SlideShare a Scribd company logo
1 of 6
Project Title

 Student Name

    Course

  TA Name

     Date
Introduction
                                           <Insert text>

                                            Problem
                                           <Insert text>

                     Six Steps to Behavior Systems Analysis
                      Step #1: Analyze the Natural Contingencies

<Insert a general description (i.e., explain and define them) of the ineffective natural and natural
competing contingencies here. Then tell how these contingencies apply to your organization.
All descriptions should precede the diagrams. You may use the diagrams given below or create
your own using the drawing toolbar. Right click on the diagram to add text. >

                                Ineffective Natural Contingency




                                Natural Competing Contingency




<Explain the possible causes why the response is not occurring at the desired frequency. This
should be an analysis/summary of the contingencies described and diagrammed above.>


                     Step #2: Specify the Performance Objectives

<In this section you should also include a description of the components of the Goal Directed
System Design (i.e., chapters 7-8. This also includes diagrams of the input-process-output model
& Goal Specification Form. Feel free to alter the coloring of the Goal Specification Form.
Explain these in great detail. >
Input-process-output



(Insert output) [Output]

        Insert the process type and specific process [Process]

                (Insert input) [Input]




                                   Goal Specification Form

Subsystem #__1___
Output

                                                     Current            Ideal
Standards
                        Quality
                        Quantity
                        Timeliness
                        Cost

Process
                        Production:           Distribution:      R&D:

Front line         Current                   Ideal               Cost of Intervention
Personnel
Procedures
Equipment
Contingencies
Management         Current                   Ideal               Cost of Intervention

Personnel
Procedure
Equipment
Contingencies
Input
                           Step #3: Design an Intervention
<Insert here what the steps to developing the intervention are. What forms and contingencies did
you review above? Give a detailed explanation of all components of your intervention. Also
include a description and diagram of the Three Contingency Model of Performance
Management. Demonstrate your understanding of these contingencies. For example, what typf
contingencies are they?>

                    Three Contingency Model of Performance Management
     Ineffective Natural Contingency




    Performance Management Contingency




    Inferred Theoretical Contingency
Step #4: Implement the Intervention
<Insert how the intervention you described above could be or will be implemented. Provide a
detailed description of the cultural change model, then analyze how the model applies to your
intervention/organization.>

                                   Cultural Change Model

Sales person’s Contingency




Store Manager’s Contingency




 District Manager’s Contingency




Regional Manager’s Contingency




CEO’s Contingency




Shareholder’s Contingency
Step #5: Evaluate the Intervention
<Insert a written description of how successful/unsuccessful the intervention was. Provide an
analysis of why it was successful or unsuccessful. Were there any additional variables that were
not part of the intervention but did occur?
Back up your description with a graph of the real or hypothetical data. This graph should contain
baseline and intervention data (label each phase), a dashed line separating these two phases, and
a dashed goal line.>

  Step #6: Recycle through previous steps until you achieve your objectives
<Insert a written description of any new components that need to be added to the intervention so
that the response frequency increases or decreases to the desired frequency. YOU MUST PUT
A HYPOTHETICAL RECYCLE PHASE IF YOU DIDN’T HAVE A REAL RECYCLE
PHASE!!!>

                                         Conclusion
                                          <Insert text>

More Related Content

What's hot (20)

7 qc tools
7 qc tools7 qc tools
7 qc tools
 
It quality management
It quality managementIt quality management
It quality management
 
7qc Tools 173
7qc Tools 1737qc Tools 173
7qc Tools 173
 
Operations research lpp
Operations research lppOperations research lpp
Operations research lpp
 
TQM Quality control Tools
TQM Quality control ToolsTQM Quality control Tools
TQM Quality control Tools
 
Tqm tools
Tqm toolsTqm tools
Tqm tools
 
Seven quality tools
Seven quality toolsSeven quality tools
Seven quality tools
 
perfect 7QC Tools in METLIFE Template
perfect 7QC Tools in METLIFE Templateperfect 7QC Tools in METLIFE Template
perfect 7QC Tools in METLIFE Template
 
Seven tools of TQM
Seven tools of TQMSeven tools of TQM
Seven tools of TQM
 
7 qc tools
7 qc tools7 qc tools
7 qc tools
 
Seven tools of quality control
Seven tools of quality controlSeven tools of quality control
Seven tools of quality control
 
7 QC Tools
7 QC Tools7 QC Tools
7 QC Tools
 
Taguchi method-process imp
Taguchi method-process impTaguchi method-process imp
Taguchi method-process imp
 
Quality control tools (QCT)
Quality control tools (QCT)Quality control tools (QCT)
Quality control tools (QCT)
 
Tqm unit 4
Tqm unit 4Tqm unit 4
Tqm unit 4
 
7 Quality tools by krishna heda
7 Quality tools by krishna heda7 Quality tools by krishna heda
7 Quality tools by krishna heda
 
7 qc tools
7 qc tools7 qc tools
7 qc tools
 
Seven quality tools
Seven quality toolsSeven quality tools
Seven quality tools
 
7 qcdoe
7 qcdoe7 qcdoe
7 qcdoe
 
Tqm tools and techniques i
Tqm tools and techniques   iTqm tools and techniques   i
Tqm tools and techniques i
 

Viewers also liked

Final fiesta project checklists
Final fiesta project checklistsFinal fiesta project checklists
Final fiesta project checklistsJulie Sanchez
 
Chapter 1
Chapter 1Chapter 1
Chapter 1tjwg44
 
Final Fiesta Student Example PowerPoint #2
Final Fiesta Student Example PowerPoint #2Final Fiesta Student Example PowerPoint #2
Final Fiesta Student Example PowerPoint #2tjwg44
 
Self Management Presentation Checklist
Self Management Presentation ChecklistSelf Management Presentation Checklist
Self Management Presentation Checklisttjwg44
 
Self management Paper Checklist
Self management Paper ChecklistSelf management Paper Checklist
Self management Paper Checklisttjwg44
 
Sunglasses worksheet
Sunglasses worksheetSunglasses worksheet
Sunglasses worksheetJulie Sanchez
 
Functional Assessment Presentation
Functional Assessment PresentationFunctional Assessment Presentation
Functional Assessment Presentationtjwg44
 

Viewers also liked (10)

Final fiesta project checklists
Final fiesta project checklistsFinal fiesta project checklists
Final fiesta project checklists
 
Pm
PmPm
Pm
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 
Final Fiesta Student Example PowerPoint #2
Final Fiesta Student Example PowerPoint #2Final Fiesta Student Example PowerPoint #2
Final Fiesta Student Example PowerPoint #2
 
Self Management Presentation Checklist
Self Management Presentation ChecklistSelf Management Presentation Checklist
Self Management Presentation Checklist
 
Self management Paper Checklist
Self management Paper ChecklistSelf management Paper Checklist
Self management Paper Checklist
 
Theoretical
TheoreticalTheoretical
Theoretical
 
Review form
Review formReview form
Review form
 
Sunglasses worksheet
Sunglasses worksheetSunglasses worksheet
Sunglasses worksheet
 
Functional Assessment Presentation
Functional Assessment PresentationFunctional Assessment Presentation
Functional Assessment Presentation
 

Similar to Final fiesta paper template

Final Fiesta Paper Template
Final Fiesta Paper TemplateFinal Fiesta Paper Template
Final Fiesta Paper Templatetjwg44
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Innovation framework
Innovation frameworkInnovation framework
Innovation frameworkJames Basker
 
Name of ProjectStudent NameIndependent Research Projec.docx
Name of ProjectStudent NameIndependent Research Projec.docxName of ProjectStudent NameIndependent Research Projec.docx
Name of ProjectStudent NameIndependent Research Projec.docxrosemarybdodson23141
 
BIS09 Application Development - III
BIS09 Application Development - IIIBIS09 Application Development - III
BIS09 Application Development - IIIPrithwis Mukerjee
 
New 7QC tools for the quality person during RCa
New 7QC tools for the quality person during RCaNew 7QC tools for the quality person during RCa
New 7QC tools for the quality person during RCaAravindhNagaraj1
 
DMAIC addressed Bearnson S-N tracking for all product.
DMAIC addressed Bearnson S-N tracking for all product.DMAIC addressed Bearnson S-N tracking for all product.
DMAIC addressed Bearnson S-N tracking for all product.Bill Bearnson
 
Quality planning
Quality planningQuality planning
Quality planningRahul Hada
 
Operating Excellence is built on Corrective & Preventive Actions
Operating Excellence is built on Corrective & Preventive ActionsOperating Excellence is built on Corrective & Preventive Actions
Operating Excellence is built on Corrective & Preventive ActionsAtanu Dhar
 
7 QC(Quality Control) Tools
7 QC(Quality Control) Tools7 QC(Quality Control) Tools
7 QC(Quality Control) Toolsmanju3426
 
Define phase lean six sigma tollgate template
Define phase   lean six sigma tollgate templateDefine phase   lean six sigma tollgate template
Define phase lean six sigma tollgate templateSteven Bonacorsi
 
Quality tools-asq-london-may-10-2006
Quality tools-asq-london-may-10-2006Quality tools-asq-london-may-10-2006
Quality tools-asq-london-may-10-2006Omnex Inc.
 
2011 business process management
2011 business process management2011 business process management
2011 business process managementAreté Partners
 
Introduction to testing.
Introduction to testing.Introduction to testing.
Introduction to testing.Jithinctzz
 

Similar to Final fiesta paper template (20)

Final Fiesta Paper Template
Final Fiesta Paper TemplateFinal Fiesta Paper Template
Final Fiesta Paper Template
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
CTQ Matrix
CTQ MatrixCTQ Matrix
CTQ Matrix
 
Innovation framework
Innovation frameworkInnovation framework
Innovation framework
 
Quality tools
Quality toolsQuality tools
Quality tools
 
Name of ProjectStudent NameIndependent Research Projec.docx
Name of ProjectStudent NameIndependent Research Projec.docxName of ProjectStudent NameIndependent Research Projec.docx
Name of ProjectStudent NameIndependent Research Projec.docx
 
BIS09 Application Development - III
BIS09 Application Development - IIIBIS09 Application Development - III
BIS09 Application Development - III
 
Six_Sigma.pptx
Six_Sigma.pptxSix_Sigma.pptx
Six_Sigma.pptx
 
New 7QC tools for the quality person during RCa
New 7QC tools for the quality person during RCaNew 7QC tools for the quality person during RCa
New 7QC tools for the quality person during RCa
 
Qc story
Qc storyQc story
Qc story
 
DMAIC addressed Bearnson S-N tracking for all product.
DMAIC addressed Bearnson S-N tracking for all product.DMAIC addressed Bearnson S-N tracking for all product.
DMAIC addressed Bearnson S-N tracking for all product.
 
Quality planning
Quality planningQuality planning
Quality planning
 
Operating Excellence is built on Corrective & Preventive Actions
Operating Excellence is built on Corrective & Preventive ActionsOperating Excellence is built on Corrective & Preventive Actions
Operating Excellence is built on Corrective & Preventive Actions
 
Rkfl Problem Solving
Rkfl Problem SolvingRkfl Problem Solving
Rkfl Problem Solving
 
7 QC(Quality Control) Tools
7 QC(Quality Control) Tools7 QC(Quality Control) Tools
7 QC(Quality Control) Tools
 
Define phase lean six sigma tollgate template
Define phase   lean six sigma tollgate templateDefine phase   lean six sigma tollgate template
Define phase lean six sigma tollgate template
 
Quality tools-asq-london-may-10-2006
Quality tools-asq-london-may-10-2006Quality tools-asq-london-may-10-2006
Quality tools-asq-london-may-10-2006
 
2011 business process management
2011 business process management2011 business process management
2011 business process management
 
Introduction to testing.
Introduction to testing.Introduction to testing.
Introduction to testing.
 

More from Julie Sanchez

Completed advanced practicum application
Completed advanced practicum applicationCompleted advanced practicum application
Completed advanced practicum applicationJulie Sanchez
 
Self management paper template
Self management paper templateSelf management paper template
Self management paper templateJulie Sanchez
 
Performance contract
Performance contractPerformance contract
Performance contractJulie Sanchez
 
Self managment presentation template
Self managment presentation templateSelf managment presentation template
Self managment presentation templateJulie Sanchez
 
10. two factor theory job aid
10. two factor theory job aid10. two factor theory job aid
10. two factor theory job aidJulie Sanchez
 
7. purple sheet checklist
7. purple sheet checklist7. purple sheet checklist
7. purple sheet checklistJulie Sanchez
 
9. transparency masters
9. transparency masters9. transparency masters
9. transparency mastersJulie Sanchez
 
6. pink sheet flashcards
6. pink sheet flashcards6. pink sheet flashcards
6. pink sheet flashcardsJulie Sanchez
 
3. pob review quiz list of terms
3. pob review quiz list of terms3. pob review quiz list of terms
3. pob review quiz list of termsJulie Sanchez
 
5. pink sheet checklist
5. pink sheet checklist5. pink sheet checklist
5. pink sheet checklistJulie Sanchez
 
2. pob review flashcards
2. pob review flashcards2. pob review flashcards
2. pob review flashcardsJulie Sanchez
 
1. blue flashcards1 21
1. blue flashcards1 211. blue flashcards1 21
1. blue flashcards1 21Julie Sanchez
 
11. yag transparency
11. yag transparency11. yag transparency
11. yag transparencyJulie Sanchez
 
Final fiesta presentation template 460
Final fiesta presentation template 460Final fiesta presentation template 460
Final fiesta presentation template 460Julie Sanchez
 
~$ Project checklists
~$ Project checklists~$ Project checklists
~$ Project checklistsJulie Sanchez
 

More from Julie Sanchez (20)

Completed advanced practicum application
Completed advanced practicum applicationCompleted advanced practicum application
Completed advanced practicum application
 
Self management paper template
Self management paper templateSelf management paper template
Self management paper template
 
Performance contract
Performance contractPerformance contract
Performance contract
 
Self managment presentation template
Self managment presentation templateSelf managment presentation template
Self managment presentation template
 
Gdsd workshow
Gdsd workshowGdsd workshow
Gdsd workshow
 
Review
ReviewReview
Review
 
Ineffective
IneffectiveIneffective
Ineffective
 
10. two factor theory job aid
10. two factor theory job aid10. two factor theory job aid
10. two factor theory job aid
 
8. purpleflashcards
8. purpleflashcards8. purpleflashcards
8. purpleflashcards
 
7. purple sheet checklist
7. purple sheet checklist7. purple sheet checklist
7. purple sheet checklist
 
9. transparency masters
9. transparency masters9. transparency masters
9. transparency masters
 
6. pink sheet flashcards
6. pink sheet flashcards6. pink sheet flashcards
6. pink sheet flashcards
 
3. pob review quiz list of terms
3. pob review quiz list of terms3. pob review quiz list of terms
3. pob review quiz list of terms
 
5. pink sheet checklist
5. pink sheet checklist5. pink sheet checklist
5. pink sheet checklist
 
4. gdsd job aid
4. gdsd job aid4. gdsd job aid
4. gdsd job aid
 
2. pob review flashcards
2. pob review flashcards2. pob review flashcards
2. pob review flashcards
 
1. blue flashcards1 21
1. blue flashcards1 211. blue flashcards1 21
1. blue flashcards1 21
 
11. yag transparency
11. yag transparency11. yag transparency
11. yag transparency
 
Final fiesta presentation template 460
Final fiesta presentation template 460Final fiesta presentation template 460
Final fiesta presentation template 460
 
~$ Project checklists
~$ Project checklists~$ Project checklists
~$ Project checklists
 

Final fiesta paper template

  • 1. Project Title Student Name Course TA Name Date
  • 2. Introduction <Insert text> Problem <Insert text> Six Steps to Behavior Systems Analysis Step #1: Analyze the Natural Contingencies <Insert a general description (i.e., explain and define them) of the ineffective natural and natural competing contingencies here. Then tell how these contingencies apply to your organization. All descriptions should precede the diagrams. You may use the diagrams given below or create your own using the drawing toolbar. Right click on the diagram to add text. > Ineffective Natural Contingency Natural Competing Contingency <Explain the possible causes why the response is not occurring at the desired frequency. This should be an analysis/summary of the contingencies described and diagrammed above.> Step #2: Specify the Performance Objectives <In this section you should also include a description of the components of the Goal Directed System Design (i.e., chapters 7-8. This also includes diagrams of the input-process-output model & Goal Specification Form. Feel free to alter the coloring of the Goal Specification Form. Explain these in great detail. >
  • 3. Input-process-output (Insert output) [Output] Insert the process type and specific process [Process] (Insert input) [Input] Goal Specification Form Subsystem #__1___ Output Current Ideal Standards Quality Quantity Timeliness Cost Process Production: Distribution: R&D: Front line Current Ideal Cost of Intervention Personnel Procedures Equipment Contingencies Management Current Ideal Cost of Intervention Personnel Procedure Equipment Contingencies Input Step #3: Design an Intervention
  • 4. <Insert here what the steps to developing the intervention are. What forms and contingencies did you review above? Give a detailed explanation of all components of your intervention. Also include a description and diagram of the Three Contingency Model of Performance Management. Demonstrate your understanding of these contingencies. For example, what typf contingencies are they?> Three Contingency Model of Performance Management Ineffective Natural Contingency Performance Management Contingency Inferred Theoretical Contingency
  • 5. Step #4: Implement the Intervention <Insert how the intervention you described above could be or will be implemented. Provide a detailed description of the cultural change model, then analyze how the model applies to your intervention/organization.> Cultural Change Model Sales person’s Contingency Store Manager’s Contingency District Manager’s Contingency Regional Manager’s Contingency CEO’s Contingency Shareholder’s Contingency
  • 6. Step #5: Evaluate the Intervention <Insert a written description of how successful/unsuccessful the intervention was. Provide an analysis of why it was successful or unsuccessful. Were there any additional variables that were not part of the intervention but did occur? Back up your description with a graph of the real or hypothetical data. This graph should contain baseline and intervention data (label each phase), a dashed line separating these two phases, and a dashed goal line.> Step #6: Recycle through previous steps until you achieve your objectives <Insert a written description of any new components that need to be added to the intervention so that the response frequency increases or decreases to the desired frequency. YOU MUST PUT A HYPOTHETICAL RECYCLE PHASE IF YOU DIDN’T HAVE A REAL RECYCLE PHASE!!!> Conclusion <Insert text>