This document is intended as a basic template to assist in the completion of a risk assessment for film production activities.
Detailed information is available from a variety of risk management and risk assessment specialists. Useful information can also be obtained
from the Health & Safety Executive www.hse.gov.uk
When conducting a risk assessment, consider all the likely hazards; who may be harmed, property which may be damaged, and the controls
already in place. Then, for each likely hazard, bearing in mind the controls already in place, record the ‘risk assessment’ level. The further
action(s) to be considered will be determined by the level of risk assessment.
HAZARD IN WHICH SCENE
IS THIS HAZARD
PRESENT?
PERSON WHO MAY
BE HARMED
PROPERTY THAT
COULD BE
DAMAGED
RISK CONTROLS
ALREADY INPLACE
RISK ASSESSMENT
*See chart
FURTHER ACTION
TO BE TAKEN
Tripping/Slipping This hazard can
take place within
any scene.
All crew/Actors Possible damage to
Camera
As thereis a high
chancein tripping,
especially within
filming onthe
stairway thecrew
memberswill have
to takeextra
precautionsuchas
the useof the
bannister,aswell
there will alwaysbe
somethingcloseto
the crew membersto
graba holdof in
case of emergency
High The production
team will be there
to help reduce the
risk of tripping by
pointing out any
dangers that may
result in tripping.
Cutting one’s self This hazard can
take place within
All crew/actors N/A There is a possible
chance that a crew
Low For extra
precaution, all crew
any scene but
especially in the
final scene.
member may cut
themselves, this
could be from
outside or just on a
sharp edge so in
order to prevent
crew members will
stay away from
sharp objects and
keep an eye out for
anything which crew
may cut themselves
on outside
members will point
out anything which
may cause harm to
another crew
member.
Time Pressure This hazard can
take place within
any scene.
N/A Camera Equipment
as well as myself
or/and the people I
am with
With little time for
filming, there is a
risk that I may run
out of time of have
very little time to
film so by rushing I
could cause harm to
myself and/orothers
around me, in order
prevent this I will
allocate time within
the shooting
schedule so that I do
not run out of time
Moderate The use of the
shooting schedule
will help allocate
time to each scene
however in the
ofchancethatImay
run out of time, I
will allocate extra
time for filming just
in case.
Running out of
battery
This hazard can
take place within
any scene.
N/A N/A The risk that the
camera may run out
of battery would
cause problems
within the shooting
schedule and
Moderate As an extra
precaution, I will
include a sparefully
charged battery
just on the off
chance that the
thereforerunthe risk
of running out of
time, in order to
prevent this I will
charge the camera
overnight before
filming so that the
camera is ready to
go.
camera ends up
running out of
battery
Dropping the
camera
This hazard can
take place within
any scene.
N/A Camera +
Equipment
The chance of
droppingthecamera
can be quite high
due to doing some
special shots so in
order to prevent this
I will keep both
handsonthecamera
andonly take oneoff
if necessary.
Low As an extra
precaution, along
with the camera
comes a strap so I
will wear this
around my neck to
ensurethe safetyof
the camera
Falling down stairs This hazard may
take place within
any scene but
especially within
scene 4.
Myself + Crew
members
Camera +
Equipment
With filming a scene
on the stairway,
there is a risk that
either the
actor/crew may fall
and injure
themselves so to
prevent the
production team
must have hands on
the banisters as well
as paying attention
on where they are
walking
High For extra
precaution encase
a crew member
falls, there will be
someonein front to
catch along with
someone behind
them for support.
Risk AssessmentChart
Hazard likelihood/Consequences RISK ASSESSMENT
VERY LIKELY TO HAPPEN or SEVERE CONSEQUENCES(ie.Someone couldget
seriouslyhurt)
EXTREME
Couldhappenormildconsequences(i.e.someone couldsufferaminor
injury)
HIGH
Unlikelytohappenorminorconsequences(i.e.productioncouldbe slightly
delayed)
MODERATE
Rarelyhappensandveryinsignificantconsequences LOW

More Related Content

What's hot

Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessmentconner3326
 
Photography Shoot Risk Assessment Portrait
Photography Shoot Risk Assessment PortraitPhotography Shoot Risk Assessment Portrait
Photography Shoot Risk Assessment Portrait
emilyaldredd
 
Risks assessment – tv studio
Risks assessment – tv studioRisks assessment – tv studio
Risks assessment – tv studio
bethanglover
 
Landscape photography shoot risk assessment form
Landscape photography shoot risk assessment formLandscape photography shoot risk assessment form
Landscape photography shoot risk assessment form
LouiseMaher18
 
Photography shoot risk assessment form (3)
Photography shoot risk assessment form (3)Photography shoot risk assessment form (3)
Photography shoot risk assessment form (3)
ShannonOrr
 
Risks assessment – tv studio
Risks assessment – tv studioRisks assessment – tv studio
Risks assessment – tv studio
bethanglover
 
Risk assessment media task
Risk assessment media taskRisk assessment media task
Risk assessment media taskBenjehmayo
 
Risks assessment – tv studio
Risks assessment – tv studioRisks assessment – tv studio
Risks assessment – tv studio
bethanglover
 
Photography shoot risk assessment form landscape
Photography shoot risk assessment form landscapePhotography shoot risk assessment form landscape
Photography shoot risk assessment form landscape
danielharrison12
 
Portrait risk assessment
Portrait risk assessmentPortrait risk assessment
Portrait risk assessmentSarahMurrayy
 
Equine shoot risk assessment form
Equine shoot risk assessment formEquine shoot risk assessment form
Equine shoot risk assessment form
ShannonOrr
 
Portrait photography shoot risk assessment form
Portrait photography shoot risk assessment formPortrait photography shoot risk assessment form
Portrait photography shoot risk assessment form
RoseBishay
 
Photography shoot risk assessment form (1)
Photography shoot risk assessment form (1)Photography shoot risk assessment form (1)
Photography shoot risk assessment form (1)
danhops888
 
Photography shoot risk assessment form (2)
Photography shoot risk assessment form (2)Photography shoot risk assessment form (2)
Photography shoot risk assessment form (2)
ShannonOrr
 
Film opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment formFilm opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment formDeclanTyldsley
 
Landscape photography risk assessment
Landscape photography risk assessmentLandscape photography risk assessment
Landscape photography risk assessment
reecemechan
 
Dslr workshop camera audit form blank 2019
Dslr workshop camera audit form blank 2019Dslr workshop camera audit form blank 2019
Dslr workshop camera audit form blank 2019
Jamescooperabel1
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
GillyFerries
 

What's hot (19)

Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Photography Shoot Risk Assessment Portrait
Photography Shoot Risk Assessment PortraitPhotography Shoot Risk Assessment Portrait
Photography Shoot Risk Assessment Portrait
 
Risks assessment – tv studio
Risks assessment – tv studioRisks assessment – tv studio
Risks assessment – tv studio
 
Landscape photography shoot risk assessment form
Landscape photography shoot risk assessment formLandscape photography shoot risk assessment form
Landscape photography shoot risk assessment form
 
Photography shoot risk assessment form (3)
Photography shoot risk assessment form (3)Photography shoot risk assessment form (3)
Photography shoot risk assessment form (3)
 
Risks assessment – tv studio
Risks assessment – tv studioRisks assessment – tv studio
Risks assessment – tv studio
 
Risk assessment media task
Risk assessment media taskRisk assessment media task
Risk assessment media task
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risks assessment – tv studio
Risks assessment – tv studioRisks assessment – tv studio
Risks assessment – tv studio
 
Photography shoot risk assessment form landscape
Photography shoot risk assessment form landscapePhotography shoot risk assessment form landscape
Photography shoot risk assessment form landscape
 
Portrait risk assessment
Portrait risk assessmentPortrait risk assessment
Portrait risk assessment
 
Equine shoot risk assessment form
Equine shoot risk assessment formEquine shoot risk assessment form
Equine shoot risk assessment form
 
Portrait photography shoot risk assessment form
Portrait photography shoot risk assessment formPortrait photography shoot risk assessment form
Portrait photography shoot risk assessment form
 
Photography shoot risk assessment form (1)
Photography shoot risk assessment form (1)Photography shoot risk assessment form (1)
Photography shoot risk assessment form (1)
 
Photography shoot risk assessment form (2)
Photography shoot risk assessment form (2)Photography shoot risk assessment form (2)
Photography shoot risk assessment form (2)
 
Film opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment formFilm opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment form
 
Landscape photography risk assessment
Landscape photography risk assessmentLandscape photography risk assessment
Landscape photography risk assessment
 
Dslr workshop camera audit form blank 2019
Dslr workshop camera audit form blank 2019Dslr workshop camera audit form blank 2019
Dslr workshop camera audit form blank 2019
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 

Similar to Final major projecgt risk assessment form

Photography shoot risk assessment form
Photography shoot risk assessment formPhotography shoot risk assessment form
Photography shoot risk assessment form
CallumWallace
 
Risk assessment for poster advertisment
Risk assessment for poster advertismentRisk assessment for poster advertisment
Risk assessment for poster advertisment
AlexNesbit
 
Film opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment formFilm opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment formAdam Grundy
 
Photography shoot risk assessment form
Photography shoot risk assessment formPhotography shoot risk assessment form
Photography shoot risk assessment formLouiseMaher18
 
Film opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment formFilm opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment formAdam Grundy
 
Fmp risk assessment form
Fmp risk assessment formFmp risk assessment form
Fmp risk assessment form
danhops888
 
Fmp risk assessment form
Fmp risk assessment formFmp risk assessment form
Fmp risk assessment form
danhops888
 
Portrait Photography Shoot Risk Assessment Form
Portrait Photography Shoot Risk Assessment FormPortrait Photography Shoot Risk Assessment Form
Portrait Photography Shoot Risk Assessment Form
ryansharman
 
Film opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment formFilm opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment formkendellburgess
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
CallumWallace
 
Risk Assesment for Filming
Risk Assesment for FilmingRisk Assesment for Filming
Risk Assesment for Filming
29556
 
Risk Assesment for Filming
Risk Assesment for FilmingRisk Assesment for Filming
Risk Assesment for Filming
29556
 
Photography shoot risk assessment form
Photography shoot risk assessment formPhotography shoot risk assessment form
Photography shoot risk assessment form
TomMichaelRoss
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
DanmediaNCS
 
risk assesment
risk assesmentrisk assesment
risk assesment
roydaboy
 
Beast rampz skatepark risk assessment
Beast rampz skatepark risk assessmentBeast rampz skatepark risk assessment
Beast rampz skatepark risk assessment
LewisDunn
 
Film openingtitlesequenceshootriskassessmentform
Film openingtitlesequenceshootriskassessmentformFilm openingtitlesequenceshootriskassessmentform
Film openingtitlesequenceshootriskassessmentformAdam Grundy
 
Risk Assessment 1
Risk Assessment 1Risk Assessment 1
Risk Assessment 1
Carla Appleby
 

Similar to Final major projecgt risk assessment form (20)

Photography shoot risk assessment form
Photography shoot risk assessment formPhotography shoot risk assessment form
Photography shoot risk assessment form
 
Musicvideorisk
MusicvideoriskMusicvideorisk
Musicvideorisk
 
Risk assessment for poster advertisment
Risk assessment for poster advertismentRisk assessment for poster advertisment
Risk assessment for poster advertisment
 
Film opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment formFilm opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment form
 
Photography shoot risk assessment form
Photography shoot risk assessment formPhotography shoot risk assessment form
Photography shoot risk assessment form
 
Risk assesment
Risk assesmentRisk assesment
Risk assesment
 
Film opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment formFilm opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment form
 
Fmp risk assessment form
Fmp risk assessment formFmp risk assessment form
Fmp risk assessment form
 
Fmp risk assessment form
Fmp risk assessment formFmp risk assessment form
Fmp risk assessment form
 
Portrait Photography Shoot Risk Assessment Form
Portrait Photography Shoot Risk Assessment FormPortrait Photography Shoot Risk Assessment Form
Portrait Photography Shoot Risk Assessment Form
 
Film opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment formFilm opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment form
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk Assesment for Filming
Risk Assesment for FilmingRisk Assesment for Filming
Risk Assesment for Filming
 
Risk Assesment for Filming
Risk Assesment for FilmingRisk Assesment for Filming
Risk Assesment for Filming
 
Photography shoot risk assessment form
Photography shoot risk assessment formPhotography shoot risk assessment form
Photography shoot risk assessment form
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
risk assesment
risk assesmentrisk assesment
risk assesment
 
Beast rampz skatepark risk assessment
Beast rampz skatepark risk assessmentBeast rampz skatepark risk assessment
Beast rampz skatepark risk assessment
 
Film openingtitlesequenceshootriskassessmentform
Film openingtitlesequenceshootriskassessmentformFilm openingtitlesequenceshootriskassessmentform
Film openingtitlesequenceshootriskassessmentform
 
Risk Assessment 1
Risk Assessment 1Risk Assessment 1
Risk Assessment 1
 

More from Adam Grundy

Pr9 sourcing images
Pr9 sourcing imagesPr9 sourcing images
Pr9 sourcing images
Adam Grundy
 
Pr24
Pr24Pr24
Editing process
Editing processEditing process
Editing process
Adam Grundy
 
Evaluation
EvaluationEvaluation
Evaluation
Adam Grundy
 
Fonts
FontsFonts
Reference sheet
Reference sheetReference sheet
Reference sheet
Adam Grundy
 
Sar script final
Sar script finalSar script final
Sar script final
Adam Grundy
 
Sar script final
Sar script finalSar script final
Sar script final
Adam Grundy
 
Sar script rough
Sar script roughSar script rough
Sar script rough
Adam Grundy
 
Guidelines for Final Major Project Pitch
Guidelines for Final Major Project PitchGuidelines for Final Major Project Pitch
Guidelines for Final Major Project Pitch
Adam Grundy
 
Task one
Task oneTask one
Task one
Adam Grundy
 
Task one
Task oneTask one
Task one
Adam Grundy
 
Gwl5 m
Gwl5 mGwl5 m
Gwl5 m
Adam Grundy
 
Magazine anaylsis's
Magazine anaylsis'sMagazine anaylsis's
Magazine anaylsis's
Adam Grundy
 
Production diary
Production diaryProduction diary
Production diary
Adam Grundy
 
Script for pitch
Script for pitchScript for pitch
Script for pitch
Adam Grundy
 
Final major projecgt risk assessment form
Final major projecgt risk assessment formFinal major projecgt risk assessment form
Final major projecgt risk assessment form
Adam Grundy
 
call sheet
call sheetcall sheet
call sheet
Adam Grundy
 
Short film analysis 3
Short film analysis 3Short film analysis 3
Short film analysis 3
Adam Grundy
 
surrender
surrendersurrender
surrender
Adam Grundy
 

More from Adam Grundy (20)

Pr9 sourcing images
Pr9 sourcing imagesPr9 sourcing images
Pr9 sourcing images
 
Pr24
Pr24Pr24
Pr24
 
Editing process
Editing processEditing process
Editing process
 
Evaluation
EvaluationEvaluation
Evaluation
 
Fonts
FontsFonts
Fonts
 
Reference sheet
Reference sheetReference sheet
Reference sheet
 
Sar script final
Sar script finalSar script final
Sar script final
 
Sar script final
Sar script finalSar script final
Sar script final
 
Sar script rough
Sar script roughSar script rough
Sar script rough
 
Guidelines for Final Major Project Pitch
Guidelines for Final Major Project PitchGuidelines for Final Major Project Pitch
Guidelines for Final Major Project Pitch
 
Task one
Task oneTask one
Task one
 
Task one
Task oneTask one
Task one
 
Gwl5 m
Gwl5 mGwl5 m
Gwl5 m
 
Magazine anaylsis's
Magazine anaylsis'sMagazine anaylsis's
Magazine anaylsis's
 
Production diary
Production diaryProduction diary
Production diary
 
Script for pitch
Script for pitchScript for pitch
Script for pitch
 
Final major projecgt risk assessment form
Final major projecgt risk assessment formFinal major projecgt risk assessment form
Final major projecgt risk assessment form
 
call sheet
call sheetcall sheet
call sheet
 
Short film analysis 3
Short film analysis 3Short film analysis 3
Short film analysis 3
 
surrender
surrendersurrender
surrender
 

Recently uploaded

Chapter -12, Antibiotics (One Page Notes).pdf
Chapter -12, Antibiotics (One Page Notes).pdfChapter -12, Antibiotics (One Page Notes).pdf
Chapter -12, Antibiotics (One Page Notes).pdf
Kartik Tiwari
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
TechSoup
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
heathfieldcps1
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Atul Kumar Singh
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
DhatriParmar
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
timhan337
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
SACHIN R KONDAGURI
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 
Marketing internship report file for MBA
Marketing internship report file for MBAMarketing internship report file for MBA
Marketing internship report file for MBA
gb193092
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
Peter Windle
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
Group Presentation 2 Economics.Ariana Buscigliopptx
Group Presentation 2 Economics.Ariana BuscigliopptxGroup Presentation 2 Economics.Ariana Buscigliopptx
Group Presentation 2 Economics.Ariana Buscigliopptx
ArianaBusciglio
 

Recently uploaded (20)

Chapter -12, Antibiotics (One Page Notes).pdf
Chapter -12, Antibiotics (One Page Notes).pdfChapter -12, Antibiotics (One Page Notes).pdf
Chapter -12, Antibiotics (One Page Notes).pdf
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 
Marketing internship report file for MBA
Marketing internship report file for MBAMarketing internship report file for MBA
Marketing internship report file for MBA
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
Group Presentation 2 Economics.Ariana Buscigliopptx
Group Presentation 2 Economics.Ariana BuscigliopptxGroup Presentation 2 Economics.Ariana Buscigliopptx
Group Presentation 2 Economics.Ariana Buscigliopptx
 

Final major projecgt risk assessment form

  • 1. FINAL MAJOR PROJECT RISK ASSESSMENT This document is intended as a basic template to assist in the completion of a risk assessment for film production activities. Detailed information is available from a variety of risk management and risk assessment specialists. Useful information can also be obtained from the Health & Safety Executive www.hse.gov.uk When conducting a risk assessment, consider all the likely hazards; who may be harmed, property which may be damaged, and the controls already in place. Then, for each likely hazard, bearing in mind the controls already in place, record the ‘risk assessment’ level. The further action(s) to be considered will be determined by the level of risk assessment. HAZARD IN WHICH SCENE IS THIS HAZARD PRESENT? PERSON WHO MAY BE HARMED PROPERTY THAT COULD BE DAMAGED RISK CONTROLS ALREADY INPLACE RISK ASSESSMENT *See chart FURTHER ACTION TO BE TAKEN Tripping/Slipping This hazard can take place within any scene. All crew/Actors Possible damage to Camera As thereis a high chancein tripping, especially within filming onthe stairway thecrew memberswill have to takeextra precautionsuchas the useof the bannister,aswell there will alwaysbe somethingcloseto the crew membersto graba holdof in case of emergency High The production team will be there to help reduce the risk of tripping by pointing out any dangers that may result in tripping. Cutting one’s self This hazard can take place within All crew/actors N/A There is a possible chance that a crew Low For extra precaution, all crew
  • 2. any scene but especially in the final scene. member may cut themselves, this could be from outside or just on a sharp edge so in order to prevent crew members will stay away from sharp objects and keep an eye out for anything which crew may cut themselves on outside members will point out anything which may cause harm to another crew member. Time Pressure This hazard can take place within any scene. N/A Camera Equipment as well as myself or/and the people I am with With little time for filming, there is a risk that I may run out of time of have very little time to film so by rushing I could cause harm to myself and/orothers around me, in order prevent this I will allocate time within the shooting schedule so that I do not run out of time Moderate The use of the shooting schedule will help allocate time to each scene however in the ofchancethatImay run out of time, I will allocate extra time for filming just in case. Running out of battery This hazard can take place within any scene. N/A N/A The risk that the camera may run out of battery would cause problems within the shooting schedule and Moderate As an extra precaution, I will include a sparefully charged battery just on the off chance that the
  • 3. thereforerunthe risk of running out of time, in order to prevent this I will charge the camera overnight before filming so that the camera is ready to go. camera ends up running out of battery Dropping the camera This hazard can take place within any scene. N/A Camera + Equipment The chance of droppingthecamera can be quite high due to doing some special shots so in order to prevent this I will keep both handsonthecamera andonly take oneoff if necessary. Low As an extra precaution, along with the camera comes a strap so I will wear this around my neck to ensurethe safetyof the camera Falling down stairs This hazard may take place within any scene but especially within scene 4. Myself + Crew members Camera + Equipment With filming a scene on the stairway, there is a risk that either the actor/crew may fall and injure themselves so to prevent the production team must have hands on the banisters as well as paying attention on where they are walking High For extra precaution encase a crew member falls, there will be someonein front to catch along with someone behind them for support.
  • 4.
  • 5. Risk AssessmentChart Hazard likelihood/Consequences RISK ASSESSMENT VERY LIKELY TO HAPPEN or SEVERE CONSEQUENCES(ie.Someone couldget seriouslyhurt) EXTREME Couldhappenormildconsequences(i.e.someone couldsufferaminor injury) HIGH Unlikelytohappenorminorconsequences(i.e.productioncouldbe slightly delayed) MODERATE Rarelyhappensandveryinsignificantconsequences LOW