Real
System
Pemodelan
System
Model
Simulasi
Pemrograman
Simulasi
Experiment/
Running
Y
output
input
Validasi
Terbagi 2 :
- Program Programming
- Program Modeling
N
SIMULASI SISTEM
Simulasi sistem terdiri dari :
1. Simulasi Sistem Diskrit, bila hanya didefinisikan pd titik-titik
waktu tertentu :
a. Kejadian Diskrit (Event Based Simulation)
b. Pendekatan Aktivitas (Activity Based Simulation)
c. Process Interaction Approach
d. Three Phase Approach
2. Simulasi Sistem Kontinyu, merupakan fungsi kontinyu dari
waktu :
a. Model Sistem Kontinyu :
- Sistem Statis  state variables independen terhadap waktu
- Sistem Dinamis  state variables merupakan fungsi waktu
b. Sistem umpan balik
c. Metode analog
Software Simulasi
Secara kasar software tools utk membangun discrete event
simulation dapat dikategorikan kedlm empat kategori :
1. General purpose languages
– C, Pascal, FORTRAN, C++, ADA, Java, dll.
2. Event Scheduled Simulation Languages
– SLAM, SIMAN, SIMPAS, SIM++, JAVASIM, dll,
3. Process Oriented Simulation Languages
– CSIM, EZSIM, GPSS, SIMAN, SLAM, GASP, JAVASIM dll.
4. Application Oriented Simulators
– Opnet, Comnet III, Tangram II, ns-2, Qualnet, Jade, dll.
Software tools utk membangun kontinyu simulation dapat
dikategorikan kedlm : VENSIM, SEESIM, Dynamo dll
Bagaimana Simulasi Diskrit Berjalan……..
(Programming Simulation)
– Time-driven: simulasi berjalan pd interval waktu
tertentu/fixed (mis. state ditentukan pada saat t, t + ∆t,
t + 2 ∆t, …)
 Time-based simulation
– Event-driven: simulasi berjalan dari event-ke-event
(mis. state ditentukan pd titik waktu dari event
berikutnya)
 Event-based simulation
1. Simulasi Diskrit
Contoh :
Mensimulasikan Discrete Event System (Event Approach) 
pendekatan kejadian yakni pengembangan model simulasi didasarkan
pd adanya kejadian yg terjadi pd sistem
• States
Kumpulan variabel-variabel yg diperlukan utk karakterisasi sistem pada
sembarang titik waktu
• Entities
Objek-objek yg diproses dalam simulasi – mis. packet atau panggilan
telepon
• Attributes
Karakteristik dari entities (mis., panjang paket, tipe dan tujuan)
• Resources
Substansi/items dimana entities menduduki atau menggunakan (mis., buffer
space pd router, tokens pd FDDI network, bandwidth pd suatu link)
• Activities
Durasi waktu dimana panjangnya diketahui saat dimulai. Misalnya, waktu
transmisi dari suatu paket pd suatu link
• Delay
Durasi waktu dg panjang yg tdk terspesifikasi yg tdk diketahui sebelum
selesai. misalnya – waktu perjalanan suatu paket dari node A ke node B dlm
suatu jaringan
• Utk mengimplementasikan suatu event scheduling simulasi
perlu membangun suatu event list, secara tdk langsung perlu
membangun suatu deretan events
• Perhatikan contoh antrian Single Server (M/M1) – misalnya
pada proses permesinan.
• Ada EVENT bila ada job Datang dan Pergi (selesai di proses)
• Ada ACTIVITY bila job tsb di Proses`
A M
Job in servise
Job AntriArrive
Departure
Batas Sistem
Mesin/Proses
D
• Model
– IID Exponential interarrival time dg mean 1/λ
– IID Exponential service time dg mean 1/µ
• Ingin mendapatkan mean job delay dlm antrian
– Solusi analitis  mean waiting time = ρ/ (µ - λ)
Adapun representasi komputasinya sbb :
Misal data waktu kedatangan (A) dan waktu permesinan (M) :
A1=55 A2=32 A3=24 A4=40 A5=12 A6=29 …… dstnya
S1=43 S2=36 S3=34 …..dstnya
Catatan :
data2 tsb diperoleh dari hasil Pembangkitan Bilangan Random
(Random Number Generator) berdasarkan distribusi kedatangan
dan proses (pelayanan)  Minggu depan akan di jelaskan !!!
0 t1 t2 t3C1 C2 time
s1 s2 s3s0 s4 s5
A1 A2 A3
S1 S2
Illustrasi sistem antrian M/M/1 dengan pendekatan event time
Keterangan :
ti : wkt kedatangan customer ke i (to = 0)
Ai = ti – ti-1 = antar wkt kedatangan antara (i-1) dan customer ke I
Si : time server actually spends serving customer ke i (termasuk customer
delay pd antrian)
Di : delay in queue customer ke I
Ci : ti + Di + Si = wkt selesai melayani customer ke i dan pergi dari sistem
A1 datang pd wkt simulasi menit ke 55
A2 datang pd wkt simulasi menit ke 32 kemudian atau menit ke 87 (55 + 32) dst
A1 dilayani selama 43 menit (S1), selesai pd menit 98 (55 + 43) sehingga A2 yg
datang pd menit ke 87 menunggu hingga menit 98 (selama 11 menit) atau
menunggu hingga A1 selesai dilayani
A2 mulai dilayani pada menit ke 98 selama 36 menit (S2) dan selesai pd menit ke
134 (98 + 36) …..dstnya
Time = 0
System
System State
Status Number in Time of Last
Queue Event
Time of Arrival
A
D
Clock Event List
Statistical Counters
Number Total Area
delay delay under Q(t)
0
55
0 (8.00)
0 0 0
0 0 0
S
Time = 55
System
System State
Status Number in Time of Last
Queue Event
Time of Arrival
A
D
Clock Event List
Statistical Counters
Number Total Area
delay delay under Q(t)
Time = 87 System State
Status Number in Time of Last
Queue Event
Time of Arrival
A
D
Clock Event List
Statistical Counters
Number Total Area
delay delay under Q(t)
S
S
1
1
0
1
55
87
55
1
87
1
0
0
0
0
98
87
98
111
87
1
customer
2
customer
1
Time = 98
System
System State
Status Number in Time of Last
Queue Event
Time of Arrival
A
D
Clock Event List
Statistical Counters
Number Total Area
delay delay under Q(t)
98
111
134
2 11 11
1 0 98
S
Time = 111 System State
Status Number in Time of Last
Queue Event
Time of Arrival
A
D
Clock Event List
Statistical Counters
Number Total Area
delay delay under Q(t)
Time = 134
System
System State
Status Number in Time of Last
Queue Event
Time of Arrival
A
D
Clock Event List
Statistical Counters
Number Total Area
delay delay under Q(t)
S
S
1
1
1
0
11
1
134
11
1
2
134
3
11
34
11
34
111 134
151
168
151
2
customer
3
customer
2
customer
3
Time =
System
System State
Status Number in Time of Last
Queue Event
Time of Arrival
A
D
Clock Event List
Statistical Counters
Number Total Area
delay delay under Q(t)
S
Time = System State
Status Number in Time of Last
Queue Event
Time of Arrival
A
D
Clock Event List
Statistical Counters
Number Total Area
delay delay under Q(t)
Time =
System
System State
Status Number in Time of Last
Queue Event
Time of Arrival
A
D
Clock Event List
Statistical Counters
Number Total Area
delay delay under Q(t)
S
S
customer
customer
customer
Pemrograman Simulasi Diskrit
Komponen & Pengorganisasian Model Pemrograman
• System State
menggambarkan keadaan sistem pd suatu waktu tertentu
• Simulation Clock
Jam simulasi yang menentukan waktu terjadinya event
• Even List
Daftar yg memuat kejadian berikutnya
• Statistical Counter
variabel2 yg dipakai utk menghitung statistik (memberikan informasi
statistik tentang performance sistem)
• Initialization Routine
sub-rutin untuk memulai/menolkan waktu simulasi
• Timing Routine
sub-rutin utk menentukan event berikutnya dan melanjutkan jam
simulasi untuk event berikutnya
• Event Routine
sub-rutin utk meng-update state (keadaan) sistem ketika suatu
event terjadi
• Report Generator
sub-rutin estimasi perhitungan (dari statistical counter) dan mencetak
laporan
• Main Program
sub-program untuk memanggil timing routin untuk menentukan event
berikutnya dan meng-update keadaan sistem
Hubungan logical (flow control) dari masing-masing
komponen tersebut sebagai berikut :
Hubungan Logical (Flow Chart)
1. Set simulation clock = 0
2. Initialize system state and
statistical counters
3. Initialize event list
1. Call the timing routine
2. Call event routine i
1. Update system state
2. Update statistical counters
3. Generate future events and
add to the event list
1. Compute estimates of interest
2. Print Report
1. Determine the next
event type, misal i
2. Advance the
simulation clock
Is simulation
over ?
No
Yes
Initialization
Routine
Main
Program
Event
Routine i
Report
Generator
Timing Routine
Generate random
variates
Library Routine
Pemrograman (Bahasa Program FORTRAN) :
Beberapa asumsi tentang single-server queueing system yaitu waktu antar
kedatangan konsumen berdistribusi exponential, misal rata-rata 1 menit &
waktu pelayanan berdistribusi eksponential dgn rata-rata 0,5 menit. Simulasi
berhenti jika jumlah konsumen yg dilayani n = 1000 orang.
a. Event Deskripsi :
- Kedatangan / Arrival (A) = 1
- Kepergian / Departure (D) = 2
b. Sub – Routine :
Sub - Program Purpose
INIT
TIMING
ARRIVE
DEPART
REPORT
EXPON (RMEAN)
Initialisasi routine
Timing routine
Event routine (1)
Event routine (2)
Laporan simulasi (dipanggil ketika simulasi
selesai n = 1000)
Distribusi eksponential dgn rata-rata RMEAN
(λ = 1 dan μ = 0,5)
Definisi
MARRVT
MSERVT
TOTCUS
Waktu rata-rata antar kedatangan
Waktu pelayanan rata-rata
Jumlah total n yang selesai dilayani
c. Input Parameter :
d. Modeling variables :
Definisi
ANIQ
DELAY
NEVNTS
NEXT
NIQ
NUMCUS
RMEAN
RMIN
STATUS
TARRVL(1)
TIME
TLEVNT
TNE(1)
TOTDEL
U
Fungsi dari grafik jumlah dalam antrian
Lamanya customer dalam antrian
Jumlah event dalam simulasi (2 event yakni datang & pergi)
Jenis event yg terjadi berikutnya
Jumlah customer dalam antrian
Jumlah customer yg telah menyelesaikan waktu tunggunya
Rata-rata dari distribusi eksponential yg digunakan
Utk menyatakan event yg akan terjadi utk jangka yg masih lama
Status = 0 jika server idle dan staus = 1 jika sibuk
Waktu kedatangan customer ke I
Jam simulasi
Waktu kejadian terakhir
Wkt perubahan dari waktu sekarang ke waktu berikutnya
Total customer yg mengalami antrian
Variabel random berdistribusi uniform antara 0 dan 1 (utk
pembangkitan bilangan random)
Definisi
AVGDEL
AVGNIQ
Waktu antrian rata-rata
Panjang antrian rata-rata
e. Output Variables :
PEMROGRAMAN FORTRAN :
1. SUB-ROUTINE PROGRAM UTAMA
*** MAIN PROGRAM
INTEGER NEVNTS, NEXT, NIQ, NUMCUS, STATUS, TOTCUS
REAL ANIQ, MARRVT, MSERVT, TARRVL(100), TIME, TNE(2), TOTDEL
COMMON /MODEL/ ANIQ, MARVT, MSERVT, NEVNTS, NEXT, NIQ,
NUMCUS, STATUS, TIME, TLEVNT, TNE, TOTCUS, TOTDEL
*** SPECIFY THE NUMBER OF EVENT TYPES FOR THE TIMING ROUTINE
NEVNTS=2
*** READ INPUT PARAMETERS
REALD 10, MARRVT, MSERVT
10 FORMAT (2F, 10.0)
READ 20, TOTCUS
20 FORMAT (I 10)
Deklarasi
*** INITIALIZE THE SIMULATION
CALL INIT
*** DETERMINE THE NEXT EVENT
30 CALL TIMING
*** CALL THE APPROPRIATE EVENT ROUTINE
GO TO (40, 50), NEXT
40 CALL ARRIVE
GO TO 60
50 CALL DEPART
*** IF THE SIMULATION IS OVER, CALL THE REPORT GENERATOR AND END THE
*** SIMUALTION, IF NOT, CONTINUE THE SIMULATION
60 IF(NUMCUS.LT. TOTCUS) GO TO 30
CALL REPORT
STOP
END
2. SUB-ROUTINE INITIALISATION :
SUBROUTINE INIT
INTEGER NEVNTS, NEXT, NIQ, NUMCUS, STATUS, TOTCUS
REAL ANIQ, MARRVT, MSERVT, TARRVL(1000), TIME, TLEVNT, TNE(2), TOTDEL
COMMON /MODEL/ ANIQ, MARRVT, MSERVT, NEVNTS, NEXT, NIQ, NUMCUS, STATUS,
1TARRVL, TIME, TLEVNT, TNE, TOTCUS, TOTDEL
*** INITIALIZE THE SIMULATION CLOCK
TIME=0
.
*** INITIALIZE THE ATATE VARIABLES
STATUS=0
NIQ=0
TLEVNT=0
*** INITIALIZE THE STATISTICAL COUNTERS
NUMCUS=0
TOTDEL=0
ANIQ=0
*** INITIALIZE THE EVENT LIST. SINCE NO CUSTOMERS ARE PRESENT, THE TIME OF THE
*** NEXT DEPARTURE (SERVICE COMPLETION) IS SET TO ‘INFINITY.’
TNE(1)=TIME+EXPON(MARRVT)
TNE(2)=1.E+30
RETURN
END
3. SUB-ROUTINE TIMING :
SUBROUTINE TIMING
INTEGER NEVNTS, NEXT, NIQ, NUMCUS, STATUS, TOTCUS
REAL ANIQ, MARRVT, MSERVT, TARRVL(1000), TIME, TLEVNT, TNE(2), TOTDEL
COMMON /MODEL/ ANIQ, MARRVT, MSERVT, NEVNTS, NEXT, NIQ, NUMCUS, STATUS,
1TARRVL, TIME, TLEVNT, TNE, TOTCUS, TOTDEL
RMIN=1.E+29
NEXT=0
*** DETERMINE THE EVENT TYPE OF THE NEXT EVENT TO OCCUR
DO 10 I=1.NEVNTS
IF (TNE(I).E.RMIN) GO TO 10
RMIN=TNE(I)
NEXT=I
10 CONTINUE
.
*** IF THE EVENT LIST IS EMPTY (1.E., NEXT=0), STOP THE SIMULATION
*** OTHERWISE, ADVANCE THE SIMULATION CLOCK
IF (NEXT, GT.0) GO TO 30
PRINT 20
20 FORMAT (1h1, 5X, ‘EVENT LIST EMPTY’)
STOP
30 TIME=TNE(NEXT)
RETURN
END
FLOWCHART SUBROUTINE ARRIVE
Subroutine
ARRIVE
Schedule the next arrival
event
Set DELAY = 0 for this
customer and gather statistics
Add 1 to the number of
customers delayed
Make server busy
Schedule a departure
event for this customer
Return
Update area under the
number in queue function
Add 1 to the number in
queue
Store the time of arrival
of this customer
Return
4. SUB-ROUTINE ARRIVE :
SUBROUTINE ARRIVE
INTEGER NEVNTS, NEXT, NIQ, NUMCUS, STATUS, TOTCUS
REAL ANIQ, MARRVT, MSERVT, TARRVL(1000), TIME, TLEVNT, TNE(2), TOTDEL
COMMON /MODEL/ ANIQ, MARRVT, MSERVT, NEVNTS, NEXT, NIQ, NUMCUS, STATUS,
1TARRVL, TIME, TLEVNT, TNE, TOTCUS, TOTDEL
***
FLOWCHART SUBROUTINE DEPART
Subroutine
DEPART
Update area under the
number in queue function
Subtract 1 from the number in
queue
Compute delay of
customer entering service
and gather statistics
Add 1 to the number of
customers delayed
Schedule a departure
event for this customer
Return
Make server busy
Set the time of the next
departure to infinity
Return
5. SUB-ROUTINE DEPART :
SUBROUTINE DEPART
INTEGER NEVNTS, NEXT, NIQ, NUMCUS, STATUS, TOTCUS
REAL ANIQ, MARRVT, MSERVT, TARRVL(1000), TIME, TLEVNT, TNE(2), TOTDEL
COMMON /MODEL/ ANIQ, MARRVT, MSERVT, NEVNTS, NEXT, NIQ, NUMCUS, STATUS,
1TARRVL, TIME, TLEVNT, TNE, TOTCUS, TOTDEL
***
6. SUB-ROUTINE REPORT :
SUBROUTINE REPORT
INTEGER NEVNTS, NEXT, NIQ, NUMCUS, STATUS, TOTCUS
REAL ANIQ, MARRVT, MSERVT, TARRVL(1000), TIME, TLEVNT, TNE(2), TOTDEL
COMMON /MODEL/ ANIQ, MARRVT, MSERVT, NEVNTS, NEXT, NIQ, NUMCUS, STATUS,
1TARRVL, TIME, TLEVNT, TNE, TOTCUS, TOTDEL
***
7. SUB-ROUTINE FUNGSI EXPONENTIAL :
FUNCTION EXPON(RMEAN)
REAL RMEAN, U
*** GENERATE A U(0,1) RANDOM VARIABLE, THE FORM OF THIS STATEMENT DEPENDS
*** ON THE COMPUTER USED
U=RANUN (Z)
*** GENERATE AN EXPONENTIAL RANDOM VARIABLE WITH MEAN RMEAN
EXPON=-RMEAN*ALOG (U)
RETURN
END
8 . OUTPUT HASIL SIMULASI :
-------------------------------------------------------------------------
SINGLE-SERVER QUEUEING SYSTEM
REAL RMEAN, U
MEAN INTERARRIVAL TIME : 1.000 MINUTES
MEAN SERVICE TIME : .500 MINUTES
NUMBER OF CUSTOMERS : 1000
AVERAGE DELAY IN QUEUE : .497 MINUTES
AVERAGE NUMBER IN QUEUE : .500

More Related Content

What's hot

What's hot (20)

Risk assasement
Risk assasementRisk assasement
Risk assasement
 
Peramalan Forecasting
Peramalan ForecastingPeramalan Forecasting
Peramalan Forecasting
 
MM ITBK-Kecap Bango (Unilever)-Menjadi Kecap Nomor Satu-Marketing Strategic b...
MM ITBK-Kecap Bango (Unilever)-Menjadi Kecap Nomor Satu-Marketing Strategic b...MM ITBK-Kecap Bango (Unilever)-Menjadi Kecap Nomor Satu-Marketing Strategic b...
MM ITBK-Kecap Bango (Unilever)-Menjadi Kecap Nomor Satu-Marketing Strategic b...
 
5. manajemen operasional
5. manajemen operasional5. manajemen operasional
5. manajemen operasional
 
SIstem Informasi Pemesanan Barang - Wulanda Anggoro
SIstem Informasi Pemesanan Barang - Wulanda AnggoroSIstem Informasi Pemesanan Barang - Wulanda Anggoro
SIstem Informasi Pemesanan Barang - Wulanda Anggoro
 
Akuntansi pertanggung jawaban
Akuntansi pertanggung jawabanAkuntansi pertanggung jawaban
Akuntansi pertanggung jawaban
 
CPM (Network Planning CPM) - Manajemen proyek
CPM (Network Planning CPM) - Manajemen proyekCPM (Network Planning CPM) - Manajemen proyek
CPM (Network Planning CPM) - Manajemen proyek
 
Chapter#11 pengukuran kinerja
Chapter#11 pengukuran kinerjaChapter#11 pengukuran kinerja
Chapter#11 pengukuran kinerja
 
Just in time (jit)
Just in time (jit)Just in time (jit)
Just in time (jit)
 
ANALISIS TINGKAT KUALITAS PRODUK DAN PELAYANAN KENTUCKY FRIED CHICKEN (KFC) C...
ANALISIS TINGKAT KUALITAS PRODUK DAN PELAYANAN KENTUCKY FRIED CHICKEN (KFC) C...ANALISIS TINGKAT KUALITAS PRODUK DAN PELAYANAN KENTUCKY FRIED CHICKEN (KFC) C...
ANALISIS TINGKAT KUALITAS PRODUK DAN PELAYANAN KENTUCKY FRIED CHICKEN (KFC) C...
 
Modul 05 Pemodelan Konseptual
Modul 05 Pemodelan KonseptualModul 05 Pemodelan Konseptual
Modul 05 Pemodelan Konseptual
 
Tugas kelompok 1 man pro
Tugas kelompok 1 man proTugas kelompok 1 man pro
Tugas kelompok 1 man pro
 
Contoh Ppt Seminar Proposal
Contoh Ppt Seminar ProposalContoh Ppt Seminar Proposal
Contoh Ppt Seminar Proposal
 
Available to Promise (ATP) & Rough Cut Capacity Plan (RCCP) _ Materi Training...
Available to Promise (ATP) & Rough Cut Capacity Plan (RCCP) _ Materi Training...Available to Promise (ATP) & Rough Cut Capacity Plan (RCCP) _ Materi Training...
Available to Promise (ATP) & Rough Cut Capacity Plan (RCCP) _ Materi Training...
 
Kelompok 4 mb39 01-analisis perusahaan pt nippon indosari corpindo tbk
Kelompok 4 mb39 01-analisis perusahaan pt nippon indosari corpindo tbkKelompok 4 mb39 01-analisis perusahaan pt nippon indosari corpindo tbk
Kelompok 4 mb39 01-analisis perusahaan pt nippon indosari corpindo tbk
 
Penjelasan COSO & COBIT
Penjelasan COSO & COBITPenjelasan COSO & COBIT
Penjelasan COSO & COBIT
 
Pendekatan kualitatif dalam pemilihan metode penanganan risiko
Pendekatan kualitatif dalam pemilihan metode penanganan risiko Pendekatan kualitatif dalam pemilihan metode penanganan risiko
Pendekatan kualitatif dalam pemilihan metode penanganan risiko
 
Penentuan Harga Transfer
Penentuan Harga TransferPenentuan Harga Transfer
Penentuan Harga Transfer
 
Sistem Informasi Manajemen Perusahaan E-Commerce Studi Kasus pada: Shopee Ind...
Sistem Informasi Manajemen Perusahaan E-Commerce Studi Kasus pada: Shopee Ind...Sistem Informasi Manajemen Perusahaan E-Commerce Studi Kasus pada: Shopee Ind...
Sistem Informasi Manajemen Perusahaan E-Commerce Studi Kasus pada: Shopee Ind...
 
Strategi pemasaran sari roti
Strategi pemasaran sari rotiStrategi pemasaran sari roti
Strategi pemasaran sari roti
 

Similar to iv. minggu keempat

Foundations and methods of stochastic simulation
Foundations and methods of stochastic simulationFoundations and methods of stochastic simulation
Foundations and methods of stochastic simulation
Springer
 
Analysis of algorithn class 2
Analysis of algorithn class 2Analysis of algorithn class 2
Analysis of algorithn class 2
Kumar
 
Scalable Realtime Analytics with declarative SQL like Complex Event Processin...
Scalable Realtime Analytics with declarative SQL like Complex Event Processin...Scalable Realtime Analytics with declarative SQL like Complex Event Processin...
Scalable Realtime Analytics with declarative SQL like Complex Event Processin...
Srinath Perera
 

Similar to iv. minggu keempat (20)

2_2_Event_Mechanism_Chapter_2.pdf
2_2_Event_Mechanism_Chapter_2.pdf2_2_Event_Mechanism_Chapter_2.pdf
2_2_Event_Mechanism_Chapter_2.pdf
 
Fundamentals of the Analysis of Algorithm Efficiency
Fundamentals of the Analysis of Algorithm EfficiencyFundamentals of the Analysis of Algorithm Efficiency
Fundamentals of the Analysis of Algorithm Efficiency
 
A calculus of mobile Real-Time processes
A calculus of mobile Real-Time processesA calculus of mobile Real-Time processes
A calculus of mobile Real-Time processes
 
Foundations and methods of stochastic simulation
Foundations and methods of stochastic simulationFoundations and methods of stochastic simulation
Foundations and methods of stochastic simulation
 
Sample final report
Sample final reportSample final report
Sample final report
 
DES
DES DES
DES
 
Unit i
Unit iUnit i
Unit i
 
Discrete Event Simulation.ppt
Discrete Event Simulation.pptDiscrete Event Simulation.ppt
Discrete Event Simulation.ppt
 
Unit 3 des
Unit 3 desUnit 3 des
Unit 3 des
 
Analysis of algorithn class 2
Analysis of algorithn class 2Analysis of algorithn class 2
Analysis of algorithn class 2
 
Unit i basic concepts of algorithms
Unit i basic concepts of algorithmsUnit i basic concepts of algorithms
Unit i basic concepts of algorithms
 
Time advance mehcanism
Time advance mehcanismTime advance mehcanism
Time advance mehcanism
 
Scalable Realtime Analytics with declarative SQL like Complex Event Processin...
Scalable Realtime Analytics with declarative SQL like Complex Event Processin...Scalable Realtime Analytics with declarative SQL like Complex Event Processin...
Scalable Realtime Analytics with declarative SQL like Complex Event Processin...
 
Design and Performance Optimization of Authentication, Authorization, and Acc...
Design and Performance Optimization of Authentication, Authorization, and Acc...Design and Performance Optimization of Authentication, Authorization, and Acc...
Design and Performance Optimization of Authentication, Authorization, and Acc...
 
Java application monitoring with Dropwizard Metrics and graphite
Java application monitoring with Dropwizard Metrics and graphite Java application monitoring with Dropwizard Metrics and graphite
Java application monitoring with Dropwizard Metrics and graphite
 
5_2019_01_12!09_25_57_AM.ppt
5_2019_01_12!09_25_57_AM.ppt5_2019_01_12!09_25_57_AM.ppt
5_2019_01_12!09_25_57_AM.ppt
 
FFWD - Fast Forward With Degradation
FFWD - Fast Forward With DegradationFFWD - Fast Forward With Degradation
FFWD - Fast Forward With Degradation
 
Chapter 2 variety of modelling
Chapter 2 variety of modellingChapter 2 variety of modelling
Chapter 2 variety of modelling
 
[EUC2016] FFWD: latency-aware event stream processing via domain-specific loa...
[EUC2016] FFWD: latency-aware event stream processing via domain-specific loa...[EUC2016] FFWD: latency-aware event stream processing via domain-specific loa...
[EUC2016] FFWD: latency-aware event stream processing via domain-specific loa...
 
Introduction to embedded computing and arm processors
Introduction to embedded computing and arm processorsIntroduction to embedded computing and arm processors
Introduction to embedded computing and arm processors
 

More from Isna Aryanty

More from Isna Aryanty (15)

Materi 6 sistematika
Materi 6 sistematikaMateri 6 sistematika
Materi 6 sistematika
 
Materi 8 pengolahan dan analisa data
Materi 8 pengolahan dan analisa dataMateri 8 pengolahan dan analisa data
Materi 8 pengolahan dan analisa data
 
Materi 7 pengumpulan data
Materi 7 pengumpulan  dataMateri 7 pengumpulan  data
Materi 7 pengumpulan data
 
Materi 5 studi pustaka
Materi 5 studi pustakaMateri 5 studi pustaka
Materi 5 studi pustaka
 
Materi 4
Materi 4Materi 4
Materi 4
 
Materi 3
Materi 3Materi 3
Materi 3
 
Materi 2
Materi 2Materi 2
Materi 2
 
Materi 2
Materi 2Materi 2
Materi 2
 
Materi 9 penulisan laporan
Materi 9 penulisan laporanMateri 9 penulisan laporan
Materi 9 penulisan laporan
 
Materi 1
Materi 1Materi 1
Materi 1
 
Vi. minggu keenam
Vi. minggu keenamVi. minggu keenam
Vi. minggu keenam
 
iii. minggu ketiga
iii. minggu ketigaiii. minggu ketiga
iii. minggu ketiga
 
ii. minggu kedua
ii. minggu keduaii. minggu kedua
ii. minggu kedua
 
i. minggu pertama
i. minggu pertamai. minggu pertama
i. minggu pertama
 
Probabilitas konsepsi peluang
Probabilitas konsepsi peluangProbabilitas konsepsi peluang
Probabilitas konsepsi peluang
 

Recently uploaded

Recently uploaded (20)

Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 

iv. minggu keempat

  • 2. Simulasi sistem terdiri dari : 1. Simulasi Sistem Diskrit, bila hanya didefinisikan pd titik-titik waktu tertentu : a. Kejadian Diskrit (Event Based Simulation) b. Pendekatan Aktivitas (Activity Based Simulation) c. Process Interaction Approach d. Three Phase Approach 2. Simulasi Sistem Kontinyu, merupakan fungsi kontinyu dari waktu : a. Model Sistem Kontinyu : - Sistem Statis  state variables independen terhadap waktu - Sistem Dinamis  state variables merupakan fungsi waktu b. Sistem umpan balik c. Metode analog
  • 3. Software Simulasi Secara kasar software tools utk membangun discrete event simulation dapat dikategorikan kedlm empat kategori : 1. General purpose languages – C, Pascal, FORTRAN, C++, ADA, Java, dll. 2. Event Scheduled Simulation Languages – SLAM, SIMAN, SIMPAS, SIM++, JAVASIM, dll, 3. Process Oriented Simulation Languages – CSIM, EZSIM, GPSS, SIMAN, SLAM, GASP, JAVASIM dll. 4. Application Oriented Simulators – Opnet, Comnet III, Tangram II, ns-2, Qualnet, Jade, dll. Software tools utk membangun kontinyu simulation dapat dikategorikan kedlm : VENSIM, SEESIM, Dynamo dll
  • 4. Bagaimana Simulasi Diskrit Berjalan…….. (Programming Simulation) – Time-driven: simulasi berjalan pd interval waktu tertentu/fixed (mis. state ditentukan pada saat t, t + ∆t, t + 2 ∆t, …)  Time-based simulation – Event-driven: simulasi berjalan dari event-ke-event (mis. state ditentukan pd titik waktu dari event berikutnya)  Event-based simulation 1. Simulasi Diskrit
  • 5. Contoh : Mensimulasikan Discrete Event System (Event Approach)  pendekatan kejadian yakni pengembangan model simulasi didasarkan pd adanya kejadian yg terjadi pd sistem • States Kumpulan variabel-variabel yg diperlukan utk karakterisasi sistem pada sembarang titik waktu • Entities Objek-objek yg diproses dalam simulasi – mis. packet atau panggilan telepon • Attributes Karakteristik dari entities (mis., panjang paket, tipe dan tujuan) • Resources Substansi/items dimana entities menduduki atau menggunakan (mis., buffer space pd router, tokens pd FDDI network, bandwidth pd suatu link) • Activities Durasi waktu dimana panjangnya diketahui saat dimulai. Misalnya, waktu transmisi dari suatu paket pd suatu link • Delay Durasi waktu dg panjang yg tdk terspesifikasi yg tdk diketahui sebelum selesai. misalnya – waktu perjalanan suatu paket dari node A ke node B dlm suatu jaringan
  • 6. • Utk mengimplementasikan suatu event scheduling simulasi perlu membangun suatu event list, secara tdk langsung perlu membangun suatu deretan events • Perhatikan contoh antrian Single Server (M/M1) – misalnya pada proses permesinan. • Ada EVENT bila ada job Datang dan Pergi (selesai di proses) • Ada ACTIVITY bila job tsb di Proses` A M Job in servise Job AntriArrive Departure Batas Sistem Mesin/Proses D • Model – IID Exponential interarrival time dg mean 1/λ – IID Exponential service time dg mean 1/µ • Ingin mendapatkan mean job delay dlm antrian – Solusi analitis  mean waiting time = ρ/ (µ - λ)
  • 7. Adapun representasi komputasinya sbb : Misal data waktu kedatangan (A) dan waktu permesinan (M) : A1=55 A2=32 A3=24 A4=40 A5=12 A6=29 …… dstnya S1=43 S2=36 S3=34 …..dstnya Catatan : data2 tsb diperoleh dari hasil Pembangkitan Bilangan Random (Random Number Generator) berdasarkan distribusi kedatangan dan proses (pelayanan)  Minggu depan akan di jelaskan !!! 0 t1 t2 t3C1 C2 time s1 s2 s3s0 s4 s5 A1 A2 A3 S1 S2 Illustrasi sistem antrian M/M/1 dengan pendekatan event time
  • 8. Keterangan : ti : wkt kedatangan customer ke i (to = 0) Ai = ti – ti-1 = antar wkt kedatangan antara (i-1) dan customer ke I Si : time server actually spends serving customer ke i (termasuk customer delay pd antrian) Di : delay in queue customer ke I Ci : ti + Di + Si = wkt selesai melayani customer ke i dan pergi dari sistem A1 datang pd wkt simulasi menit ke 55 A2 datang pd wkt simulasi menit ke 32 kemudian atau menit ke 87 (55 + 32) dst A1 dilayani selama 43 menit (S1), selesai pd menit 98 (55 + 43) sehingga A2 yg datang pd menit ke 87 menunggu hingga menit 98 (selama 11 menit) atau menunggu hingga A1 selesai dilayani A2 mulai dilayani pada menit ke 98 selama 36 menit (S2) dan selesai pd menit ke 134 (98 + 36) …..dstnya
  • 9. Time = 0 System System State Status Number in Time of Last Queue Event Time of Arrival A D Clock Event List Statistical Counters Number Total Area delay delay under Q(t) 0 55 0 (8.00) 0 0 0 0 0 0 S Time = 55 System System State Status Number in Time of Last Queue Event Time of Arrival A D Clock Event List Statistical Counters Number Total Area delay delay under Q(t) Time = 87 System State Status Number in Time of Last Queue Event Time of Arrival A D Clock Event List Statistical Counters Number Total Area delay delay under Q(t) S S 1 1 0 1 55 87 55 1 87 1 0 0 0 0 98 87 98 111 87 1 customer 2 customer 1
  • 10. Time = 98 System System State Status Number in Time of Last Queue Event Time of Arrival A D Clock Event List Statistical Counters Number Total Area delay delay under Q(t) 98 111 134 2 11 11 1 0 98 S Time = 111 System State Status Number in Time of Last Queue Event Time of Arrival A D Clock Event List Statistical Counters Number Total Area delay delay under Q(t) Time = 134 System System State Status Number in Time of Last Queue Event Time of Arrival A D Clock Event List Statistical Counters Number Total Area delay delay under Q(t) S S 1 1 1 0 11 1 134 11 1 2 134 3 11 34 11 34 111 134 151 168 151 2 customer 3 customer 2 customer 3
  • 11. Time = System System State Status Number in Time of Last Queue Event Time of Arrival A D Clock Event List Statistical Counters Number Total Area delay delay under Q(t) S Time = System State Status Number in Time of Last Queue Event Time of Arrival A D Clock Event List Statistical Counters Number Total Area delay delay under Q(t) Time = System System State Status Number in Time of Last Queue Event Time of Arrival A D Clock Event List Statistical Counters Number Total Area delay delay under Q(t) S S customer customer customer
  • 12. Pemrograman Simulasi Diskrit Komponen & Pengorganisasian Model Pemrograman • System State menggambarkan keadaan sistem pd suatu waktu tertentu • Simulation Clock Jam simulasi yang menentukan waktu terjadinya event • Even List Daftar yg memuat kejadian berikutnya • Statistical Counter variabel2 yg dipakai utk menghitung statistik (memberikan informasi statistik tentang performance sistem) • Initialization Routine sub-rutin untuk memulai/menolkan waktu simulasi • Timing Routine sub-rutin utk menentukan event berikutnya dan melanjutkan jam simulasi untuk event berikutnya • Event Routine sub-rutin utk meng-update state (keadaan) sistem ketika suatu event terjadi
  • 13. • Report Generator sub-rutin estimasi perhitungan (dari statistical counter) dan mencetak laporan • Main Program sub-program untuk memanggil timing routin untuk menentukan event berikutnya dan meng-update keadaan sistem Hubungan logical (flow control) dari masing-masing komponen tersebut sebagai berikut :
  • 14. Hubungan Logical (Flow Chart) 1. Set simulation clock = 0 2. Initialize system state and statistical counters 3. Initialize event list 1. Call the timing routine 2. Call event routine i 1. Update system state 2. Update statistical counters 3. Generate future events and add to the event list 1. Compute estimates of interest 2. Print Report 1. Determine the next event type, misal i 2. Advance the simulation clock Is simulation over ? No Yes Initialization Routine Main Program Event Routine i Report Generator Timing Routine Generate random variates Library Routine
  • 15. Pemrograman (Bahasa Program FORTRAN) : Beberapa asumsi tentang single-server queueing system yaitu waktu antar kedatangan konsumen berdistribusi exponential, misal rata-rata 1 menit & waktu pelayanan berdistribusi eksponential dgn rata-rata 0,5 menit. Simulasi berhenti jika jumlah konsumen yg dilayani n = 1000 orang. a. Event Deskripsi : - Kedatangan / Arrival (A) = 1 - Kepergian / Departure (D) = 2 b. Sub – Routine : Sub - Program Purpose INIT TIMING ARRIVE DEPART REPORT EXPON (RMEAN) Initialisasi routine Timing routine Event routine (1) Event routine (2) Laporan simulasi (dipanggil ketika simulasi selesai n = 1000) Distribusi eksponential dgn rata-rata RMEAN (λ = 1 dan μ = 0,5)
  • 16. Definisi MARRVT MSERVT TOTCUS Waktu rata-rata antar kedatangan Waktu pelayanan rata-rata Jumlah total n yang selesai dilayani c. Input Parameter : d. Modeling variables : Definisi ANIQ DELAY NEVNTS NEXT NIQ NUMCUS RMEAN RMIN STATUS TARRVL(1) TIME TLEVNT TNE(1) TOTDEL U Fungsi dari grafik jumlah dalam antrian Lamanya customer dalam antrian Jumlah event dalam simulasi (2 event yakni datang & pergi) Jenis event yg terjadi berikutnya Jumlah customer dalam antrian Jumlah customer yg telah menyelesaikan waktu tunggunya Rata-rata dari distribusi eksponential yg digunakan Utk menyatakan event yg akan terjadi utk jangka yg masih lama Status = 0 jika server idle dan staus = 1 jika sibuk Waktu kedatangan customer ke I Jam simulasi Waktu kejadian terakhir Wkt perubahan dari waktu sekarang ke waktu berikutnya Total customer yg mengalami antrian Variabel random berdistribusi uniform antara 0 dan 1 (utk pembangkitan bilangan random)
  • 17. Definisi AVGDEL AVGNIQ Waktu antrian rata-rata Panjang antrian rata-rata e. Output Variables : PEMROGRAMAN FORTRAN : 1. SUB-ROUTINE PROGRAM UTAMA *** MAIN PROGRAM INTEGER NEVNTS, NEXT, NIQ, NUMCUS, STATUS, TOTCUS REAL ANIQ, MARRVT, MSERVT, TARRVL(100), TIME, TNE(2), TOTDEL COMMON /MODEL/ ANIQ, MARVT, MSERVT, NEVNTS, NEXT, NIQ, NUMCUS, STATUS, TIME, TLEVNT, TNE, TOTCUS, TOTDEL *** SPECIFY THE NUMBER OF EVENT TYPES FOR THE TIMING ROUTINE NEVNTS=2 *** READ INPUT PARAMETERS REALD 10, MARRVT, MSERVT 10 FORMAT (2F, 10.0) READ 20, TOTCUS 20 FORMAT (I 10) Deklarasi
  • 18. *** INITIALIZE THE SIMULATION CALL INIT *** DETERMINE THE NEXT EVENT 30 CALL TIMING *** CALL THE APPROPRIATE EVENT ROUTINE GO TO (40, 50), NEXT 40 CALL ARRIVE GO TO 60 50 CALL DEPART *** IF THE SIMULATION IS OVER, CALL THE REPORT GENERATOR AND END THE *** SIMUALTION, IF NOT, CONTINUE THE SIMULATION 60 IF(NUMCUS.LT. TOTCUS) GO TO 30 CALL REPORT STOP END
  • 19. 2. SUB-ROUTINE INITIALISATION : SUBROUTINE INIT INTEGER NEVNTS, NEXT, NIQ, NUMCUS, STATUS, TOTCUS REAL ANIQ, MARRVT, MSERVT, TARRVL(1000), TIME, TLEVNT, TNE(2), TOTDEL COMMON /MODEL/ ANIQ, MARRVT, MSERVT, NEVNTS, NEXT, NIQ, NUMCUS, STATUS, 1TARRVL, TIME, TLEVNT, TNE, TOTCUS, TOTDEL *** INITIALIZE THE SIMULATION CLOCK TIME=0 . *** INITIALIZE THE ATATE VARIABLES STATUS=0 NIQ=0 TLEVNT=0 *** INITIALIZE THE STATISTICAL COUNTERS NUMCUS=0 TOTDEL=0 ANIQ=0 *** INITIALIZE THE EVENT LIST. SINCE NO CUSTOMERS ARE PRESENT, THE TIME OF THE *** NEXT DEPARTURE (SERVICE COMPLETION) IS SET TO ‘INFINITY.’ TNE(1)=TIME+EXPON(MARRVT) TNE(2)=1.E+30 RETURN END
  • 20. 3. SUB-ROUTINE TIMING : SUBROUTINE TIMING INTEGER NEVNTS, NEXT, NIQ, NUMCUS, STATUS, TOTCUS REAL ANIQ, MARRVT, MSERVT, TARRVL(1000), TIME, TLEVNT, TNE(2), TOTDEL COMMON /MODEL/ ANIQ, MARRVT, MSERVT, NEVNTS, NEXT, NIQ, NUMCUS, STATUS, 1TARRVL, TIME, TLEVNT, TNE, TOTCUS, TOTDEL RMIN=1.E+29 NEXT=0 *** DETERMINE THE EVENT TYPE OF THE NEXT EVENT TO OCCUR DO 10 I=1.NEVNTS IF (TNE(I).E.RMIN) GO TO 10 RMIN=TNE(I) NEXT=I 10 CONTINUE . *** IF THE EVENT LIST IS EMPTY (1.E., NEXT=0), STOP THE SIMULATION *** OTHERWISE, ADVANCE THE SIMULATION CLOCK IF (NEXT, GT.0) GO TO 30 PRINT 20 20 FORMAT (1h1, 5X, ‘EVENT LIST EMPTY’) STOP 30 TIME=TNE(NEXT) RETURN END
  • 21. FLOWCHART SUBROUTINE ARRIVE Subroutine ARRIVE Schedule the next arrival event Set DELAY = 0 for this customer and gather statistics Add 1 to the number of customers delayed Make server busy Schedule a departure event for this customer Return Update area under the number in queue function Add 1 to the number in queue Store the time of arrival of this customer Return
  • 22. 4. SUB-ROUTINE ARRIVE : SUBROUTINE ARRIVE INTEGER NEVNTS, NEXT, NIQ, NUMCUS, STATUS, TOTCUS REAL ANIQ, MARRVT, MSERVT, TARRVL(1000), TIME, TLEVNT, TNE(2), TOTDEL COMMON /MODEL/ ANIQ, MARRVT, MSERVT, NEVNTS, NEXT, NIQ, NUMCUS, STATUS, 1TARRVL, TIME, TLEVNT, TNE, TOTCUS, TOTDEL ***
  • 23. FLOWCHART SUBROUTINE DEPART Subroutine DEPART Update area under the number in queue function Subtract 1 from the number in queue Compute delay of customer entering service and gather statistics Add 1 to the number of customers delayed Schedule a departure event for this customer Return Make server busy Set the time of the next departure to infinity Return
  • 24. 5. SUB-ROUTINE DEPART : SUBROUTINE DEPART INTEGER NEVNTS, NEXT, NIQ, NUMCUS, STATUS, TOTCUS REAL ANIQ, MARRVT, MSERVT, TARRVL(1000), TIME, TLEVNT, TNE(2), TOTDEL COMMON /MODEL/ ANIQ, MARRVT, MSERVT, NEVNTS, NEXT, NIQ, NUMCUS, STATUS, 1TARRVL, TIME, TLEVNT, TNE, TOTCUS, TOTDEL ***
  • 25. 6. SUB-ROUTINE REPORT : SUBROUTINE REPORT INTEGER NEVNTS, NEXT, NIQ, NUMCUS, STATUS, TOTCUS REAL ANIQ, MARRVT, MSERVT, TARRVL(1000), TIME, TLEVNT, TNE(2), TOTDEL COMMON /MODEL/ ANIQ, MARRVT, MSERVT, NEVNTS, NEXT, NIQ, NUMCUS, STATUS, 1TARRVL, TIME, TLEVNT, TNE, TOTCUS, TOTDEL ***
  • 26. 7. SUB-ROUTINE FUNGSI EXPONENTIAL : FUNCTION EXPON(RMEAN) REAL RMEAN, U *** GENERATE A U(0,1) RANDOM VARIABLE, THE FORM OF THIS STATEMENT DEPENDS *** ON THE COMPUTER USED U=RANUN (Z) *** GENERATE AN EXPONENTIAL RANDOM VARIABLE WITH MEAN RMEAN EXPON=-RMEAN*ALOG (U) RETURN END 8 . OUTPUT HASIL SIMULASI : ------------------------------------------------------------------------- SINGLE-SERVER QUEUEING SYSTEM REAL RMEAN, U MEAN INTERARRIVAL TIME : 1.000 MINUTES MEAN SERVICE TIME : .500 MINUTES NUMBER OF CUSTOMERS : 1000 AVERAGE DELAY IN QUEUE : .497 MINUTES AVERAGE NUMBER IN QUEUE : .500