
120
140
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 4
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
2 7
4 9
6 11
9 12
12 14
14 15
0 6
3 9
7 12
10 15
14 17
18 20
21 22
1 8
6 12
11 17
16 22
22 25
27 29
32 33
= Use first sampling plan below arrow (refer to continuation of table on following page, when necessary). If sample size equals or exceeds lot or batch size, do 100 percent inspection. = Use first sampling plan above arrow.
= Use corresponding single sampling plan (or alternatively, use double sampling plan below, where available). Ac = Acceptance number. Re = Rejection number.
++ = Use corresponding double sampling plan (or alternatively, use multiple sampling plan below, where available). # = Acceptance not permitted at this sample size.
11
Table IV - B. (continued).
Sample
size
code
letter
Sample
Sample
size
Cumula
tive
sample
size
Acceptable Quality Levels (tightened inspection)
0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000
Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re
K First
Second
Third
Fourth
Fifth
Sixth
Seventh
32
32
32
32
32
32
32
32
64
96
128
160
192
224
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 4
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
2 7
4 9
6 11
9 12
12 14
14 15
0 6
3 9
7 12
10 15
14 17
18 20
21 22
1 8
6 12
11 17
16 22
22 25
27 29
32 33
L First
Second
Third
Fourth
Fifth
Sixth
Seventh
50
50
50
50
50
50
50
50
100
150
200
250
300
350
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 4
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
2 7
4 9
6 11
9 12
12 14
14 15
0 6
3 9
7 12
10 15
14 17
18 20
21 22
1 8
6 12
11 17
16 22
22 25
27 29
32 33
M First
Second
Third
Fourth
Fifth
Sixth
Seventh
80
80
80
80
80
80
80
80
160
240
320
400
480
560
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 4
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
2 7
4 9
6 11
9 12
12 14
14 15
0 6
3 9
7 12
10 15
14 17
18 20
21 22
1 8
6 12
11 17
16 22
22 25
27 29
32 33
N First
Second
Third
Fourth
Fifth
Sixth
Seventh
125
125
125
125
125
125
125
125
250
375
500
625
750
875
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 4
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
2 7
4 9
6 11
9 12
12 14
14 15
0 6
3 9
7 12
10 15
14 17
18 20
21 22
1 8
6 12
11 17
16 22
22 25
27 29
32 33
P First
Second
Third
Fourth
Fifth
Sixth
Seventh
200
200
200
200
200
200
200
200
400
600
800
1000
1200
1400
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 4
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
2 7
4 9
6 11
9 12
12 14
14 15
0 6
3 9
7 12
10 15
14 17
18 20
21 22
1 8
6 12
11 17
16 22
22 25
27 29
32 33
Q First
Second
Third
Fourth
Fifth
Sixth
Seventh
315
315
315
315
315
315
315
315
630
945
1260
1575
1890
2205
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 4
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
2 7
4 9
6 11
9 12
12 14
14 15
0 6
3 9
7 12
10 15
14 17
18 20
21 22
1 8
6 12
11 17
16 22
22 25
27 29
32 33
R First
Second
Third
Fourth
Fifth
Sixth
Seventh
500
500
500
500
500
500
500
500
1000
1500
2000
2500
3000
3500
# 2
# 2
0 2
0 3
1 3
1 3
2 3
# 2
0 3
0 3
1 4
2 4
3 5
4 5
# 3
0 4
1 4
2 5
3 6
4 6
6 7
# 4
1 5
2 6
3 7
5 8
7 9
9 10
0 4
2 7
4 9
6 11
9 12
12 14
14 15
0 6
3 9
7 12
10 15
14 17
18 20
21 22
1 8
6 12
11 17
16 22
22 25
27 29
32 33
S First
Second
Third
Fourth
Fifth
Sixth
Seventh
800
800
800
800
800
800
800
800
1600
2400
3200
4000
4800
5600
# 2
# 2
0 2
0 3
1 3
1 3
2 3
12
Table IV - C. Multiple Sampling Plans for Reduced Inspection (Master Table).
Sample
size
code
letter
Sample
Sample
size
Cumula
tive
sample
size
Acceptable Quality Levels (reduced inspection)
0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000
Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re
A
B
C
D
E ++
++
++
++
++
++
++
++
++
++
++
++
++
++
++
++
++
++
++
++
F First
Second
Third
Fourth
Fifth
Sixth
Seventh
2
2
2
2
2
2
2
2
4
6
8
10
12
14
# 2
# 2
0 2
0 3
0 3
0 3
1 3
# 2
# 3
0 3
0 4
0 4
1 5
1 5
# 3
# 3
0 4
0 5
1 6
1 6
2 7
# 3
0 4
0 5
1 6
2 7
3 7
4 8
# 4
0 5
1 6
2 7
3 8
4 9
6 10
# 4
1 6
2 8
3 10
5 11
7 12
9 14
0 5
1 7
3 9
5 12
7 13
10 15
13 17
0 6
3 9
6 12
8 15
11 17
14 20
18 22
G First
Second
Third
Fourth
Fifth
Sixth
Seventh
3
3
3
3
3
3
3
3
6
9
12
15
18
21
# 2
# 2
0 2
0 3
0 3
0 3
1 3
# 2
# 3
0 3
0 4
0 4
1 5
1 5
# 3
# 3
0 4
0 5
1 6
1 6
2 7
# 3
0 4
0 5
1 6
2 7
3 7
4 8
# 4
0 5
1 6
2 7
3 8
4 9
6 10
# 4
1 6
2 8
3 10
5 11
7 12
9 14
0 5
1 7
3 9
5 12
7 13
10 15
13 17
0 6
3 9
6 12
8 15
11 17
14 20
18 22
H First
Second
Third
Fourth
Fifth
Sixth
Seventh
5
5
5
5
5
5
5
5
10
15
20
25
30
35
# 2
# 2
0 2
0 3
0 3
0 3
1 3
# 2
# 3
0 3
0 4
0 4
1 5
1 5
# 3
# 3
0 4
0 5
1 6
1 6
2 7
# 3
0 4
0 5
1 6
2 7
3 7
4 8
# 4
0 5
1 6
2 7
3 8
4 9
6 10
# 4
1 6
2 8
3 10
5 11
7 12
9 14
0 5
1 7
3 9
5 12
7 13
10 15
13 17
0 6
3 9
6 12
8 15
11 17
14 20
18 22
J First
Second
Third
Fourth
Fifth
Sixth
Seventh
8
8
8
8
8
8
8
8
16
24
32
40
48
56
# 2
# 2
0 2
0 3
0 3
0 3
1 3
# 2
# 3
0 3
0 4
0 4
1 5
1 5
# 3
# 3
0 4
0 5
1 6
1 6
2 7
# 3
0 4
0 5
1 6
2 7
3 7
4 8
# 4
0 5
1 6
2 7
3 8
4 9
6 10
# 4
1 6
2 8
3 10
5 11
7 12
9 14
0 5
1 7
3 9
5 12
7 13
10 15
13 17
0 6
3 9
6 12
8 15
11 17
14 20
18 22
K First
Second
Third
Fourth
Fifth
Sixth
Seventh
13
13
13
13
13
13
13
13
26
39
52
65
78
91
# 2
# 2
0 2
0 3
0 3
0 3
1 3
# 2
# 3
0 3
0 4
0 4
1 5
1 5
# 3
# 3
0 4
0 5
1 6
1 6
2 7
# 3
0 4
0 5
1 6
2 7
3 7
4 8
# 4
0 5
1 6
2 7
3 8
4 9
6 10
# 4
1 6
2 8
3 10
5 11
7 12
9 14
0 5
1 7
3 9
5 12
7 13
10 15
13 17
0 6
3 9
6 12
8 15
11 17
14 20
18 22
= Use first sampling plan below arrow (refer to continuation of table on following page, when necessary). If sample size equals or exceeds lot or batch size, do 100 percent inspection. = Use first sampling plan above arrow.
= Use corresponding single sampling plan (or alternatively, use double sampling plan below, where available). Ac = Acceptance number. Re = Rejection number.
++ = Use corresponding double sampling plan (or alternatively, use multiple sampling plan below, where available). # = Acceptance not permitted at this sample size.
= If, after the final sample, the acceptance number has been exceeded but the rejection number has not been reached, accept the lot but reinstate normal inspection.
13
Table IV - C. (continued).
Sample
size
code
letter
Sample
Sample
size
Cumula
tive
sample
size
Acceptable Quality Levels (reduced inspection)
0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000
Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re
L First
Second
Third
Fourth
Fifth
Sixth
Seventh
20
20
20
20
20
20
20
20
40
60
80
100
120
140
# 2
# 2
0 2
0 3
0 3
0 3
1 3
# 2
# 3
0 3
0 4
0 4
1 5
1 5
# 3
# 3
0 4
0 5
1 6
1 6
2 7
# 3
0 4
0 5
1 6
2 7
3 7
4 8
# 4
0 5
1 6
2 7
3 8
4 9
6 10
# 4
1 6
2 8
3 10
5 11
7 12
9 14
0 5
1 7
3 9
5 12
7 13
10 15
13 17
0 6
3 9
6 12
8 15
11 17
14 20
18 22
M First
Second
Third
Fourth
Fifth
Sixth
Seventh
32
32
32
32
32
32
32
32
64
96
128
160
192
224
# 2
# 2
0 2
0 3
0 3
0 3
1 3
# 2
# 3
0 3
0 4
0 4
1 5
1 5
# 3
# 3
0 4
0 5
1 6
1 6
2 7
# 3
0 4
0 5
1 6
2 7
3 7
4 8
# 4
0 5
1 6
2 7
3 8
4 9
6 10
# 4
1 6
2 8
3 10
5 11
7 12
9 14
0 5
1 7
3 9
5 12
7 13
10 15
13 17
0 6
3 9
6 12
8 15
11 17
14 20
18 22
N First
Second
Third
Fourth
Fifth
Sixth
Seventh
50
50
50
50
50
50
50
50
100
150
200
250
300
350
# 2
# 2
0 2
0 3
0 3
0 3
1 3
# 2
# 3
0 3
0 4
0 4
1 5
1 5
# 3
# 3
0 4
0 5
1 6
1 6
2 7
# 3
0 4
0 5
1 6
2 7
3 7
4 8
# 4
0 5
1 6
2 7
3 8
4 9
6 10
# 4
1 6
2 8
3 10
5 11
7 12
9 14
0 5
1 7
3 9
5 12
7 13
10 15
13 17
0 6
3 9
6 12
8 15
11 17
14 20
18 22
P First
Second
Third
Fourth
Fifth
Sixth
Seventh
80
80
80
80
80
80
80
80
160
240
320
400
480
560
# 2
# 2
0 2
0 3
0 3
0 3
1 3
# 2
# 3
0 3
0 4
0 4
1 5
1 5
# 3
# 3
0 4
0 5
1 6
1 6
2 7
# 3
0 4
0 5
1 6
2 7
3 7
4 8
# 4
0 5
1 6
2 7
3 8
4 9
6 10
# 4
1 6
2 8
3 10
5 11
7 12
9 14
0 5
1 7
3 9
5 12
7 13
10 15
13 17
0 6
3 9
6 12
8 15
11 17
14 20
18 22
Q First
Second
Third
Fourth
Fifth
Sixth
Seventh
125
125
125
125
125
125
125
125
250
375
500
625
750
875
# 2
# 2
0 2
0 3
0 3
0 3
1 3
# 2
# 3
0 3
0 4
0 4
1 5
1 5
# 3
# 3
0 4
0 5
1 6
1 6
2 7
# 3
0 4
0 5
1 6
2 7
3 7
4 8
# 4
0 5
1 6
2 7
3 8
4 9
6 10
# 4
1 6
2 8
3 10
5 11
7 12
9 14
0 5
1 7
3 9
5 12
7 13
10 15
13 17
0 6
3 9
6 12
8 15
11 17
14 20
18 22
R First
Second
Third
Fourth
Fifth
Sixth
Seventh
200
200
200
200
200
200
200
200
400
600
800
1000
1200
1400
# 2
# 2
0 2
0 3
0 3
0 3
1 3
# 2
# 3
0 3
0 4
0 4
1 5
1 5
# 3
# 3
0 4
0 5
1 6
1 6
2 7
# 3
0 4
0 5
1 6
2 7
3 7
4 8
# 4
0 5
1 6
2 7
3 8
4 9
6 10
# 4
1 6
2 8
3 10
5 11
7 12
9 14
0 5
1 7
3 9
5 12
7 13
10 15
13 17
0 6
3 9
6 12
8 15
11 17
14 20
18 22
= Use first sampling plan below arrow (refer to continuation of table on following page, when necessary). If sample size equals or exceeds lot or batch size, do 100 percent inspection. = Use first sampling plan above arrow.
= Use corresponding single sampling plan (or alternatively, use double sampling plan below, where available). Ac = Acceptance number. Re = Rejection number.
++ = Use corresponding double sampling plan (or alternatively, use multiple sampling plan below, where available). # = Acceptance not permitted at this sample size.
= If, after the final sample, the acceptance number has been exceeded but the rejection number has not been reached, accept the lot but reinstate normal inspection.
14
Table V-A. Average Outgoing Quality Limit Factors for Normal Inspection (Single Sampling) *
Code
Letter
Sample
size
Acceptable Quality Level
0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000
A
B
C
2
3
5 7.4
12
18
17
28
27
42
46
39
69
65
63
97
110
90
160
150
130
220
220
190
330
310
290
470
490
430
730
720
660
1100
1100
D
E
F
8
13
20 1.8
2.8
4.6
4.2
6.5
6.9
11
11
9.7
17
15
16
24
24
22
40
34
33
56
50
47
82
72
73
120
110
180
170
270
250
410
G
H
J
32
50
80 0.46
0.74
1.2
1.1
1.7
1.7
2.6
2.7
2.4
4.3
3.9
4.0
6.1
6.3
5.6
9.9
9.0
8.2
14
13
12
21
19
18
29
29
46
K
L
M
125
200
315 0.12
0.18
0.29
0.27
0.42
0.44
0.67
0.69
0.62
1.1
0.97
1.00
1.6
1.6
1.4
2.5
2.2
2.1
3.6
3.3
3.0
5.2
4.7
4.7
7.5
7.3
12
N
P
Q
500
800
1250 0.029
0.046
0.074
0.067
0.11
0.11
0.17
0.17
0.16
0.27
0.24
0.25
0.39
0.40
0.36
0.63
0.56
0.52
0.90
0.82
0.75
1.3
1.2
1.2
1.9
1.8
2.9
R 2000 0.042 0.069 0.097 0.16 0.22 0.33 0.47 0.73
* Note: For the exact AOQL, the above volume must be multiplied by
sizeBatchorLot
sizeSample
1
15
Table V-B. Average Outgoing Quality Limit Factors for Tightened Inspection (Single Sampling) *
Code
Letter
Sample
size
Acceptable Quality Level
0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000
A
B
C
2
3
5 7.4
12
17
28
27
42
46
39
69
65
63
97
110
100
160
170
160
260
270
250
400
410
390
620
650
610
970
1100
D
E
F
8
13
20 1.8
2.8
4.6
4.2
6.5
6.9
11
11
9.7
17
15
16
24
24
26
40
40
40
64
61
62
99
95
160
150
240
240
380
G
H
J
32
50
80 0.46
0.74
1.2
1.1
1.7
1.7
2.6
2.7
2.4
4.3
3.9
4.0
6.1
6.3
6.4
9.9
10
9.9
16
16
16
25
25
39
K
L
M
125
200
315 0.12
0.18
0.29
0.27
0.42
0.44
0.67
0.69
0.62
1.1
0.97
1.0
1.6
1.6
1.6
2.5
2.6
2.5
4.1
4.0
3.9
6.4
6.2
9.9
N
P
Q
500
800
1250 0.029
0.046
0.074
0.067
0.11
0.11
0.17
0.17
0.16
0.27
0.24
0.25
0.39
0.40
0.41
0.63
0.64
0.64
1.0
0.99
0.99
1.6
1.6
2.5
R
S
2000
3150
0.018
0.027
0.042 0.069 0.097 0.16 0.26 0.40 0.62
* Note: For the exact AOQL, the above volume must be multiplied by
sizeBatchorLot
sizeSample
1
16
Table VIII. Limit Numbers for Reduced Inspection.
Number of
sample units
Acceptable Quality Level
from last 10
lots or batches 0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000
20 - 29
30 - 49
50 - 79
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
0
∙
0
0
0
0
2
0
1
3
2
3
7
4
7
14
8
13
25
14
22
40
22
36
63
40
63
110
68
105
181
115
178
301
181
277
80 - 129
130 - 199
200 - 319
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
0
∙
0
0
0
0
2
0
2
4
2
4
8
4
7
14
7
13
22
14
25
40
24
42
68
42
72
115
68
115
181
105
177
277
181
301
471
297
490
320 - 499
500 - 799
800 - 1249
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
0
∙
0
0
0
0
2
0
2
4
1
3
7
4
7
14
8
14
24
14
25
42
24
40
68
39
63
105
68
110
181
113
181
189
1250 - 1999
2000 - 3149
3150 - 4999
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
∙
0
∙
0
0
0
0
1
0
2
4
2
4
8
4
8
14
7
14
24
13
22
38
24
40
67
40
68
111
69
115
186
110
181
169
5000 - 7999
8000 - 12499
12500 - 19999
∙
∙
∙
∙
∙
0
∙
0
0
0
0
2
0
2
4
2
4
7
3
7
13
7
14
24
14
24
40
25
42
69
40
68
110
63
105
169
110
181
181
20000 - 31499
31500 - 49999
50000 & over
0
0
2
0
1
3
2
4
7
4
8
14
8
14
25
14
24
40
22
38
63
40
67
110
68
111
181
115
186
301
181
∙ Denotes that the number of sample units from the last ten lots or batches is not sufficient for reduced inspection for this AQL. In this instance more than ten lots or batches may be used for the calculation, provided that the lots or
batches used are the most recent ones in sequence, that they have all been on normal inspection, and that none has been rejected while on original inspection.

More Related Content

What's hot

5.material handling
5.material handling5.material handling
5.material handlingDuta Pratama
 
Perencanaan jadwal & kapasitas beban produksi berorientasi mahasiswa meng...
Perencanaan jadwal & kapasitas beban produksi berorientasi mahasiswa meng...Perencanaan jadwal & kapasitas beban produksi berorientasi mahasiswa meng...
Perencanaan jadwal & kapasitas beban produksi berorientasi mahasiswa meng...Ir. Duddy Arisandi, ST, MT
 
Tabel bunga pemajemukan diskrit
Tabel  bunga  pemajemukan  diskritTabel  bunga  pemajemukan  diskrit
Tabel bunga pemajemukan diskritRyry Rizky Asri
 
Analisis perancangan kerja modul 2 by sazali
Analisis perancangan kerja modul 2 by sazaliAnalisis perancangan kerja modul 2 by sazali
Analisis perancangan kerja modul 2 by sazaliNera Aprina
 
Presentasi lab statistik
Presentasi lab statistikPresentasi lab statistik
Presentasi lab statistikJulita Anggrek
 
Procedure identification and traceability
Procedure   identification and traceabilityProcedure   identification and traceability
Procedure identification and traceabilityWilliam Laride
 
Gage r&r
Gage r&rGage r&r
Gage r&rAris UM
 
SNI 19-7119.2-2005 tentang Udara Ambien - Bagian 2: Cara Uji Kadar Nitrogen D...
SNI 19-7119.2-2005 tentang Udara Ambien - Bagian 2: Cara Uji Kadar Nitrogen D...SNI 19-7119.2-2005 tentang Udara Ambien - Bagian 2: Cara Uji Kadar Nitrogen D...
SNI 19-7119.2-2005 tentang Udara Ambien - Bagian 2: Cara Uji Kadar Nitrogen D...Muhamad Imam Khairy
 
materi training IATF 16949.pptx
materi training IATF 16949.pptxmateri training IATF 16949.pptx
materi training IATF 16949.pptxrhamset
 
ISO 45001:2018 Awareness & Upgrading
ISO 45001:2018 Awareness & UpgradingISO 45001:2018 Awareness & Upgrading
ISO 45001:2018 Awareness & UpgradingAli Fuad R
 
4. pengukuran waktu baku
4. pengukuran waktu baku4. pengukuran waktu baku
4. pengukuran waktu bakuDjoe343536
 
Introduction to ISO 17025 - versi 2 (General)
Introduction to ISO 17025 - versi 2 (General)Introduction to ISO 17025 - versi 2 (General)
Introduction to ISO 17025 - versi 2 (General)Dwi Kurniawan
 
Pemahaman SMM Laboratorium ISO 17025:2017
Pemahaman SMM Laboratorium ISO 17025:2017Pemahaman SMM Laboratorium ISO 17025:2017
Pemahaman SMM Laboratorium ISO 17025:2017Ali Fuad R
 
IATF16949:2016 Automotive QMS Awareness
IATF16949:2016 Automotive QMS AwarenessIATF16949:2016 Automotive QMS Awareness
IATF16949:2016 Automotive QMS AwarenessAli Fuad R
 
Pengendalian dan Penjaminan Mutu
Pengendalian dan Penjaminan MutuPengendalian dan Penjaminan Mutu
Pengendalian dan Penjaminan MutuNuri Kartini
 

What's hot (20)

5.material handling
5.material handling5.material handling
5.material handling
 
Statistik Industri 1 - PENDAHULUAN
Statistik Industri 1 - PENDAHULUANStatistik Industri 1 - PENDAHULUAN
Statistik Industri 1 - PENDAHULUAN
 
Definisi Kualitas
Definisi KualitasDefinisi Kualitas
Definisi Kualitas
 
Perencanaan jadwal & kapasitas beban produksi berorientasi mahasiswa meng...
Perencanaan jadwal & kapasitas beban produksi berorientasi mahasiswa meng...Perencanaan jadwal & kapasitas beban produksi berorientasi mahasiswa meng...
Perencanaan jadwal & kapasitas beban produksi berorientasi mahasiswa meng...
 
Tabel bunga pemajemukan diskrit
Tabel  bunga  pemajemukan  diskritTabel  bunga  pemajemukan  diskrit
Tabel bunga pemajemukan diskrit
 
Prinsip-Prinsip GMP
Prinsip-Prinsip GMPPrinsip-Prinsip GMP
Prinsip-Prinsip GMP
 
Analisis perancangan kerja modul 2 by sazali
Analisis perancangan kerja modul 2 by sazaliAnalisis perancangan kerja modul 2 by sazali
Analisis perancangan kerja modul 2 by sazali
 
Tabel bunga
Tabel bungaTabel bunga
Tabel bunga
 
Presentasi lab statistik
Presentasi lab statistikPresentasi lab statistik
Presentasi lab statistik
 
Procedure identification and traceability
Procedure   identification and traceabilityProcedure   identification and traceability
Procedure identification and traceability
 
Gage r&r
Gage r&rGage r&r
Gage r&r
 
SNI 19-7119.2-2005 tentang Udara Ambien - Bagian 2: Cara Uji Kadar Nitrogen D...
SNI 19-7119.2-2005 tentang Udara Ambien - Bagian 2: Cara Uji Kadar Nitrogen D...SNI 19-7119.2-2005 tentang Udara Ambien - Bagian 2: Cara Uji Kadar Nitrogen D...
SNI 19-7119.2-2005 tentang Udara Ambien - Bagian 2: Cara Uji Kadar Nitrogen D...
 
materi training IATF 16949.pptx
materi training IATF 16949.pptxmateri training IATF 16949.pptx
materi training IATF 16949.pptx
 
PPT QA QC.pptx
PPT QA QC.pptxPPT QA QC.pptx
PPT QA QC.pptx
 
ISO 45001:2018 Awareness & Upgrading
ISO 45001:2018 Awareness & UpgradingISO 45001:2018 Awareness & Upgrading
ISO 45001:2018 Awareness & Upgrading
 
4. pengukuran waktu baku
4. pengukuran waktu baku4. pengukuran waktu baku
4. pengukuran waktu baku
 
Introduction to ISO 17025 - versi 2 (General)
Introduction to ISO 17025 - versi 2 (General)Introduction to ISO 17025 - versi 2 (General)
Introduction to ISO 17025 - versi 2 (General)
 
Pemahaman SMM Laboratorium ISO 17025:2017
Pemahaman SMM Laboratorium ISO 17025:2017Pemahaman SMM Laboratorium ISO 17025:2017
Pemahaman SMM Laboratorium ISO 17025:2017
 
IATF16949:2016 Automotive QMS Awareness
IATF16949:2016 Automotive QMS AwarenessIATF16949:2016 Automotive QMS Awareness
IATF16949:2016 Automotive QMS Awareness
 
Pengendalian dan Penjaminan Mutu
Pengendalian dan Penjaminan MutuPengendalian dan Penjaminan Mutu
Pengendalian dan Penjaminan Mutu
 

Viewers also liked (20)

Tablas militares
Tablas militares Tablas militares
Tablas militares
 
Military standard 105E and 414
Military standard 105E and 414Military standard 105E and 414
Military standard 105E and 414
 
norma-mil-std-105d
norma-mil-std-105dnorma-mil-std-105d
norma-mil-std-105d
 
Quality Control Of Garment
Quality Control Of Garment Quality Control Of Garment
Quality Control Of Garment
 
Hospitality presentation nagelhout
Hospitality presentation nagelhoutHospitality presentation nagelhout
Hospitality presentation nagelhout
 
8 planes de muestreo
8 planes de muestreo8 planes de muestreo
8 planes de muestreo
 
MUESTREO DE ACEPTACION
MUESTREO DE ACEPTACIONMUESTREO DE ACEPTACION
MUESTREO DE ACEPTACION
 
Sistema de muestreo de aceptacion utilizando la norma ANSI/ASQ Z 1.4
Sistema de muestreo de aceptacion utilizando la norma ANSI/ASQ Z 1.4Sistema de muestreo de aceptacion utilizando la norma ANSI/ASQ Z 1.4
Sistema de muestreo de aceptacion utilizando la norma ANSI/ASQ Z 1.4
 
Calidad empresarial, mil std-105 e
Calidad empresarial, mil std-105 eCalidad empresarial, mil std-105 e
Calidad empresarial, mil std-105 e
 
Muestreo y Tabla Militar
Muestreo y Tabla MilitarMuestreo y Tabla Militar
Muestreo y Tabla Militar
 
Muestreo Aceptacion por atributos Generalidades
Muestreo Aceptacion por atributos GeneralidadesMuestreo Aceptacion por atributos Generalidades
Muestreo Aceptacion por atributos Generalidades
 
Basic mathematics integration
Basic mathematics integrationBasic mathematics integration
Basic mathematics integration
 
Dasar2 termo
Dasar2 termoDasar2 termo
Dasar2 termo
 
Kd meeting 9 10
Kd meeting 9 10Kd meeting 9 10
Kd meeting 9 10
 
Spektrofotometri uv vis spektrum
Spektrofotometri uv vis spektrumSpektrofotometri uv vis spektrum
Spektrofotometri uv vis spektrum
 
Suku banyak-kd-4 2
Suku banyak-kd-4 2Suku banyak-kd-4 2
Suku banyak-kd-4 2
 
Prokario teukariot
Prokario teukariotProkario teukariot
Prokario teukariot
 
Kp3 membran
Kp3 membranKp3 membran
Kp3 membran
 
Limitkekontinuan stt-b (versi 2)
Limitkekontinuan stt-b (versi 2)Limitkekontinuan stt-b (versi 2)
Limitkekontinuan stt-b (versi 2)
 
Titrasi asam basa
Titrasi asam basaTitrasi asam basa
Titrasi asam basa
 

Similar to Table mil std_105_e

Similar to Table mil std_105_e (20)

Table_MIL_STD_105E.pdf
Table_MIL_STD_105E.pdfTable_MIL_STD_105E.pdf
Table_MIL_STD_105E.pdf
 
Ch04
Ch04Ch04
Ch04
 
Distracter Analysis - Index of Effectiveness
Distracter Analysis - Index of EffectivenessDistracter Analysis - Index of Effectiveness
Distracter Analysis - Index of Effectiveness
 
control charts to enhance your problem solving abilities
control charts to enhance your problem solving abilitiescontrol charts to enhance your problem solving abilities
control charts to enhance your problem solving abilities
 
Statistical process control ppt @ doms
Statistical process control ppt @ doms Statistical process control ppt @ doms
Statistical process control ppt @ doms
 
Acceptance sampling Q&A
Acceptance sampling Q&AAcceptance sampling Q&A
Acceptance sampling Q&A
 
ch06.ppt
ch06.pptch06.ppt
ch06.ppt
 
SAT Practice Tests
SAT Practice TestsSAT Practice Tests
SAT Practice Tests
 
Statistical quality control
Statistical quality controlStatistical quality control
Statistical quality control
 
Statisticalqualitycontrol
StatisticalqualitycontrolStatisticalqualitycontrol
Statisticalqualitycontrol
 
Statisticalqualitycontrol
StatisticalqualitycontrolStatisticalqualitycontrol
Statisticalqualitycontrol
 
Control charts
Control chartsControl charts
Control charts
 
Log11 uitwerking opdrachten
Log11 uitwerking opdrachtenLog11 uitwerking opdrachten
Log11 uitwerking opdrachten
 
Response Surface Regression
Response Surface RegressionResponse Surface Regression
Response Surface Regression
 
TRY USING A PARETO CHART TO RESOLVE DEFECTS
TRY USING A PARETO CHART TO RESOLVE DEFECTSTRY USING A PARETO CHART TO RESOLVE DEFECTS
TRY USING A PARETO CHART TO RESOLVE DEFECTS
 
Statistical quality control
Statistical quality controlStatistical quality control
Statistical quality control
 
DoE Project
DoE ProjectDoE Project
DoE Project
 
Statirstical Process Control in manufacturing
Statirstical Process Control in manufacturingStatirstical Process Control in manufacturing
Statirstical Process Control in manufacturing
 
Chapter 1 spc
Chapter 1   spcChapter 1   spc
Chapter 1 spc
 
Forecasting Assignment Help
Forecasting Assignment HelpForecasting Assignment Help
Forecasting Assignment Help
 

More from Muhammad Luthfan

Kuliah Mikrobiologi Umum FATTOMP 2014-150713101121-lva1-app6891.ppt
Kuliah Mikrobiologi Umum FATTOMP 2014-150713101121-lva1-app6891.pptKuliah Mikrobiologi Umum FATTOMP 2014-150713101121-lva1-app6891.ppt
Kuliah Mikrobiologi Umum FATTOMP 2014-150713101121-lva1-app6891.pptMuhammad Luthfan
 
Seminar MM Universitas Brawijaya
Seminar MM Universitas BrawijayaSeminar MM Universitas Brawijaya
Seminar MM Universitas BrawijayaMuhammad Luthfan
 
Forkita Potensi Diri 150809115556-lva1-app6892
Forkita Potensi Diri 150809115556-lva1-app6892Forkita Potensi Diri 150809115556-lva1-app6892
Forkita Potensi Diri 150809115556-lva1-app6892Muhammad Luthfan
 
Spl Solid Waste Treatment 150702072553-lva1-app6892
Spl Solid Waste Treatment 150702072553-lva1-app6892Spl Solid Waste Treatment 150702072553-lva1-app6892
Spl Solid Waste Treatment 150702072553-lva1-app6892Muhammad Luthfan
 
Spl Pengolahan Limbah Gas FTP UB 150702072311-lva1-app6892
Spl Pengolahan Limbah Gas FTP UB 150702072311-lva1-app6892Spl Pengolahan Limbah Gas FTP UB 150702072311-lva1-app6892
Spl Pengolahan Limbah Gas FTP UB 150702072311-lva1-app6892Muhammad Luthfan
 
Listeria FTP UB 150207083307-conversion-gate02
Listeria FTP UB 150207083307-conversion-gate02Listeria FTP UB 150207083307-conversion-gate02
Listeria FTP UB 150207083307-conversion-gate02Muhammad Luthfan
 
Sterilisasi versi 2016 (FTP UB)
Sterilisasi versi 2016 (FTP UB)Sterilisasi versi 2016 (FTP UB)
Sterilisasi versi 2016 (FTP UB)Muhammad Luthfan
 
Dasar Keteknikan (Dastek) Pengolahan Pangan FTP UB 150529064527-lva1-app6891
Dasar Keteknikan (Dastek) Pengolahan Pangan FTP UB 150529064527-lva1-app6891Dasar Keteknikan (Dastek) Pengolahan Pangan FTP UB 150529064527-lva1-app6891
Dasar Keteknikan (Dastek) Pengolahan Pangan FTP UB 150529064527-lva1-app6891Muhammad Luthfan
 
Manajemen sanitasi dan limbah industri 160704035630
Manajemen sanitasi dan limbah industri 160704035630Manajemen sanitasi dan limbah industri 160704035630
Manajemen sanitasi dan limbah industri 160704035630Muhammad Luthfan
 
PUP (Perencanaan Unit Pengolahan) Utilitas Air 160704042806
PUP (Perencanaan Unit Pengolahan) Utilitas Air 160704042806PUP (Perencanaan Unit Pengolahan) Utilitas Air 160704042806
PUP (Perencanaan Unit Pengolahan) Utilitas Air 160704042806Muhammad Luthfan
 
Introduction to Electrophoresis
Introduction to ElectrophoresisIntroduction to Electrophoresis
Introduction to ElectrophoresisMuhammad Luthfan
 
Spl klasifikasi limbah 150702072113-lva1-app6892
Spl klasifikasi limbah 150702072113-lva1-app6892Spl klasifikasi limbah 150702072113-lva1-app6892
Spl klasifikasi limbah 150702072113-lva1-app6892Muhammad Luthfan
 
Jenis - Jenis Pengawet Alami 141225053457-conversion-gate02
Jenis - Jenis Pengawet Alami 141225053457-conversion-gate02Jenis - Jenis Pengawet Alami 141225053457-conversion-gate02
Jenis - Jenis Pengawet Alami 141225053457-conversion-gate02Muhammad Luthfan
 
Analisis Antioksidan + ORAC
Analisis Antioksidan + ORACAnalisis Antioksidan + ORAC
Analisis Antioksidan + ORACMuhammad Luthfan
 

More from Muhammad Luthfan (20)

Pengumuman.pptx
Pengumuman.pptxPengumuman.pptx
Pengumuman.pptx
 
Kuliah Mikrobiologi Umum FATTOMP 2014-150713101121-lva1-app6891.ppt
Kuliah Mikrobiologi Umum FATTOMP 2014-150713101121-lva1-app6891.pptKuliah Mikrobiologi Umum FATTOMP 2014-150713101121-lva1-app6891.ppt
Kuliah Mikrobiologi Umum FATTOMP 2014-150713101121-lva1-app6891.ppt
 
Lipid Evaluation (FTP UB)
Lipid Evaluation (FTP UB)Lipid Evaluation (FTP UB)
Lipid Evaluation (FTP UB)
 
Seminar MM Universitas Brawijaya
Seminar MM Universitas BrawijayaSeminar MM Universitas Brawijaya
Seminar MM Universitas Brawijaya
 
Forkita Potensi Diri 150809115556-lva1-app6892
Forkita Potensi Diri 150809115556-lva1-app6892Forkita Potensi Diri 150809115556-lva1-app6892
Forkita Potensi Diri 150809115556-lva1-app6892
 
Spl Solid Waste Treatment 150702072553-lva1-app6892
Spl Solid Waste Treatment 150702072553-lva1-app6892Spl Solid Waste Treatment 150702072553-lva1-app6892
Spl Solid Waste Treatment 150702072553-lva1-app6892
 
Polisakarida Fungsional
Polisakarida FungsionalPolisakarida Fungsional
Polisakarida Fungsional
 
Suplemen makanan
Suplemen makanan Suplemen makanan
Suplemen makanan
 
Spl Pengolahan Limbah Gas FTP UB 150702072311-lva1-app6892
Spl Pengolahan Limbah Gas FTP UB 150702072311-lva1-app6892Spl Pengolahan Limbah Gas FTP UB 150702072311-lva1-app6892
Spl Pengolahan Limbah Gas FTP UB 150702072311-lva1-app6892
 
Listeria FTP UB 150207083307-conversion-gate02
Listeria FTP UB 150207083307-conversion-gate02Listeria FTP UB 150207083307-conversion-gate02
Listeria FTP UB 150207083307-conversion-gate02
 
Sterilisasi versi 2017
Sterilisasi versi 2017Sterilisasi versi 2017
Sterilisasi versi 2017
 
Sterilisasi Versi 2015
Sterilisasi Versi 2015Sterilisasi Versi 2015
Sterilisasi Versi 2015
 
Sterilisasi versi 2016 (FTP UB)
Sterilisasi versi 2016 (FTP UB)Sterilisasi versi 2016 (FTP UB)
Sterilisasi versi 2016 (FTP UB)
 
Dasar Keteknikan (Dastek) Pengolahan Pangan FTP UB 150529064527-lva1-app6891
Dasar Keteknikan (Dastek) Pengolahan Pangan FTP UB 150529064527-lva1-app6891Dasar Keteknikan (Dastek) Pengolahan Pangan FTP UB 150529064527-lva1-app6891
Dasar Keteknikan (Dastek) Pengolahan Pangan FTP UB 150529064527-lva1-app6891
 
Manajemen sanitasi dan limbah industri 160704035630
Manajemen sanitasi dan limbah industri 160704035630Manajemen sanitasi dan limbah industri 160704035630
Manajemen sanitasi dan limbah industri 160704035630
 
PUP (Perencanaan Unit Pengolahan) Utilitas Air 160704042806
PUP (Perencanaan Unit Pengolahan) Utilitas Air 160704042806PUP (Perencanaan Unit Pengolahan) Utilitas Air 160704042806
PUP (Perencanaan Unit Pengolahan) Utilitas Air 160704042806
 
Introduction to Electrophoresis
Introduction to ElectrophoresisIntroduction to Electrophoresis
Introduction to Electrophoresis
 
Spl klasifikasi limbah 150702072113-lva1-app6892
Spl klasifikasi limbah 150702072113-lva1-app6892Spl klasifikasi limbah 150702072113-lva1-app6892
Spl klasifikasi limbah 150702072113-lva1-app6892
 
Jenis - Jenis Pengawet Alami 141225053457-conversion-gate02
Jenis - Jenis Pengawet Alami 141225053457-conversion-gate02Jenis - Jenis Pengawet Alami 141225053457-conversion-gate02
Jenis - Jenis Pengawet Alami 141225053457-conversion-gate02
 
Analisis Antioksidan + ORAC
Analisis Antioksidan + ORACAnalisis Antioksidan + ORAC
Analisis Antioksidan + ORAC
 

Recently uploaded

Industrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfIndustrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfLars Albertsson
 
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /WhatsappsBeautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsappssapnasaifi408
 
B2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docxB2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docxStephen266013
 
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改atducpo
 
Customer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxCustomer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxEmmanuel Dauda
 
Ukraine War presentation: KNOW THE BASICS
Ukraine War presentation: KNOW THE BASICSUkraine War presentation: KNOW THE BASICS
Ukraine War presentation: KNOW THE BASICSAishani27
 
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Jack DiGiovanna
 
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfKantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfSocial Samosa
 
100-Concepts-of-AI by Anupama Kate .pptx
100-Concepts-of-AI by Anupama Kate .pptx100-Concepts-of-AI by Anupama Kate .pptx
100-Concepts-of-AI by Anupama Kate .pptxAnupama Kate
 
Log Analysis using OSSEC sasoasasasas.pptx
Log Analysis using OSSEC sasoasasasas.pptxLog Analysis using OSSEC sasoasasasas.pptx
Log Analysis using OSSEC sasoasasasas.pptxJohnnyPlasten
 
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service BhilaiLow Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service BhilaiSuhani Kapoor
 
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptxthyngster
 
定制英国白金汉大学毕业证(UCB毕业证书) 成绩单原版一比一
定制英国白金汉大学毕业证(UCB毕业证书)																			成绩单原版一比一定制英国白金汉大学毕业证(UCB毕业证书)																			成绩单原版一比一
定制英国白金汉大学毕业证(UCB毕业证书) 成绩单原版一比一ffjhghh
 
From idea to production in a day – Leveraging Azure ML and Streamlit to build...
From idea to production in a day – Leveraging Azure ML and Streamlit to build...From idea to production in a day – Leveraging Azure ML and Streamlit to build...
From idea to production in a day – Leveraging Azure ML and Streamlit to build...Florian Roscheck
 
Dubai Call Girls Wifey O52&786472 Call Girls Dubai
Dubai Call Girls Wifey O52&786472 Call Girls DubaiDubai Call Girls Wifey O52&786472 Call Girls Dubai
Dubai Call Girls Wifey O52&786472 Call Girls Dubaihf8803863
 
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...dajasot375
 

Recently uploaded (20)

Industrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfIndustrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdf
 
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /WhatsappsBeautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsapps
 
B2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docxB2 Creative Industry Response Evaluation.docx
B2 Creative Industry Response Evaluation.docx
 
E-Commerce Order PredictionShraddha Kamble.pptx
E-Commerce Order PredictionShraddha Kamble.pptxE-Commerce Order PredictionShraddha Kamble.pptx
E-Commerce Order PredictionShraddha Kamble.pptx
 
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
 
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
 
Customer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxCustomer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptx
 
Ukraine War presentation: KNOW THE BASICS
Ukraine War presentation: KNOW THE BASICSUkraine War presentation: KNOW THE BASICS
Ukraine War presentation: KNOW THE BASICS
 
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
 
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfKantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
 
100-Concepts-of-AI by Anupama Kate .pptx
100-Concepts-of-AI by Anupama Kate .pptx100-Concepts-of-AI by Anupama Kate .pptx
100-Concepts-of-AI by Anupama Kate .pptx
 
Log Analysis using OSSEC sasoasasasas.pptx
Log Analysis using OSSEC sasoasasasas.pptxLog Analysis using OSSEC sasoasasasas.pptx
Log Analysis using OSSEC sasoasasasas.pptx
 
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service BhilaiLow Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
 
꧁❤ Aerocity Call Girls Service Aerocity Delhi ❤꧂ 9999965857 ☎️ Hard And Sexy ...
꧁❤ Aerocity Call Girls Service Aerocity Delhi ❤꧂ 9999965857 ☎️ Hard And Sexy ...꧁❤ Aerocity Call Girls Service Aerocity Delhi ❤꧂ 9999965857 ☎️ Hard And Sexy ...
꧁❤ Aerocity Call Girls Service Aerocity Delhi ❤꧂ 9999965857 ☎️ Hard And Sexy ...
 
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
 
定制英国白金汉大学毕业证(UCB毕业证书) 成绩单原版一比一
定制英国白金汉大学毕业证(UCB毕业证书)																			成绩单原版一比一定制英国白金汉大学毕业证(UCB毕业证书)																			成绩单原版一比一
定制英国白金汉大学毕业证(UCB毕业证书) 成绩单原版一比一
 
From idea to production in a day – Leveraging Azure ML and Streamlit to build...
From idea to production in a day – Leveraging Azure ML and Streamlit to build...From idea to production in a day – Leveraging Azure ML and Streamlit to build...
From idea to production in a day – Leveraging Azure ML and Streamlit to build...
 
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
 
Dubai Call Girls Wifey O52&786472 Call Girls Dubai
Dubai Call Girls Wifey O52&786472 Call Girls DubaiDubai Call Girls Wifey O52&786472 Call Girls Dubai
Dubai Call Girls Wifey O52&786472 Call Girls Dubai
 
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
 

Table mil std_105_e

  • 1. KUMPULAN TABEL MIL-STD-105E Ir. Budi Nurtama, M.Agr. 2008 Program Studi Supervisor Jaminan Mutu Pangan PROGRAM DIPLOMA Institut Pertanian Bogor
  • 2. i Tables for MIL-STD-105E *) Page Table I. Sample-Size Code Letters. 1 Table II-A. Single Sampling Plans for Normal Inspection (Master Table). 2 Table II-B. Single Sampling Plans for Tightened Inspection (Master Table). 3 Table II-C. Single Sampling Plans for Reduced Inspection (Master Table). 4 Table III-A. Double Sampling Plans for Normal Inspection (Master Table). 5 Table III-B. Double Sampling Plans for Tightened Inspection (Master Table). 6 Table III-C. Double Sampling Plans for Reduced Inspection (Master Table). 7 Table IV-A. Multiple Sampling Plans for Normal Inspection (Master Table). 8 Table IV-A.(continued) 9 Table IV-B. Multiple Sampling Plans for Tightened Inspection (Master Table). 10 Table IV-B.(continued). 11 Table IV-C. Multiple Sampling Plans for Reduced Inspection (Master Table). 12 Table IV-C.(continued). 13 Table V-A. Average Outgoing Quality Limit Factors for Normal Inspection (Single Sampling). 14 Table V-A. Average Outgoing Quality Limit Factors for Tightened Inspection (Single Sampling). 15 Table VIII. Limit Numbers for Reduced Inspection. 16 *) Farnum, Nicholas R. 1994. Modern Statistical Quality Control and Improvement. Wadsworth, Inc., California.
  • 3. ii Tahapan Implementasi MIL-STD-105E 1. Tentukan AQL (Acceptable Quality Level) berdasarkan perjanjian produsen dan pelanggan. 2. Tetapkan modus dan tingkat inspeksi (jika tidak, gunakan Normal Inspection, Level II ). 3. Tentukan ukuran lot (lot size). 4. Gunakan tabel Sample Size Code Letters untuk memilih huruf kode yang sesuai. 5. Tetapkan tipe prosedur pengambilan sampel : single, double, atau multiple sampling. 6. Gunakan tabel yang berkaitan dengan prosedur pengambilan sampel terpilih (tahap 5) dan modus/tingkat inspeksi (tahap 2) untuk mendapatkan ukuran sampel dan angka penerimaan (Ac) serta angka penolakan (Re). Dalam kasus dimana suatu rancangan tidak ada untuk ukuran lot dan AQL-nya, hati-hati mengikuti tanda panah dalam tabel ke rancangan terdekat yang ada. 7. Mulailah gunakan rancangan tersebut dan catat penerimaan dan penolakan sehingga switching rule dapat diterapkan. Jika switching dilakukan, tentukan modus dan tingkat dan ulangi tahap 4-6 untuk mendapatkan rancangan pengambilan sampel yang baru. SWITCHING RULE for MIL-STD-105E • Dari Normal ke Tightened Inspection : setelah 2 lot ditolak dari 2, 3, 4, atau 5 lot berurutan • Dari Tightened ke Normal Inspection : setelah 5 lot berurutan diterima • Dari Normal ke Reduced Inspection : jika (i) 10 lot berurutan diterima, dan (ii) jumlah total nonconforming items dalam 10 lot tersebut tidak melebihi batas pada Table VIII. Limit Numbers for Reduced Inspection., dan (iii) produksi stabil/mantap, dan (iv) disetujui oleh otoritas yang bertanggungjawab. • Dari Reduced ke Normal Inspection : jika (i) suatu lot tunggal ditolak, atau (ii) suatu lot hanya sebagian dapat diterima (dhi. jumlah nonconforming items diantara angka diterima dan ditolak), atau (iii) produksi menjadi tidak stabil, atau (iv) kondisi-kondisi lain yang menjamin bahwa inspeksi Normal dapat dilakukan.
  • 4. 1 Table I. Sample-Size Code Letters. Lot or batch size Special Inspection Levels General Inspection Levels S-1 S-2 S-3 S-4 I II III 2 to 8 9 to 15 16 to 25 A A A A A A A A B A A B A A B A B C B C D 26 to 50 51 to 90 91 to 150 A B B B B B B C C C C D C C D D E F E F G 151 to 280 281 to 500 501 to 1,200 B B C C C C D D E E E F E F G G H J H J K 1,201 to 3,200 3,201 to 10,000 10,001 to 35,000 C C C D D D E F F G G H H J K K L M L M N 35,001 to 150,000 150,001 to 500,000 500,001 and over D D D E E E G G H J J K L M N N P Q P Q R
  • 5. 2 Table II - A. Single Sampling Plans for Normal Inspection (Master Table). Sample size code letter Sample size Acceptable Quality Levels (normal inspection) 0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000 Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re A B C 2 3 5 0 1 0 1 0 1 1 2 1 2 2 3 1 2 2 3 3 4 2 3 3 4 5 6 3 4 5 6 7 8 5 6 7 8 10 11 7 8 10 11 14 15 10 11 14 15 21 22 14 15 21 22 30 31 21 22 30 31 44 45 30 31 44 45 D E F 8 13 20 0 1 0 1 0 1 1 2 1 2 2 3 1 2 2 3 3 4 2 3 3 4 5 6 3 4 5 6 7 8 5 6 7 8 10 11 7 8 10 11 14 15 10 11 14 15 21 22 14 15 21 22 21 22 30 31 30 31 44 45 44 45 G H J 32 50 80 0 1 0 1 0 1 1 2 1 2 2 3 1 2 2 3 3 4 2 3 3 4 5 6 3 4 5 6 7 8 5 6 7 8 10 11 7 8 10 11 14 15 10 11 14 15 21 22 14 15 21 22 21 22 K L M 125 200 315 0 1 0 1 0 1 1 2 1 2 2 3 1 2 2 3 3 4 2 3 3 4 5 6 3 4 5 6 7 8 5 6 7 8 10 11 7 8 10 11 14 15 10 11 14 15 21 22 14 15 21 22 21 22 N P Q 500 800 1250 0 1 0 1 0 1 1 2 1 2 2 3 1 2 2 3 3 4 2 3 3 4 5 6 3 4 5 6 7 8 5 6 7 8 10 11 7 8 10 11 14 15 10 11 14 15 21 22 14 15 21 22 21 22 R 2000 1 2 2 3 3 4 5 6 7 8 10 11 14 15 21 22 = Use first sampling plan below arrow. If sample size equals or exceeds lot or batch size, do 100 percent inspection. Ac = Acceptance number. = Use first sampling plan above arrow. Re = Rejection number.
  • 6. 3 Table II - B. Single Sampling Plans for Tightened Inspection (Master Table). Sample size code letter Sample size Acceptable Quality Levels (tightened inspection) 0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000 Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re A B C 2 3 5 0 1 0 1 1 2 1 2 2 3 1 2 2 3 3 4 2 3 3 4 5 6 3 4 5 6 8 9 5 6 8 9 12 13 8 9 12 13 18 19 12 13 18 19 27 28 18 19 27 28 41 42 27 28 41 42 D E F 8 13 20 0 1 0 1 0 1 1 2 1 2 2 3 1 2 2 3 3 4 2 3 3 4 5 6 3 4 5 6 8 9 5 6 8 9 12 13 8 9 12 13 18 19 12 13 18 19 18 19 27 28 27 28 41 42 41 42 G H J 32 50 80 0 1 0 1 0 1 1 2 1 2 2 3 1 2 2 3 3 4 2 3 3 4 5 6 3 4 5 6 8 9 5 6 8 9 12 13 8 9 12 13 18 19 12 13 18 19 18 19 K L M 125 200 315 0 1 0 1 0 1 1 2 1 2 2 3 1 2 2 3 3 4 2 3 3 4 5 6 3 4 5 6 8 9 5 6 8 9 12 13 8 9 12 13 18 19 12 13 18 19 18 19 N P Q 500 800 1250 0 1 0 1 0 1 1 2 1 2 2 3 1 2 2 3 3 4 2 3 3 4 5 6 3 4 5 6 8 9 5 6 8 9 12 13 8 9 12 13 18 19 12 13 18 19 18 19 R S 2000 3150 0 1 1 2 1 2 2 3 3 4 5 6 8 9 12 13 18 19 = Use first sampling plan below arrow. If sample size equals or exceeds lot or batch size, do 100 percent inspection. Ac = Acceptance number. = Use first sampling plan above arrow. Re = Rejection number.
  • 7. 4 Table II - C. Single Sampling Plans for Reduced Inspection (Master Table). Sample size code letter Sample size Acceptable Quality Levels (reduced inspection) 0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000 Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re A B C 2 2 2 0 1 0 1 0 1 0 2 0 2 1 3 1 2 1 3 1 4 2 3 2 4 2 5 3 4 3 5 3 6 5 6 5 6 5 8 7 8 7 8 7 10 10 11 10 11 10 13 14 15 14 15 14 17 21 22 21 22 21 24 30 31 30 31 D E F 3 5 8 0 1 0 1 0 1 0 2 0 2 1 3 0 2 1 3 1 4 1 3 1 4 2 5 1 4 2 5 3 6 2 5 3 6 5 8 3 6 5 8 7 10 5 8 7 10 10 13 7 10 10 13 10 13 14 17 14 17 21 24 21 24 G H J 13 20 32 0 1 0 1 0 1 0 2 0 2 1 3 0 2 1 3 1 4 1 3 1 4 2 5 1 4 2 5 3 6 2 5 3 6 5 8 3 6 5 8 7 10 5 8 7 10 10 13 7 10 10 13 10 13 K L M 50 80 125 0 1 0 1 0 1 0 2 0 2 1 3 0 2 1 3 1 4 1 3 1 4 2 5 1 4 2 5 3 6 2 5 3 6 5 8 3 6 5 8 7 10 5 8 7 10 10 13 7 10 10 13 10 13 N P Q 200 315 500 0 1 0 1 0 1 0 2 0 2 1 3 0 2 1 3 1 4 1 3 1 4 2 5 1 4 2 5 3 6 2 5 3 6 5 8 3 6 5 8 7 10 5 8 7 10 10 13 7 10 10 13 10 13 R 800 0 2 1 3 1 4 2 5 3 6 5 8 7 10 10 13 = Use first sampling plan below arrow. If sample size equals or exceeds lot or batch size, do 100 percent inspection. Ac = Acceptance number. = Use first sampling plan above arrow. Re = Rejection number. = If the acceptance number has been exceeded, but the rejection number has not been reached; accept the lot, but reinstate normal inspection.
  • 8. 5 Table III - A. Double Sampling Plans for Normal Inspection (Master Table). Sample size code letter Sample Sample size Cumula tive sample size Acceptable Quality Levels (normal inspection) 0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000 Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re A B First Second 2 2 2 4 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 8 9 5 9 12 13 7 11 18 19 11 16 26 27 17 22 37 38 25 31 56 57 C First Second 3 3 3 6 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 8 9 5 9 12 13 7 11 18 19 11 16 26 27 17 22 37 38 25 31 56 57 D First Second 5 5 5 10 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 8 9 5 9 12 13 7 11 18 19 11 16 26 27 17 22 37 38 25 31 56 57 E First Second 8 8 8 16 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 8 9 5 9 12 13 7 11 18 19 11 16 26 27 17 22 37 38 25 31 56 57 F First Second 13 13 13 26 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 8 9 5 9 12 13 7 11 18 19 11 16 26 27 G First Second 20 20 20 40 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 8 9 5 9 12 13 7 11 18 19 11 16 26 27 H First Second 32 32 32 64 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 8 9 5 9 12 13 7 11 18 19 11 16 26 27 J First Second 50 50 50 100 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 8 9 5 9 12 13 7 11 18 19 11 16 26 27 K First Second 80 80 80 160 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 8 9 5 9 12 13 7 11 18 19 11 16 26 27 L First Second 125 125 125 250 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 8 9 5 9 12 13 7 11 18 19 11 16 26 27 M First Second 200 200 200 400 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 8 9 5 9 12 13 7 11 18 19 11 16 26 27 N First Second 315 315 315 630 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 8 9 5 9 12 13 7 11 18 19 11 16 26 27 P First Second 500 500 500 1000 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 8 9 5 9 12 13 7 11 18 19 11 16 26 27 Q First Second 800 800 800 1600 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 8 9 5 9 12 13 7 11 18 19 11 16 26 27 R First Second 1250 1250 1250 2500 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 8 9 5 9 12 13 7 11 18 19 11 16 26 27 = Use first sampling plan below arrow. If sample size equals or exceeds lot or batch size, do 100 percent inspection. Ac = Acceptance number. = Use first sampling plan above arrow. Re = Rejection number. = Use corresponding single sampling plan (or alternatively, use double sampling plan below, where available).
  • 9. 6 Table III - B. Double Sampling Plans for Tightened Inspection (Master Table). Sample size code letter Sample Sample size Cumula tive sample size Acceptable Quality Levels (normal inspection) 0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000 Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re A B First Second 2 2 2 4 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 11 12 6 10 15 16 9 14 23 24 15 20 34 35 23 29 52 53 C First Second 3 3 3 6 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 11 12 6 10 15 16 9 14 23 24 15 20 34 35 23 29 52 53 D First Second 5 5 5 10 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 11 12 6 10 15 16 9 14 23 24 15 20 34 35 23 29 52 53 E First Second 8 8 8 16 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 11 12 6 10 15 16 9 14 23 24 15 20 34 35 23 29 52 53 F First Second 13 13 13 26 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 11 12 6 10 15 16 9 14 23 24 G First Second 20 20 20 40 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 11 12 6 10 15 16 9 14 23 24 H First Second 32 32 32 64 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 11 12 6 10 15 16 9 14 23 24 J First Second 50 50 50 100 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 11 12 6 10 15 16 9 14 23 24 K First Second 80 80 80 160 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 11 12 6 10 15 16 9 14 23 24 L First Second 125 125 125 250 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 11 12 6 10 15 16 9 14 23 24 M First Second 200 200 200 400 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 11 12 6 10 15 16 9 14 23 24 N First Second 315 315 315 630 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 11 12 6 10 15 16 9 14 23 24 P First Second 500 500 500 1000 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 11 12 6 10 15 16 9 14 23 24 Q First Second 800 800 800 1600 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 11 12 6 10 15 16 9 14 23 24 R First Second 1250 1250 1250 2500 0 2 1 2 0 3 3 4 1 4 4 5 2 5 6 7 3 7 11 12 6 10 15 16 9 14 23 24 S First Second 2000 2000 2000 4000 0 2 1 2 = Use first sampling plan below arrow. If sample size equals or exceeds lot or batch size, do 100 percent inspection. Ac = Acceptance number. = Use first sampling plan above arrow. Re = Rejection number. = Use corresponding single sampling plan (or alternatively, use double sampling plan below, where available).
  • 10. 7 Table III - C. Double Sampling Plans for Reduced Inspection (Master Table). Sample size code letter Sample Sample size Cumula tive sample size Acceptable Quality Levels (reduced inspection) 0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000 Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re A B C D First Second 2 2 2 4 0 2 0 2 0 3 0 4 0 4 1 5 0 4 3 6 1 5 4 7 2 7 6 9 3 8 8 12 5 10 12 16 7 12 18 22 11 17 26 30 E First Second 3 3 3 6 0 2 0 2 0 3 0 4 0 4 1 5 0 4 3 6 1 5 4 7 2 7 6 9 3 8 8 12 5 10 12 16 7 12 18 22 11 17 26 30 F First Second 5 5 5 10 0 2 0 2 0 3 0 4 0 4 1 5 0 4 3 6 1 5 4 7 2 7 6 9 3 8 8 12 5 10 12 16 G First Second 8 8 8 16 0 2 0 2 0 3 0 4 0 4 1 5 0 4 3 6 1 5 4 7 2 7 6 9 3 8 8 12 5 10 12 16 H First Second 13 13 13 26 0 2 0 2 0 3 0 4 0 4 1 5 0 4 3 6 1 5 4 7 2 7 6 9 3 8 8 12 5 10 12 16 J First Second 20 20 20 40 0 2 0 2 0 3 0 4 0 4 1 5 0 4 3 6 1 5 4 7 2 7 6 9 3 8 8 12 5 10 12 16 K First Second 32 32 32 64 0 2 0 2 0 3 0 4 0 4 1 5 0 4 3 6 1 5 4 7 2 7 6 9 3 8 8 12 5 10 12 16 L First Second 50 50 50 100 0 2 0 2 0 3 0 4 0 4 1 5 0 4 3 6 1 5 4 7 2 7 6 9 3 8 8 12 5 10 12 16 M First Second 80 80 80 160 0 2 0 2 0 3 0 4 0 4 1 5 0 4 3 6 1 5 4 7 2 7 6 9 3 8 8 12 5 10 12 16 N First Second 125 125 125 250 0 2 0 2 0 3 0 4 0 4 1 5 0 4 3 6 1 5 4 7 2 7 6 9 3 8 8 12 5 10 12 16 P First Second 200 200 200 400 0 2 0 2 0 3 0 4 0 4 1 5 0 4 3 6 1 5 4 7 2 7 6 9 3 8 8 12 5 10 12 16 Q First Second 315 315 315 630 0 2 0 2 0 3 0 4 0 4 1 5 0 4 3 6 1 5 4 7 2 7 6 9 3 8 8 12 5 10 12 16 R First Second 500 500 500 1000 0 2 0 2 0 3 0 4 0 4 1 5 0 4 3 6 1 5 4 7 2 7 6 9 3 8 8 12 5 10 12 16 = Use first sampling plan below arrow. If sample size equals or exceeds lot or batch size, do 100 percent inspection. = Use first sampling plan above arrow. Ac = Acceptance number. Re = Rejection number. = Use corresponding single sampling plan (or alternatively, use double sampling plan below, where available). = If, after the second sample, the acceptance number has been exceeded, but the rejection number has not been reached, accept the lot, but reinstate normal inspection.
  • 11. 8 Table IV - A. Multiple Sampling Plans for Normal Inspection (Master Table). Sample size code letter Sample Sample size Cumula tive sample size Acceptable Quality Levels (normal inspection) 0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000 Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re A B C ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ D First Second Third Fourth Fifth Sixth Seventh 2 2 2 2 2 2 2 2 4 6 8 10 12 14 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 3 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 1 6 3 8 5 10 7 11 10 12 13 14 0 5 3 8 6 10 8 13 11 15 14 17 18 19 1 7 4 10 8 13 12 17 17 20 21 23 25 26 2 9 7 14 13 19 19 25 25 29 31 33 37 38 4 12 11 19 19 27 27 34 36 40 45 47 53 54 6 16 17 27 29 39 40 49 53 58 65 68 77 78 E First Second Third Fourth Fifth Sixth Seventh 3 3 3 3 3 3 3 3 6 9 12 15 18 21 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 3 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 1 6 3 8 5 10 7 11 10 12 13 14 0 5 3 8 6 10 8 13 11 15 14 17 18 19 1 7 4 10 8 13 12 17 17 20 21 23 25 26 2 9 7 14 13 19 19 25 25 29 31 33 37 38 4 12 11 19 19 27 27 34 36 40 45 47 53 54 6 16 17 27 29 39 40 49 53 58 65 68 77 78 F First Second Third Fourth Fifth Sixth Seventh 5 5 5 5 5 5 5 5 10 15 20 25 30 35 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 3 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 1 6 3 8 5 10 7 11 10 12 13 14 0 5 3 8 6 10 8 13 11 15 14 17 18 19 1 7 4 10 8 13 12 17 17 20 21 23 25 26 2 9 7 14 13 19 19 25 25 29 31 33 37 38 G First Second Third Fourth Fifth Sixth Seventh 8 8 8 8 8 8 8 8 16 24 32 40 48 56 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 3 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 1 6 3 8 5 10 7 11 10 12 13 14 0 5 3 8 6 10 8 13 11 15 14 17 18 19 1 7 4 10 8 13 12 17 17 20 21 23 25 26 2 9 7 14 13 19 19 25 25 29 31 33 37 38 H First Second Third Fourth Fifth Sixth Seventh 13 13 13 13 13 13 13 13 26 39 52 65 78 91 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 3 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 1 6 3 8 5 10 7 11 10 12 13 14 0 5 3 8 6 10 8 13 11 15 14 17 18 19 1 7 4 10 8 13 12 17 17 20 21 23 25 26 2 9 7 14 13 19 19 25 25 29 31 33 37 38 J First Second Third Fourth Fifth Sixth Seventh 20 20 20 20 20 20 20 20 40 60 80 100 120 140 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 3 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 1 6 3 8 5 10 7 11 10 12 13 14 0 5 3 8 6 10 8 13 11 15 14 17 18 19 1 7 4 10 8 13 12 17 17 20 21 23 25 26 2 9 7 14 13 19 19 25 25 29 31 33 37 38 = Use first sampling plan below arrow (refer to continuation of table on following page, when necessary). If sample size equals or exceeds lot or batch size, do 100 percent inspection. = Use first sampling plan above arrow. = Use corresponding single sampling plan (or alternatively, use double sampling plan below, where available). Ac = Acceptance number. Re = Rejection number. ++ = Use corresponding double sampling plan (or alternatively, use multiple sampling plan below, where available). # = Acceptance not permitted at this sample size.
  • 12. Table IV - A. (continued). Sample size code letter Sample Sample size Cumula tive sample size Acceptable Quality Levels (normal inspection 0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re K First Second Third Fourth Fifth Sixth Seventh 32 32 32 32 32 32 32 32 64 96 128 160 192 224 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 3 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 1 6 3 8 5 10 7 11 10 12 13 14 0 5 3 8 6 10 8 13 11 15 14 17 18 19 1 7 4 10 8 13 12 17 17 20 21 23 25 26 2 9 7 14 13 19 19 25 25 29 31 33 37 38 L First Second Third Fourth Fifth Sixth Seventh 50 50 50 50 50 50 50 50 100 150 200 250 300 350 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 3 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 1 6 3 8 5 10 7 11 10 12 13 14 0 5 3 8 6 10 8 13 11 15 14 17 18 19 1 7 4 10 8 13 12 17 17 20 21 23 25 26 2 9 7 14 13 19 19 25 25 29 31 33 37 38 M First Second Third Fourth Fifth Sixth Seventh 80 80 80 80 80 80 80 80 160 240 320 400 480 560 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 3 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 1 6 3 8 5 10 7 11 10 12 13 14 0 5 3 8 6 10 8 13 11 15 14 17 18 19 1 7 4 10 8 13 12 17 17 20 21 23 25 26 2 9 7 14 13 19 19 25 25 29 31 33 37 38 N First Second Third Fourth Fifth Sixth Seventh 125 125 125 125 125 125 125 125 250 375 500 625 750 875 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 3 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 1 6 3 8 5 10 7 11 10 12 13 14 0 5 3 8 6 10 8 13 11 15 14 17 18 19 1 7 4 10 8 13 12 17 17 20 21 23 25 26 2 9 7 14 13 19 19 25 25 29 31 33 37 38 P First Second Third Fourth Fifth Sixth Seventh 200 200 200 200 200 200 200 200 400 600 800 1000 1200 1400 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 3 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 1 6 3 8 5 10 7 11 10 12 13 14 0 5 3 8 6 10 8 13 11 15 14 17 18 19 1 7 4 10 8 13 12 17 17 20 21 23 25 26 2 9 7 14 13 19 19 25 25 29 31 33 37 38 Q First Second Third Fourth Fifth Sixth Seventh 315 315 315 315 315 315 315 315 630 945 1260 1575 1890 2205 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 3 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 1 6 3 8 5 10 7 11 10 12 13 14 0 5 3 8 6 10 8 13 11 15 14 17 18 19 1 7 4 10 8 13 12 17 17 20 21 23 25 26 2 9 7 14 13 19 19 25 25 29 31 33 37 38 R First Second Third Fourth Fifth Sixth Seventh 500 500 500 500 500 500 500 500 1000 1500 2000 2500 3000 3500 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 3 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 1 6 3 8 5 10 7 11 10 12 13 14 0 5 3 8 6 10 8 13 11 15 14 17 18 19 1 7 4 10 8 13 12 17 17 20 21 23 25 26 2 9 7 14 13 19 19 25 25 29 31 33 37 38 = Use first sampling plan below arrow (refer to continuation of table on following page, when necessary). If sample size equals or exceeds lot or batch size, do 1 = Use corresponding single sampling plan (or alternatively, use double sampling plan below, where available). Ac = Acceptance number. ++ = Use corresponding double sampling plan (or alternatively, use multiple sampling plan below, where available). # = Acceptance not permitte
  • 13. 10 Table IV - B. Multiple Sampling Plans for Tightened Inspection (Master Table). Sample size code letter Sample Sample size Cumula tive sample size Acceptable Quality Levels (tightened inspection) 0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000 Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re A B C ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ D First Second Third Fourth Fifth Sixth Seventh 2 2 2 2 2 2 2 2 4 6 8 10 12 14 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 3 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 2 7 4 9 6 11 9 12 12 14 14 15 0 6 3 9 7 12 10 15 14 17 18 20 21 22 1 8 6 12 11 17 16 22 22 25 27 29 32 33 3 10 10 17 17 24 24 31 32 37 40 43 48 49 6 15 16 25 26 36 37 46 49 55 61 64 72 73 E First Second Third Fourth Fifth Sixth Seventh 3 3 3 3 3 3 3 3 6 9 12 15 18 21 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 3 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 2 7 4 9 6 11 9 12 12 14 14 15 0 6 3 9 7 12 10 15 14 17 18 20 21 22 1 8 6 12 11 17 16 22 22 25 27 29 32 33 3 10 10 17 17 24 24 31 32 37 40 43 48 49 6 15 16 25 26 36 37 46 49 55 61 64 72 73 F First Second Third Fourth Fifth Sixth Seventh 5 5 5 5 5 5 5 5 10 15 20 25 30 35 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 4 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 2 7 4 9 6 11 9 12 12 14 14 15 0 6 3 9 7 12 10 15 14 17 18 20 21 22 1 8 6 12 11 17 16 22 22 25 27 29 32 33 G First Second Third Fourth Fifth Sixth Seventh 8 8 8 8 8 8 8 8 16 24 32 40 48 56 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 4 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 2 7 4 9 6 11 9 12 12 14 14 15 0 6 3 9 7 12 10 15 14 17 18 20 21 22 1 8 6 12 11 17 16 22 22 25 27 29 32 33 H First Second Third Fourth Fifth Sixth Seventh 13 13 13 13 13 13 13 13 26 39 52 65 78 91 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 4 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 2 7 4 9 6 11 9 12 12 14 14 15 0 6 3 9 7 12 10 15 14 17 18 20 21 22 1 8 6 12 11 17 16 22 22 25 27 29 32 33 J First Second Third Fourth Fifth Sixth Seventh 20 20 20 20 20 20 20 20 40 60 80 100 120 140 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 4 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 2 7 4 9 6 11 9 12 12 14 14 15 0 6 3 9 7 12 10 15 14 17 18 20 21 22 1 8 6 12 11 17 16 22 22 25 27 29 32 33 = Use first sampling plan below arrow (refer to continuation of table on following page, when necessary). If sample size equals or exceeds lot or batch size, do 100 percent inspection. = Use first sampling plan above arrow. = Use corresponding single sampling plan (or alternatively, use double sampling plan below, where available). Ac = Acceptance number. Re = Rejection number. ++ = Use corresponding double sampling plan (or alternatively, use multiple sampling plan below, where available). # = Acceptance not permitted at this sample size.
  • 14. 11 Table IV - B. (continued). Sample size code letter Sample Sample size Cumula tive sample size Acceptable Quality Levels (tightened inspection) 0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000 Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re K First Second Third Fourth Fifth Sixth Seventh 32 32 32 32 32 32 32 32 64 96 128 160 192 224 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 4 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 2 7 4 9 6 11 9 12 12 14 14 15 0 6 3 9 7 12 10 15 14 17 18 20 21 22 1 8 6 12 11 17 16 22 22 25 27 29 32 33 L First Second Third Fourth Fifth Sixth Seventh 50 50 50 50 50 50 50 50 100 150 200 250 300 350 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 4 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 2 7 4 9 6 11 9 12 12 14 14 15 0 6 3 9 7 12 10 15 14 17 18 20 21 22 1 8 6 12 11 17 16 22 22 25 27 29 32 33 M First Second Third Fourth Fifth Sixth Seventh 80 80 80 80 80 80 80 80 160 240 320 400 480 560 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 4 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 2 7 4 9 6 11 9 12 12 14 14 15 0 6 3 9 7 12 10 15 14 17 18 20 21 22 1 8 6 12 11 17 16 22 22 25 27 29 32 33 N First Second Third Fourth Fifth Sixth Seventh 125 125 125 125 125 125 125 125 250 375 500 625 750 875 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 4 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 2 7 4 9 6 11 9 12 12 14 14 15 0 6 3 9 7 12 10 15 14 17 18 20 21 22 1 8 6 12 11 17 16 22 22 25 27 29 32 33 P First Second Third Fourth Fifth Sixth Seventh 200 200 200 200 200 200 200 200 400 600 800 1000 1200 1400 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 4 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 2 7 4 9 6 11 9 12 12 14 14 15 0 6 3 9 7 12 10 15 14 17 18 20 21 22 1 8 6 12 11 17 16 22 22 25 27 29 32 33 Q First Second Third Fourth Fifth Sixth Seventh 315 315 315 315 315 315 315 315 630 945 1260 1575 1890 2205 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 4 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 2 7 4 9 6 11 9 12 12 14 14 15 0 6 3 9 7 12 10 15 14 17 18 20 21 22 1 8 6 12 11 17 16 22 22 25 27 29 32 33 R First Second Third Fourth Fifth Sixth Seventh 500 500 500 500 500 500 500 500 1000 1500 2000 2500 3000 3500 # 2 # 2 0 2 0 3 1 3 1 3 2 3 # 2 0 3 0 3 1 4 2 4 3 5 4 5 # 3 0 4 1 4 2 5 3 6 4 6 6 7 # 4 1 5 2 6 3 7 5 8 7 9 9 10 0 4 2 7 4 9 6 11 9 12 12 14 14 15 0 6 3 9 7 12 10 15 14 17 18 20 21 22 1 8 6 12 11 17 16 22 22 25 27 29 32 33 S First Second Third Fourth Fifth Sixth Seventh 800 800 800 800 800 800 800 800 1600 2400 3200 4000 4800 5600 # 2 # 2 0 2 0 3 1 3 1 3 2 3
  • 15. 12 Table IV - C. Multiple Sampling Plans for Reduced Inspection (Master Table). Sample size code letter Sample Sample size Cumula tive sample size Acceptable Quality Levels (reduced inspection) 0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000 Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re A B C D E ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ ++ F First Second Third Fourth Fifth Sixth Seventh 2 2 2 2 2 2 2 2 4 6 8 10 12 14 # 2 # 2 0 2 0 3 0 3 0 3 1 3 # 2 # 3 0 3 0 4 0 4 1 5 1 5 # 3 # 3 0 4 0 5 1 6 1 6 2 7 # 3 0 4 0 5 1 6 2 7 3 7 4 8 # 4 0 5 1 6 2 7 3 8 4 9 6 10 # 4 1 6 2 8 3 10 5 11 7 12 9 14 0 5 1 7 3 9 5 12 7 13 10 15 13 17 0 6 3 9 6 12 8 15 11 17 14 20 18 22 G First Second Third Fourth Fifth Sixth Seventh 3 3 3 3 3 3 3 3 6 9 12 15 18 21 # 2 # 2 0 2 0 3 0 3 0 3 1 3 # 2 # 3 0 3 0 4 0 4 1 5 1 5 # 3 # 3 0 4 0 5 1 6 1 6 2 7 # 3 0 4 0 5 1 6 2 7 3 7 4 8 # 4 0 5 1 6 2 7 3 8 4 9 6 10 # 4 1 6 2 8 3 10 5 11 7 12 9 14 0 5 1 7 3 9 5 12 7 13 10 15 13 17 0 6 3 9 6 12 8 15 11 17 14 20 18 22 H First Second Third Fourth Fifth Sixth Seventh 5 5 5 5 5 5 5 5 10 15 20 25 30 35 # 2 # 2 0 2 0 3 0 3 0 3 1 3 # 2 # 3 0 3 0 4 0 4 1 5 1 5 # 3 # 3 0 4 0 5 1 6 1 6 2 7 # 3 0 4 0 5 1 6 2 7 3 7 4 8 # 4 0 5 1 6 2 7 3 8 4 9 6 10 # 4 1 6 2 8 3 10 5 11 7 12 9 14 0 5 1 7 3 9 5 12 7 13 10 15 13 17 0 6 3 9 6 12 8 15 11 17 14 20 18 22 J First Second Third Fourth Fifth Sixth Seventh 8 8 8 8 8 8 8 8 16 24 32 40 48 56 # 2 # 2 0 2 0 3 0 3 0 3 1 3 # 2 # 3 0 3 0 4 0 4 1 5 1 5 # 3 # 3 0 4 0 5 1 6 1 6 2 7 # 3 0 4 0 5 1 6 2 7 3 7 4 8 # 4 0 5 1 6 2 7 3 8 4 9 6 10 # 4 1 6 2 8 3 10 5 11 7 12 9 14 0 5 1 7 3 9 5 12 7 13 10 15 13 17 0 6 3 9 6 12 8 15 11 17 14 20 18 22 K First Second Third Fourth Fifth Sixth Seventh 13 13 13 13 13 13 13 13 26 39 52 65 78 91 # 2 # 2 0 2 0 3 0 3 0 3 1 3 # 2 # 3 0 3 0 4 0 4 1 5 1 5 # 3 # 3 0 4 0 5 1 6 1 6 2 7 # 3 0 4 0 5 1 6 2 7 3 7 4 8 # 4 0 5 1 6 2 7 3 8 4 9 6 10 # 4 1 6 2 8 3 10 5 11 7 12 9 14 0 5 1 7 3 9 5 12 7 13 10 15 13 17 0 6 3 9 6 12 8 15 11 17 14 20 18 22 = Use first sampling plan below arrow (refer to continuation of table on following page, when necessary). If sample size equals or exceeds lot or batch size, do 100 percent inspection. = Use first sampling plan above arrow. = Use corresponding single sampling plan (or alternatively, use double sampling plan below, where available). Ac = Acceptance number. Re = Rejection number. ++ = Use corresponding double sampling plan (or alternatively, use multiple sampling plan below, where available). # = Acceptance not permitted at this sample size. = If, after the final sample, the acceptance number has been exceeded but the rejection number has not been reached, accept the lot but reinstate normal inspection.
  • 16. 13 Table IV - C. (continued). Sample size code letter Sample Sample size Cumula tive sample size Acceptable Quality Levels (reduced inspection) 0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000 Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re Ac Re L First Second Third Fourth Fifth Sixth Seventh 20 20 20 20 20 20 20 20 40 60 80 100 120 140 # 2 # 2 0 2 0 3 0 3 0 3 1 3 # 2 # 3 0 3 0 4 0 4 1 5 1 5 # 3 # 3 0 4 0 5 1 6 1 6 2 7 # 3 0 4 0 5 1 6 2 7 3 7 4 8 # 4 0 5 1 6 2 7 3 8 4 9 6 10 # 4 1 6 2 8 3 10 5 11 7 12 9 14 0 5 1 7 3 9 5 12 7 13 10 15 13 17 0 6 3 9 6 12 8 15 11 17 14 20 18 22 M First Second Third Fourth Fifth Sixth Seventh 32 32 32 32 32 32 32 32 64 96 128 160 192 224 # 2 # 2 0 2 0 3 0 3 0 3 1 3 # 2 # 3 0 3 0 4 0 4 1 5 1 5 # 3 # 3 0 4 0 5 1 6 1 6 2 7 # 3 0 4 0 5 1 6 2 7 3 7 4 8 # 4 0 5 1 6 2 7 3 8 4 9 6 10 # 4 1 6 2 8 3 10 5 11 7 12 9 14 0 5 1 7 3 9 5 12 7 13 10 15 13 17 0 6 3 9 6 12 8 15 11 17 14 20 18 22 N First Second Third Fourth Fifth Sixth Seventh 50 50 50 50 50 50 50 50 100 150 200 250 300 350 # 2 # 2 0 2 0 3 0 3 0 3 1 3 # 2 # 3 0 3 0 4 0 4 1 5 1 5 # 3 # 3 0 4 0 5 1 6 1 6 2 7 # 3 0 4 0 5 1 6 2 7 3 7 4 8 # 4 0 5 1 6 2 7 3 8 4 9 6 10 # 4 1 6 2 8 3 10 5 11 7 12 9 14 0 5 1 7 3 9 5 12 7 13 10 15 13 17 0 6 3 9 6 12 8 15 11 17 14 20 18 22 P First Second Third Fourth Fifth Sixth Seventh 80 80 80 80 80 80 80 80 160 240 320 400 480 560 # 2 # 2 0 2 0 3 0 3 0 3 1 3 # 2 # 3 0 3 0 4 0 4 1 5 1 5 # 3 # 3 0 4 0 5 1 6 1 6 2 7 # 3 0 4 0 5 1 6 2 7 3 7 4 8 # 4 0 5 1 6 2 7 3 8 4 9 6 10 # 4 1 6 2 8 3 10 5 11 7 12 9 14 0 5 1 7 3 9 5 12 7 13 10 15 13 17 0 6 3 9 6 12 8 15 11 17 14 20 18 22 Q First Second Third Fourth Fifth Sixth Seventh 125 125 125 125 125 125 125 125 250 375 500 625 750 875 # 2 # 2 0 2 0 3 0 3 0 3 1 3 # 2 # 3 0 3 0 4 0 4 1 5 1 5 # 3 # 3 0 4 0 5 1 6 1 6 2 7 # 3 0 4 0 5 1 6 2 7 3 7 4 8 # 4 0 5 1 6 2 7 3 8 4 9 6 10 # 4 1 6 2 8 3 10 5 11 7 12 9 14 0 5 1 7 3 9 5 12 7 13 10 15 13 17 0 6 3 9 6 12 8 15 11 17 14 20 18 22 R First Second Third Fourth Fifth Sixth Seventh 200 200 200 200 200 200 200 200 400 600 800 1000 1200 1400 # 2 # 2 0 2 0 3 0 3 0 3 1 3 # 2 # 3 0 3 0 4 0 4 1 5 1 5 # 3 # 3 0 4 0 5 1 6 1 6 2 7 # 3 0 4 0 5 1 6 2 7 3 7 4 8 # 4 0 5 1 6 2 7 3 8 4 9 6 10 # 4 1 6 2 8 3 10 5 11 7 12 9 14 0 5 1 7 3 9 5 12 7 13 10 15 13 17 0 6 3 9 6 12 8 15 11 17 14 20 18 22 = Use first sampling plan below arrow (refer to continuation of table on following page, when necessary). If sample size equals or exceeds lot or batch size, do 100 percent inspection. = Use first sampling plan above arrow. = Use corresponding single sampling plan (or alternatively, use double sampling plan below, where available). Ac = Acceptance number. Re = Rejection number. ++ = Use corresponding double sampling plan (or alternatively, use multiple sampling plan below, where available). # = Acceptance not permitted at this sample size. = If, after the final sample, the acceptance number has been exceeded but the rejection number has not been reached, accept the lot but reinstate normal inspection.
  • 17. 14 Table V-A. Average Outgoing Quality Limit Factors for Normal Inspection (Single Sampling) * Code Letter Sample size Acceptable Quality Level 0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000 A B C 2 3 5 7.4 12 18 17 28 27 42 46 39 69 65 63 97 110 90 160 150 130 220 220 190 330 310 290 470 490 430 730 720 660 1100 1100 D E F 8 13 20 1.8 2.8 4.6 4.2 6.5 6.9 11 11 9.7 17 15 16 24 24 22 40 34 33 56 50 47 82 72 73 120 110 180 170 270 250 410 G H J 32 50 80 0.46 0.74 1.2 1.1 1.7 1.7 2.6 2.7 2.4 4.3 3.9 4.0 6.1 6.3 5.6 9.9 9.0 8.2 14 13 12 21 19 18 29 29 46 K L M 125 200 315 0.12 0.18 0.29 0.27 0.42 0.44 0.67 0.69 0.62 1.1 0.97 1.00 1.6 1.6 1.4 2.5 2.2 2.1 3.6 3.3 3.0 5.2 4.7 4.7 7.5 7.3 12 N P Q 500 800 1250 0.029 0.046 0.074 0.067 0.11 0.11 0.17 0.17 0.16 0.27 0.24 0.25 0.39 0.40 0.36 0.63 0.56 0.52 0.90 0.82 0.75 1.3 1.2 1.2 1.9 1.8 2.9 R 2000 0.042 0.069 0.097 0.16 0.22 0.33 0.47 0.73 * Note: For the exact AOQL, the above volume must be multiplied by sizeBatchorLot sizeSample 1
  • 18. 15 Table V-B. Average Outgoing Quality Limit Factors for Tightened Inspection (Single Sampling) * Code Letter Sample size Acceptable Quality Level 0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000 A B C 2 3 5 7.4 12 17 28 27 42 46 39 69 65 63 97 110 100 160 170 160 260 270 250 400 410 390 620 650 610 970 1100 D E F 8 13 20 1.8 2.8 4.6 4.2 6.5 6.9 11 11 9.7 17 15 16 24 24 26 40 40 40 64 61 62 99 95 160 150 240 240 380 G H J 32 50 80 0.46 0.74 1.2 1.1 1.7 1.7 2.6 2.7 2.4 4.3 3.9 4.0 6.1 6.3 6.4 9.9 10 9.9 16 16 16 25 25 39 K L M 125 200 315 0.12 0.18 0.29 0.27 0.42 0.44 0.67 0.69 0.62 1.1 0.97 1.0 1.6 1.6 1.6 2.5 2.6 2.5 4.1 4.0 3.9 6.4 6.2 9.9 N P Q 500 800 1250 0.029 0.046 0.074 0.067 0.11 0.11 0.17 0.17 0.16 0.27 0.24 0.25 0.39 0.40 0.41 0.63 0.64 0.64 1.0 0.99 0.99 1.6 1.6 2.5 R S 2000 3150 0.018 0.027 0.042 0.069 0.097 0.16 0.26 0.40 0.62 * Note: For the exact AOQL, the above volume must be multiplied by sizeBatchorLot sizeSample 1
  • 19. 16 Table VIII. Limit Numbers for Reduced Inspection. Number of sample units Acceptable Quality Level from last 10 lots or batches 0.010 0.015 0.025 0.040 0.065 0.10 0.15 0.25 0.40 0.65 1.0 1.5 2.5 4.0 6.5 10 15 25 40 65 100 150 250 400 650 1000 20 - 29 30 - 49 50 - 79 ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ 0 ∙ 0 0 0 0 2 0 1 3 2 3 7 4 7 14 8 13 25 14 22 40 22 36 63 40 63 110 68 105 181 115 178 301 181 277 80 - 129 130 - 199 200 - 319 ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ 0 ∙ 0 0 0 0 2 0 2 4 2 4 8 4 7 14 7 13 22 14 25 40 24 42 68 42 72 115 68 115 181 105 177 277 181 301 471 297 490 320 - 499 500 - 799 800 - 1249 ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ 0 ∙ 0 0 0 0 2 0 2 4 1 3 7 4 7 14 8 14 24 14 25 42 24 40 68 39 63 105 68 110 181 113 181 189 1250 - 1999 2000 - 3149 3150 - 4999 ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ ∙ 0 ∙ 0 0 0 0 1 0 2 4 2 4 8 4 8 14 7 14 24 13 22 38 24 40 67 40 68 111 69 115 186 110 181 169 5000 - 7999 8000 - 12499 12500 - 19999 ∙ ∙ ∙ ∙ ∙ 0 ∙ 0 0 0 0 2 0 2 4 2 4 7 3 7 13 7 14 24 14 24 40 25 42 69 40 68 110 63 105 169 110 181 181 20000 - 31499 31500 - 49999 50000 & over 0 0 2 0 1 3 2 4 7 4 8 14 8 14 25 14 24 40 22 38 63 40 67 110 68 111 181 115 186 301 181 ∙ Denotes that the number of sample units from the last ten lots or batches is not sufficient for reduced inspection for this AQL. In this instance more than ten lots or batches may be used for the calculation, provided that the lots or batches used are the most recent ones in sequence, that they have all been on normal inspection, and that none has been rejected while on original inspection.