SlideShare a Scribd company logo
1 of 7
Download to read offline
© Canberra Institute of Technology RTO Code 0101 Page 1 of 7 Date created: 30/08/2016
cit.edu.au Date updated: 25/06/2019
Assessment Practical/Observation
Student Name CIT Number
Competency Title, Code
and Banner Code
CRN
Advanced Roofs - CPCCCA3009B
OCTAGONAL END
Assessment Type ☐ In the workplace ☒ Simulated environment ☐ Other
Other Team Members
Student Statement: This assessment is my own work. Any ideas and comments made by other people have been
acknowledged. I understand that by emailing or submitting this assessment electronically, I agree to this statement.
Student Signature Date
PRIVACY DISCLAIMER: CIT is collecting your personal information for assessment purposes. The information will only be used in accordance
with the CIT Privacy Policy.
Assessor Feedback (also complete observation checklist and questions on last page)
 Student provided with feedback
Attempt 1 ☐ Satisfactory ☐ Not Yet Satisfactory Date / /
Attempt 2 ☐ Satisfactory ☐ Not Yet Satisfactory Date / /
Assessor
Name
Assessor Signature
Note to Assessor: Please record any reasonable adjustment that has occurred for this assessment.
Instructions to Assessor
Work, Health and Safety: A work health and safety check of the assessment environment is to be conducted prior to the assessment and any
hazards addressed appropriately.
List the assessment range and conditions, time and materials on the next page
These sections should be detailed enough for multiple assessors to consistently implement the assessment and include details of location, time
restrictions, level of assistance permitted (if any), WHS, environment protocols, etc. The student should have access to techniques, procedures,
information, resources and aids which would normally be available in the workplace. Include if open or closed book.
Materials provided may include: assessment paper, site plan, text, internet access, etc.
Materials supplied by student may include: personal protective equipment
A
d
v
a
n
c
e
d
R
o
o
f
s
O
c
t
a
g
o
n
a
l
© Canberra Institute of Technology RTO Code 0101 Page 2 of 7 Date created: 30/08/2016
cit.edu.au Date updated: 25/06/2019
Information for Students: You may have two (2) attempts for this assessment.
• If your first attempt is not successful, your teacher will discuss your results with you and will arrange a
second attempt.
• If your second attempt is not successful, you will be required to re-enrol in this unit.
Only one re-assessment attempt will be granted for each assessment item.
Time Allowed: 4 hours
Materials Provided by Assessor: All materials and tools required to complete the task will be provided.
Materials and Equipment to be Supplied by the Student: Personal protective equipment PPE and nail bag.
Assessment Range and Conditions: Assessment will be conducted in simulated work environment CIT
Bruce under teacher supervision at all times. if at any stage the assessors deem the assessment to be
unsafe it will be stopped. Access to all resources, manual and standards is permitted. All mobile phones
are to be switch off.
Assessment Criteria: To achieve a Satisfactory result, your assessor will be looking for your ability to
demonstrate the key skills/tasks/knowledge detailed in the Assessment Task to industry standard.
The criteria that you will be assessed for this task are:
Planning and Processes Planned, organised task and perform work following
accepted industry processes and standards.
Take responsibility for own
outputs in work and learning
Actively participated and engaged as an individual and/or
team member in all tasks and activities.
Specifications Job meets specification requirements, to industry standard
Time Management Task achieved within time and available information
requirements
Communication Written and oral communication met minimal job /task
requirements
WH&S Maintain a safe work environment and complied with
WHS regulations supervisor instructions and used
appropriate PPE for required tasks
Clean-Up Materials, tools and equipment are stored in line with
instruction. Area is left clean and free from hazards
© Canberra Institute of Technology RTO Code 0101 Page 3 of 7 Date created: 30/08/2016
cit.edu.au Date updated: 25/06/2019
INSTRUCTIONS:
You are required to construct a “OCTAGONAL END’ Pitched Roof.
Using the plans provided, you are required to:
1. Complete the JSA and Toolbox talk for this Practical Assessment
Class participation activity on Ready Skills. Your trainer will form an
open discussion to assist with completing both the JSA & Toolbox talk activities.
2. Select all hand & power tools required for this Practical Assessment
Class participation activity with Toolbox Talk. Your trainer will form an
open discussion to assist with completing this activity.
3. Select all materials required for this Practical Assessment
Class participation activity with Toolbox Talk. Your trainer will form an
open discussion to assist with completing this activity.
4. Complete all calculations required for measuring, marking & cutting roof framing
members
Students will need a pencil, eraser & a scientific calculator.
Your trainer will supply worksheets for all roof member calculations.
Students are required to successfully complete all calculations and
to write these dimensions on the attached rafter drawings.
5. Construct both Major & Minor roofs
In teams of 2, students are to construct the OCTAGONAL END Pitched Roof.
Using 70 x 35 mgp10 pine. Students are to set-out, measure & cut 1 pattern
Common Rafter & 1 pattern Hip Rafter. Once your trainer has inspected &
confirmed these rafters, you may then proceed to setting out the roof frame member
locations and constructing your OCTAGONAL END pitched roof.
6. Take photographs of completed Practical Assessment activity & upload to drop-box
Use your phone and the ready skills app, take a few photographs of the completed Roof
and a photograph of your completed calculations sheet.
These are to be submittedintoreadyskills.
7. Dismantle, de-nail roof frame & return all tools to store.
Roof model to be SAFELY de-constructed, ALL fixings removed.
Any re-usable timber lengths are to be stowed in racks.
All small timber pieces placed in scrap bins and work area cleaned.
All tools are to be returned to the store.
You MUST report any tool defects or damage to your trainer.
© Canberra Institute of Technology RTO Code 0101 Page 4 of 7 Date created: 30/08/2016
cit.edu.au Date updated: 25/06/2019
Student Checklist 
T1 Student actively participated in a toolbox talk and agreed to its content ☐
Student contributed to the development of a JSA and its control rating, with consideration to environmental
requirements
☐
Student correctly selected and used PPE for given tasks ☐
Student carried out task in accordance with the JSA and organisational policies and procedures. ☐
T2 Student used written and verbal communication skills during this topic, also completed the non-verbal
communication document
☐
Student worked with others in a team to achieve given tasks ☐
T3 Student was able to interpret and apply relevant work instruction and complete all documentation given. ☐
Student was able to read and interpret plans, site drawings and specifications ☐
T4 Student listed and selected the correct materials for the given tasks ☐
Student listed and selected the correct tools for the given tasks ☐
☐
Student checked tool and equipment for serviceability and reported any faults to the appropriate person ☐
T5 Working in small groups the student communicated and coordinated with the team to set out roof
members for an octagonal end roof
The task:
• Student set out the top plate for roofing members according to plans and calculations
• Ridge board was cut and marked to plans and calculations
• Common rafter were cut to the correct length including birds mouth, ridge reduction and eave
overhang to meet drawings and calculations
• Hip rafters were cut to the correct length including birds mouth, ridge reduction and eave overhang
to meet drawings and calculations
• Creeper and valley rafters are cut to meet drawings and calculations
• Student installed Rafters in correct sequence
☐
T6 Working in small groups the student communicated and coordinated with the team to install roof supports
for an oblique end roof
The task:
• Student cut and installed under purlins according to drawings and specs
• Student cut and installed struts according to drawing and specs
• Trimmers are fitted to gable ends and a verge rafter installed according to drawings and specs
• Student was able to show and communicate where and how a fire system would be installed
☐
T7 Student had been assessed and uploaded photos of task to eLearn before clean up commenced ☐
Student de-constructed the task in a safe and methodical system ☐
All material was disposed of appropriately, reusing and recycling materials when applicable ☐
© Canberra Institute of Technology RTO Code 0101 Page 5 of 7 Date created: 30/08/2016
cit.edu.au Date updated: 25/06/2019
Calculate rafters for the octagonal bay end
Based on the steel frame in the barn, measure and calculate the following measurements, the attached
plans on this document may help you.
1 roof span
2 half span
3 degree
4 degree
5 plan length
6 plan length
Eave span 300mm
Rafter spacing 450mm
© Canberra Institute of Technology RTO Code 0101 Page 6 of 7 Date created: 30/08/2016
cit.edu.au Date updated: 25/06/2019
1 half span rafter 7 hip half span
2 eave rafter 8 hip rise
3 deg rafter 9 rafter line length of hip
4 rafter line length 10 hip deg
5 eave RLL 11 hip eave
6 ridge reduction
(on the angle)
12 hip eave RLL
My Roof Pitch:__________
Note: You may need to refer to the
plans on page 5 to help solve some
of these equations
© Canberra Institute of Technology RTO Code 0101 Page 7 of 7 Date created: 30/08/2016
cit.edu.au Date updated: 25/06/2019
This drawing is to show placement and connection points. You must use the pitch and
measurements given and calculated from this document.
This document simulates a working site specifications document, you will need to
gather the complete picture of this job from multiple pages and sections of
information and bring it all together to complete the task.
Note: Under-perlins break the span of the rafter in half
Collar ties stop the rafters from spreading

More Related Content

Similar to Octagonal End_Student Assessment.pdf

Similar to Octagonal End_Student Assessment.pdf (9)

Practical Assessment 1 - Reinforcement
Practical Assessment 1 - ReinforcementPractical Assessment 1 - Reinforcement
Practical Assessment 1 - Reinforcement
 
Practical Assessment 3 - Reinforcement
Practical Assessment 3 - ReinforcementPractical Assessment 3 - Reinforcement
Practical Assessment 3 - Reinforcement
 
Practical assessment-Construct, assemble and install timber external stairs
Practical assessment-Construct, assemble and install timber external stairsPractical assessment-Construct, assemble and install timber external stairs
Practical assessment-Construct, assemble and install timber external stairs
 
Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels
 
NBA
NBANBA
NBA
 
2. practical assessment apply trowelled texture coat finishes
2. practical assessment apply trowelled texture coat finishes2. practical assessment apply trowelled texture coat finishes
2. practical assessment apply trowelled texture coat finishes
 
Student Practical Assessment_DEMOLITION
Student Practical Assessment_DEMOLITIONStudent Practical Assessment_DEMOLITION
Student Practical Assessment_DEMOLITION
 
Practical Assessment-Construct eaves-Metal eaves
Practical Assessment-Construct eaves-Metal eavesPractical Assessment-Construct eaves-Metal eaves
Practical Assessment-Construct eaves-Metal eaves
 
Practical Assessment-Construct eaves-Raked eaves
Practical Assessment-Construct eaves-Raked eavesPractical Assessment-Construct eaves-Raked eaves
Practical Assessment-Construct eaves-Raked eaves
 

More from Canberra Institute of technology

Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptxPlace and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptxCanberra Institute of technology
 
Work Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docxWork Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docxCanberra Institute of technology
 
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdfHansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdfCanberra Institute of technology
 
Practical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal cornerPractical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal cornerCanberra Institute of technology
 

More from Canberra Institute of technology (20)

Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptxPlace and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
 
Demolition - 7 Process' of demolition Scenarios.pptx
Demolition - 7 Process' of demolition Scenarios.pptxDemolition - 7 Process' of demolition Scenarios.pptx
Demolition - 7 Process' of demolition Scenarios.pptx
 
Practical Assessment_ Repair wall and floor tiling.docx
Practical Assessment_ Repair wall and floor tiling.docxPractical Assessment_ Repair wall and floor tiling.docx
Practical Assessment_ Repair wall and floor tiling.docx
 
Hansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdfHansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdf
 
Small House Plans & Calculations.pdf
Small House Plans & Calculations.pdfSmall House Plans & Calculations.pdf
Small House Plans & Calculations.pdf
 
Deck and Screen plans & Calculations
Deck and Screen plans & CalculationsDeck and Screen plans & Calculations
Deck and Screen plans & Calculations
 
CIT Subject Guide EPT
CIT Subject Guide EPTCIT Subject Guide EPT
CIT Subject Guide EPT
 
Example Site Induction Map .pdf
Example Site Induction Map .pdfExample Site Induction Map .pdf
Example Site Induction Map .pdf
 
Hansens Lodge for Plan and Organise
Hansens Lodge for Plan and OrganiseHansens Lodge for Plan and Organise
Hansens Lodge for Plan and Organise
 
Work Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docxWork Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docx
 
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdfHansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
 
Axon Cladding Installation Guide
Axon Cladding Installation GuideAxon Cladding Installation Guide
Axon Cladding Installation Guide
 
Woodhouse installation guide for cladding boards
Woodhouse installation guide for cladding boardsWoodhouse installation guide for cladding boards
Woodhouse installation guide for cladding boards
 
Optical Dumpy Enlarge staff reading.docx
Optical Dumpy Enlarge staff reading.docxOptical Dumpy Enlarge staff reading.docx
Optical Dumpy Enlarge staff reading.docx
 
Cladding introduction class presentation
Cladding introduction class presentationCladding introduction class presentation
Cladding introduction class presentation
 
Practical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal cornerPractical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal corner
 
Practical Assessment 1 - Install horizontal weatherboards
Practical Assessment 1 - Install horizontal weatherboardsPractical Assessment 1 - Install horizontal weatherboards
Practical Assessment 1 - Install horizontal weatherboards
 
Makita cold cut manual
Makita cold cut manualMakita cold cut manual
Makita cold cut manual
 
Small House Calculations
Small House CalculationsSmall House Calculations
Small House Calculations
 
Practical assessment Pitched Roof.docx
Practical assessment Pitched Roof.docxPractical assessment Pitched Roof.docx
Practical assessment Pitched Roof.docx
 

Recently uploaded

Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesShubhangi Sonawane
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIShubhangi Sonawane
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 

Recently uploaded (20)

Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 

Octagonal End_Student Assessment.pdf

  • 1. © Canberra Institute of Technology RTO Code 0101 Page 1 of 7 Date created: 30/08/2016 cit.edu.au Date updated: 25/06/2019 Assessment Practical/Observation Student Name CIT Number Competency Title, Code and Banner Code CRN Advanced Roofs - CPCCCA3009B OCTAGONAL END Assessment Type ☐ In the workplace ☒ Simulated environment ☐ Other Other Team Members Student Statement: This assessment is my own work. Any ideas and comments made by other people have been acknowledged. I understand that by emailing or submitting this assessment electronically, I agree to this statement. Student Signature Date PRIVACY DISCLAIMER: CIT is collecting your personal information for assessment purposes. The information will only be used in accordance with the CIT Privacy Policy. Assessor Feedback (also complete observation checklist and questions on last page)  Student provided with feedback Attempt 1 ☐ Satisfactory ☐ Not Yet Satisfactory Date / / Attempt 2 ☐ Satisfactory ☐ Not Yet Satisfactory Date / / Assessor Name Assessor Signature Note to Assessor: Please record any reasonable adjustment that has occurred for this assessment. Instructions to Assessor Work, Health and Safety: A work health and safety check of the assessment environment is to be conducted prior to the assessment and any hazards addressed appropriately. List the assessment range and conditions, time and materials on the next page These sections should be detailed enough for multiple assessors to consistently implement the assessment and include details of location, time restrictions, level of assistance permitted (if any), WHS, environment protocols, etc. The student should have access to techniques, procedures, information, resources and aids which would normally be available in the workplace. Include if open or closed book. Materials provided may include: assessment paper, site plan, text, internet access, etc. Materials supplied by student may include: personal protective equipment A d v a n c e d R o o f s O c t a g o n a l
  • 2. © Canberra Institute of Technology RTO Code 0101 Page 2 of 7 Date created: 30/08/2016 cit.edu.au Date updated: 25/06/2019 Information for Students: You may have two (2) attempts for this assessment. • If your first attempt is not successful, your teacher will discuss your results with you and will arrange a second attempt. • If your second attempt is not successful, you will be required to re-enrol in this unit. Only one re-assessment attempt will be granted for each assessment item. Time Allowed: 4 hours Materials Provided by Assessor: All materials and tools required to complete the task will be provided. Materials and Equipment to be Supplied by the Student: Personal protective equipment PPE and nail bag. Assessment Range and Conditions: Assessment will be conducted in simulated work environment CIT Bruce under teacher supervision at all times. if at any stage the assessors deem the assessment to be unsafe it will be stopped. Access to all resources, manual and standards is permitted. All mobile phones are to be switch off. Assessment Criteria: To achieve a Satisfactory result, your assessor will be looking for your ability to demonstrate the key skills/tasks/knowledge detailed in the Assessment Task to industry standard. The criteria that you will be assessed for this task are: Planning and Processes Planned, organised task and perform work following accepted industry processes and standards. Take responsibility for own outputs in work and learning Actively participated and engaged as an individual and/or team member in all tasks and activities. Specifications Job meets specification requirements, to industry standard Time Management Task achieved within time and available information requirements Communication Written and oral communication met minimal job /task requirements WH&S Maintain a safe work environment and complied with WHS regulations supervisor instructions and used appropriate PPE for required tasks Clean-Up Materials, tools and equipment are stored in line with instruction. Area is left clean and free from hazards
  • 3. © Canberra Institute of Technology RTO Code 0101 Page 3 of 7 Date created: 30/08/2016 cit.edu.au Date updated: 25/06/2019 INSTRUCTIONS: You are required to construct a “OCTAGONAL END’ Pitched Roof. Using the plans provided, you are required to: 1. Complete the JSA and Toolbox talk for this Practical Assessment Class participation activity on Ready Skills. Your trainer will form an open discussion to assist with completing both the JSA & Toolbox talk activities. 2. Select all hand & power tools required for this Practical Assessment Class participation activity with Toolbox Talk. Your trainer will form an open discussion to assist with completing this activity. 3. Select all materials required for this Practical Assessment Class participation activity with Toolbox Talk. Your trainer will form an open discussion to assist with completing this activity. 4. Complete all calculations required for measuring, marking & cutting roof framing members Students will need a pencil, eraser & a scientific calculator. Your trainer will supply worksheets for all roof member calculations. Students are required to successfully complete all calculations and to write these dimensions on the attached rafter drawings. 5. Construct both Major & Minor roofs In teams of 2, students are to construct the OCTAGONAL END Pitched Roof. Using 70 x 35 mgp10 pine. Students are to set-out, measure & cut 1 pattern Common Rafter & 1 pattern Hip Rafter. Once your trainer has inspected & confirmed these rafters, you may then proceed to setting out the roof frame member locations and constructing your OCTAGONAL END pitched roof. 6. Take photographs of completed Practical Assessment activity & upload to drop-box Use your phone and the ready skills app, take a few photographs of the completed Roof and a photograph of your completed calculations sheet. These are to be submittedintoreadyskills. 7. Dismantle, de-nail roof frame & return all tools to store. Roof model to be SAFELY de-constructed, ALL fixings removed. Any re-usable timber lengths are to be stowed in racks. All small timber pieces placed in scrap bins and work area cleaned. All tools are to be returned to the store. You MUST report any tool defects or damage to your trainer.
  • 4. © Canberra Institute of Technology RTO Code 0101 Page 4 of 7 Date created: 30/08/2016 cit.edu.au Date updated: 25/06/2019 Student Checklist  T1 Student actively participated in a toolbox talk and agreed to its content ☐ Student contributed to the development of a JSA and its control rating, with consideration to environmental requirements ☐ Student correctly selected and used PPE for given tasks ☐ Student carried out task in accordance with the JSA and organisational policies and procedures. ☐ T2 Student used written and verbal communication skills during this topic, also completed the non-verbal communication document ☐ Student worked with others in a team to achieve given tasks ☐ T3 Student was able to interpret and apply relevant work instruction and complete all documentation given. ☐ Student was able to read and interpret plans, site drawings and specifications ☐ T4 Student listed and selected the correct materials for the given tasks ☐ Student listed and selected the correct tools for the given tasks ☐ ☐ Student checked tool and equipment for serviceability and reported any faults to the appropriate person ☐ T5 Working in small groups the student communicated and coordinated with the team to set out roof members for an octagonal end roof The task: • Student set out the top plate for roofing members according to plans and calculations • Ridge board was cut and marked to plans and calculations • Common rafter were cut to the correct length including birds mouth, ridge reduction and eave overhang to meet drawings and calculations • Hip rafters were cut to the correct length including birds mouth, ridge reduction and eave overhang to meet drawings and calculations • Creeper and valley rafters are cut to meet drawings and calculations • Student installed Rafters in correct sequence ☐ T6 Working in small groups the student communicated and coordinated with the team to install roof supports for an oblique end roof The task: • Student cut and installed under purlins according to drawings and specs • Student cut and installed struts according to drawing and specs • Trimmers are fitted to gable ends and a verge rafter installed according to drawings and specs • Student was able to show and communicate where and how a fire system would be installed ☐ T7 Student had been assessed and uploaded photos of task to eLearn before clean up commenced ☐ Student de-constructed the task in a safe and methodical system ☐ All material was disposed of appropriately, reusing and recycling materials when applicable ☐
  • 5. © Canberra Institute of Technology RTO Code 0101 Page 5 of 7 Date created: 30/08/2016 cit.edu.au Date updated: 25/06/2019 Calculate rafters for the octagonal bay end Based on the steel frame in the barn, measure and calculate the following measurements, the attached plans on this document may help you. 1 roof span 2 half span 3 degree 4 degree 5 plan length 6 plan length Eave span 300mm Rafter spacing 450mm
  • 6. © Canberra Institute of Technology RTO Code 0101 Page 6 of 7 Date created: 30/08/2016 cit.edu.au Date updated: 25/06/2019 1 half span rafter 7 hip half span 2 eave rafter 8 hip rise 3 deg rafter 9 rafter line length of hip 4 rafter line length 10 hip deg 5 eave RLL 11 hip eave 6 ridge reduction (on the angle) 12 hip eave RLL My Roof Pitch:__________ Note: You may need to refer to the plans on page 5 to help solve some of these equations
  • 7. © Canberra Institute of Technology RTO Code 0101 Page 7 of 7 Date created: 30/08/2016 cit.edu.au Date updated: 25/06/2019 This drawing is to show placement and connection points. You must use the pitch and measurements given and calculated from this document. This document simulates a working site specifications document, you will need to gather the complete picture of this job from multiple pages and sections of information and bring it all together to complete the task. Note: Under-perlins break the span of the rafter in half Collar ties stop the rafters from spreading