Risk Assessment
Producer: Katie Snook ProductionDetails: Filming
Types of Risk: PersonalInjury /Health & Safety / Damage to equipment/ Halting Production
RiskType Detailsof Risk Ways to minimiserisk Person(s) Responsible
Trippingovertree logs. I am filmingnearatrain track withlotsof
loose tree trunksandtherefore there isarisk
of tippingover.
Ensuring the space where we filmisclearbefore
we begintofilm
Katie
Batteryof camera
dying
The camera couldbe leftonor not pre
chargedand therefore die.
Ensure enoughtime isleftincase needingtore
charge andre film.
Make sure the camera isn’tleftonwhenit’snot
inuse.
Katie
Weatherconditions Unfortunate change inweathercould
preventme notbeingable tofilm,egrain.
Filminmy inside locationtopreventwasting
time.
Katie
Damage to equipment Due to usinga varietyof equipmentthere isa
riskof some beingbroken.
Making sure that equipmentisneverleft
unattended.