1. Curriculum Vitae
PERSONAL DATA
NAME : Mahmoud Mahmoud Ahmed Gaber
DATE OF BIRTH : 09-02-1977
NATIONALITY : EGYPTION
MILITARY SERVICE : Completed
MARITAL STATUS : MARRID
I.D No. : 27702091801791 – Edku – El madia
Driving License : 31876 - 09040000062743
Passport Number : 3774324
QUALIFICATION DATA
More than 14 year experience of Mechanical Construction Projects Execution with multi
international and national construction CompanieS.
EDUCATION DATA
UNIVERSITY : AIN SHAMS UNIVERSITY FACULTY OF ENGINEERING
UNIVERSITY DEGREE : B.s.c Mechanical Power Engineering
DATE OF GRADUATION : 2002
GRADUATION PROJECT
PROJECT : Automatic Control in Industrial Process (Automatic Control in Distillation column)
PROJECT GRADE : Excellent
Page 1 of 8
ADDRESS: Elmostafa-Tower
Elmostasharin Street- Back of High
Information Technology- Institute – Tosson –
Alexandria – Egypt
MOBILE.NO. 01002821972, 01277666436
E-MAIL
:mma_engwindow@hotmail.com
mma_engwindow1@yahoo.com
2. TRAINING COURSES
Training Coursesno
- Round in First Aid
- Egyptian Medical Institute in Cairo
- Certification : First Aid certificate From Egyptian Institute in 2001.
Course Title:
Place:
Date of the Course:
1
- 15 days Training in pneumatic system (design and apply pneumatic
circuits)
- FESTO (Arcoma) In Suadia Arabia
- Certification : Basics of Pneumatic FESTO Certificate (Grade
Excellent)in 2005
Course Title:
Place:
Date of the Course:
2
- 3 months in learning all office programs, English language &
internet
- IBM Institute Company of CompEX
- Certification : -Microsoft certificate in Microsoft excel (grade
excellent)
Microsoft certificate in Microsoft word ( grade excellent )
IBM Attends Certificate 2003
Course Title:
Place:
Date of the Course:
3
-Material control.
-THE AMERICAN UNIVERSITY IN CAIRO .
-30/5 to 4/5/2015
Course Title:
Place:
Date of the Course:
4
-Fundamentals of welding technology process ,inspection and quality
control
-THE AMERICAN UNIVERSITY IN CAIRO .
-1-5-july-2012
Course Title:
Place:
Date of the Course:
5
-Fluid power pumps and motors design and selection 5-9-June 2011
-THE AMERICAN UNIVERSITY IN CAIRO
-5-9-June 2011
Course Title:
Place:
Date of the Course:
6
- Managerial skills developing for engineers 22-26-april-2007
- American supplier institute – international
- 22-26-april-2007
Course Title:
Place:
Date of the Course:
7
-Technical writing letters and paragraphs
-MMC modern management centre
-17-21-feb-2008
Course Title:
Place:
Date of the Course:
8
Page 2 of 8
3. -Cost control of engineering projects
-THE AMERICAN UNIVERSITY IN CAIRO
-9-14-dec-2006
Course Title:
Place:
Date of the Course:
9
-Corrosion in petroleum industry
-High technology institute 10 of Ramadan in Cairo
-2007
Course Title:
Place:
Date of the Course:
10
-Preparation of new employs
-Faculty of commerce – Cairo university
-2007
Course Title:
Place:
Date of the Course:
11
-BOSIET ( Basic Offshore Safety Induction & Emergency
Training )
-Maritime Safety Institute OPITO Management System In
Arab Academy Of Science And Technology.
- From 9-8-2015 to 11-8-2015
Course Title:
Place:
Date of the Course:
12
JOB TITEL ( Construction Manager )
WORK EXPERIENCE
DATE: FROM 31-10-2006 till NOW
PETROJET (The Petroleum Projects and Technical Consultations Company)
Marine department
Job Description:
· Handling of multidisciplinary engineering/construction activities related to setting up of new
facilities, expansions, offshore platforms, subsea structures, upgrades and modifications for
onshore and offshore oil and gas fields , power plants and petrochemical or refining plants for
our clients companies.
· Participate in delivery of major projects related to national and international oil and gas
companies ( Cameron, Tecnomare, Vetco gray, Petrobel JV ENI, Gupco JV BP, PHPCO JV
BP, Northsinai, Bapetco, Petrofac , ETHYDC , SAIPEM EGYPT, BREDA ENERGIA ,
GUPCO COMPANY, ENPPI COMPANY, BURULLUS GAS COMPANY, TECHNIP
FRANCE, ARAMCO SUADIA ARABIA EL KHAFJI FIELD OFFSHORE, ABU QIR
COMPANY, MIDOR (MIDDLE EAST REFINING COMPANY) RAJHI STEEL FACTORY ,
DANIELI , UNILEVER ARABIA (Binzager Lever) company (KSA) , Asec for Casting
&Heat Treatment (ARESCO), EGYPTIAN LNG PROJECTS IDKU , BECHTEL. ..........).
· Good knowledge with major international codes and standards (ASME, API, AWS, DNV) for
these projects and in implementation of projects in operating plant environments.
Page 3 of 8
4. Roles and Accountabilities:-
· Manage the projects in construction and commissioning phases
· Ensure that all work is done in accordance with the approved procedures and drawings.
· Ensure the full involvement of Quality Control/Assurance in all projects construction phases.
· Prepare procedures for installation work at particular location; monitor the progress of work,
quality and safety aspects.
· Ensure the projects are running according to the approved schedule.
· Manage the interface between subcontractors through periodic interface meetings.
· Provide Construction inputs to client reps related to new design facilities during engineering
phase.
· Ensure that all the HSE requirements is followed during the construction phase and ensure
continuous refreshment of safety induction courses to the working crew.
PROJECT : ABU QIR PLATFORM
CLIENT : ABU QIR COMPANY
M. contractor : PETROJET
JOB : Project Coordinator & Piping Construction manger
* Construction piping fabrication & errection manager
* Piping punch list, hydro test
* Pre commissioning and GLT , CLT activities
PROJECT : PHPC phase III and BP EAST NILE DELTA
CLIENT : PHPC COMPANY
M. contractor : SUB SEA 7 EGYPT
JOB : Project Coordinator & Construction manager
* Fabrication 8 tie in spools with CHC , installation aids and sea fastening frames.
* Assistant for EFAT and SIT activity
* Load out and sea fastening.
PROJECT : MEDOR UNIT 9 REHAPITATION
CLIENT : MEDOR
M. contractor : EBROM
JOB : Project manager
* supervised all activity during shut down duration in three shifts
* remove all pig tials , subheaders and transfer line.
* install new transferline , sub headers and pig tails.
* Pre commissioning and commissioning activity.
* finish all scope of work early than shut down period by 10 days .
PROJECT : CONGHO MONOPOD
CLIENT : ENI
M. contractor : ENI CONGHO
JOB : Project Coordinator & Construction manager
* Fabrication one monopod ( jacket , boat land deck support and deck )
Page 4 of 8
5. PROJECT : ETHYDC (THE EGYPTIAN ETHYLENE AND DERIVATIVES COMPANY )
CLIENT : LUMMUS TECHNOLOGY HEAT TRANSFER
M. contractor : LUMMUS
JOB : Project Coordinator & Construction manager
for 28*70 ton convection modules ( heat exchanger )
* Fabrication tubular in J shape
* Structure fabrication and assembly
* Tubular insertion and welding
* hydro testing and blowing
* packing and load out
PROJECT : WDDM Phase IX a
CLIENT : BURULLUS GAS COMPANY
M. contractor : SAIPEM EGYPT
JOB : Project Coordinator & Construction manager
* Fabrication 1 manifolds structure, 1 HIPPS foundation & 2 Suction pile and foundation
* piping super duplex fabrication, erection in manifold and subsea distribution assembly
* Piping punch list, hydro test
* Pre commissioning and commissioning activity
* Assistant for EFAT and SIT activity
* Load out and sea fastening
PROJECT : DEKA DEVELOPMENT PROJECT
CLIENT : PETROBEL (BELAYIM PETROLEUM COMPANY) CAIRO - EGYPT
M. contractor : BREDA ENERGIA
JOB : Project Coordinator & Construction Engineer
* Fabrication PLEM (pipe line end termination) structure
* piping super duplex fabrication, erection in PLEM
* Piping punch list, hydro test
* Pre commissioning and commissioning activity
* Assistant for EFAT
* Load out and sea fastening
PROJECT : Ramadan 6 Platform rehabitation Project
CLIENT : GUPCO COMPANY
M. contractor : ENPPI COMPANY
JOB : Project Coordinator & Construction manager
* Fabrication piping spools and painting
PROJECT : WDDM Phase VIIIB
CLIENT : BURULLUS GAS COMPANY
M. contractor : SAIPEM EGYPT
JOB : Project Coordinator & Construction manager
* Fabrication 1 manifolds structure, 1 SDA structure& 2 Suction pile and foundation
* piping super duplex fabrication, erection in manifold and subsea distribution assembly
* Piping punch list, hydro test
* Pre commissioning and commissioning activity
* Assistant for EFAT and SIT activity
* Load out and sea fastening
Page 5 of 8
6. PROJECT : WDDM Phase VIIIA
CLIENT : BURULLUS GAS COMPANY
M. contractor : TECHNIP FRANCE
JOB : Project Coordinator & Construction Engineer
* Fabrication 3 manifolds structure, 3 SDA structure& 3 Suction pile and foundation
* piping super duplex erection in all manifolds and SDA
* Piping punch list, hydro test
* Pre commissioning and commissioning activity
* Assistant for EFAT and SIT activity
* Load out and sea fastening
PROJECT : ELKHAFJI OFFSHORE PLATFORMS Y2B, Y1B, IWJ5
CLIENT : ARAMCO SUADIA ARABIA EL KHAFJI FIELD OFFSHORE
M. contractor : PETROJET, ENPI, PMS
JOB : Project Coordinator & Piping Construction manger
* Construction punch list manager in platforms Y2B, Y1B, PDP1, PDP2,
* Pre commissioning and commissioning activity
* Control vessels (supply boats) distribution between work points
PROJECT : ABU QIR PLATFORM
CLIENT : ABU QIR COMPANY
M. contractor : PETROJET
JOB : Project Coordinator & Piping Construction manger
* Construction piping fabrication & errection manager
* Piping punch list, hydro test
* Pre commissioning and commissioning activity
PROJECT : ELKHAFJI OFFSHORE PLATFORMS Y2B, Y1B, PDP1, PDP2, PDP3,
IWJ5, Y1, Y2, Y3, Y4
CLIENT : ARAMCO SUADIA ARABIA EL KHAFJI FIELD OFFSHORE
M. contractor : PETROJET, ENPI, PMS
JOB : Project Coordinator & Piping Construction manger
* Construction punch list manager in platforms Y2B, Y1B, PDP1, PDP2,
* Platforms modifications in Y1, Y2, Y3, Y4
* Pre-shutdown activity (equipment and piping preparation and errection)
* Shut down activity (piping, equipment removing and equipment, piping erection)
* Piping punch list, hydro test
* Pre commissioning and commissioning activity
* Control vessels (supply boats) distribution between work points
PROJECT : MIDOR (MIDDLE EAST REFINING COMPANY) UNIT 8 REHABITATION
CLINT : MIDOR
M. contractor : TECHNIP
JOB : Project Coordinator & Piping Construction manger
* Piping fabrication & erection
* Piping punch list, hydro test, G.L.T & C.L.T
* Pre commissioning and commissioning activity
PROJECT : ELKHAFJI PLATFORMS Y2B, Y1B TOTAL WIGHT 5000TON
CLIENT : ARAMCO SUADIA ARABIA
M. contractor : PETROJET, ENPI, PMS
Page 6 of 8
7. JOB : Piping Construction engineer
* Piping fabrication and erection
* piping flushing and testing
*Piping reinstatement and drying
* Clear all mechanical and piping punch lists
* Piping punch list, hydro test, G.L.T & C.L.T
* Pre commissioning and commissioning activity
PROJECT : GUPCO TAURT FIELD DEVELOPMENT PROJECT
CLIENT : BP (BRITICH PETROLUM) CO. & GUPCO
M. contractor : CAMERON
JOB : Piping Construction manger
* Steel Structure fabrication and Erection
* Piping fabrication and erection
* Fabricate manifold, Tie In Manifold, SDU all frames, Protections, TREE
Protections, FAT and EFAT for frames
PROJECT : SAQARA PLATFORM
CLIENT : BP (BRITICH PETROLUM) CO. &GUPCO
JOB : Project Coordinator & Piping Construction manger
* Steel Structure fabrication and Erection
* Piping fabrication and erection
* piping flushing and testing
*Piping reinstatement and drying
* Clear all mechanical and piping punch lists
* Piping punch list, hydro test, G.L.T & C.L.T
* Pre commissioning and commissioning activity
PROJECT : ELAB
CLIENT : ELAB
JOB : Site Construction Mechanical Engineer
* Steel Structure fabrication
DATE: FROM 11-3-2006 till 25-10-2006
Arabian Rehabilitation & Services Engineering (ARESCO) in (KSA)
PROJECT : RAJHI STEEL FACTORY
CLIENT : DANIELI
JOB : Piping Construction manger
DUTIES : Material Check and Issue for Erection
- Piping fabrication and erection manger in EAF, LF
- Piping fabrication and erection manger in melt shop areas
- Piping fabrication and erection manger in water treatment areas and all tunnels
- Martial Handling System
DATE: FROM 22-6-2005 till 11-3-2006
UNILEVER ARABIA (Binzager Lever) company (KSA)
JOB : Maintenance& Project Engineer
Check for all rotating equipment in Soap, shower gell and tooth paste making areas
Check and adjust all production lines machines
Change size (change over) for production lines machines
Maintenance, check and modification of production lines Machines before Start up
Page 7 of 8
8. Preventive maintenance for all machines
DATE: FROM 24-8-2004 till 12-6-2005
Asec for Casting &Heat Treatment (ARESCO)
PROJECT : EGYPTIAN LNG PROJECTS IDKU PROJECT TRAIN 2.
CLIENT : BECHTEL.
* Piping fabrication and erection
* piping flushing and testing
*Piping reinstatement
* Clear all mechanical and piping punch lists
* Piping punch list, hydro test, G.L.T & C.L.T
* Pre commissioning and commissioning activity
* Mechanical works inside confined Space
* permit requester engineer for Confined space or any works in the gases areas
COMPUTER SKILLS
MS Windows XP – AutoCAD - MS Excel – MS Word –
MS Power Point - Internet
LANGUAGES
Arabic: Mother Languages
English: (Writing, Spoken & Reading) Very good
Page 8 of 8