Submit Search
Upload
Octagonal End_Student Assessment.pdf
•
0 likes
•
880 views
Canberra Institute of technology
Follow
CIT Construction
Read less
Read more
Education
Report
Share
Report
Share
1 of 7
Download now
Download to read offline
Recommended
Oblique End_Student Assessment.pdf
Oblique End_Student Assessment.pdf
Canberra Institute of technology
Student Assessment_Eaves.docx
Student Assessment_Eaves.docx
Folk James
Practical Assessment_Full set of stairs with handrail.pdf
Practical Assessment_Full set of stairs with handrail.pdf
Canberra Institute of technology
Student Assessment- Metal fascia with raked eaves.docx
Student Assessment- Metal fascia with raked eaves.docx
Folk James
Student Practical Assessment_Frame & Fit Wet Areas.docx
Student Practical Assessment_Frame & Fit Wet Areas.docx
Canberra Institute of technology
3. Practical Assessment Skillion roof.docx
3. Practical Assessment Skillion roof.docx
Canberra Institute of technology
Practical Assessment-Construct Eaves-Boxed eaves
Practical Assessment-Construct Eaves-Boxed eaves
Canberra Institute of technology
Practical Assessment EPT with CIT Legal.docx
Practical Assessment EPT with CIT Legal.docx
Canberra Institute of technology
Recommended
Oblique End_Student Assessment.pdf
Oblique End_Student Assessment.pdf
Canberra Institute of technology
Student Assessment_Eaves.docx
Student Assessment_Eaves.docx
Folk James
Practical Assessment_Full set of stairs with handrail.pdf
Practical Assessment_Full set of stairs with handrail.pdf
Canberra Institute of technology
Student Assessment- Metal fascia with raked eaves.docx
Student Assessment- Metal fascia with raked eaves.docx
Folk James
Student Practical Assessment_Frame & Fit Wet Areas.docx
Student Practical Assessment_Frame & Fit Wet Areas.docx
Canberra Institute of technology
3. Practical Assessment Skillion roof.docx
3. Practical Assessment Skillion roof.docx
Canberra Institute of technology
Practical Assessment-Construct Eaves-Boxed eaves
Practical Assessment-Construct Eaves-Boxed eaves
Canberra Institute of technology
Practical Assessment EPT with CIT Legal.docx
Practical Assessment EPT with CIT Legal.docx
Canberra Institute of technology
Practical Assessment 1 - Reinforcement
Practical Assessment 1 - Reinforcement
Canberra Institute of technology
Practical Assessment 3 - Reinforcement
Practical Assessment 3 - Reinforcement
Canberra Institute of technology
Practical assessment-Construct, assemble and install timber external stairs
Practical assessment-Construct, assemble and install timber external stairs
Canberra Institute of technology
Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels
Canberra Institute of technology
NBA
NBA
SHIMI S L
2. practical assessment apply trowelled texture coat finishes
2. practical assessment apply trowelled texture coat finishes
CITPainting
Student Practical Assessment_DEMOLITION
Student Practical Assessment_DEMOLITION
Canberra Institute of technology
Practical Assessment-Construct eaves-Metal eaves
Practical Assessment-Construct eaves-Metal eaves
Canberra Institute of technology
Practical Assessment-Construct eaves-Raked eaves
Practical Assessment-Construct eaves-Raked eaves
Canberra Institute of technology
Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Canberra Institute of technology
Demolition - 7 Process' of demolition Scenarios.pptx
Demolition - 7 Process' of demolition Scenarios.pptx
Canberra Institute of technology
Practical Assessment_ Repair wall and floor tiling.docx
Practical Assessment_ Repair wall and floor tiling.docx
Canberra Institute of technology
Hansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdf
Canberra Institute of technology
Small House Plans & Calculations.pdf
Small House Plans & Calculations.pdf
Canberra Institute of technology
Deck and Screen plans & Calculations
Deck and Screen plans & Calculations
Canberra Institute of technology
CIT Subject Guide EPT
CIT Subject Guide EPT
Canberra Institute of technology
Example Site Induction Map .pdf
Example Site Induction Map .pdf
Canberra Institute of technology
Hansens Lodge for Plan and Organise
Hansens Lodge for Plan and Organise
Canberra Institute of technology
Work Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docx
Canberra Institute of technology
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Canberra Institute of technology
Axon Cladding Installation Guide
Axon Cladding Installation Guide
Canberra Institute of technology
Woodhouse installation guide for cladding boards
Woodhouse installation guide for cladding boards
Canberra Institute of technology
More Related Content
Similar to Octagonal End_Student Assessment.pdf
Practical Assessment 1 - Reinforcement
Practical Assessment 1 - Reinforcement
Canberra Institute of technology
Practical Assessment 3 - Reinforcement
Practical Assessment 3 - Reinforcement
Canberra Institute of technology
Practical assessment-Construct, assemble and install timber external stairs
Practical assessment-Construct, assemble and install timber external stairs
Canberra Institute of technology
Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels
Canberra Institute of technology
NBA
NBA
SHIMI S L
2. practical assessment apply trowelled texture coat finishes
2. practical assessment apply trowelled texture coat finishes
CITPainting
Student Practical Assessment_DEMOLITION
Student Practical Assessment_DEMOLITION
Canberra Institute of technology
Practical Assessment-Construct eaves-Metal eaves
Practical Assessment-Construct eaves-Metal eaves
Canberra Institute of technology
Practical Assessment-Construct eaves-Raked eaves
Practical Assessment-Construct eaves-Raked eaves
Canberra Institute of technology
Similar to Octagonal End_Student Assessment.pdf
(9)
Practical Assessment 1 - Reinforcement
Practical Assessment 1 - Reinforcement
Practical Assessment 3 - Reinforcement
Practical Assessment 3 - Reinforcement
Practical assessment-Construct, assemble and install timber external stairs
Practical assessment-Construct, assemble and install timber external stairs
Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels
NBA
NBA
2. practical assessment apply trowelled texture coat finishes
2. practical assessment apply trowelled texture coat finishes
Student Practical Assessment_DEMOLITION
Student Practical Assessment_DEMOLITION
Practical Assessment-Construct eaves-Metal eaves
Practical Assessment-Construct eaves-Metal eaves
Practical Assessment-Construct eaves-Raked eaves
Practical Assessment-Construct eaves-Raked eaves
More from Canberra Institute of technology
Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Canberra Institute of technology
Demolition - 7 Process' of demolition Scenarios.pptx
Demolition - 7 Process' of demolition Scenarios.pptx
Canberra Institute of technology
Practical Assessment_ Repair wall and floor tiling.docx
Practical Assessment_ Repair wall and floor tiling.docx
Canberra Institute of technology
Hansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdf
Canberra Institute of technology
Small House Plans & Calculations.pdf
Small House Plans & Calculations.pdf
Canberra Institute of technology
Deck and Screen plans & Calculations
Deck and Screen plans & Calculations
Canberra Institute of technology
CIT Subject Guide EPT
CIT Subject Guide EPT
Canberra Institute of technology
Example Site Induction Map .pdf
Example Site Induction Map .pdf
Canberra Institute of technology
Hansens Lodge for Plan and Organise
Hansens Lodge for Plan and Organise
Canberra Institute of technology
Work Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docx
Canberra Institute of technology
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Canberra Institute of technology
Axon Cladding Installation Guide
Axon Cladding Installation Guide
Canberra Institute of technology
Woodhouse installation guide for cladding boards
Woodhouse installation guide for cladding boards
Canberra Institute of technology
Optical Dumpy Enlarge staff reading.docx
Optical Dumpy Enlarge staff reading.docx
Canberra Institute of technology
Cladding introduction class presentation
Cladding introduction class presentation
Canberra Institute of technology
Practical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal corner
Canberra Institute of technology
Practical Assessment 1 - Install horizontal weatherboards
Practical Assessment 1 - Install horizontal weatherboards
Canberra Institute of technology
Makita cold cut manual
Makita cold cut manual
Canberra Institute of technology
Small House Calculations
Small House Calculations
Canberra Institute of technology
Practical assessment Pitched Roof.docx
Practical assessment Pitched Roof.docx
Canberra Institute of technology
More from Canberra Institute of technology
(20)
Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Demolition - 7 Process' of demolition Scenarios.pptx
Demolition - 7 Process' of demolition Scenarios.pptx
Practical Assessment_ Repair wall and floor tiling.docx
Practical Assessment_ Repair wall and floor tiling.docx
Hansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdf
Small House Plans & Calculations.pdf
Small House Plans & Calculations.pdf
Deck and Screen plans & Calculations
Deck and Screen plans & Calculations
CIT Subject Guide EPT
CIT Subject Guide EPT
Example Site Induction Map .pdf
Example Site Induction Map .pdf
Hansens Lodge for Plan and Organise
Hansens Lodge for Plan and Organise
Work Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docx
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Axon Cladding Installation Guide
Axon Cladding Installation Guide
Woodhouse installation guide for cladding boards
Woodhouse installation guide for cladding boards
Optical Dumpy Enlarge staff reading.docx
Optical Dumpy Enlarge staff reading.docx
Cladding introduction class presentation
Cladding introduction class presentation
Practical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal corner
Practical Assessment 1 - Install horizontal weatherboards
Practical Assessment 1 - Install horizontal weatherboards
Makita cold cut manual
Makita cold cut manual
Small House Calculations
Small House Calculations
Practical assessment Pitched Roof.docx
Practical assessment Pitched Roof.docx
Recently uploaded
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
misteraugie
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
Ramakrishna Reddy Bijjam
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
christianmathematics
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
MaritesTamaniVerdade
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Shubhangi Sonawane
psychiatric nursing HISTORY COLLECTION .docx
psychiatric nursing HISTORY COLLECTION .docx
PoojaSen20
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
RAM LAL ANAND COLLEGE, DELHI UNIVERSITY.
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Denish Jangid
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
Thiyagu K
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
AyushMahapatra5
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Shubhangi Sonawane
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
Celine George
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
bronxfugly43
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
jbellavia9
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
AreebaZafar22
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
Poonam Aher Patil
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
Recently uploaded
(20)
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
psychiatric nursing HISTORY COLLECTION .docx
psychiatric nursing HISTORY COLLECTION .docx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Octagonal End_Student Assessment.pdf
1.
© Canberra Institute
of Technology RTO Code 0101 Page 1 of 7 Date created: 30/08/2016 cit.edu.au Date updated: 25/06/2019 Assessment Practical/Observation Student Name CIT Number Competency Title, Code and Banner Code CRN Advanced Roofs - CPCCCA3009B OCTAGONAL END Assessment Type ☐ In the workplace ☒ Simulated environment ☐ Other Other Team Members Student Statement: This assessment is my own work. Any ideas and comments made by other people have been acknowledged. I understand that by emailing or submitting this assessment electronically, I agree to this statement. Student Signature Date PRIVACY DISCLAIMER: CIT is collecting your personal information for assessment purposes. The information will only be used in accordance with the CIT Privacy Policy. Assessor Feedback (also complete observation checklist and questions on last page) Student provided with feedback Attempt 1 ☐ Satisfactory ☐ Not Yet Satisfactory Date / / Attempt 2 ☐ Satisfactory ☐ Not Yet Satisfactory Date / / Assessor Name Assessor Signature Note to Assessor: Please record any reasonable adjustment that has occurred for this assessment. Instructions to Assessor Work, Health and Safety: A work health and safety check of the assessment environment is to be conducted prior to the assessment and any hazards addressed appropriately. List the assessment range and conditions, time and materials on the next page These sections should be detailed enough for multiple assessors to consistently implement the assessment and include details of location, time restrictions, level of assistance permitted (if any), WHS, environment protocols, etc. The student should have access to techniques, procedures, information, resources and aids which would normally be available in the workplace. Include if open or closed book. Materials provided may include: assessment paper, site plan, text, internet access, etc. Materials supplied by student may include: personal protective equipment A d v a n c e d R o o f s O c t a g o n a l
2.
© Canberra Institute
of Technology RTO Code 0101 Page 2 of 7 Date created: 30/08/2016 cit.edu.au Date updated: 25/06/2019 Information for Students: You may have two (2) attempts for this assessment. • If your first attempt is not successful, your teacher will discuss your results with you and will arrange a second attempt. • If your second attempt is not successful, you will be required to re-enrol in this unit. Only one re-assessment attempt will be granted for each assessment item. Time Allowed: 4 hours Materials Provided by Assessor: All materials and tools required to complete the task will be provided. Materials and Equipment to be Supplied by the Student: Personal protective equipment PPE and nail bag. Assessment Range and Conditions: Assessment will be conducted in simulated work environment CIT Bruce under teacher supervision at all times. if at any stage the assessors deem the assessment to be unsafe it will be stopped. Access to all resources, manual and standards is permitted. All mobile phones are to be switch off. Assessment Criteria: To achieve a Satisfactory result, your assessor will be looking for your ability to demonstrate the key skills/tasks/knowledge detailed in the Assessment Task to industry standard. The criteria that you will be assessed for this task are: Planning and Processes Planned, organised task and perform work following accepted industry processes and standards. Take responsibility for own outputs in work and learning Actively participated and engaged as an individual and/or team member in all tasks and activities. Specifications Job meets specification requirements, to industry standard Time Management Task achieved within time and available information requirements Communication Written and oral communication met minimal job /task requirements WH&S Maintain a safe work environment and complied with WHS regulations supervisor instructions and used appropriate PPE for required tasks Clean-Up Materials, tools and equipment are stored in line with instruction. Area is left clean and free from hazards
3.
© Canberra Institute
of Technology RTO Code 0101 Page 3 of 7 Date created: 30/08/2016 cit.edu.au Date updated: 25/06/2019 INSTRUCTIONS: You are required to construct a “OCTAGONAL END’ Pitched Roof. Using the plans provided, you are required to: 1. Complete the JSA and Toolbox talk for this Practical Assessment Class participation activity on Ready Skills. Your trainer will form an open discussion to assist with completing both the JSA & Toolbox talk activities. 2. Select all hand & power tools required for this Practical Assessment Class participation activity with Toolbox Talk. Your trainer will form an open discussion to assist with completing this activity. 3. Select all materials required for this Practical Assessment Class participation activity with Toolbox Talk. Your trainer will form an open discussion to assist with completing this activity. 4. Complete all calculations required for measuring, marking & cutting roof framing members Students will need a pencil, eraser & a scientific calculator. Your trainer will supply worksheets for all roof member calculations. Students are required to successfully complete all calculations and to write these dimensions on the attached rafter drawings. 5. Construct both Major & Minor roofs In teams of 2, students are to construct the OCTAGONAL END Pitched Roof. Using 70 x 35 mgp10 pine. Students are to set-out, measure & cut 1 pattern Common Rafter & 1 pattern Hip Rafter. Once your trainer has inspected & confirmed these rafters, you may then proceed to setting out the roof frame member locations and constructing your OCTAGONAL END pitched roof. 6. Take photographs of completed Practical Assessment activity & upload to drop-box Use your phone and the ready skills app, take a few photographs of the completed Roof and a photograph of your completed calculations sheet. These are to be submittedintoreadyskills. 7. Dismantle, de-nail roof frame & return all tools to store. Roof model to be SAFELY de-constructed, ALL fixings removed. Any re-usable timber lengths are to be stowed in racks. All small timber pieces placed in scrap bins and work area cleaned. All tools are to be returned to the store. You MUST report any tool defects or damage to your trainer.
4.
© Canberra Institute
of Technology RTO Code 0101 Page 4 of 7 Date created: 30/08/2016 cit.edu.au Date updated: 25/06/2019 Student Checklist T1 Student actively participated in a toolbox talk and agreed to its content ☐ Student contributed to the development of a JSA and its control rating, with consideration to environmental requirements ☐ Student correctly selected and used PPE for given tasks ☐ Student carried out task in accordance with the JSA and organisational policies and procedures. ☐ T2 Student used written and verbal communication skills during this topic, also completed the non-verbal communication document ☐ Student worked with others in a team to achieve given tasks ☐ T3 Student was able to interpret and apply relevant work instruction and complete all documentation given. ☐ Student was able to read and interpret plans, site drawings and specifications ☐ T4 Student listed and selected the correct materials for the given tasks ☐ Student listed and selected the correct tools for the given tasks ☐ ☐ Student checked tool and equipment for serviceability and reported any faults to the appropriate person ☐ T5 Working in small groups the student communicated and coordinated with the team to set out roof members for an octagonal end roof The task: • Student set out the top plate for roofing members according to plans and calculations • Ridge board was cut and marked to plans and calculations • Common rafter were cut to the correct length including birds mouth, ridge reduction and eave overhang to meet drawings and calculations • Hip rafters were cut to the correct length including birds mouth, ridge reduction and eave overhang to meet drawings and calculations • Creeper and valley rafters are cut to meet drawings and calculations • Student installed Rafters in correct sequence ☐ T6 Working in small groups the student communicated and coordinated with the team to install roof supports for an oblique end roof The task: • Student cut and installed under purlins according to drawings and specs • Student cut and installed struts according to drawing and specs • Trimmers are fitted to gable ends and a verge rafter installed according to drawings and specs • Student was able to show and communicate where and how a fire system would be installed ☐ T7 Student had been assessed and uploaded photos of task to eLearn before clean up commenced ☐ Student de-constructed the task in a safe and methodical system ☐ All material was disposed of appropriately, reusing and recycling materials when applicable ☐
5.
© Canberra Institute
of Technology RTO Code 0101 Page 5 of 7 Date created: 30/08/2016 cit.edu.au Date updated: 25/06/2019 Calculate rafters for the octagonal bay end Based on the steel frame in the barn, measure and calculate the following measurements, the attached plans on this document may help you. 1 roof span 2 half span 3 degree 4 degree 5 plan length 6 plan length Eave span 300mm Rafter spacing 450mm
6.
© Canberra Institute
of Technology RTO Code 0101 Page 6 of 7 Date created: 30/08/2016 cit.edu.au Date updated: 25/06/2019 1 half span rafter 7 hip half span 2 eave rafter 8 hip rise 3 deg rafter 9 rafter line length of hip 4 rafter line length 10 hip deg 5 eave RLL 11 hip eave 6 ridge reduction (on the angle) 12 hip eave RLL My Roof Pitch:__________ Note: You may need to refer to the plans on page 5 to help solve some of these equations
7.
© Canberra Institute
of Technology RTO Code 0101 Page 7 of 7 Date created: 30/08/2016 cit.edu.au Date updated: 25/06/2019 This drawing is to show placement and connection points. You must use the pitch and measurements given and calculated from this document. This document simulates a working site specifications document, you will need to gather the complete picture of this job from multiple pages and sections of information and bring it all together to complete the task. Note: Under-perlins break the span of the rafter in half Collar ties stop the rafters from spreading
Download now