Opportunities and Challenges of Modular Coordination: A Review
Vinay S. Prajapati1, Dr. J. R. Pitroda2, Prof. C. S. Raichura3
1M. Tech. (Civil) Construction Engineering and Management, BVM Engineering College, Vallabh Vidyanagar,
Gujarat
2Associate Professor, PG Coordinator Construction Engineering and Management, Civil
Engineering Department, BVM Engineering College, Vallabh Vidyanagar, Gujarat
ORCID: 0000-0002-2869-3158
3Assistant Professor, Civil Department, Darshan Institute of Engineering and Technology, Rajkot
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - Modular coordinating may significantly reduce project timelines andcostswhilepreservingor improvingthe quality
of the final product by moving a portion of site-based work to an off-site fabrication facility. Module coordination can also
significantly improve sustainabilitybyreducingsite disruption, decreasingwastegenerated, enhancingrelatabilityand reusability,
causing less dust and noise pollution, and reducing equipment loss, theft, and damage. Modularcoordinationcanalsosignificantly
improve sustainability by reducing site disruption, decreasing wastegenerated, improvingrelatabilityandreusability, andcausing
less dust and noise pollution. By examining modular coordination'sexistingstateandfeatures, theresearcherswanttouncoverthe
potential and obstacles of using modular building methodologies.
Key Words: Challenges, Components, Productivity, Modular coordination, Opportunities
1. INTRODUCTION
Buildings and components are sized and placed in a fundamental unitormoduleunderthenotionofmodularcoordination
of dimension and space. Off-site construction of building components is known as modular coordination. After that, they are
delivered to the construction site in a finished state. While traditionally constructed structures use the same materials and
adhere to the same norms and standards as modularly constructed ones, they are erected around half the time and under
controlled plant conditions off-site. Structures are built off-site, under controlled plant conditions, using identical assets and
planning to the same rules and norms as modestly erected offices, but in about half the time. Modular coordination is part of
this cycle. Buildings are sent in "modules" that can be erected on-site to imitate the indistinguishablegoal andspecificsofeven
the most exquisite site-made office. Increasing industrialization in the construction industry has led to the creation of larger,
pre-assembled items transported to the construction site from processing factories. Modular coordination necessitates
selecting a size that is both acceptable and optimum. The economicandhumanfactorsshould beconsideredwhiledetermining
the ideal size. [1].
Building technologies may benefit from modular coordination, which can be used in various ways, from component
construction to partial prefabrication to rationalized conventional construction methods. Additionally, renovation
programmers may use components coordinated on a modular basis. Dimensional coordinationbetweencomponentsmakesit
possible to employ them in various tasks [2]. Therelativelynewconstructionstyle,modular,isunderconsideration forusagein
high-rise residential structures with a height of 12 stories or more [3]. For example, modular coordination minimizes thecost
of constructing a structure and its long-term maintenance costs [6]. By presenting a unique house design that blends high
quality and energy efficiency at an accessible price [7].
1.1 Principle of Modular Coordination
Using related modular proportions, the primary goal of modular coordination is to achieve Dimensional Compatibility
between building dimensions, spans or spaces, and component and material sizes. Inaddition,thearrangementofthebuilding
components concerning each other and the building is often provided through Modular Coordination, which facilitates
collaboration between planners, manufacturers, distributors, and contractors.
Principle of Modular Coordination:
a) Basic Module
b) Modular Dimension
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 04 | Apr 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2418
c) Planning Module
d) Placing of Components
e) Modular Grid
Basic Module: This unit of measurement is crucial. The Latin word "modulus," which means "little measurement"in English,is
the source of the name "module."
Modular Dimension: In most cases, engineers are taught to work with basic sums of numbers. Architectural aestheticsmaybe
satisfied with modular coordination, which gives a solid foundation for an ordered selection of dimensions and allows for
relational flexibility.
Planning Module and Placing of Components: Dimensional frame marking of the building uses many processes for finding
components, such as slapping them vertically or horizontally to determinedistributionacrossload-bearingwalls.Components
are either positioned axially or perpendicularly to the boundary plan.
Modular Grids: A three-dimensional mesh of lines with a desired spatial dimension is used to speed up the design process for
all kinds of structures. Realizing modular cohesion in a grid structure is methodical [1].
1.2 Objective of the study
The objectives of the study are as follows:
• To study modular coordination in the construction industry.
• To find out the factors of modular coordination and compare modular coordination with traditional construction.
• To investigate the current status of the building industry toward the modular concept in the construction industry.
2. Literature Review
However, there is considerable diversity in the consequences of both on-site and modular construction, according to
research conducted by John Quale and colleagues (2012). For example, Modular Company 1'semissionsweremuchgreater
than the other two modular examples and higher than one of the five on-site firms.Ascomparedtotheothermodular facilities,
this one is situated in a rural region with a commute of more than twice as long. In addition to using more power than the
others, this firm used fuel oil to heat itself, which resulted in greater emissions. [12].
Saiyed Farhana et. al. (2015) stated that modular coordination has many advantages overtraditional construction.Ithasthe
simplicity of dexterity, which offers the capacity to supply single source establishment through production line prepared
provider organization. Modular coordination is reliably great both in plan and in development. Measured coordination gives
the greatest adaptability to meet the plan [4].
For a more subjective evaluation, Palak Sachdev and colleagues (2018) proposed an analysis technique based on cost per
square foot to evaluate modular methods and an objective method that relied on posting the benefits of each development
strategy separately and considering the differences between them. It is possible to evaluate the cost feasibility of the two
development methods for multi-story company projects using this approach in a way that might serve as an important
navigational tool [19].
L.J. Fifield et. al. (2018) there is an urgent need for extra hospital bed spaces in the UK, and modular construction may be an
energy-efficient and handy answer. A new design for the fabric and mechanical systems is essential if these facilities are safe
and pleasant for patients and clinical personnel throughout the sweltering summer months. [9].
In order to alleviate the housing shortage in the United Kingdom and boost the construction industry's productivity and long-
term viability, according to Gatheeshgar Perampalam et al. (2019), cost-effectivemodularbuildingsolutionswith improved
structural performance are urgently needed. Therefore, cold-formed hollow flange steel sections are used in modular
construction systems, and computational analyses of hollow flange beam structural behavior are presented in this study [10].
Huu-Tai Thai et. al. (2020) a comprehensive audit of ongoing advances of modular innovations has been given an
accentuation on primary parts of particular structures, including underlying frameworks, between module associations,
primary investigation, and foundational layout. Althoughparticulardevelopmentislargelyutilizedinlow-ascentstructures,its
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 04 | Apr 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2419
applications to elevated structures are restricted. The specialized difficulties impeding the broad reception of particular
development for tall structures were stressed and talked about [15].
Karthik Subramanya et. al. (2020) talked about the key advantages, including venture plans, project costs, the well-beingof
the workers, project quality and efficiency, and natural. The significant impediments included venture arranging,
transportation, public and master acknowledgment, establishing cost and cost because of intricacy, and coordination. The
outcomes found that although particulardevelopmenthasmoreadvantagesthanconstraints,furtherexplorationis expectedto
moderate or destroy the difficulties [5].
3. Opportunities and Challenges of Modular Coordination
The advantages and disadvantages of modular construction must be taken into account. As a result, many
possibilities are tied to cost-cutting measures such as reducing the amount of time it takes to get a project started,
increasing the quality of the finished product, and making it more environmentally friendly. We will go through
each of these points in more detail below.
3.1 Opportunities
The opportunities for modular coordination are as follows:
Reduce Time: Multiple tasks may be completed instantly, and weather circumstances cannot impact the building schedule
when using the modularization approach. Consequently, modular construction takes less time to complete than conventional
techniques, which may be crucial for quick turnaround projects, such as repairing infrastructure and hospitals after a
catastrophe [5]. As a result of modular coordination, the building process is faster, more efficient, and safer. Modular building
has been shown to save time and money in several projects. For example, concurrent building on-site and in a factory has
reduced the time to complete a project [18].
Cost Effectiveness: Modularization is supposed to lower the cost of building projects. Equipment transportationforon-site
personnel is minimized, as is the extremely efficient installation of off-site building components. The absence of weather
extremes also contributes to the cheaper cost. There is less engineering and time required in the design process of modular
construction than in the conventional design approach [5]. Productivityandcostsavingsaretheprimarygoalsofthisapproach
[14]. In order to minimize costs and enhance construction efficiency, modular construction can abbreviate project design.
Modular structures are cost-effective to install. New materials and construction techniques are introduced under the
substantial usage of energy-savingtechnology.Specialistsareworkingtofind methodstokeep buildingexpensesdown.Offsite-
produced modules, or "modular construction," are today one of the most promising and high-tech areas in architectural and
construction development throughout the globe [8].
Highly Safe: The rising incidence of fatalities and non-fatal injuries associated withon-the-joblabourhasprompteda slewof
academics to scour the literature for answers. Studieshaveshownthatmodularizationsignificantlyimpactsreducingincidents
when it comes to worker safety. When the modular building approach is applied, the incidence of construction-related
accidents drops. Nevertheless, safety guidelines must be set for modularization, even though it reduces the likelihood of
workplace injuries [5]. The modular coordination industry is burdened with the ordinary risks and problems of conventional
construction and the additional risks and difficulties unique to modular coordination [11].
Reduce Material Waste: The amount of trash produced by conventional building processes has long been a problem for
project managers and other stakeholders in terms of environmental impact. Compared to conventional building methods,
modular ones create less waste and can be reused and recycled moreeasily.Inaddition,theirwastecan beseparatedatthe end
of their useful lives. They also produce less dust, greenhouse gases, and noise on the job site. To cut down on waste, modular
construction is ideal [5] [20].
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 04 | Apr 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2420
The following table 1 shows the opportunities for modular coordination in the construction industry.
Table -1: Opportunities for modular coordination in the construction industry
3.2 Challenges
The challenges of modular coordination are as follows:
Require Accurate Planning: Many complicated components must be created and gathered in the prefabrication process,
which presents a specific challenge to the planning process.Priortotheproject'sinitiation,preciseplanningwithdefined scope
and design specifications is needed [5]. The project of Modular coordination suffers from a lack of adequate management and
expertise [13]. Therefore, careful pre-planning and engineering are required prior to beginning any project. As modules
become more complicated in design, more considerations and planning are required for integration and transportation,
placement on the foundation, and assembly at the final project location [19].
Transportation Challenges: For modular construction, the mass-produced components must be delivered to the
workplace in an adequate number of trucks. The transfer of large components needs careful consideration, which delays
development, increases costs, and complicates the process. Modular construction's transportation limits are a major
impediment to the project's schedule and cost efficiency [5][19]. Modular coordination in transportationtransport modulesis
limited by the setup (cranes) and accompanying rise in designer expenses if new to the procedure, etc. [20]
Negative Public and Expert Perception: The general public and certain construction professionals often negatively
impression modular construction. Until the public is made aware of the good advantages of this technology, it will not be
extensively employed [5].
Establishment and High initial Cost: Even if off-site construction costs less, it necessitates the development of a
construction facility. This means that if labour and other needs for conventional buildingarelessexpensivethanestablishing a
manufacturing facility for modular construction, stakeholderschoosetraditional construction.Theshortageofprofessionals in
the prefabricated building is a major impediment to implementing modular construction. Some researchers have voiced
questions regarding the beneficial effects of modularization on building project costssincenumerouseconomicpaperscannot
be accessible. Modules should be overseen properly to link the cost-effective elements with the success of modularization. A
modular manufacturing facility requires a lot of upfront money to acquire the necessary equipment. A combination of
traditional and prefabricated modular building methods may be found in these places; both structures' manufacturing and
construction expenses were dissected and examined to determine the final home's total cost per square foot, a similar
measurement unit which option is more cost-effective [19].
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 04 | Apr 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2421
The following table 2 shows the challenges of modular coordination in the construction industry.
Table - 2: Challenges of Modular coordination in construction industry
4. Case Study
4.1 Case studies in modular prefabrication: comparative analysis and discoveries
Prefabrication, including modular building, was the focus of this research. With this comparison, China has the quickest
building pace by fabricating steel modules off-site. This may have been due to Advanced Modular Technology (AMT) usage.
Modular high-rise construction may enter a new era with this innovative new method. As modular prefabrication becomes
more common, AMT may be used to enhance the design and collection of prefabricated flat packs. Due to study and data
collecting limitations, more research into project costing might be initiated to counterbalance current research. Since neither
the estimated budget nor the actual cost of the projects was made public, no fair comparison could be drawn between them.
Case studies were shown to have the lowest project length throughout this investigation. However, it is possible to assess
additional information about the process's costs, personnel, and duration. Even if certain case studieswerecompletedhalfthe
time, the project cost might have been more than twice as much.
4.2 Benchmarking and improving dimensional quality on modular construction projects -A case study
A key issue in the modular building business is dimensional quality, addressed in this paper. In order to developscalesfor
dimensional quality, there is currently a paucity of comparison data from cross-projects. In modular building projects,
aggregation challenges arise due to the dimensional unpredictability of system components and the non-conformanceof end-
to-end modules. This research listed revisions, structural safety,constructability,aesthetics,andutilityaspossible implications
of low dimensional quality. The presently available resources do not consider projects' specific demands for tolerance
requirements, which are merely worst-case scenarios. It is advantageous for contractors to measure regularly, scale, and
enhance dimensional quality because of the product return in modular building systems. Modifying dimensional qualityplans
to suit particular manufacturing processes, assembly, handling, and erection may help projects succeed and save money by
reducing rework. In a case study involving two identical modular building projects, methods for calculating dimensional
discrepancy were presented and put into practice. Scan vs. BIM and statistical distribution analysis was then used to examine
the data. Finally, a framework was used based on an ongoing study on ways to optimise the building process.
5. Conclusion
Several literature studies on the modular coordinating approach were examined. The good and negative aspects of the
technique were analyzed in terms of potential problems. The most significant potential highlighted were time reduction, cost
efficiency, worker safety, project quality and productivity, and environmental considerations. On the other hand,
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 04 | Apr 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2422
transportation, project planning, public and expert acceptability, setup costs and high beginning costs, and coordinationwere
among the most difficult difficulties to overcome. As a consequence of the research, it was revealed that modularcoordination
offers more possibilities than it does obstacles.
REFERENCES
[1] Shao, Y., & Mo, Y. (2020). Research on Modular Coordination of Indemnificatory Finished Product Housing in Severe Cold
Region of China-A Case Study of an Experimental Residential ProjectinHarbin. IOPConferenceSeries:MaterialsScienceand
Engineering, 811(1). https://doi.org/10.1088/1757-899X/811/1/012016
[2] Yunus, R., Suratkon, A., Wimala, M., Hamid, H. A., Rahimah, S., & Noor, M. (n.d.). Motivational Factors on Adopting Modular
Coordination Concept in Industrialized Building System (IBS). https://doi.org/10.1051/C
[3] Mark Lawson, R., & Richards, J. (2010). Modular design for high-rise buildings. Proceedings of the Institution of Civil
Engineers: Structures and Buildings, 163(3), 151–164. https://doi.org/10.1680/stbu.2010.163.3.151
[4] Farhana, S., Pitroda, J., Bhavsar, J. J., & Dave, S. K. (2015). Modular coordination: an application in construction industry.
https://www.researchgate.net/publication/281174977
[5] Karthik, S., Sharareh, K., & Behzad, R. (2020). Modular Construction vs. Traditional Construction: Advantages and
Limitations: A Comparative Study. 11–19. https://doi.org/10.3311/ccc2020-012
[6] Bertram, N., Fuchs, S., Mischke, J., Palter, R., Strube, G., &Woetzel,J.(2019). Modularconstruction:Fromprojectstoproducts.
[7] Cantu, H., Canal, C., & Costin, A. (2019). Modular Construction: Assessing the Challenges Faced with the Adoption of an
Innovative Approach to Improve U.S. Residential Construction. In CIB World Building Congress.
[8] Generalova, E. M., Generalov, V. P., & Kuznetsova, A. A. (2016). Modular Buildings in Modern Construction. Procedia
Engineering, 153, 167–172. https://doi.org/10.1016/j.proeng.2016.08.098
[9] Fifield, L. J., Lomas, K. J., Giridharan, R., & Allinson, D. (2018). Hospital wards and modular Construction: Summertime
overheating and energy efficiency. BuildingandEnvironment,141,28–44.https://doi.org/10.1016/j.buildenv.2018.05.041
[10] Perampalam, G., Dobson, R., Poologanathan, K., Tsavdaridis,K.D.,Nagaratnam,B.,&Iacovidou,E.(2019).ModularBuilding
Design: Post‐Brexit Housing. Ce/Papers, 3(3–4), 219–224. https://doi.org/10.1002/cepa.1160
[11] Meehleis, M. W. (n.d.). Difficulties Posed and Overcoming Challenges in Modular Construction: A Case Study.
[12] Quale, J., Eckelman, M. J., Williams, K. W., Sloditskie, G., & Zimmerman, J. B. (2012). Construction Matters: Comparing
Environmental Impacts of Building Modular and Conventional Homes in the United States. Journal of Industrial Ecology,
16(2), 243–253. https://doi.org/10.1111/j.1530-9290.2011.00424.x
[13] Rausch, C., Edwards, C., & Haas, C. (2020). Benchmarking and Improving Dimensional Quality on Modular Construction
Projects – A Case Study. International Journal of Industrialized Construction, 1(1), 2–21. https://doi.org/10.29173/ijic212
[14] Neelamkavil, J. (n.d.). Automation in the Prefab and Modular Construction Industry.
[15] Thai, H. T., Ngo, T., & Uy, B. (2020). A review on modular construction for high-rise buildings. In Structures (Vol. 28, pp.
1265–1290). Elsevier Ltd. https://doi.org/10.1016/j.istruc.2020.09.070
[16] Singh, M. M., Sawhney, A., & Borrmann, A. (2015). Modular Coordination and BIM: Development of Rule Based Smart
Building Components. Procedia Engineering, 123, 519–527. https://doi.org/10.1016/j.proeng.2015.10.104
[17] Zhang, J., Long, Y., Lv, S., & Xiang, Y. (2016). BIM-enabled Modular and Industrialized Construction in China. Procedia
Engineering, 145, 1456–1461. https://doi.org/10.1016/j.proeng.2016.04.183
[18] Pichardie, D. (2008). Building Certified Static AnalysersbyModularConstructionof Well-foundedLattices.ElectronicNotes
in Theoretical Computer Science, 212(C), 225–239. https://doi.org/10.1016/j.entcs.2008.04.064
[19] Palak Sachdev (2018). Modular construction and its adaption in India. International Journal of Research in
Engineering, Science and Management, 2581-5782.
[20] Smith, R. E. (n.d.). An Authoritative Source of Innovative Solutions for the Built Environment Off-Site and Modular
Construction Explained.

More Related Content

Similar to Opportunities and Challenges of Modular Coordination: A Review

Coordination of Building Services: A Review
Coordination of Building Services: A ReviewCoordination of Building Services: A Review
Coordination of Building Services: A ReviewIRJET Journal
 
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...IRJET Journal
 
IRJET- Analysis, Design and Estimation of Multi- Storied Residential Buil...
IRJET-  	  Analysis, Design and Estimation of Multi- Storied Residential Buil...IRJET-  	  Analysis, Design and Estimation of Multi- Storied Residential Buil...
IRJET- Analysis, Design and Estimation of Multi- Storied Residential Buil...IRJET Journal
 
IRJET- U-Boot Technology
IRJET-  	  U-Boot TechnologyIRJET-  	  U-Boot Technology
IRJET- U-Boot TechnologyIRJET Journal
 
Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...IRJET Journal
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET Journal
 
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...IRJET Journal
 
IRJET- Application of Decision Making Tool in Sustainable Construction
IRJET- Application of Decision Making Tool in Sustainable ConstructionIRJET- Application of Decision Making Tool in Sustainable Construction
IRJET- Application of Decision Making Tool in Sustainable ConstructionIRJET Journal
 
IRJET- The Evaluation of Payback period for Formwork system
IRJET-  	  The Evaluation of Payback period for Formwork systemIRJET-  	  The Evaluation of Payback period for Formwork system
IRJET- The Evaluation of Payback period for Formwork systemIRJET Journal
 
Concurrent Engineering- for Environment & Sustainability
Concurrent Engineering- for Environment & SustainabilityConcurrent Engineering- for Environment & Sustainability
Concurrent Engineering- for Environment & SustainabilityIRJET Journal
 
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...IRJET Journal
 
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...Nat Rice
 
PLANNING AND ANALYSIS OF MULTI-SPECIALITY HOSPITAL BUILDING
PLANNING AND ANALYSIS OF MULTI-SPECIALITY HOSPITAL BUILDINGPLANNING AND ANALYSIS OF MULTI-SPECIALITY HOSPITAL BUILDING
PLANNING AND ANALYSIS OF MULTI-SPECIALITY HOSPITAL BUILDINGIRJET Journal
 
A Framework to optimize Construction Site Layout Planning
A Framework to optimize Construction Site Layout PlanningA Framework to optimize Construction Site Layout Planning
A Framework to optimize Construction Site Layout PlanningIRJET Journal
 
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit ModelIRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit ModelIRJET Journal
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...IRJET Journal
 
Review on Benefits, Features, Applications and Implementation of Building Inf...
Review on Benefits, Features, Applications and Implementation of Building Inf...Review on Benefits, Features, Applications and Implementation of Building Inf...
Review on Benefits, Features, Applications and Implementation of Building Inf...IRJET Journal
 
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”IRJET Journal
 
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsTime, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsIRJET Journal
 
Application of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectApplication of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectIRJET Journal
 

Similar to Opportunities and Challenges of Modular Coordination: A Review (20)

Coordination of Building Services: A Review
Coordination of Building Services: A ReviewCoordination of Building Services: A Review
Coordination of Building Services: A Review
 
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
 
IRJET- Analysis, Design and Estimation of Multi- Storied Residential Buil...
IRJET-  	  Analysis, Design and Estimation of Multi- Storied Residential Buil...IRJET-  	  Analysis, Design and Estimation of Multi- Storied Residential Buil...
IRJET- Analysis, Design and Estimation of Multi- Storied Residential Buil...
 
IRJET- U-Boot Technology
IRJET-  	  U-Boot TechnologyIRJET-  	  U-Boot Technology
IRJET- U-Boot Technology
 
Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
 
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
 
IRJET- Application of Decision Making Tool in Sustainable Construction
IRJET- Application of Decision Making Tool in Sustainable ConstructionIRJET- Application of Decision Making Tool in Sustainable Construction
IRJET- Application of Decision Making Tool in Sustainable Construction
 
IRJET- The Evaluation of Payback period for Formwork system
IRJET-  	  The Evaluation of Payback period for Formwork systemIRJET-  	  The Evaluation of Payback period for Formwork system
IRJET- The Evaluation of Payback period for Formwork system
 
Concurrent Engineering- for Environment & Sustainability
Concurrent Engineering- for Environment & SustainabilityConcurrent Engineering- for Environment & Sustainability
Concurrent Engineering- for Environment & Sustainability
 
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...
 
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
An Integrated BIM System To Track The Time And Cost Of Construction Projects ...
 
PLANNING AND ANALYSIS OF MULTI-SPECIALITY HOSPITAL BUILDING
PLANNING AND ANALYSIS OF MULTI-SPECIALITY HOSPITAL BUILDINGPLANNING AND ANALYSIS OF MULTI-SPECIALITY HOSPITAL BUILDING
PLANNING AND ANALYSIS OF MULTI-SPECIALITY HOSPITAL BUILDING
 
A Framework to optimize Construction Site Layout Planning
A Framework to optimize Construction Site Layout PlanningA Framework to optimize Construction Site Layout Planning
A Framework to optimize Construction Site Layout Planning
 
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit ModelIRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...
 
Review on Benefits, Features, Applications and Implementation of Building Inf...
Review on Benefits, Features, Applications and Implementation of Building Inf...Review on Benefits, Features, Applications and Implementation of Building Inf...
Review on Benefits, Features, Applications and Implementation of Building Inf...
 
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
 
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsTime, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction Projects
 
Application of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectApplication of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction Project
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 

Opportunities and Challenges of Modular Coordination: A Review

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 04 | Apr 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2417 Opportunities and Challenges of Modular Coordination: A Review Vinay S. Prajapati1, Dr. J. R. Pitroda2, Prof. C. S. Raichura3 1M. Tech. (Civil) Construction Engineering and Management, BVM Engineering College, Vallabh Vidyanagar, Gujarat 2Associate Professor, PG Coordinator Construction Engineering and Management, Civil Engineering Department, BVM Engineering College, Vallabh Vidyanagar, Gujarat ORCID: 0000-0002-2869-3158 3Assistant Professor, Civil Department, Darshan Institute of Engineering and Technology, Rajkot ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - Modular coordinating may significantly reduce project timelines andcostswhilepreservingor improvingthe quality of the final product by moving a portion of site-based work to an off-site fabrication facility. Module coordination can also significantly improve sustainabilitybyreducingsite disruption, decreasingwastegenerated, enhancingrelatabilityand reusability, causing less dust and noise pollution, and reducing equipment loss, theft, and damage. Modularcoordinationcanalsosignificantly improve sustainability by reducing site disruption, decreasing wastegenerated, improvingrelatabilityandreusability, andcausing less dust and noise pollution. By examining modular coordination'sexistingstateandfeatures, theresearcherswanttouncoverthe potential and obstacles of using modular building methodologies. Key Words: Challenges, Components, Productivity, Modular coordination, Opportunities 1. INTRODUCTION Buildings and components are sized and placed in a fundamental unitormoduleunderthenotionofmodularcoordination of dimension and space. Off-site construction of building components is known as modular coordination. After that, they are delivered to the construction site in a finished state. While traditionally constructed structures use the same materials and adhere to the same norms and standards as modularly constructed ones, they are erected around half the time and under controlled plant conditions off-site. Structures are built off-site, under controlled plant conditions, using identical assets and planning to the same rules and norms as modestly erected offices, but in about half the time. Modular coordination is part of this cycle. Buildings are sent in "modules" that can be erected on-site to imitate the indistinguishablegoal andspecificsofeven the most exquisite site-made office. Increasing industrialization in the construction industry has led to the creation of larger, pre-assembled items transported to the construction site from processing factories. Modular coordination necessitates selecting a size that is both acceptable and optimum. The economicandhumanfactorsshould beconsideredwhiledetermining the ideal size. [1]. Building technologies may benefit from modular coordination, which can be used in various ways, from component construction to partial prefabrication to rationalized conventional construction methods. Additionally, renovation programmers may use components coordinated on a modular basis. Dimensional coordinationbetweencomponentsmakesit possible to employ them in various tasks [2]. Therelativelynewconstructionstyle,modular,isunderconsideration forusagein high-rise residential structures with a height of 12 stories or more [3]. For example, modular coordination minimizes thecost of constructing a structure and its long-term maintenance costs [6]. By presenting a unique house design that blends high quality and energy efficiency at an accessible price [7]. 1.1 Principle of Modular Coordination Using related modular proportions, the primary goal of modular coordination is to achieve Dimensional Compatibility between building dimensions, spans or spaces, and component and material sizes. Inaddition,thearrangementofthebuilding components concerning each other and the building is often provided through Modular Coordination, which facilitates collaboration between planners, manufacturers, distributors, and contractors. Principle of Modular Coordination: a) Basic Module b) Modular Dimension
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 04 | Apr 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2418 c) Planning Module d) Placing of Components e) Modular Grid Basic Module: This unit of measurement is crucial. The Latin word "modulus," which means "little measurement"in English,is the source of the name "module." Modular Dimension: In most cases, engineers are taught to work with basic sums of numbers. Architectural aestheticsmaybe satisfied with modular coordination, which gives a solid foundation for an ordered selection of dimensions and allows for relational flexibility. Planning Module and Placing of Components: Dimensional frame marking of the building uses many processes for finding components, such as slapping them vertically or horizontally to determinedistributionacrossload-bearingwalls.Components are either positioned axially or perpendicularly to the boundary plan. Modular Grids: A three-dimensional mesh of lines with a desired spatial dimension is used to speed up the design process for all kinds of structures. Realizing modular cohesion in a grid structure is methodical [1]. 1.2 Objective of the study The objectives of the study are as follows: • To study modular coordination in the construction industry. • To find out the factors of modular coordination and compare modular coordination with traditional construction. • To investigate the current status of the building industry toward the modular concept in the construction industry. 2. Literature Review However, there is considerable diversity in the consequences of both on-site and modular construction, according to research conducted by John Quale and colleagues (2012). For example, Modular Company 1'semissionsweremuchgreater than the other two modular examples and higher than one of the five on-site firms.Ascomparedtotheothermodular facilities, this one is situated in a rural region with a commute of more than twice as long. In addition to using more power than the others, this firm used fuel oil to heat itself, which resulted in greater emissions. [12]. Saiyed Farhana et. al. (2015) stated that modular coordination has many advantages overtraditional construction.Ithasthe simplicity of dexterity, which offers the capacity to supply single source establishment through production line prepared provider organization. Modular coordination is reliably great both in plan and in development. Measured coordination gives the greatest adaptability to meet the plan [4]. For a more subjective evaluation, Palak Sachdev and colleagues (2018) proposed an analysis technique based on cost per square foot to evaluate modular methods and an objective method that relied on posting the benefits of each development strategy separately and considering the differences between them. It is possible to evaluate the cost feasibility of the two development methods for multi-story company projects using this approach in a way that might serve as an important navigational tool [19]. L.J. Fifield et. al. (2018) there is an urgent need for extra hospital bed spaces in the UK, and modular construction may be an energy-efficient and handy answer. A new design for the fabric and mechanical systems is essential if these facilities are safe and pleasant for patients and clinical personnel throughout the sweltering summer months. [9]. In order to alleviate the housing shortage in the United Kingdom and boost the construction industry's productivity and long- term viability, according to Gatheeshgar Perampalam et al. (2019), cost-effectivemodularbuildingsolutionswith improved structural performance are urgently needed. Therefore, cold-formed hollow flange steel sections are used in modular construction systems, and computational analyses of hollow flange beam structural behavior are presented in this study [10]. Huu-Tai Thai et. al. (2020) a comprehensive audit of ongoing advances of modular innovations has been given an accentuation on primary parts of particular structures, including underlying frameworks, between module associations, primary investigation, and foundational layout. Althoughparticulardevelopmentislargelyutilizedinlow-ascentstructures,its
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 04 | Apr 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2419 applications to elevated structures are restricted. The specialized difficulties impeding the broad reception of particular development for tall structures were stressed and talked about [15]. Karthik Subramanya et. al. (2020) talked about the key advantages, including venture plans, project costs, the well-beingof the workers, project quality and efficiency, and natural. The significant impediments included venture arranging, transportation, public and master acknowledgment, establishing cost and cost because of intricacy, and coordination. The outcomes found that although particulardevelopmenthasmoreadvantagesthanconstraints,furtherexplorationis expectedto moderate or destroy the difficulties [5]. 3. Opportunities and Challenges of Modular Coordination The advantages and disadvantages of modular construction must be taken into account. As a result, many possibilities are tied to cost-cutting measures such as reducing the amount of time it takes to get a project started, increasing the quality of the finished product, and making it more environmentally friendly. We will go through each of these points in more detail below. 3.1 Opportunities The opportunities for modular coordination are as follows: Reduce Time: Multiple tasks may be completed instantly, and weather circumstances cannot impact the building schedule when using the modularization approach. Consequently, modular construction takes less time to complete than conventional techniques, which may be crucial for quick turnaround projects, such as repairing infrastructure and hospitals after a catastrophe [5]. As a result of modular coordination, the building process is faster, more efficient, and safer. Modular building has been shown to save time and money in several projects. For example, concurrent building on-site and in a factory has reduced the time to complete a project [18]. Cost Effectiveness: Modularization is supposed to lower the cost of building projects. Equipment transportationforon-site personnel is minimized, as is the extremely efficient installation of off-site building components. The absence of weather extremes also contributes to the cheaper cost. There is less engineering and time required in the design process of modular construction than in the conventional design approach [5]. Productivityandcostsavingsaretheprimarygoalsofthisapproach [14]. In order to minimize costs and enhance construction efficiency, modular construction can abbreviate project design. Modular structures are cost-effective to install. New materials and construction techniques are introduced under the substantial usage of energy-savingtechnology.Specialistsareworkingtofind methodstokeep buildingexpensesdown.Offsite- produced modules, or "modular construction," are today one of the most promising and high-tech areas in architectural and construction development throughout the globe [8]. Highly Safe: The rising incidence of fatalities and non-fatal injuries associated withon-the-joblabourhasprompteda slewof academics to scour the literature for answers. Studieshaveshownthatmodularizationsignificantlyimpactsreducingincidents when it comes to worker safety. When the modular building approach is applied, the incidence of construction-related accidents drops. Nevertheless, safety guidelines must be set for modularization, even though it reduces the likelihood of workplace injuries [5]. The modular coordination industry is burdened with the ordinary risks and problems of conventional construction and the additional risks and difficulties unique to modular coordination [11]. Reduce Material Waste: The amount of trash produced by conventional building processes has long been a problem for project managers and other stakeholders in terms of environmental impact. Compared to conventional building methods, modular ones create less waste and can be reused and recycled moreeasily.Inaddition,theirwastecan beseparatedatthe end of their useful lives. They also produce less dust, greenhouse gases, and noise on the job site. To cut down on waste, modular construction is ideal [5] [20].
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 04 | Apr 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2420 The following table 1 shows the opportunities for modular coordination in the construction industry. Table -1: Opportunities for modular coordination in the construction industry 3.2 Challenges The challenges of modular coordination are as follows: Require Accurate Planning: Many complicated components must be created and gathered in the prefabrication process, which presents a specific challenge to the planning process.Priortotheproject'sinitiation,preciseplanningwithdefined scope and design specifications is needed [5]. The project of Modular coordination suffers from a lack of adequate management and expertise [13]. Therefore, careful pre-planning and engineering are required prior to beginning any project. As modules become more complicated in design, more considerations and planning are required for integration and transportation, placement on the foundation, and assembly at the final project location [19]. Transportation Challenges: For modular construction, the mass-produced components must be delivered to the workplace in an adequate number of trucks. The transfer of large components needs careful consideration, which delays development, increases costs, and complicates the process. Modular construction's transportation limits are a major impediment to the project's schedule and cost efficiency [5][19]. Modular coordination in transportationtransport modulesis limited by the setup (cranes) and accompanying rise in designer expenses if new to the procedure, etc. [20] Negative Public and Expert Perception: The general public and certain construction professionals often negatively impression modular construction. Until the public is made aware of the good advantages of this technology, it will not be extensively employed [5]. Establishment and High initial Cost: Even if off-site construction costs less, it necessitates the development of a construction facility. This means that if labour and other needs for conventional buildingarelessexpensivethanestablishing a manufacturing facility for modular construction, stakeholderschoosetraditional construction.Theshortageofprofessionals in the prefabricated building is a major impediment to implementing modular construction. Some researchers have voiced questions regarding the beneficial effects of modularization on building project costssincenumerouseconomicpaperscannot be accessible. Modules should be overseen properly to link the cost-effective elements with the success of modularization. A modular manufacturing facility requires a lot of upfront money to acquire the necessary equipment. A combination of traditional and prefabricated modular building methods may be found in these places; both structures' manufacturing and construction expenses were dissected and examined to determine the final home's total cost per square foot, a similar measurement unit which option is more cost-effective [19].
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 04 | Apr 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2421 The following table 2 shows the challenges of modular coordination in the construction industry. Table - 2: Challenges of Modular coordination in construction industry 4. Case Study 4.1 Case studies in modular prefabrication: comparative analysis and discoveries Prefabrication, including modular building, was the focus of this research. With this comparison, China has the quickest building pace by fabricating steel modules off-site. This may have been due to Advanced Modular Technology (AMT) usage. Modular high-rise construction may enter a new era with this innovative new method. As modular prefabrication becomes more common, AMT may be used to enhance the design and collection of prefabricated flat packs. Due to study and data collecting limitations, more research into project costing might be initiated to counterbalance current research. Since neither the estimated budget nor the actual cost of the projects was made public, no fair comparison could be drawn between them. Case studies were shown to have the lowest project length throughout this investigation. However, it is possible to assess additional information about the process's costs, personnel, and duration. Even if certain case studieswerecompletedhalfthe time, the project cost might have been more than twice as much. 4.2 Benchmarking and improving dimensional quality on modular construction projects -A case study A key issue in the modular building business is dimensional quality, addressed in this paper. In order to developscalesfor dimensional quality, there is currently a paucity of comparison data from cross-projects. In modular building projects, aggregation challenges arise due to the dimensional unpredictability of system components and the non-conformanceof end- to-end modules. This research listed revisions, structural safety,constructability,aesthetics,andutilityaspossible implications of low dimensional quality. The presently available resources do not consider projects' specific demands for tolerance requirements, which are merely worst-case scenarios. It is advantageous for contractors to measure regularly, scale, and enhance dimensional quality because of the product return in modular building systems. Modifying dimensional qualityplans to suit particular manufacturing processes, assembly, handling, and erection may help projects succeed and save money by reducing rework. In a case study involving two identical modular building projects, methods for calculating dimensional discrepancy were presented and put into practice. Scan vs. BIM and statistical distribution analysis was then used to examine the data. Finally, a framework was used based on an ongoing study on ways to optimise the building process. 5. Conclusion Several literature studies on the modular coordinating approach were examined. The good and negative aspects of the technique were analyzed in terms of potential problems. The most significant potential highlighted were time reduction, cost efficiency, worker safety, project quality and productivity, and environmental considerations. On the other hand,
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 04 | Apr 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2422 transportation, project planning, public and expert acceptability, setup costs and high beginning costs, and coordinationwere among the most difficult difficulties to overcome. As a consequence of the research, it was revealed that modularcoordination offers more possibilities than it does obstacles. REFERENCES [1] Shao, Y., & Mo, Y. (2020). Research on Modular Coordination of Indemnificatory Finished Product Housing in Severe Cold Region of China-A Case Study of an Experimental Residential ProjectinHarbin. IOPConferenceSeries:MaterialsScienceand Engineering, 811(1). https://doi.org/10.1088/1757-899X/811/1/012016 [2] Yunus, R., Suratkon, A., Wimala, M., Hamid, H. A., Rahimah, S., & Noor, M. (n.d.). Motivational Factors on Adopting Modular Coordination Concept in Industrialized Building System (IBS). https://doi.org/10.1051/C [3] Mark Lawson, R., & Richards, J. (2010). Modular design for high-rise buildings. Proceedings of the Institution of Civil Engineers: Structures and Buildings, 163(3), 151–164. https://doi.org/10.1680/stbu.2010.163.3.151 [4] Farhana, S., Pitroda, J., Bhavsar, J. J., & Dave, S. K. (2015). Modular coordination: an application in construction industry. https://www.researchgate.net/publication/281174977 [5] Karthik, S., Sharareh, K., & Behzad, R. (2020). Modular Construction vs. Traditional Construction: Advantages and Limitations: A Comparative Study. 11–19. https://doi.org/10.3311/ccc2020-012 [6] Bertram, N., Fuchs, S., Mischke, J., Palter, R., Strube, G., &Woetzel,J.(2019). Modularconstruction:Fromprojectstoproducts. [7] Cantu, H., Canal, C., & Costin, A. (2019). Modular Construction: Assessing the Challenges Faced with the Adoption of an Innovative Approach to Improve U.S. Residential Construction. In CIB World Building Congress. [8] Generalova, E. M., Generalov, V. P., & Kuznetsova, A. A. (2016). Modular Buildings in Modern Construction. Procedia Engineering, 153, 167–172. https://doi.org/10.1016/j.proeng.2016.08.098 [9] Fifield, L. J., Lomas, K. J., Giridharan, R., & Allinson, D. (2018). Hospital wards and modular Construction: Summertime overheating and energy efficiency. BuildingandEnvironment,141,28–44.https://doi.org/10.1016/j.buildenv.2018.05.041 [10] Perampalam, G., Dobson, R., Poologanathan, K., Tsavdaridis,K.D.,Nagaratnam,B.,&Iacovidou,E.(2019).ModularBuilding Design: Post‐Brexit Housing. Ce/Papers, 3(3–4), 219–224. https://doi.org/10.1002/cepa.1160 [11] Meehleis, M. W. (n.d.). Difficulties Posed and Overcoming Challenges in Modular Construction: A Case Study. [12] Quale, J., Eckelman, M. J., Williams, K. W., Sloditskie, G., & Zimmerman, J. B. (2012). Construction Matters: Comparing Environmental Impacts of Building Modular and Conventional Homes in the United States. Journal of Industrial Ecology, 16(2), 243–253. https://doi.org/10.1111/j.1530-9290.2011.00424.x [13] Rausch, C., Edwards, C., & Haas, C. (2020). Benchmarking and Improving Dimensional Quality on Modular Construction Projects – A Case Study. International Journal of Industrialized Construction, 1(1), 2–21. https://doi.org/10.29173/ijic212 [14] Neelamkavil, J. (n.d.). Automation in the Prefab and Modular Construction Industry. [15] Thai, H. T., Ngo, T., & Uy, B. (2020). A review on modular construction for high-rise buildings. In Structures (Vol. 28, pp. 1265–1290). Elsevier Ltd. https://doi.org/10.1016/j.istruc.2020.09.070 [16] Singh, M. M., Sawhney, A., & Borrmann, A. (2015). Modular Coordination and BIM: Development of Rule Based Smart Building Components. Procedia Engineering, 123, 519–527. https://doi.org/10.1016/j.proeng.2015.10.104 [17] Zhang, J., Long, Y., Lv, S., & Xiang, Y. (2016). BIM-enabled Modular and Industrialized Construction in China. Procedia Engineering, 145, 1456–1461. https://doi.org/10.1016/j.proeng.2016.04.183 [18] Pichardie, D. (2008). Building Certified Static AnalysersbyModularConstructionof Well-foundedLattices.ElectronicNotes in Theoretical Computer Science, 212(C), 225–239. https://doi.org/10.1016/j.entcs.2008.04.064 [19] Palak Sachdev (2018). Modular construction and its adaption in India. International Journal of Research in Engineering, Science and Management, 2581-5782. [20] Smith, R. E. (n.d.). An Authoritative Source of Innovative Solutions for the Built Environment Off-Site and Modular Construction Explained.