SlideShare a Scribd company logo
1 of 10
C.V
Name: Ramy Hassan Attia.
Address: 41branched from Ibrahim Ragy st.-Bolkey-Alex.
Phone: (03)-5467633 .
Mobile: +966593798690
E-mail: ramy_attia33@yahoo.com
_____________________________________________________________
Personal information:
Material state: Married
Date of birth: 3/10/1978
Military status: Final Exemption.
Graduation: Faculty of engineering-Alexandria University
Civil dep. (2002) Grade: pass
Graduation Project: Sanitary Engineering
Grade: EXCELLENT
Language: English: Excellent
French: Fair
Interests and Activities:-
Computer programs: (Office – AutoCAD –Primavera 6.82 – internet skills)
Experience:
1-Working in:
ABD ALLAH SAEED AL GAMDI EST. ( ASGE ) - (K.S.A) since
13/9/2010 till now in the following:
• In main office as the Planning, Monitoring & Cost Control Head
• As a planner for the following projects:
1. PREFABRICATED BUILDINGS AND EQUIPMENT FOR EVACUATION
AREA (608-P12A) since (19-2-2014) till now (as a code 1 approved planner).
Brief Description of work:
1. Procuring, constructing and installing of prefabricated module house port cabins, including all
structural/steel structural / architectural/mechanical (plumbing, fire safety & HVAC) / electrical
works.
2. Procuring and installing facility equipment, generators, panel boards and tanks.
3. Connecting all port cabins and equipment with existing site infrastructure and commissioning of all
items.
• Owner: Royal Commission of Jubail & Yanbu.
• Period of performance: 10 month.
• Type of work: buildings.
• Location: Jubail industrial city.
2. Construction of Royal Commission O&M CENTERS PHASE II contract no.
(537-CO3R) since 3/7/2013 till now (as a code 1 approved planner).
Brief Description of work:
• SITE DEVELOPMENT( infra structure , roads , landscape and hardscape) with a total
area of ( 57,665 m2)which are:
1. MAIN ROAD 2
2. ROAD 3 & PARKING AREA (R-A,R-B,R-C)
3. ROAD 4 A, 4 & 5
4. ROAD 6,7,8,9,10,11&12
5. MAIN ROAD 1
6. LIFT STATION
7. SUBSTATION
8. CONNECTION TO MAIN ( TIE IN )
9. STOCK YARD
• CONSTRUCTION OF BUILDING with a total of built up area of ( 6,621 m2) which are:
1. ROYAL COMMISSION & CONTRACTOR'S OFFICE BUILDING =1,468 m2
2. MOSQUE = 171 m2
3. MAINTENANCE SHOPS = 609 m2
4. EXTERNAL STORAGE =459 m2
5. WAREHOUSE =1,552 m2
6. MECHANICAL WORKSHOP = 1,940 m2
7. REFUELING STATION =266 m2
8. STORAGE ROOMS = 137 m2
9. GUARD HOUSE = 19 m2
• Owner: Royal Commission of Jubail & Yanbu.
• Period of performance: 18 month.
• Type of work: buildings.
• Location: Jubail industrial city.
3. Rehabilitation of Royal Commission public facilities contract no. (608-C10) since
1/9/2012 till now.
Brief Description of work:
- Description: Material procurement and construction/rehabilitation of (12)
Royal Commission public facilities and structures.
- Owner: Royal Commission of Jubail & Yanbu.
- Period of performance: 24 month.
- Type of work: Rehabilitation.
- Location: Jubail industrial city.
4. Construction of the Military Police College building the King Abdul Aziz Naval
base in Jubail since 21/1/2013 till now.
Brief Description of work:
- Description: office building consists of3 floors (ground and first and
second), site development, landscaping, hardscaping , parking area and
roads and the covered area is( 31200 m2 ) .
- Owner: Ministry of defense.
- Period of performance: 18 month.
- Type of work: Skelton &Finishing “Turn Key ".
- Location: king Abdel Aziz naval base- Jubail city.
5. Construction of EXPANSION OF EXISTING TRAINING BUILDING,
CANTEEN BUILDING, MAIN ENTRANCE GATE # 01 & FIRE STATION @
AL WAHA PLANT PROJECT since 28/1/2013 till now.
Brief Description of work:
- Description: work expansion of training building and CANTEEN
BUILDING (construction work and finishing) and construct a FIRE
STATION building with an area of (410 m 2) and the building is
composed of two part one for fire trucks and the other part is offices area
(construction and finishing work) and the establishment of the umbrella
of the main entrance (installations, and lighting).
-Owner: Sahara Petrochemicals. .
- Period of performance: 13.5 month.
- Type of work: Skelton &Finishing “Turn Key ".
- Location: Jubail industrial city.
6. Construction of the Infantry School at military Port of Ras AL- Ghar, since
21/1/2013 till now.
Brief Description of work:
- Description: office building consists of 2 floors (ground and first) and the
covered area is (1200 m2).
- Owner: Ministry of defense.
- Period of performance: 18 month.
- Type of work: Skelton &Finishing “Turn Key ".
- Location: Ras AL- Ghar naval base- Jubail city.
7. Construction of (14) villas in the province of Al- KHAFGI for the Ministry of
Finance since 1/5/2013 till now.
Brief Description of work:
- Description: Construction of (14) villas each villa Consists Of 2 Floors "
Ground +First +Annex " the covered area is (1700m2).
-Owner: Ministry of Finance.
- Period of performance: 24 month.
- Type of work: Skelton &Finishing “Turn Key ".
- Location: AL-KHAFGI.
8. Construction of RESIDENTIAL BUILDING for MAED ALALYANE SONS
COMPANY since 31/5/2012 till now.
Brief Description of work:
- Description: Construction of RESIDENTIAL BUILDING consists of
two basement, ground floor, mezzanine and 7 floors and the built up area
is (18,700 m2).
- Owner: MAED ALALYANE SONS COMPANY.
- Period of performance: 24 month.
- Type of work: Skelton &Finishing “Turn Key ".
- Location: Jubail city.
9. Construction of OFFICES FOR Jubail Commission for emergency (GAMAA)
since 1/5/2011 till 15/6/2013.
Brief Description of work:
- Description: Construction of office building consists of 2 floors (ground
and first) and the covered area is (600 m2).
- Owner: GAMAA.
- Period of performance: 24 month.
- Type of work: Skelton &Finishing “Turn Key ".
- Location: Jubail industrial city.
10.Construction of OFFICES FOR Metal facility and rental and maintenance of
equipment for (INERNATIONAL MESHEAAL EST.)Since 15/4/2011 till
15/4/2013.
Brief Description of work:
- Description: Construction of 4 COMMERCIAL Building Each One
Consists of 2 Floors " Ground + first ", the ground floor will be used as
workshops and the first floor will be used as offices and the covered area
is (4000 m2).
- Owner: INERNATIONAL MESHEAAL EST.
- Period of performance: 24 month.
- Type of work: Skelton &Finishing “Turn Key ".
- Location: Jubail industrial city.
11.Construction of Residential Building for Technical Studies Institute in Dammam
since 1/12/2010 till 1/7/2012.
Brief Description of work:
- Description: Construction of 4 Residential Building For The Navy Force
Each One Consists Of 5 Floors “Ground + 4 Floors ".
- Owner: Ministry of defense.
- Period of performance: 19 month.
- Type of work: Skelton &Finishing “Turn Key ".
- Location: Dammam.
12.Construction of TRAINNG SHIP SIMULATION inside King Abdel Aziz navel
base since 1/2/2011 till 1/1/2012.
Brief Description of work:
- Description: Construction of 4 Residential Building For The Navy Force
Each One Consists Of 5 Floors “Ground + 4 Floors ".
- Owner: Ministry of defense.
- Period of performance: 10 month.
- Type of work: Skelton & Plastering.
- Location: king Abdel Aziz naval base- Jubail city.
13.Construction of TRAINNG DOCTORS RESIDENTIAL BUILDING inside king
Abdel Aziz naval base since 1/10/2010 till 1/8/2012.
Brief Description of work:
- Description: Construction of Residential Building For The doctors
Consists of 2 Floors " Ground +First +Annex ".
- Owner: Ministry of defense.
- Period of performance: 22 month.
- Type of work: Skelton &Finishing “Turn Key ".
- Location: king Abdel Aziz naval base- Jubail city.
14.Construction of NURSES RESIDENTIAL BUILDING inside king Abdel Aziz
navel base since 1/10/2010 till 1/2/2012.
Brief Description of work:
- Description: Construction of Residential Building for the Navy Force
Consists Of 2Floors " Ground + First + Annex ".
- Owner: Ministry of defense.
- Period of performance: 16 month.
- Type of work: Skelton &Finishing “Turn Key ".
- Location: king Abdel Aziz naval base- Jubail city.
2-Working in:
Mena for Engineering Consultation & Development since 1/6/2007 till
1/9/2010 in the following projects:
• In main office at the Dept. Of Planning & Monitoring & Tenders (as
planning engineer + technical office engineer) from 1/10/2007 till
10/9/2010.
Duties & Responsibilities:
1. Preparing schedules for projects.
2. Preparing cash flow for projects (cash in – cash out).
3. Monitoring the time schedule & making updates for projects.
4. Preparing & supervision of quantity surveying for all project items.
5. Preparing & supervision of shop drawings.
6. Preparing & revising invoices for both owner & contractors.
7. Managing & supervision of contracts.
8. Supporting upper management with reports for making best decision.
• Arab academy residential buildings in Smouha (as site engineer) till
it were handed to the owner (turn key) from 1/6/2007 till
30/9/2007.
3- Working in:
• Sons of Anis Helmy for Construction & Development since 1/10/2004 till
31/5/2007 in the following project.
• SOL SYERENE RESORT (Sharm El-Sheikh) no. of rooms (250) as
site engineer.
4- Working in:
Mena for Engineering Consultation & Development since 1/3/2003 till
30/9/2004 following projects.
• PALM BEACH RESORT (Ras Seder) no. of villas (320)
• SOL SHARM HOTEL (Sharm El-Sheikh) no. of rooms (220)
• As site engineer then (site engineer + technical office)
5- Summer training in:
• Abu Shabana Contractors Company 2000
• Arab Contractors Company 2001
4- Working in:
Mena for Engineering Consultation & Development since 1/3/2003 till
30/9/2004 following projects.
• PALM BEACH RESORT (Ras Seder) no. of villas (320)
• SOL SHARM HOTEL (Sharm El-Sheikh) no. of rooms (220)
• As site engineer then (site engineer + technical office)
5- Summer training in:
• Abu Shabana Contractors Company 2000
• Arab Contractors Company 2001

More Related Content

What's hot (20)

elsayed cv last
elsayed cv lastelsayed cv last
elsayed cv last
 
CV - Civil Enginner - Amr Atef - English - 2017
CV - Civil Enginner - Amr Atef - English - 2017CV - Civil Enginner - Amr Atef - English - 2017
CV - Civil Enginner - Amr Atef - English - 2017
 
civil engr Ali elmahdyC. V
civil engr Ali elmahdyC. Vcivil engr Ali elmahdyC. V
civil engr Ali elmahdyC. V
 
mohamed salem cv final
mohamed salem cv finalmohamed salem cv final
mohamed salem cv final
 
CV
CVCV
CV
 
Mohammed Obaidat CV-NEW -PDF
Mohammed Obaidat CV-NEW -PDFMohammed Obaidat CV-NEW -PDF
Mohammed Obaidat CV-NEW -PDF
 
Ahmed el gohary cv
Ahmed el gohary cvAhmed el gohary cv
Ahmed el gohary cv
 
ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)
 
My Resume Full
My Resume FullMy Resume Full
My Resume Full
 
Cv @Ali maruoof
Cv @Ali maruoofCv @Ali maruoof
Cv @Ali maruoof
 
Civil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastCivil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter last
 
aldarat
aldarataldarat
aldarat
 
Adam Bonnell Resume
Adam Bonnell ResumeAdam Bonnell Resume
Adam Bonnell Resume
 
CV AR 2015
CV AR 2015CV AR 2015
CV AR 2015
 
my cv
my cvmy cv
my cv
 
Hassan youssef c vs
Hassan youssef c vsHassan youssef c vs
Hassan youssef c vs
 
hassan aly
hassan aly hassan aly
hassan aly
 
Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1 Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1
 
osama C.V
osama  C.V osama  C.V
osama C.V
 
Ibrahim_Abdelkhalig_Curriculum_vitae_(2)
Ibrahim_Abdelkhalig_Curriculum_vitae_(2) Ibrahim_Abdelkhalig_Curriculum_vitae_(2)
Ibrahim_Abdelkhalig_Curriculum_vitae_(2)
 

Viewers also liked

Gujarat persecuting people through greedy governance
Gujarat persecuting people through greedy governanceGujarat persecuting people through greedy governance
Gujarat persecuting people through greedy governancebjpexposed
 
El baloncesto a fondo
El baloncesto a fondoEl baloncesto a fondo
El baloncesto a fondoNachand
 
Lanuovagastronomia catalogo
Lanuovagastronomia catalogoLanuovagastronomia catalogo
Lanuovagastronomia catalogoClaudio BELOTTI
 
Calypso testimonial: GPS for the Body, directing cancer treatment
Calypso testimonial: GPS for the Body, directing cancer treatmentCalypso testimonial: GPS for the Body, directing cancer treatment
Calypso testimonial: GPS for the Body, directing cancer treatmentInterCommunity Cancer Institute
 
Reglamentodelconcursoelectrosnow
ReglamentodelconcursoelectrosnowReglamentodelconcursoelectrosnow
Reglamentodelconcursoelectrosnowfrancisconixon
 
Geef de macht terug aan het volk
Geef de macht terug aan het volkGeef de macht terug aan het volk
Geef de macht terug aan het volkMatthijs Pontier
 
Aprendizaje electrónico y cultura digital
Aprendizaje electrónico y cultura digitalAprendizaje electrónico y cultura digital
Aprendizaje electrónico y cultura digitalJosé Luis
 
Target audience profile
Target audience profileTarget audience profile
Target audience profilejemmalauren123
 
Q1. IN WHAT WAYS DOES YOUR MEDIA PRODUCT USE, DEVELOP OR CHALLENGE FORMS AND ...
Q1. IN WHAT WAYS DOES YOUR MEDIA PRODUCT USE, DEVELOP OR CHALLENGE FORMS AND ...Q1. IN WHAT WAYS DOES YOUR MEDIA PRODUCT USE, DEVELOP OR CHALLENGE FORMS AND ...
Q1. IN WHAT WAYS DOES YOUR MEDIA PRODUCT USE, DEVELOP OR CHALLENGE FORMS AND ...TashikaBailey
 
Manual con anexos para utilizar slideshare feli y sandra.
Manual con anexos para utilizar slideshare feli y sandra.Manual con anexos para utilizar slideshare feli y sandra.
Manual con anexos para utilizar slideshare feli y sandra.arroyosandra
 
Palabras y expresiones fuengirola (málaga)
Palabras y expresiones fuengirola (málaga)Palabras y expresiones fuengirola (málaga)
Palabras y expresiones fuengirola (málaga)Irene Ferrero
 
Luminarias que ahorran energía y dinero
Luminarias que ahorran energía y dineroLuminarias que ahorran energía y dinero
Luminarias que ahorran energía y dineroEnerdyne
 
USMC PEO LS Advanced Technology Investment Plan
USMC PEO LS Advanced Technology Investment PlanUSMC PEO LS Advanced Technology Investment Plan
USMC PEO LS Advanced Technology Investment PlanTom "Blad" Lindblad
 

Viewers also liked (20)

Gujarat persecuting people through greedy governance
Gujarat persecuting people through greedy governanceGujarat persecuting people through greedy governance
Gujarat persecuting people through greedy governance
 
El baloncesto a fondo
El baloncesto a fondoEl baloncesto a fondo
El baloncesto a fondo
 
Mapas 26 02 2013
Mapas 26 02 2013Mapas 26 02 2013
Mapas 26 02 2013
 
Nghe bao
Nghe baoNghe bao
Nghe bao
 
Lanuovagastronomia catalogo
Lanuovagastronomia catalogoLanuovagastronomia catalogo
Lanuovagastronomia catalogo
 
Dr. holasek press release final
Dr. holasek press release finalDr. holasek press release final
Dr. holasek press release final
 
Presentatie Delicious
Presentatie DeliciousPresentatie Delicious
Presentatie Delicious
 
Calypso testimonial: GPS for the Body, directing cancer treatment
Calypso testimonial: GPS for the Body, directing cancer treatmentCalypso testimonial: GPS for the Body, directing cancer treatment
Calypso testimonial: GPS for the Body, directing cancer treatment
 
Reglamentodelconcursoelectrosnow
ReglamentodelconcursoelectrosnowReglamentodelconcursoelectrosnow
Reglamentodelconcursoelectrosnow
 
Geef de macht terug aan het volk
Geef de macht terug aan het volkGeef de macht terug aan het volk
Geef de macht terug aan het volk
 
Aprendizaje electrónico y cultura digital
Aprendizaje electrónico y cultura digitalAprendizaje electrónico y cultura digital
Aprendizaje electrónico y cultura digital
 
Target audience profile
Target audience profileTarget audience profile
Target audience profile
 
Q1. IN WHAT WAYS DOES YOUR MEDIA PRODUCT USE, DEVELOP OR CHALLENGE FORMS AND ...
Q1. IN WHAT WAYS DOES YOUR MEDIA PRODUCT USE, DEVELOP OR CHALLENGE FORMS AND ...Q1. IN WHAT WAYS DOES YOUR MEDIA PRODUCT USE, DEVELOP OR CHALLENGE FORMS AND ...
Q1. IN WHAT WAYS DOES YOUR MEDIA PRODUCT USE, DEVELOP OR CHALLENGE FORMS AND ...
 
Breast Cancer Treatment Options
Breast Cancer Treatment OptionsBreast Cancer Treatment Options
Breast Cancer Treatment Options
 
Manual con anexos para utilizar slideshare feli y sandra.
Manual con anexos para utilizar slideshare feli y sandra.Manual con anexos para utilizar slideshare feli y sandra.
Manual con anexos para utilizar slideshare feli y sandra.
 
01 a - informação
01   a - informação01   a - informação
01 a - informação
 
Palabras y expresiones fuengirola (málaga)
Palabras y expresiones fuengirola (málaga)Palabras y expresiones fuengirola (málaga)
Palabras y expresiones fuengirola (málaga)
 
CRECIMIENTO DEL SER PARA EL LIDERAZGO
CRECIMIENTO DEL SER PARA EL LIDERAZGOCRECIMIENTO DEL SER PARA EL LIDERAZGO
CRECIMIENTO DEL SER PARA EL LIDERAZGO
 
Luminarias que ahorran energía y dinero
Luminarias que ahorran energía y dineroLuminarias que ahorran energía y dinero
Luminarias que ahorran energía y dinero
 
USMC PEO LS Advanced Technology Investment Plan
USMC PEO LS Advanced Technology Investment PlanUSMC PEO LS Advanced Technology Investment Plan
USMC PEO LS Advanced Technology Investment Plan
 

Similar to Eng._Ramy_Hassan_Attia_C.V (11-3-2015)

Similar to Eng._Ramy_Hassan_Attia_C.V (11-3-2015) (20)

Engr._Fahad_CV[1]
Engr._Fahad_CV[1]Engr._Fahad_CV[1]
Engr._Fahad_CV[1]
 
modified cv khaled
modified  cv khaledmodified  cv khaled
modified cv khaled
 
Hendawy ragabb cv update 21 6 2015
Hendawy ragabb cv update 21   6   2015Hendawy ragabb cv update 21   6   2015
Hendawy ragabb cv update 21 6 2015
 
cv 8-8-2016
cv 8-8-2016cv 8-8-2016
cv 8-8-2016
 
Ayad Fakhery Karass2013
Ayad Fakhery Karass2013Ayad Fakhery Karass2013
Ayad Fakhery Karass2013
 
Hesham ELdieushy 2016
Hesham ELdieushy 2016Hesham ELdieushy 2016
Hesham ELdieushy 2016
 
Samy Gaber CV sep18
Samy Gaber CV sep18Samy Gaber CV sep18
Samy Gaber CV sep18
 
-----ENGLISH--HESHAM-C.V
-----ENGLISH--HESHAM-C.V-----ENGLISH--HESHAM-C.V
-----ENGLISH--HESHAM-C.V
 
Mahmoud Abou-Elhamd
Mahmoud Abou-ElhamdMahmoud Abou-Elhamd
Mahmoud Abou-Elhamd
 
Mahmoud Abou-Elhamd
Mahmoud Abou-ElhamdMahmoud Abou-Elhamd
Mahmoud Abou-Elhamd
 
Mahmoud Abou-Elhamd
Mahmoud Abou-ElhamdMahmoud Abou-Elhamd
Mahmoud Abou-Elhamd
 
Mahmoud Abou EL-Hmad
Mahmoud Abou EL-HmadMahmoud Abou EL-Hmad
Mahmoud Abou EL-Hmad
 
george nasralla CV
george nasralla CVgeorge nasralla CV
george nasralla CV
 
CV_M ASKAR 2017
CV_M ASKAR 2017CV_M ASKAR 2017
CV_M ASKAR 2017
 
Abd El-Rahman Wakeb CV
Abd El-Rahman Wakeb CVAbd El-Rahman Wakeb CV
Abd El-Rahman Wakeb CV
 
EMAD ABDELAZIM CV 2016
EMAD ABDELAZIM CV 2016EMAD ABDELAZIM CV 2016
EMAD ABDELAZIM CV 2016
 
eng_hanykamel1976-2
eng_hanykamel1976-2eng_hanykamel1976-2
eng_hanykamel1976-2
 
Mohamed Magdy
Mohamed MagdyMohamed Magdy
Mohamed Magdy
 
cv_AHMED 2016-EGY1
cv_AHMED 2016-EGY1cv_AHMED 2016-EGY1
cv_AHMED 2016-EGY1
 
hosam cv english 1
hosam cv english 1hosam cv english 1
hosam cv english 1
 

Eng._Ramy_Hassan_Attia_C.V (11-3-2015)

  • 1. C.V Name: Ramy Hassan Attia. Address: 41branched from Ibrahim Ragy st.-Bolkey-Alex. Phone: (03)-5467633 . Mobile: +966593798690 E-mail: ramy_attia33@yahoo.com _____________________________________________________________ Personal information: Material state: Married Date of birth: 3/10/1978 Military status: Final Exemption. Graduation: Faculty of engineering-Alexandria University Civil dep. (2002) Grade: pass Graduation Project: Sanitary Engineering Grade: EXCELLENT Language: English: Excellent French: Fair Interests and Activities:- Computer programs: (Office – AutoCAD –Primavera 6.82 – internet skills) Experience:
  • 2. 1-Working in: ABD ALLAH SAEED AL GAMDI EST. ( ASGE ) - (K.S.A) since 13/9/2010 till now in the following: • In main office as the Planning, Monitoring & Cost Control Head • As a planner for the following projects: 1. PREFABRICATED BUILDINGS AND EQUIPMENT FOR EVACUATION AREA (608-P12A) since (19-2-2014) till now (as a code 1 approved planner). Brief Description of work: 1. Procuring, constructing and installing of prefabricated module house port cabins, including all structural/steel structural / architectural/mechanical (plumbing, fire safety & HVAC) / electrical works. 2. Procuring and installing facility equipment, generators, panel boards and tanks. 3. Connecting all port cabins and equipment with existing site infrastructure and commissioning of all items. • Owner: Royal Commission of Jubail & Yanbu. • Period of performance: 10 month. • Type of work: buildings.
  • 3. • Location: Jubail industrial city. 2. Construction of Royal Commission O&M CENTERS PHASE II contract no. (537-CO3R) since 3/7/2013 till now (as a code 1 approved planner). Brief Description of work: • SITE DEVELOPMENT( infra structure , roads , landscape and hardscape) with a total area of ( 57,665 m2)which are: 1. MAIN ROAD 2 2. ROAD 3 & PARKING AREA (R-A,R-B,R-C) 3. ROAD 4 A, 4 & 5 4. ROAD 6,7,8,9,10,11&12 5. MAIN ROAD 1 6. LIFT STATION 7. SUBSTATION 8. CONNECTION TO MAIN ( TIE IN ) 9. STOCK YARD • CONSTRUCTION OF BUILDING with a total of built up area of ( 6,621 m2) which are: 1. ROYAL COMMISSION & CONTRACTOR'S OFFICE BUILDING =1,468 m2 2. MOSQUE = 171 m2 3. MAINTENANCE SHOPS = 609 m2 4. EXTERNAL STORAGE =459 m2 5. WAREHOUSE =1,552 m2 6. MECHANICAL WORKSHOP = 1,940 m2 7. REFUELING STATION =266 m2 8. STORAGE ROOMS = 137 m2 9. GUARD HOUSE = 19 m2 • Owner: Royal Commission of Jubail & Yanbu. • Period of performance: 18 month.
  • 4. • Type of work: buildings. • Location: Jubail industrial city. 3. Rehabilitation of Royal Commission public facilities contract no. (608-C10) since 1/9/2012 till now. Brief Description of work: - Description: Material procurement and construction/rehabilitation of (12) Royal Commission public facilities and structures. - Owner: Royal Commission of Jubail & Yanbu. - Period of performance: 24 month. - Type of work: Rehabilitation. - Location: Jubail industrial city. 4. Construction of the Military Police College building the King Abdul Aziz Naval base in Jubail since 21/1/2013 till now. Brief Description of work: - Description: office building consists of3 floors (ground and first and second), site development, landscaping, hardscaping , parking area and roads and the covered area is( 31200 m2 ) . - Owner: Ministry of defense. - Period of performance: 18 month. - Type of work: Skelton &Finishing “Turn Key ". - Location: king Abdel Aziz naval base- Jubail city. 5. Construction of EXPANSION OF EXISTING TRAINING BUILDING, CANTEEN BUILDING, MAIN ENTRANCE GATE # 01 & FIRE STATION @ AL WAHA PLANT PROJECT since 28/1/2013 till now.
  • 5. Brief Description of work: - Description: work expansion of training building and CANTEEN BUILDING (construction work and finishing) and construct a FIRE STATION building with an area of (410 m 2) and the building is composed of two part one for fire trucks and the other part is offices area (construction and finishing work) and the establishment of the umbrella of the main entrance (installations, and lighting). -Owner: Sahara Petrochemicals. . - Period of performance: 13.5 month. - Type of work: Skelton &Finishing “Turn Key ". - Location: Jubail industrial city. 6. Construction of the Infantry School at military Port of Ras AL- Ghar, since 21/1/2013 till now. Brief Description of work: - Description: office building consists of 2 floors (ground and first) and the covered area is (1200 m2). - Owner: Ministry of defense. - Period of performance: 18 month. - Type of work: Skelton &Finishing “Turn Key ". - Location: Ras AL- Ghar naval base- Jubail city. 7. Construction of (14) villas in the province of Al- KHAFGI for the Ministry of Finance since 1/5/2013 till now. Brief Description of work: - Description: Construction of (14) villas each villa Consists Of 2 Floors " Ground +First +Annex " the covered area is (1700m2). -Owner: Ministry of Finance. - Period of performance: 24 month. - Type of work: Skelton &Finishing “Turn Key ". - Location: AL-KHAFGI. 8. Construction of RESIDENTIAL BUILDING for MAED ALALYANE SONS COMPANY since 31/5/2012 till now. Brief Description of work: - Description: Construction of RESIDENTIAL BUILDING consists of two basement, ground floor, mezzanine and 7 floors and the built up area is (18,700 m2).
  • 6. - Owner: MAED ALALYANE SONS COMPANY. - Period of performance: 24 month. - Type of work: Skelton &Finishing “Turn Key ". - Location: Jubail city. 9. Construction of OFFICES FOR Jubail Commission for emergency (GAMAA) since 1/5/2011 till 15/6/2013. Brief Description of work: - Description: Construction of office building consists of 2 floors (ground and first) and the covered area is (600 m2). - Owner: GAMAA. - Period of performance: 24 month. - Type of work: Skelton &Finishing “Turn Key ". - Location: Jubail industrial city. 10.Construction of OFFICES FOR Metal facility and rental and maintenance of equipment for (INERNATIONAL MESHEAAL EST.)Since 15/4/2011 till 15/4/2013. Brief Description of work: - Description: Construction of 4 COMMERCIAL Building Each One Consists of 2 Floors " Ground + first ", the ground floor will be used as workshops and the first floor will be used as offices and the covered area is (4000 m2). - Owner: INERNATIONAL MESHEAAL EST. - Period of performance: 24 month. - Type of work: Skelton &Finishing “Turn Key ". - Location: Jubail industrial city. 11.Construction of Residential Building for Technical Studies Institute in Dammam since 1/12/2010 till 1/7/2012. Brief Description of work: - Description: Construction of 4 Residential Building For The Navy Force Each One Consists Of 5 Floors “Ground + 4 Floors ". - Owner: Ministry of defense. - Period of performance: 19 month. - Type of work: Skelton &Finishing “Turn Key ". - Location: Dammam.
  • 7. 12.Construction of TRAINNG SHIP SIMULATION inside King Abdel Aziz navel base since 1/2/2011 till 1/1/2012. Brief Description of work: - Description: Construction of 4 Residential Building For The Navy Force Each One Consists Of 5 Floors “Ground + 4 Floors ". - Owner: Ministry of defense. - Period of performance: 10 month. - Type of work: Skelton & Plastering. - Location: king Abdel Aziz naval base- Jubail city. 13.Construction of TRAINNG DOCTORS RESIDENTIAL BUILDING inside king Abdel Aziz naval base since 1/10/2010 till 1/8/2012. Brief Description of work: - Description: Construction of Residential Building For The doctors Consists of 2 Floors " Ground +First +Annex ". - Owner: Ministry of defense. - Period of performance: 22 month. - Type of work: Skelton &Finishing “Turn Key ". - Location: king Abdel Aziz naval base- Jubail city. 14.Construction of NURSES RESIDENTIAL BUILDING inside king Abdel Aziz navel base since 1/10/2010 till 1/2/2012. Brief Description of work: - Description: Construction of Residential Building for the Navy Force Consists Of 2Floors " Ground + First + Annex ". - Owner: Ministry of defense. - Period of performance: 16 month. - Type of work: Skelton &Finishing “Turn Key ". - Location: king Abdel Aziz naval base- Jubail city.
  • 8. 2-Working in: Mena for Engineering Consultation & Development since 1/6/2007 till 1/9/2010 in the following projects: • In main office at the Dept. Of Planning & Monitoring & Tenders (as planning engineer + technical office engineer) from 1/10/2007 till 10/9/2010. Duties & Responsibilities: 1. Preparing schedules for projects. 2. Preparing cash flow for projects (cash in – cash out). 3. Monitoring the time schedule & making updates for projects. 4. Preparing & supervision of quantity surveying for all project items. 5. Preparing & supervision of shop drawings. 6. Preparing & revising invoices for both owner & contractors. 7. Managing & supervision of contracts. 8. Supporting upper management with reports for making best decision. • Arab academy residential buildings in Smouha (as site engineer) till it were handed to the owner (turn key) from 1/6/2007 till 30/9/2007. 3- Working in: • Sons of Anis Helmy for Construction & Development since 1/10/2004 till 31/5/2007 in the following project. • SOL SYERENE RESORT (Sharm El-Sheikh) no. of rooms (250) as site engineer.
  • 9. 4- Working in: Mena for Engineering Consultation & Development since 1/3/2003 till 30/9/2004 following projects. • PALM BEACH RESORT (Ras Seder) no. of villas (320) • SOL SHARM HOTEL (Sharm El-Sheikh) no. of rooms (220) • As site engineer then (site engineer + technical office) 5- Summer training in: • Abu Shabana Contractors Company 2000 • Arab Contractors Company 2001
  • 10. 4- Working in: Mena for Engineering Consultation & Development since 1/3/2003 till 30/9/2004 following projects. • PALM BEACH RESORT (Ras Seder) no. of villas (320) • SOL SHARM HOTEL (Sharm El-Sheikh) no. of rooms (220) • As site engineer then (site engineer + technical office) 5- Summer training in: • Abu Shabana Contractors Company 2000 • Arab Contractors Company 2001