International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2331
WATER MANAGEMENT AT PARANDWADI VILLAGE
Amit Gaikwad1, Swapnil Waghmare2, Ravi Baser3 , Sunil Gajbar4,, Akshaya Ghalimath5
1Amit Gaikwad, ICEM, Pune.
2Swapnil Waghmare , ICEM, Pune.
3Ravi Baser, ICEM, Pune.
4Sunil Gajbar, ICEM, Pune.
5 Professor Akshaya Ghalimath, Dept. Of Civil Engineering, ICEM, Pune, Maharashtra, India.
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract: Water supply is one of the most important sectors
in development. Access to water supply is the basic human
needs and rights. Worldwide, 71% of the rural population has
access to improved water supply. In rural India, 60% of the
population has access to improved water supply and in rural
Maharashtra, the percentages are 70%.In parandwadivillage
80%of people connected to water distribution system. The
objective of this study was to assess the water supply system
and storm water management in the village of Parandwadi, a
rural village in Tal. Maval Dist. Pune, Maharashtra.
By conducting an assessment of determine water supply
system. Identify water supply system problems in the village
and then propose solutions to improve water supply system.
Water supply coverage is defined as the percentage of the
population with access to safe (improved) water supplies that
provide 130 liters/person/day within one kilometer of the
household compound. Population of Parandwadi village in
2000-2001 was 1350 and in 2015-2016 population is 2350.
The 90% houses connectedwithwatersupplysystemand30%
of houses are their own boreholes and well.
1. INTRODUCTION
Village parandwadi is situated in Maval Taluka of
pune District. Maharashtra. It is situated on Mumbai pune
express way. The population as per 2011 census of village is
2350.A water supply scheme designed for population of
1250 souls for design year 2031 is there in the village. There
is one supply well of 5 m dia and 10m deep with a switch
room of 3m x 3m x 3m size 8HP Submersible pump sets
having 20000 LPH discharge and 59m head is installed on
the supply well.
A PVC 110mm 6kg/sqcm rising main of length 5450m is laid
from supply well to existing ESR of capacity 150000 liters
and a distribution system of PVC110mmto75mmdia length
1385m is laid in the village.
This water supply scheme is catering the need of only one
half of total village population which is not at all sufficient.
Secondly the yield of existing supply well is not sufficient
especially in summer season. Asthedevelopmentisveryfast
and hence a new water supply scheme is urgently needed.
Purpose of redesign water distribution system is to achieve
daily water demand of every person in the village of
parandwadi. Second reason was the water is supplied has a
poor treatment before supply in village. Third reason is
increase in the number of patients of water bond disease in
the village.
2. PROJECT METHODOLOGY
2.1. To Assess The Existing Water Distribution System:
A water supply scheme designed for population of
1250 for design year 2020 is there in parandwadi
village.This water supply scheme is cateringthe needofonly
one half of total village population which is not at all
sufficient. Secondly the yield of existing supply well is not
sufficient especially in summer season. As the development
is very fast and hence a new water supplyschemeisurgently
needed.
2.2. Visited Existing Water Distribution System Of
Parandwadi Village:
After deciding theprojecttopicwevisitedinparandwadi
village we had seen whole water distribution system. The
starting point the system pawana river to intake well
thenusing pump water is pumped to ESR (elevated storage
reservoir) then chemicals like chlorine and bleaching
powder than distribute to whole village.Maintaining the
Integrity of the Specifications.
2.3. Data Collected Of Water Distribution System
In this survey we estimated noofhousesconnectedwith
distribution system. Than we collected information about
ESR .capacity of ESR is 150000 lit. PVC pipes of 10 cm to 30
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2332
cm diameter pipes are use to distribute water to whole
village. 20 horsepower capacity of pump is use to for
pumping of water. Intake well of 5 meter dia is located near
the pawana river.
2.4. Problems of Villagers Due To Water Distribution
System
1. Daily water demand as per IS code is not fulfill by
existing water supply system in village
2. Due to low degree of treatment of water increase in
water born disease
3. Due to increasing crack in pipe line water get
polluted and wasted which effect daily water demand
4. Decrease in ground water table ground water
getting polluted and scarcity of water occurring in village.
2.5. Hospital Visit Near By Parandwadi
1. We visited nearby hospital came to know getting
affected by drinking water.
2. Increasing no of patients in hospital due water borne
diseases.
2.6.TestingOfWaterFrom SourceAndWaterDistribution
System
1. The testing of water is done at kana phata health center.
2. No of tests carried out on water are BOD, COD, DO, etc.
2.7. Rain Fall Data Collected From Indian Metrological
Department Pune(Imp)
Rain fall data is collected from IMD pune in shivajinagar .We
have collected annual rain fall parandawadi villagefromlast
30 years.
3. TYPES OF DESIGNS
3.1. Population Design Of Village
Pop Future = Pop Present X ( 1+I ) n
Where :
Pop Future = Future Population
Pop Present = Present Population
i = Growth Rate (unknown)
n = Number of Years
3.2. Requirement Of Daily Water Demand To Be Treated
Bathing: 55 liters
Toilet flushing: 30 liters
Washing of clothes: 20 liters
Washing the house: 10 liters
Washing utensils: 10 liters
Total water demand = 135 liters
3.3. Estimation Of Storm Water Management
C.I.A
Storm water quantity, Q ==---------
360
Where,
Q = Quantity of storm water, m3/sec
C = Coefficient of runoff
I = intensity of rainfall (mm/hour) for the duration equal to
time of concentration, and
A = Drainage area in hectares
4. CONCLUSIONS
In present study of Parandwadi village and Water
Distribution Network (WDN)wasstudied,whichwaslocated
at district Pune, State Maharashtra, India. For the design of
Parandwadi water distribution network study of present
population, forecast Population for the three decade, daily
water demand, flow and also survey of village parandwadi
was done. The surface run-off resulting after precipitation
contributes to the storm water. The quantity of storm water
reaching to the sewers or drains is very large as compared
with sanitary sewage. The rainfall intensity could be
measured by using rain gauges and recording the amount of
rain falling in unit time.
REFERENCES
[1] A. Gheisi, Gh. Naser, Water distribution systems
reliability under simultaneous multicomponent Failure
Scenario, J. Am. Water Works Ass.106 no. 7 (2014)
E319-E327.
[2] A. Ostfeld, Reliability analysis of water distribution
systems, J. Hydroinformatics. 6 (2004) 281-294
[3] Eiger G, Shamir U, Ben- Tal A. (1994) “Opatimal Design
of Water Distribution Network” Water Resources
Research, Vol. 30, No.9, pp- 2637-2638R.Nicole,“Titleof
paper with only first word capitalized,” J. Name Stand.
Abbrev., in press.
[4] IoanSarbu (2009)“Design of optimal water distribution
systems”, IJE, Vol. 3, pp 59-60. |
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2333
[5] L. Perelman, S. Amin, A network interdiction model for
analyzing the vulnerability of water distribution
systems, In Proceedings of the 3rd international
conferenceonhighconfidencenetworkedsystems.ACM,
(2014) 135-144.
[6] Maulik Joshi, Feb (2014) “Design of Water Distribution
Supply NetworkFor KuchhadiVillage”Volume:3|Issue:
2 | Feb 2014 ISSN - 2250-1991J. Clerk Maxwell, A
Treatise on Electricity and Magnetism, 3rd ed., vol. 2.
Oxford: Clarendon, 1892, pp.68-73.
[7] Minaxi.M.Yengale, P. J. Wadhi, B.V. Khode (May June
2012) “Analysis of Water Distribution Network for
Karanja Village” IJERA, Vol 2, , PP 2352-2355. |
[8] Niklesh R. Murekar, Isha Khedival. (2006) “Design of
Distribution Network of Water Supply For Kudwa and
Katangi-Kala Villages”,IJAEST, Vol. 7, , pp 10-12. |
[9] Shamir U.(1968) “Water DistributionSystemsAnalysis”,
Journal of the Hydraulic Division Proceeding of the
ASCE, HY.1, 1968: pp.219-222. |
[10] Walski, Thomas M., (march 2006) “A History of Water
Distribution”, Journal AWWA, Vol 98, No.3, pp-110-111

More Related Content

What's hot

Rainwater harvesting in kota samarahan
Rainwater harvesting in kota samarahanRainwater harvesting in kota samarahan
Rainwater harvesting in kota samarahaneSAT Journals
 
IRJET- Assessment of Water Quality Index of Hiran River at Sihora Region in J...
IRJET- Assessment of Water Quality Index of Hiran River at Sihora Region in J...IRJET- Assessment of Water Quality Index of Hiran River at Sihora Region in J...
IRJET- Assessment of Water Quality Index of Hiran River at Sihora Region in J...IRJET Journal
 
Water security for village gavhali through roof top rain water harvesting
Water security for village gavhali through roof top rain water harvestingWater security for village gavhali through roof top rain water harvesting
Water security for village gavhali through roof top rain water harvestingeSAT Publishing House
 
Paper id 212014141
Paper id 212014141Paper id 212014141
Paper id 212014141IJRAT
 
Sri Lanka; Quality of Collected Rainwater from Sri Lanka
Sri Lanka;  Quality of Collected Rainwater from Sri LankaSri Lanka;  Quality of Collected Rainwater from Sri Lanka
Sri Lanka; Quality of Collected Rainwater from Sri LankaV9X
 
Smart Water Solution Using Internet of Things (IoT)
Smart Water Solution Using Internet of Things (IoT)Smart Water Solution Using Internet of Things (IoT)
Smart Water Solution Using Internet of Things (IoT)Vinay Gor
 
Borewells metering and tariffs in group housing communities
Borewells metering and tariffs in group housing communitiesBorewells metering and tariffs in group housing communities
Borewells metering and tariffs in group housing communitiesbiometrust
 
Water - The essential resource
Water - The essential resourceWater - The essential resource
Water - The essential resourceKASHIF SHABBIR
 
Microbial transport from Dairying under different irrigation systems in Cante...
Microbial transport from Dairying under different irrigation systems in Cante...Microbial transport from Dairying under different irrigation systems in Cante...
Microbial transport from Dairying under different irrigation systems in Cante...aimeew
 
Nepal; Eco Home For Sustainable Water Management: A Case Study In Kathmandu
Nepal;  Eco Home For Sustainable Water Management:  A Case Study In KathmanduNepal;  Eco Home For Sustainable Water Management:  A Case Study In Kathmandu
Nepal; Eco Home For Sustainable Water Management: A Case Study In KathmanduV9X
 
IRJET- A Research Paper on Jalyukt Shivar Abhiyan Assessment (Sonavade) and D...
IRJET- A Research Paper on Jalyukt Shivar Abhiyan Assessment (Sonavade) and D...IRJET- A Research Paper on Jalyukt Shivar Abhiyan Assessment (Sonavade) and D...
IRJET- A Research Paper on Jalyukt Shivar Abhiyan Assessment (Sonavade) and D...IRJET Journal
 
Water harvesting structures
Water harvesting structures Water harvesting structures
Water harvesting structures Pawan Jeet
 
Using Hydrologic and Hydraulic Modeling Water Flow Simulation in Metamorphic ...
Using Hydrologic and Hydraulic Modeling Water Flow Simulation in Metamorphic ...Using Hydrologic and Hydraulic Modeling Water Flow Simulation in Metamorphic ...
Using Hydrologic and Hydraulic Modeling Water Flow Simulation in Metamorphic ...AM Publications
 
IRJET - Study for Pipe Distribution Network (PDN) in Aruna Dam Irrigation System
IRJET - Study for Pipe Distribution Network (PDN) in Aruna Dam Irrigation SystemIRJET - Study for Pipe Distribution Network (PDN) in Aruna Dam Irrigation System
IRJET - Study for Pipe Distribution Network (PDN) in Aruna Dam Irrigation SystemIRJET Journal
 

What's hot (20)

Effects of tillage, cover crops, residue turner
Effects of tillage, cover crops, residue   turnerEffects of tillage, cover crops, residue   turner
Effects of tillage, cover crops, residue turner
 
Evolving thinking on Agricultural Water Productivity: Lessons learned from 20...
Evolving thinking on Agricultural Water Productivity: Lessons learned from 20...Evolving thinking on Agricultural Water Productivity: Lessons learned from 20...
Evolving thinking on Agricultural Water Productivity: Lessons learned from 20...
 
Rainwater harvesting in kota samarahan
Rainwater harvesting in kota samarahanRainwater harvesting in kota samarahan
Rainwater harvesting in kota samarahan
 
IRJET- Assessment of Water Quality Index of Hiran River at Sihora Region in J...
IRJET- Assessment of Water Quality Index of Hiran River at Sihora Region in J...IRJET- Assessment of Water Quality Index of Hiran River at Sihora Region in J...
IRJET- Assessment of Water Quality Index of Hiran River at Sihora Region in J...
 
Water security for village gavhali through roof top rain water harvesting
Water security for village gavhali through roof top rain water harvestingWater security for village gavhali through roof top rain water harvesting
Water security for village gavhali through roof top rain water harvesting
 
Paper id 212014141
Paper id 212014141Paper id 212014141
Paper id 212014141
 
Goss_Christopherposter-2-3
Goss_Christopherposter-2-3Goss_Christopherposter-2-3
Goss_Christopherposter-2-3
 
Sri Lanka; Quality of Collected Rainwater from Sri Lanka
Sri Lanka;  Quality of Collected Rainwater from Sri LankaSri Lanka;  Quality of Collected Rainwater from Sri Lanka
Sri Lanka; Quality of Collected Rainwater from Sri Lanka
 
Smart Water Solution Using Internet of Things (IoT)
Smart Water Solution Using Internet of Things (IoT)Smart Water Solution Using Internet of Things (IoT)
Smart Water Solution Using Internet of Things (IoT)
 
Borewells metering and tariffs in group housing communities
Borewells metering and tariffs in group housing communitiesBorewells metering and tariffs in group housing communities
Borewells metering and tariffs in group housing communities
 
Water - The essential resource
Water - The essential resourceWater - The essential resource
Water - The essential resource
 
Microbial transport from Dairying under different irrigation systems in Cante...
Microbial transport from Dairying under different irrigation systems in Cante...Microbial transport from Dairying under different irrigation systems in Cante...
Microbial transport from Dairying under different irrigation systems in Cante...
 
Nepal; Eco Home For Sustainable Water Management: A Case Study In Kathmandu
Nepal;  Eco Home For Sustainable Water Management:  A Case Study In KathmanduNepal;  Eco Home For Sustainable Water Management:  A Case Study In Kathmandu
Nepal; Eco Home For Sustainable Water Management: A Case Study In Kathmandu
 
IRJET- A Research Paper on Jalyukt Shivar Abhiyan Assessment (Sonavade) and D...
IRJET- A Research Paper on Jalyukt Shivar Abhiyan Assessment (Sonavade) and D...IRJET- A Research Paper on Jalyukt Shivar Abhiyan Assessment (Sonavade) and D...
IRJET- A Research Paper on Jalyukt Shivar Abhiyan Assessment (Sonavade) and D...
 
journal paper of mine
journal paper of minejournal paper of mine
journal paper of mine
 
Assignment 2
Assignment 2Assignment 2
Assignment 2
 
Sustainable Use of Water
Sustainable Use of WaterSustainable Use of Water
Sustainable Use of Water
 
Water harvesting structures
Water harvesting structures Water harvesting structures
Water harvesting structures
 
Using Hydrologic and Hydraulic Modeling Water Flow Simulation in Metamorphic ...
Using Hydrologic and Hydraulic Modeling Water Flow Simulation in Metamorphic ...Using Hydrologic and Hydraulic Modeling Water Flow Simulation in Metamorphic ...
Using Hydrologic and Hydraulic Modeling Water Flow Simulation in Metamorphic ...
 
IRJET - Study for Pipe Distribution Network (PDN) in Aruna Dam Irrigation System
IRJET - Study for Pipe Distribution Network (PDN) in Aruna Dam Irrigation SystemIRJET - Study for Pipe Distribution Network (PDN) in Aruna Dam Irrigation System
IRJET - Study for Pipe Distribution Network (PDN) in Aruna Dam Irrigation System
 

Similar to Water Management at Parandwadi Village

ANALYSIS AND OPTIMIZATION OF WATER DISTRIBUTION SYSTEM AT AMBAJI
ANALYSIS AND OPTIMIZATION OF WATER DISTRIBUTION SYSTEM AT AMBAJIANALYSIS AND OPTIMIZATION OF WATER DISTRIBUTION SYSTEM AT AMBAJI
ANALYSIS AND OPTIMIZATION OF WATER DISTRIBUTION SYSTEM AT AMBAJIIRJET Journal
 
“DESIGN OF WTP FOR NASHIRABAD MUNICIPAL COUNCIL”
“DESIGN OF WTP FOR NASHIRABAD MUNICIPAL COUNCIL”“DESIGN OF WTP FOR NASHIRABAD MUNICIPAL COUNCIL”
“DESIGN OF WTP FOR NASHIRABAD MUNICIPAL COUNCIL”IRJET Journal
 
IRJET- Design of Water Supply Scheme of Bhugaon Village, Mulshi, Pune
IRJET- Design of Water Supply Scheme of Bhugaon Village, Mulshi, PuneIRJET- Design of Water Supply Scheme of Bhugaon Village, Mulshi, Pune
IRJET- Design of Water Supply Scheme of Bhugaon Village, Mulshi, PuneIRJET Journal
 
Development and Performance Evaluation of Cost Effective Roof Water Purificat...
Development and Performance Evaluation of Cost Effective Roof Water Purificat...Development and Performance Evaluation of Cost Effective Roof Water Purificat...
Development and Performance Evaluation of Cost Effective Roof Water Purificat...IRJET Journal
 
DESIGN OF MULTI-VILLAGE WATER SUPPLY SYSTEM
DESIGN OF MULTI-VILLAGE WATER SUPPLY SYSTEMDESIGN OF MULTI-VILLAGE WATER SUPPLY SYSTEM
DESIGN OF MULTI-VILLAGE WATER SUPPLY SYSTEMIRJET Journal
 
DESIGN OF SOFTWARE BASED WATER DISTRIBUTION SYSTEM FOR A VILLAGE
DESIGN OF SOFTWARE BASED WATER DISTRIBUTION SYSTEM FOR A VILLAGEDESIGN OF SOFTWARE BASED WATER DISTRIBUTION SYSTEM FOR A VILLAGE
DESIGN OF SOFTWARE BASED WATER DISTRIBUTION SYSTEM FOR A VILLAGEIRJET Journal
 
Utilization of Existing Water Sources for Irrigation Purposes-Case Study of K...
Utilization of Existing Water Sources for Irrigation Purposes-Case Study of K...Utilization of Existing Water Sources for Irrigation Purposes-Case Study of K...
Utilization of Existing Water Sources for Irrigation Purposes-Case Study of K...IRJET Journal
 
Investigation Work Carried Out at Nidubrolu Water Treatment Plant
Investigation Work Carried Out at Nidubrolu Water Treatment PlantInvestigation Work Carried Out at Nidubrolu Water Treatment Plant
Investigation Work Carried Out at Nidubrolu Water Treatment PlantIRJET Journal
 
IRJET- Hydraulic and Structural Design of Water Treatment Plant
IRJET- Hydraulic and Structural Design of Water Treatment PlantIRJET- Hydraulic and Structural Design of Water Treatment Plant
IRJET- Hydraulic and Structural Design of Water Treatment PlantIRJET Journal
 
“DESIGN OF WATER SUPPLY SCHEME IN VILLAGE – BANEGAON, TALUKA – NORTH SOLAPUR,...
“DESIGN OF WATER SUPPLY SCHEME IN VILLAGE – BANEGAON, TALUKA – NORTH SOLAPUR,...“DESIGN OF WATER SUPPLY SCHEME IN VILLAGE – BANEGAON, TALUKA – NORTH SOLAPUR,...
“DESIGN OF WATER SUPPLY SCHEME IN VILLAGE – BANEGAON, TALUKA – NORTH SOLAPUR,...IRJET Journal
 
IRJET- Review on Economical Water Treatment Plant
IRJET-  	  Review on Economical Water Treatment PlantIRJET-  	  Review on Economical Water Treatment Plant
IRJET- Review on Economical Water Treatment PlantIRJET Journal
 
“WATER DEMAND FORECASTING AND DESIGN OF WATER DISTRIBUTION SYSTEM/NETWORK AT ...
“WATER DEMAND FORECASTING AND DESIGN OF WATER DISTRIBUTION SYSTEM/NETWORK AT ...“WATER DEMAND FORECASTING AND DESIGN OF WATER DISTRIBUTION SYSTEM/NETWORK AT ...
“WATER DEMAND FORECASTING AND DESIGN OF WATER DISTRIBUTION SYSTEM/NETWORK AT ...IRJET Journal
 
“GENERATION OF ELECTRICITY FROM SULLAGE WATER”
“GENERATION OF ELECTRICITY FROM SULLAGE WATER”“GENERATION OF ELECTRICITY FROM SULLAGE WATER”
“GENERATION OF ELECTRICITY FROM SULLAGE WATER”IRJET Journal
 
DEVELOPMENT OF CLEAN WATER DISTRIBUTION NETWORK CAPACITY BY USING WATERCAD
DEVELOPMENT OF CLEAN WATER DISTRIBUTION NETWORK CAPACITY BY USING WATERCADDEVELOPMENT OF CLEAN WATER DISTRIBUTION NETWORK CAPACITY BY USING WATERCAD
DEVELOPMENT OF CLEAN WATER DISTRIBUTION NETWORK CAPACITY BY USING WATERCADIAEME Publication
 
IRJET- A Study of Application of Qanat System using Modern Techniques for Oas...
IRJET- A Study of Application of Qanat System using Modern Techniques for Oas...IRJET- A Study of Application of Qanat System using Modern Techniques for Oas...
IRJET- A Study of Application of Qanat System using Modern Techniques for Oas...IRJET Journal
 
Mobile Solar Water Purifier
Mobile Solar Water PurifierMobile Solar Water Purifier
Mobile Solar Water PurifierIRJET Journal
 
“DESIGN OF WATER DISTRIBUTION NETWORK FOR DARFAL VILLAGE BY EPANET 2.0 SOFTWARE”
“DESIGN OF WATER DISTRIBUTION NETWORK FOR DARFAL VILLAGE BY EPANET 2.0 SOFTWARE”“DESIGN OF WATER DISTRIBUTION NETWORK FOR DARFAL VILLAGE BY EPANET 2.0 SOFTWARE”
“DESIGN OF WATER DISTRIBUTION NETWORK FOR DARFAL VILLAGE BY EPANET 2.0 SOFTWARE”IRJET Journal
 
CURRENT WATER MANAGEMENT PRACTICES IN SINGLE UNIT RESIDENTIAL BUNGALOWS AT KO...
CURRENT WATER MANAGEMENT PRACTICES IN SINGLE UNIT RESIDENTIAL BUNGALOWS AT KO...CURRENT WATER MANAGEMENT PRACTICES IN SINGLE UNIT RESIDENTIAL BUNGALOWS AT KO...
CURRENT WATER MANAGEMENT PRACTICES IN SINGLE UNIT RESIDENTIAL BUNGALOWS AT KO...IRJET Journal
 
IRJET- Assessment of Spatial Variations of Water Quality Index of Deepor Bee...
IRJET-	 Assessment of Spatial Variations of Water Quality Index of Deepor Bee...IRJET-	 Assessment of Spatial Variations of Water Quality Index of Deepor Bee...
IRJET- Assessment of Spatial Variations of Water Quality Index of Deepor Bee...IRJET Journal
 

Similar to Water Management at Parandwadi Village (20)

ANALYSIS AND OPTIMIZATION OF WATER DISTRIBUTION SYSTEM AT AMBAJI
ANALYSIS AND OPTIMIZATION OF WATER DISTRIBUTION SYSTEM AT AMBAJIANALYSIS AND OPTIMIZATION OF WATER DISTRIBUTION SYSTEM AT AMBAJI
ANALYSIS AND OPTIMIZATION OF WATER DISTRIBUTION SYSTEM AT AMBAJI
 
“DESIGN OF WTP FOR NASHIRABAD MUNICIPAL COUNCIL”
“DESIGN OF WTP FOR NASHIRABAD MUNICIPAL COUNCIL”“DESIGN OF WTP FOR NASHIRABAD MUNICIPAL COUNCIL”
“DESIGN OF WTP FOR NASHIRABAD MUNICIPAL COUNCIL”
 
IRJET- Design of Water Supply Scheme of Bhugaon Village, Mulshi, Pune
IRJET- Design of Water Supply Scheme of Bhugaon Village, Mulshi, PuneIRJET- Design of Water Supply Scheme of Bhugaon Village, Mulshi, Pune
IRJET- Design of Water Supply Scheme of Bhugaon Village, Mulshi, Pune
 
Development and Performance Evaluation of Cost Effective Roof Water Purificat...
Development and Performance Evaluation of Cost Effective Roof Water Purificat...Development and Performance Evaluation of Cost Effective Roof Water Purificat...
Development and Performance Evaluation of Cost Effective Roof Water Purificat...
 
DESIGN OF MULTI-VILLAGE WATER SUPPLY SYSTEM
DESIGN OF MULTI-VILLAGE WATER SUPPLY SYSTEMDESIGN OF MULTI-VILLAGE WATER SUPPLY SYSTEM
DESIGN OF MULTI-VILLAGE WATER SUPPLY SYSTEM
 
DESIGN OF SOFTWARE BASED WATER DISTRIBUTION SYSTEM FOR A VILLAGE
DESIGN OF SOFTWARE BASED WATER DISTRIBUTION SYSTEM FOR A VILLAGEDESIGN OF SOFTWARE BASED WATER DISTRIBUTION SYSTEM FOR A VILLAGE
DESIGN OF SOFTWARE BASED WATER DISTRIBUTION SYSTEM FOR A VILLAGE
 
Utilization of Existing Water Sources for Irrigation Purposes-Case Study of K...
Utilization of Existing Water Sources for Irrigation Purposes-Case Study of K...Utilization of Existing Water Sources for Irrigation Purposes-Case Study of K...
Utilization of Existing Water Sources for Irrigation Purposes-Case Study of K...
 
V130402139143
V130402139143V130402139143
V130402139143
 
Investigation Work Carried Out at Nidubrolu Water Treatment Plant
Investigation Work Carried Out at Nidubrolu Water Treatment PlantInvestigation Work Carried Out at Nidubrolu Water Treatment Plant
Investigation Work Carried Out at Nidubrolu Water Treatment Plant
 
IRJET- Hydraulic and Structural Design of Water Treatment Plant
IRJET- Hydraulic and Structural Design of Water Treatment PlantIRJET- Hydraulic and Structural Design of Water Treatment Plant
IRJET- Hydraulic and Structural Design of Water Treatment Plant
 
“DESIGN OF WATER SUPPLY SCHEME IN VILLAGE – BANEGAON, TALUKA – NORTH SOLAPUR,...
“DESIGN OF WATER SUPPLY SCHEME IN VILLAGE – BANEGAON, TALUKA – NORTH SOLAPUR,...“DESIGN OF WATER SUPPLY SCHEME IN VILLAGE – BANEGAON, TALUKA – NORTH SOLAPUR,...
“DESIGN OF WATER SUPPLY SCHEME IN VILLAGE – BANEGAON, TALUKA – NORTH SOLAPUR,...
 
IRJET- Review on Economical Water Treatment Plant
IRJET-  	  Review on Economical Water Treatment PlantIRJET-  	  Review on Economical Water Treatment Plant
IRJET- Review on Economical Water Treatment Plant
 
“WATER DEMAND FORECASTING AND DESIGN OF WATER DISTRIBUTION SYSTEM/NETWORK AT ...
“WATER DEMAND FORECASTING AND DESIGN OF WATER DISTRIBUTION SYSTEM/NETWORK AT ...“WATER DEMAND FORECASTING AND DESIGN OF WATER DISTRIBUTION SYSTEM/NETWORK AT ...
“WATER DEMAND FORECASTING AND DESIGN OF WATER DISTRIBUTION SYSTEM/NETWORK AT ...
 
“GENERATION OF ELECTRICITY FROM SULLAGE WATER”
“GENERATION OF ELECTRICITY FROM SULLAGE WATER”“GENERATION OF ELECTRICITY FROM SULLAGE WATER”
“GENERATION OF ELECTRICITY FROM SULLAGE WATER”
 
DEVELOPMENT OF CLEAN WATER DISTRIBUTION NETWORK CAPACITY BY USING WATERCAD
DEVELOPMENT OF CLEAN WATER DISTRIBUTION NETWORK CAPACITY BY USING WATERCADDEVELOPMENT OF CLEAN WATER DISTRIBUTION NETWORK CAPACITY BY USING WATERCAD
DEVELOPMENT OF CLEAN WATER DISTRIBUTION NETWORK CAPACITY BY USING WATERCAD
 
IRJET- A Study of Application of Qanat System using Modern Techniques for Oas...
IRJET- A Study of Application of Qanat System using Modern Techniques for Oas...IRJET- A Study of Application of Qanat System using Modern Techniques for Oas...
IRJET- A Study of Application of Qanat System using Modern Techniques for Oas...
 
Mobile Solar Water Purifier
Mobile Solar Water PurifierMobile Solar Water Purifier
Mobile Solar Water Purifier
 
“DESIGN OF WATER DISTRIBUTION NETWORK FOR DARFAL VILLAGE BY EPANET 2.0 SOFTWARE”
“DESIGN OF WATER DISTRIBUTION NETWORK FOR DARFAL VILLAGE BY EPANET 2.0 SOFTWARE”“DESIGN OF WATER DISTRIBUTION NETWORK FOR DARFAL VILLAGE BY EPANET 2.0 SOFTWARE”
“DESIGN OF WATER DISTRIBUTION NETWORK FOR DARFAL VILLAGE BY EPANET 2.0 SOFTWARE”
 
CURRENT WATER MANAGEMENT PRACTICES IN SINGLE UNIT RESIDENTIAL BUNGALOWS AT KO...
CURRENT WATER MANAGEMENT PRACTICES IN SINGLE UNIT RESIDENTIAL BUNGALOWS AT KO...CURRENT WATER MANAGEMENT PRACTICES IN SINGLE UNIT RESIDENTIAL BUNGALOWS AT KO...
CURRENT WATER MANAGEMENT PRACTICES IN SINGLE UNIT RESIDENTIAL BUNGALOWS AT KO...
 
IRJET- Assessment of Spatial Variations of Water Quality Index of Deepor Bee...
IRJET-	 Assessment of Spatial Variations of Water Quality Index of Deepor Bee...IRJET-	 Assessment of Spatial Variations of Water Quality Index of Deepor Bee...
IRJET- Assessment of Spatial Variations of Water Quality Index of Deepor Bee...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 

Recently uploaded (20)

Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 

Water Management at Parandwadi Village

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2331 WATER MANAGEMENT AT PARANDWADI VILLAGE Amit Gaikwad1, Swapnil Waghmare2, Ravi Baser3 , Sunil Gajbar4,, Akshaya Ghalimath5 1Amit Gaikwad, ICEM, Pune. 2Swapnil Waghmare , ICEM, Pune. 3Ravi Baser, ICEM, Pune. 4Sunil Gajbar, ICEM, Pune. 5 Professor Akshaya Ghalimath, Dept. Of Civil Engineering, ICEM, Pune, Maharashtra, India. ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract: Water supply is one of the most important sectors in development. Access to water supply is the basic human needs and rights. Worldwide, 71% of the rural population has access to improved water supply. In rural India, 60% of the population has access to improved water supply and in rural Maharashtra, the percentages are 70%.In parandwadivillage 80%of people connected to water distribution system. The objective of this study was to assess the water supply system and storm water management in the village of Parandwadi, a rural village in Tal. Maval Dist. Pune, Maharashtra. By conducting an assessment of determine water supply system. Identify water supply system problems in the village and then propose solutions to improve water supply system. Water supply coverage is defined as the percentage of the population with access to safe (improved) water supplies that provide 130 liters/person/day within one kilometer of the household compound. Population of Parandwadi village in 2000-2001 was 1350 and in 2015-2016 population is 2350. The 90% houses connectedwithwatersupplysystemand30% of houses are their own boreholes and well. 1. INTRODUCTION Village parandwadi is situated in Maval Taluka of pune District. Maharashtra. It is situated on Mumbai pune express way. The population as per 2011 census of village is 2350.A water supply scheme designed for population of 1250 souls for design year 2031 is there in the village. There is one supply well of 5 m dia and 10m deep with a switch room of 3m x 3m x 3m size 8HP Submersible pump sets having 20000 LPH discharge and 59m head is installed on the supply well. A PVC 110mm 6kg/sqcm rising main of length 5450m is laid from supply well to existing ESR of capacity 150000 liters and a distribution system of PVC110mmto75mmdia length 1385m is laid in the village. This water supply scheme is catering the need of only one half of total village population which is not at all sufficient. Secondly the yield of existing supply well is not sufficient especially in summer season. Asthedevelopmentisveryfast and hence a new water supply scheme is urgently needed. Purpose of redesign water distribution system is to achieve daily water demand of every person in the village of parandwadi. Second reason was the water is supplied has a poor treatment before supply in village. Third reason is increase in the number of patients of water bond disease in the village. 2. PROJECT METHODOLOGY 2.1. To Assess The Existing Water Distribution System: A water supply scheme designed for population of 1250 for design year 2020 is there in parandwadi village.This water supply scheme is cateringthe needofonly one half of total village population which is not at all sufficient. Secondly the yield of existing supply well is not sufficient especially in summer season. As the development is very fast and hence a new water supplyschemeisurgently needed. 2.2. Visited Existing Water Distribution System Of Parandwadi Village: After deciding theprojecttopicwevisitedinparandwadi village we had seen whole water distribution system. The starting point the system pawana river to intake well thenusing pump water is pumped to ESR (elevated storage reservoir) then chemicals like chlorine and bleaching powder than distribute to whole village.Maintaining the Integrity of the Specifications. 2.3. Data Collected Of Water Distribution System In this survey we estimated noofhousesconnectedwith distribution system. Than we collected information about ESR .capacity of ESR is 150000 lit. PVC pipes of 10 cm to 30
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2332 cm diameter pipes are use to distribute water to whole village. 20 horsepower capacity of pump is use to for pumping of water. Intake well of 5 meter dia is located near the pawana river. 2.4. Problems of Villagers Due To Water Distribution System 1. Daily water demand as per IS code is not fulfill by existing water supply system in village 2. Due to low degree of treatment of water increase in water born disease 3. Due to increasing crack in pipe line water get polluted and wasted which effect daily water demand 4. Decrease in ground water table ground water getting polluted and scarcity of water occurring in village. 2.5. Hospital Visit Near By Parandwadi 1. We visited nearby hospital came to know getting affected by drinking water. 2. Increasing no of patients in hospital due water borne diseases. 2.6.TestingOfWaterFrom SourceAndWaterDistribution System 1. The testing of water is done at kana phata health center. 2. No of tests carried out on water are BOD, COD, DO, etc. 2.7. Rain Fall Data Collected From Indian Metrological Department Pune(Imp) Rain fall data is collected from IMD pune in shivajinagar .We have collected annual rain fall parandawadi villagefromlast 30 years. 3. TYPES OF DESIGNS 3.1. Population Design Of Village Pop Future = Pop Present X ( 1+I ) n Where : Pop Future = Future Population Pop Present = Present Population i = Growth Rate (unknown) n = Number of Years 3.2. Requirement Of Daily Water Demand To Be Treated Bathing: 55 liters Toilet flushing: 30 liters Washing of clothes: 20 liters Washing the house: 10 liters Washing utensils: 10 liters Total water demand = 135 liters 3.3. Estimation Of Storm Water Management C.I.A Storm water quantity, Q ==--------- 360 Where, Q = Quantity of storm water, m3/sec C = Coefficient of runoff I = intensity of rainfall (mm/hour) for the duration equal to time of concentration, and A = Drainage area in hectares 4. CONCLUSIONS In present study of Parandwadi village and Water Distribution Network (WDN)wasstudied,whichwaslocated at district Pune, State Maharashtra, India. For the design of Parandwadi water distribution network study of present population, forecast Population for the three decade, daily water demand, flow and also survey of village parandwadi was done. The surface run-off resulting after precipitation contributes to the storm water. The quantity of storm water reaching to the sewers or drains is very large as compared with sanitary sewage. The rainfall intensity could be measured by using rain gauges and recording the amount of rain falling in unit time. REFERENCES [1] A. Gheisi, Gh. Naser, Water distribution systems reliability under simultaneous multicomponent Failure Scenario, J. Am. Water Works Ass.106 no. 7 (2014) E319-E327. [2] A. Ostfeld, Reliability analysis of water distribution systems, J. Hydroinformatics. 6 (2004) 281-294 [3] Eiger G, Shamir U, Ben- Tal A. (1994) “Opatimal Design of Water Distribution Network” Water Resources Research, Vol. 30, No.9, pp- 2637-2638R.Nicole,“Titleof paper with only first word capitalized,” J. Name Stand. Abbrev., in press. [4] IoanSarbu (2009)“Design of optimal water distribution systems”, IJE, Vol. 3, pp 59-60. |
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2333 [5] L. Perelman, S. Amin, A network interdiction model for analyzing the vulnerability of water distribution systems, In Proceedings of the 3rd international conferenceonhighconfidencenetworkedsystems.ACM, (2014) 135-144. [6] Maulik Joshi, Feb (2014) “Design of Water Distribution Supply NetworkFor KuchhadiVillage”Volume:3|Issue: 2 | Feb 2014 ISSN - 2250-1991J. Clerk Maxwell, A Treatise on Electricity and Magnetism, 3rd ed., vol. 2. Oxford: Clarendon, 1892, pp.68-73. [7] Minaxi.M.Yengale, P. J. Wadhi, B.V. Khode (May June 2012) “Analysis of Water Distribution Network for Karanja Village” IJERA, Vol 2, , PP 2352-2355. | [8] Niklesh R. Murekar, Isha Khedival. (2006) “Design of Distribution Network of Water Supply For Kudwa and Katangi-Kala Villages”,IJAEST, Vol. 7, , pp 10-12. | [9] Shamir U.(1968) “Water DistributionSystemsAnalysis”, Journal of the Hydraulic Division Proceeding of the ASCE, HY.1, 1968: pp.219-222. | [10] Walski, Thomas M., (march 2006) “A History of Water Distribution”, Journal AWWA, Vol 98, No.3, pp-110-111