1. C.V
Name: Ramy Hassan Attia.
Address: 41branched from Ibrahim Ragy st.-Bolkey-Alex.
Phone: (03)-5467633 .
Mobile: +966593798690
E-mail: ramy_attia33@yahoo.com
_____________________________________________________________
Personal information:
Material state: Married
Date of birth: 3/10/1978
Military status: Final Exemption.
Graduation: Faculty of engineering-Alexandria University
Civil dep. (2002) Grade: pass
Graduation Project: Sanitary Engineering
Grade: EXCELLENT
Language: English: Excellent
French: Fair
Interests and Activities:-
Computer programs: (Office – AutoCAD –Primavera 6.82 – internet skills)
Experience:
2. 1-Working in:
ABD ALLAH SAEED AL GAMDI EST. ( ASGE ) - (K.S.A) since
13/9/2010 till now in the following:
• In main office as the Planning, Monitoring & Cost Control Head
• As a planner for the following projects:
1. PREFABRICATED BUILDINGS AND EQUIPMENT FOR EVACUATION
AREA (608-P12A) since (19-2-2014) till now (as a code 1 approved planner).
Brief Description of work:
1. Procuring, constructing and installing of prefabricated module house port cabins, including all
structural/steel structural / architectural/mechanical (plumbing, fire safety & HVAC) / electrical
works.
2. Procuring and installing facility equipment, generators, panel boards and tanks.
3. Connecting all port cabins and equipment with existing site infrastructure and commissioning of all
items.
• Owner: Royal Commission of Jubail & Yanbu.
• Period of performance: 10 month.
• Type of work: buildings.
3. • Location: Jubail industrial city.
2. Construction of Royal Commission O&M CENTERS PHASE II contract no.
(537-CO3R) since 3/7/2013 till now (as a code 1 approved planner).
Brief Description of work:
• SITE DEVELOPMENT( infra structure , roads , landscape and hardscape) with a total
area of ( 57,665 m2)which are:
1. MAIN ROAD 2
2. ROAD 3 & PARKING AREA (R-A,R-B,R-C)
3. ROAD 4 A, 4 & 5
4. ROAD 6,7,8,9,10,11&12
5. MAIN ROAD 1
6. LIFT STATION
7. SUBSTATION
8. CONNECTION TO MAIN ( TIE IN )
9. STOCK YARD
• CONSTRUCTION OF BUILDING with a total of built up area of ( 6,621 m2) which are:
1. ROYAL COMMISSION & CONTRACTOR'S OFFICE BUILDING =1,468 m2
2. MOSQUE = 171 m2
3. MAINTENANCE SHOPS = 609 m2
4. EXTERNAL STORAGE =459 m2
5. WAREHOUSE =1,552 m2
6. MECHANICAL WORKSHOP = 1,940 m2
7. REFUELING STATION =266 m2
8. STORAGE ROOMS = 137 m2
9. GUARD HOUSE = 19 m2
• Owner: Royal Commission of Jubail & Yanbu.
• Period of performance: 18 month.
4. • Type of work: buildings.
• Location: Jubail industrial city.
3. Rehabilitation of Royal Commission public facilities contract no. (608-C10) since
1/9/2012 till now.
Brief Description of work:
- Description: Material procurement and construction/rehabilitation of (12)
Royal Commission public facilities and structures.
- Owner: Royal Commission of Jubail & Yanbu.
- Period of performance: 24 month.
- Type of work: Rehabilitation.
- Location: Jubail industrial city.
4. Construction of the Military Police College building the King Abdul Aziz Naval
base in Jubail since 21/1/2013 till now.
Brief Description of work:
- Description: office building consists of3 floors (ground and first and
second), site development, landscaping, hardscaping , parking area and
roads and the covered area is( 31200 m2 ) .
- Owner: Ministry of defense.
- Period of performance: 18 month.
- Type of work: Skelton &Finishing “Turn Key ".
- Location: king Abdel Aziz naval base- Jubail city.
5. Construction of EXPANSION OF EXISTING TRAINING BUILDING,
CANTEEN BUILDING, MAIN ENTRANCE GATE # 01 & FIRE STATION @
AL WAHA PLANT PROJECT since 28/1/2013 till now.
5. Brief Description of work:
- Description: work expansion of training building and CANTEEN
BUILDING (construction work and finishing) and construct a FIRE
STATION building with an area of (410 m 2) and the building is
composed of two part one for fire trucks and the other part is offices area
(construction and finishing work) and the establishment of the umbrella
of the main entrance (installations, and lighting).
-Owner: Sahara Petrochemicals. .
- Period of performance: 13.5 month.
- Type of work: Skelton &Finishing “Turn Key ".
- Location: Jubail industrial city.
6. Construction of the Infantry School at military Port of Ras AL- Ghar, since
21/1/2013 till now.
Brief Description of work:
- Description: office building consists of 2 floors (ground and first) and the
covered area is (1200 m2).
- Owner: Ministry of defense.
- Period of performance: 18 month.
- Type of work: Skelton &Finishing “Turn Key ".
- Location: Ras AL- Ghar naval base- Jubail city.
7. Construction of (14) villas in the province of Al- KHAFGI for the Ministry of
Finance since 1/5/2013 till now.
Brief Description of work:
- Description: Construction of (14) villas each villa Consists Of 2 Floors "
Ground +First +Annex " the covered area is (1700m2).
-Owner: Ministry of Finance.
- Period of performance: 24 month.
- Type of work: Skelton &Finishing “Turn Key ".
- Location: AL-KHAFGI.
8. Construction of RESIDENTIAL BUILDING for MAED ALALYANE SONS
COMPANY since 31/5/2012 till now.
Brief Description of work:
- Description: Construction of RESIDENTIAL BUILDING consists of
two basement, ground floor, mezzanine and 7 floors and the built up area
is (18,700 m2).
6. - Owner: MAED ALALYANE SONS COMPANY.
- Period of performance: 24 month.
- Type of work: Skelton &Finishing “Turn Key ".
- Location: Jubail city.
9. Construction of OFFICES FOR Jubail Commission for emergency (GAMAA)
since 1/5/2011 till 15/6/2013.
Brief Description of work:
- Description: Construction of office building consists of 2 floors (ground
and first) and the covered area is (600 m2).
- Owner: GAMAA.
- Period of performance: 24 month.
- Type of work: Skelton &Finishing “Turn Key ".
- Location: Jubail industrial city.
10.Construction of OFFICES FOR Metal facility and rental and maintenance of
equipment for (INERNATIONAL MESHEAAL EST.)Since 15/4/2011 till
15/4/2013.
Brief Description of work:
- Description: Construction of 4 COMMERCIAL Building Each One
Consists of 2 Floors " Ground + first ", the ground floor will be used as
workshops and the first floor will be used as offices and the covered area
is (4000 m2).
- Owner: INERNATIONAL MESHEAAL EST.
- Period of performance: 24 month.
- Type of work: Skelton &Finishing “Turn Key ".
- Location: Jubail industrial city.
11.Construction of Residential Building for Technical Studies Institute in Dammam
since 1/12/2010 till 1/7/2012.
Brief Description of work:
- Description: Construction of 4 Residential Building For The Navy Force
Each One Consists Of 5 Floors “Ground + 4 Floors ".
- Owner: Ministry of defense.
- Period of performance: 19 month.
- Type of work: Skelton &Finishing “Turn Key ".
- Location: Dammam.
7. 12.Construction of TRAINNG SHIP SIMULATION inside King Abdel Aziz navel
base since 1/2/2011 till 1/1/2012.
Brief Description of work:
- Description: Construction of 4 Residential Building For The Navy Force
Each One Consists Of 5 Floors “Ground + 4 Floors ".
- Owner: Ministry of defense.
- Period of performance: 10 month.
- Type of work: Skelton & Plastering.
- Location: king Abdel Aziz naval base- Jubail city.
13.Construction of TRAINNG DOCTORS RESIDENTIAL BUILDING inside king
Abdel Aziz naval base since 1/10/2010 till 1/8/2012.
Brief Description of work:
- Description: Construction of Residential Building For The doctors
Consists of 2 Floors " Ground +First +Annex ".
- Owner: Ministry of defense.
- Period of performance: 22 month.
- Type of work: Skelton &Finishing “Turn Key ".
- Location: king Abdel Aziz naval base- Jubail city.
14.Construction of NURSES RESIDENTIAL BUILDING inside king Abdel Aziz
navel base since 1/10/2010 till 1/2/2012.
Brief Description of work:
- Description: Construction of Residential Building for the Navy Force
Consists Of 2Floors " Ground + First + Annex ".
- Owner: Ministry of defense.
- Period of performance: 16 month.
- Type of work: Skelton &Finishing “Turn Key ".
- Location: king Abdel Aziz naval base- Jubail city.
8. 2-Working in:
Mena for Engineering Consultation & Development since 1/6/2007 till
1/9/2010 in the following projects:
• In main office at the Dept. Of Planning & Monitoring & Tenders (as
planning engineer + technical office engineer) from 1/10/2007 till
10/9/2010.
Duties & Responsibilities:
1. Preparing schedules for projects.
2. Preparing cash flow for projects (cash in – cash out).
3. Monitoring the time schedule & making updates for projects.
4. Preparing & supervision of quantity surveying for all project items.
5. Preparing & supervision of shop drawings.
6. Preparing & revising invoices for both owner & contractors.
7. Managing & supervision of contracts.
8. Supporting upper management with reports for making best decision.
• Arab academy residential buildings in Smouha (as site engineer) till
it were handed to the owner (turn key) from 1/6/2007 till
30/9/2007.
3- Working in:
• Sons of Anis Helmy for Construction & Development since 1/10/2004 till
31/5/2007 in the following project.
• SOL SYERENE RESORT (Sharm El-Sheikh) no. of rooms (250) as
site engineer.
9. 4- Working in:
Mena for Engineering Consultation & Development since 1/3/2003 till
30/9/2004 following projects.
• PALM BEACH RESORT (Ras Seder) no. of villas (320)
• SOL SHARM HOTEL (Sharm El-Sheikh) no. of rooms (220)
• As site engineer then (site engineer + technical office)
5- Summer training in:
• Abu Shabana Contractors Company 2000
• Arab Contractors Company 2001
10. 4- Working in:
Mena for Engineering Consultation & Development since 1/3/2003 till
30/9/2004 following projects.
• PALM BEACH RESORT (Ras Seder) no. of villas (320)
• SOL SHARM HOTEL (Sharm El-Sheikh) no. of rooms (220)
• As site engineer then (site engineer + technical office)
5- Summer training in:
• Abu Shabana Contractors Company 2000
• Arab Contractors Company 2001