Two way slab
 Two way slab is supported by beams in all four sides.
 The ratio of longer span to shorter span (Ly/Lx) <2
than it is call two way slab.
 Main reinforcement is provided in both direction
incase of two way slab.
Cont.
 Load distribution in slab
Types of two way slab
Design steps for two way slab
 Step 1: Preliminary Design.
 Find depth of slab using deflection control criteria.
 Take span/d = 28 for simply supported slab and 32 for
continuous slab.
 D ≥ Dmin = 100mm for normal design and 125mm for
earthquake resistant design.
 Step 2: Analysis of Slab.
 Slab is analyzed by IS code method. (Ref. Annex D-1
and Annex D-2).
 Step 3: Design of Slab.
 Verify depth of slab ‘D’.
 Determine ‘Ast’ and ‘Φ’ and number of bars in shorter direction of
slab.
 Slab section is normally designed as Singly Reinforced Under
Reinforced Rectangular Section.
 Ast = Mu/(0.87fy(d-0.416xu)) which should not be less than
Astmin.
 Check slab for shear in shorter direction.
 Step 4: Check slab at limit state of serviceability in
deflection in shorter direction.
 l/d ≤ αβγδγ
 Step 5: Detailing of reinforcement:
 Curtail/bend the surplus bars as per detailing rules of code. (Ref.
Annex)
 Check development length at support.
 Ld ≤ 1.3Ml / Vu + ld
 Provide torsion reinforcement at the discontinuous edge of slab
as per codal provision.

More Related Content

What's hot

Introduction to prestressed concrete
Introduction to prestressed concreteIntroduction to prestressed concrete
Introduction to prestressed concrete
9833356555
 
Design of two way slab
Design of two way slabDesign of two way slab
Design of two way slab
sarani_reza
 

What's hot (20)

0 ne way slab
0 ne way slab0 ne way slab
0 ne way slab
 
Design of two-way slab
Design of two-way slabDesign of two-way slab
Design of two-way slab
 
Lacing, battening
Lacing, battening Lacing, battening
Lacing, battening
 
Introduction to prestressed concrete
Introduction to prestressed concreteIntroduction to prestressed concrete
Introduction to prestressed concrete
 
Column design.ppt
Column design.pptColumn design.ppt
Column design.ppt
 
Combined footing 1-1-18
Combined footing 1-1-18Combined footing 1-1-18
Combined footing 1-1-18
 
slab concrete
slab concreteslab concrete
slab concrete
 
Two way slab
Two way slabTwo way slab
Two way slab
 
Staircase design
Staircase designStaircase design
Staircase design
 
Foundation types
Foundation typesFoundation types
Foundation types
 
Ch 7 design of rcc footing
Ch 7 design of rcc footingCh 7 design of rcc footing
Ch 7 design of rcc footing
 
Design of staircases
Design of staircasesDesign of staircases
Design of staircases
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Beams and columns
Beams and columns Beams and columns
Beams and columns
 
Design of two way slab
Design of two way slabDesign of two way slab
Design of two way slab
 
ONE WAY SLAB DESIGN
ONE WAY SLAB DESIGNONE WAY SLAB DESIGN
ONE WAY SLAB DESIGN
 
Footing design(09.02.03.096)
Footing design(09.02.03.096)Footing design(09.02.03.096)
Footing design(09.02.03.096)
 
Direct and bending stress
Direct and bending stressDirect and bending stress
Direct and bending stress
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Reinforced column design
Reinforced column design Reinforced column design
Reinforced column design
 

Similar to Two way slab

chapter6designofconcreteslab-28two-wayslab-29.pptx
chapter6designofconcreteslab-28two-wayslab-29.pptxchapter6designofconcreteslab-28two-wayslab-29.pptx
chapter6designofconcreteslab-28two-wayslab-29.pptx
WanMuhammadIzzatFitr
 

Similar to Two way slab (20)

4 slab
4 slab4 slab
4 slab
 
Onewayslab
OnewayslabOnewayslab
Onewayslab
 
Slab Design-(BNBC & ACI)
Slab Design-(BNBC & ACI)Slab Design-(BNBC & ACI)
Slab Design-(BNBC & ACI)
 
Design of RCC Column footing
Design of RCC Column footingDesign of RCC Column footing
Design of RCC Column footing
 
Isolated footing design
Isolated footing designIsolated footing design
Isolated footing design
 
chapter6designofconcreteslab-28two-wayslab-29.pptx
chapter6designofconcreteslab-28two-wayslab-29.pptxchapter6designofconcreteslab-28two-wayslab-29.pptx
chapter6designofconcreteslab-28two-wayslab-29.pptx
 
Footing design
Footing designFooting design
Footing design
 
one way slab 10.01.03.162
one way slab 10.01.03.162one way slab 10.01.03.162
one way slab 10.01.03.162
 
10.01.03.162
10.01.03.16210.01.03.162
10.01.03.162
 
one way slab 10.01.03.162
one way slab 10.01.03.162one way slab 10.01.03.162
one way slab 10.01.03.162
 
One way slab design 10.01.03.162
One way slab design 10.01.03.162One way slab design 10.01.03.162
One way slab design 10.01.03.162
 
10.01.03.162
10.01.03.16210.01.03.162
10.01.03.162
 
10.01.03.162 (one way slab)
10.01.03.162 (one way slab)10.01.03.162 (one way slab)
10.01.03.162 (one way slab)
 
PRESENTATION 3 - Copy.pptx
PRESENTATION 3 - Copy.pptxPRESENTATION 3 - Copy.pptx
PRESENTATION 3 - Copy.pptx
 
onw way slab design
onw way slab designonw way slab design
onw way slab design
 
soil mechanics ppt
soil mechanics pptsoil mechanics ppt
soil mechanics ppt
 
Slab_design_RCD_II_Lec_1_beam_column_arrangment.pptx
Slab_design_RCD_II_Lec_1_beam_column_arrangment.pptxSlab_design_RCD_II_Lec_1_beam_column_arrangment.pptx
Slab_design_RCD_II_Lec_1_beam_column_arrangment.pptx
 
FootingDesign.pptx
FootingDesign.pptxFootingDesign.pptx
FootingDesign.pptx
 
Presentation
PresentationPresentation
Presentation
 
Design of floor slab
Design of floor slabDesign of floor slab
Design of floor slab
 

Recently uploaded

Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
meharikiros2
 

Recently uploaded (20)

Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information Systems
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
 

Two way slab

  • 2. Two way slab  Two way slab is supported by beams in all four sides.  The ratio of longer span to shorter span (Ly/Lx) <2 than it is call two way slab.  Main reinforcement is provided in both direction incase of two way slab.
  • 4. Types of two way slab
  • 5.
  • 6. Design steps for two way slab  Step 1: Preliminary Design.  Find depth of slab using deflection control criteria.  Take span/d = 28 for simply supported slab and 32 for continuous slab.  D ≥ Dmin = 100mm for normal design and 125mm for earthquake resistant design.  Step 2: Analysis of Slab.  Slab is analyzed by IS code method. (Ref. Annex D-1 and Annex D-2).
  • 7.  Step 3: Design of Slab.  Verify depth of slab ‘D’.  Determine ‘Ast’ and ‘Φ’ and number of bars in shorter direction of slab.  Slab section is normally designed as Singly Reinforced Under Reinforced Rectangular Section.  Ast = Mu/(0.87fy(d-0.416xu)) which should not be less than Astmin.  Check slab for shear in shorter direction.
  • 8.  Step 4: Check slab at limit state of serviceability in deflection in shorter direction.  l/d ≤ αβγδγ  Step 5: Detailing of reinforcement:  Curtail/bend the surplus bars as per detailing rules of code. (Ref. Annex)  Check development length at support.  Ld ≤ 1.3Ml / Vu + ld  Provide torsion reinforcement at the discontinuous edge of slab as per codal provision.