1. Curriculum vitae
Name: Khaled Farouk Elwy
Date of Birth: 09/04/1965
Address: 23 Gerges Grees St. Heliopolis
Telephone: Home 002 02 22663385
Mobile 002 011/0709080 – 010/1002855
Email: ELWY65@HOTMAIL.COM
Marital Status: Married
Language Capabilities: * Arabic – Mother tongue
* English – Very Good
* French – Good
Secondary Education: Port Said School (English Language School)
Graduated In 1983
University Education: Cairo University Faculty of Engineering
Construction Engineering: High Diploma - 1994.
Cairo University Faculty of Engineering
Bachelor of Science of Civil Engineering - 1991.
Computer Capabilities:
* AutoCAD
* Primavera
* Microsoft Project
* Microsoft Word
* Excel Work Sheet
Practical Training:
Employer: DR. Hassan Fahmy Office
Type of work: Participating in the survey works for the project of drawing maps
For Sakara sites.
Period: June 1988 till September 1988
Employer: University of Budapest – Hungary
Type of work: Practical and scientific training at the Geo – Technical Department
Period: June 1989 till September 1989
1
2. Employment History:
1) General Manager : Main office
plan, monitor and control projects involving the creation and deployment-
• planning the project including identifying the necessary activities assigning tasks
and monitoring progress.
• - anticipating and where possible taking corrective action within own authority to
avoid deviations from plan. Where not possible, reporting unavoidable
deviations and proposing corrective actions.
• - Identifying and qualifying risks, determining suitable mitigating actions, and
subsequently monitoring them.
• - recording and managing change requests and issues as they arise so as to prevent
uncontrolled scope creep and keep projects on track.
• - communicating with project board and other stakeholders in a timely
for curtain wall skylight windows doors spider system and cladding
for the following Projects:
1- TOSHIBA factory building QWESNA-MNOFIA
2- GHABUR SERVECE STATION ABO RAWASH -CAIRO
3- SHARP factory building QWESNA-MNOFIA
4- HSBC BANK Dokki
5- BNP PARIBAS BANK Maadi branch
6- BNP PARIBAS BANK Suze branch
7- BNP PARIBAS BANK Hurghada
8- TOYOTA SERVECE STATION elobour
9- TOSHIBA heater factory building QWESNA-MNOFIA
10- ELGOLF REZORT VILLA ELTAGAMAA
11- VILLA DREAM Dream land six October city
12- ELOBOUR REZORT elobour
13- MIRAGE REZORT ELTAGAMAA
14- LCINDA REZORT North coast
15- MODERN ACADIME Ktamia Cairo
16- CNARY REZORT Suze
17- GHABUR REZORT ABO RAWASH -CAIRO
18- TOSHIBA SERVECE CENTER Cairo
19- ELZHOUR CLUB Cairo
20- BANDER ELOBOUR REZORT elobour
21- ELOROUBA PALACE Cairo
Employer: STYLE EGYPT for aluminium –ALOBOUR-CAIRO
Period: Oct 2003till Date
2
3. 2) Technical Office Manager: Main office
plan, monitor and control projects involving the creation and deployment-
planning the project including identifying the necessary activities
for curtain wall skylight windows doors and spider system for the following Projects:
1- MISR ELHEGAZ factory pipe building 10 th of October city
2- CITY BANK Obore Branch Salah Salem st
3- CITY BANK Abass Elakad Branch Nasr City
4- HSBC BANK Dandy male branch cairo Alex desert road
5- HSBC BANK Maadi branch
6- MISR IRAN BANK Maadi branch
7- NSGB BANK Ahmed orabi st elmohandseen
8- NSGB BANK Aswan square elmohandseen
9- ELWATANI ELOMANI BANK Heliopolice
10- EL AKARY BANK Zakazik
11- HELTON DREAM Dream land six October city
12- SHERATON DREAM Dream land six October city
13- US-AID Maadi
14- DANEMARK EMBASSY Zamalek
15- HOLLAND EMBASSY Zamalek
16- BRITSH CAUANCL Aagouza
17- HELTON TABA REZORT Taba
18- EGYPTAIR SEMULATOR BUILDING Cairo airport
19- ELBORG REZORT Marsa alam
20- HOUSEING&DEVALOPMENT BANK Abass Elakad nasr city
21- DEPARTURE ZONE NO 1 Cairo airport
22- SOL ELET REZORT Sharm shekh
23- CROWN PLAZA REZORT Sharm shekh
24- COMUNICATION BIULDING Smart village Cairo
Employer: BAHGAT GROUB ALU GLASS for aluminium (SCHUCO)
Period: July 2000 till Oct 2003
3
4. 3) Technical Office Engineer: Main office
Studying Tender documents, specification and drawings for the following
Projects:
1- AMOC PETROLIUM COMPANY Elmax Alexandria
2- VODAPHONE BUILDING 6th
October City
3- ABO SOULTAN REZORT Isan Eluzara Abo Soultan
4- MEDIA CITY 6th
October city
Employer: MISR SONS DEVELOPMENT - HASSAN ALLAM SONS
Period: July 1999 till June2000
4) Project Manager Engineer
Execution of Water pipe net for the following Project:
1- WADI ELDWASER WATER PIPE NET
Employer: ABDUL AZIZ AL – ORAINY EST - For Construction Saudi
Arabia
Period: October 1998 till July 1999
5) Project Manager & Planning Engineer
Project Manager to establish and communicate project goals, objectives, plans and
milestones to the project team.
Documents, communicates and administers project management processes
for curtain wall skylight windows doors and spider system for the following Projects:
within the project team and across the company.
Coach others on project management processes and best practices
1- CONRAD HOTEL Cornish el Nile Cairo
2- MOBARAK RESEARSH CITY Borg el-Arab Alexandria
3- HOLIDAY INN REZORT Sharm elshekh
4- FESAL ISLAMIC BANK Dokki
5- BRITSH AIRWAYS Tahrer square
6- ELSAFA HOSPITAL Mohandseen
7- DREAM LAND PARK AREA 6th
October
8- GREEN PYRAMEDS HOTE Haram
4
5. Employer: ALU–GLASS (SCHUCO)
Period: March 1996 till September 1998
6) Head of Operation Department – Cairo Branch
Execution Repairing and Protection R.C and water structure for the following
projects
1- HELWAN UNIVERSITY WATER TANK Helwan
2- ELBAHR MOUSQE Dammeta
3- AMOC PIPE LINE PROTECTION Elmax Alexandria
4- ELKAHRBA HOSPITAL Almaza
5- ELSALAM WATER CHANEL elcap – Eltena Port Said
6- ARAB CONTRACTORS CENTERAL BUILDING TANK Nasr City
Employer: CHEMPRO
Period: September 1992 – February 1996
7) Site Engineer
Execution and Supervision for the following projects
1- EL HODA RESDENTIAL BUILDING 8th Zone Nasr City
Employer: New Style Construction Engineering
Period: August 1991 till September 1992
Training Courses:
Sea water effects against R.C and Steel Cempro training center Alex 1999
Protection of R.C and Steel American University of Cairo 1999
The Newly Appointed Manager European Management Center NOV-2001
Computer system SCHUCAL SCHUCO ALU GLASS CAIRO AUG 2001
ROYALS AND FACADES SYSTEM SCHUCO Bielefeld-GERMANY: FEB-2002
•1 Member of the Egyptian syndicate of engineering
References: * Furnished upon your request
5
6. Employer: ALU–GLASS (SCHUCO)
Period: March 1996 till September 1998
6) Head of Operation Department – Cairo Branch
Execution Repairing and Protection R.C and water structure for the following
projects
1- HELWAN UNIVERSITY WATER TANK Helwan
2- ELBAHR MOUSQE Dammeta
3- AMOC PIPE LINE PROTECTION Elmax Alexandria
4- ELKAHRBA HOSPITAL Almaza
5- ELSALAM WATER CHANEL elcap – Eltena Port Said
6- ARAB CONTRACTORS CENTERAL BUILDING TANK Nasr City
Employer: CHEMPRO
Period: September 1992 – February 1996
7) Site Engineer
Execution and Supervision for the following projects
1- EL HODA RESDENTIAL BUILDING 8th Zone Nasr City
Employer: New Style Construction Engineering
Period: August 1991 till September 1992
Training Courses:
Sea water effects against R.C and Steel Cempro training center Alex 1999
Protection of R.C and Steel American University of Cairo 1999
The Newly Appointed Manager European Management Center NOV-2001
Computer system SCHUCAL SCHUCO ALU GLASS CAIRO AUG 2001
ROYALS AND FACADES SYSTEM SCHUCO Bielefeld-GERMANY: FEB-2002
•1 Member of the Egyptian syndicate of engineering
References: * Furnished upon your request
5