CHAPTER 6
JOB ORDER AND PROCESS COSTING
QUESTIONS FOR WRITING AND DISCUSSION
1. Job-order costing accumulates costs by
jobs, and process costing accumulates costs
by processes. Job-order costing is suitable
for operations that produce custom-made
products that receive different doses of
manufacturing costs. Process costing, on
the other hand, is suitable for operations that
produce homogeneous products that receive
equal doses of manufacturing costs in each
process.
2. More paperwork is required. Labor and ma-
terials are assigned to departments in a
process-costing system. In a job-order cost-
ing system, labor and materials must be
tracked to each job, requiring time tickets
and more use of materials requisitions. Addi-
tionally, a job-order costing system requires
a separate job-order cost sheet for each job.
3. Job-order costing is appropriate for many
service firms. The key factor is that differing
amounts of resources must be used for dif-
ferent jobs. Examples of service firms that
use job-order costing are law firms, account-
ing firms, dentists, automobile repair, and
architectural firms.
4. Unless all your jobs (lawns) are the same
size and require the same services, you will
need to use a job-order costing system. At
minimum, you will need job-order cost
sheets for each customer. You will need la-
bor time tickets to record the amount of time
spent on each job, both to cost the job and
to pay the individual doing the work. A mate-
rials requisition form may be needed if ferti-
lizer or weed control products are used (al-
ternatively, it may be possible to just list the
amount of product used directly on the job-
order cost sheet). The more complicated
your business becomes (e.g., mowing,
trimming, fertilizing, trimming shrubbery, and
planting shrubs and trees), the more source
documents will be needed to keep track of
time, materials, and use of capital equip-
ment (e.g., trimmers and brushhogs).
5. The cost of a job is often strongly related to
the price charged. Logically enough, the
higher the cost of the job, the higher the
price charged to the customer. This relation-
ship makes sense not only to the business
but also to the customer. By comparing the
cost of the individual job with the price
charged, the firm can determine the profit at-
tributable to each job. Then, the firm can de-
cide whether the profit is sufficient to contin-
ue offering the product or service under the
current terms.
6. Materials requisition forms serve as the
source documents for posting materials
usage and costs to individual jobs. Time or
work tickets serve a similar function for la-
bor. Predetermined overhead rates are used
to allocate overhead to jobs.
7. In sequential processing, products pass
through a series of processes, one after
another (i.e., in a given sequence). In paral-
lel processing, products pass through two or
more different sequences at the same time,
merging eventually at the final process.
8. Equivalent units are the number of whole
units that could have been produced, given
the amount of materials, labor, and over-
head used. Equivalent units are the meas-
ure of a period’s output, a necessary input
for the computation of unit costs in a
process-costing system.
9. In calculating this period’s unit cost, the
weighted average method treats prior-period
output and costs carried over to the current
period as belonging to the current period.
The FIFO method excludes any costs and
output carried over from this period’s unit
cost computation.
10. If the per-unit cost of the prior period is the
same as the per-unit cost of the current pe-
riod, there will be no difference between the
results of the weighted average and FIFO
methods. Additionally, if no beginning work-
in-process inventory exists, both the FIFO
and weighted average methods give the
same results.
11. Separate equivalent units must be calcu-
lated for materials and conversion costs.
12. Transferred-in units represent partially com-
pleted units and are clearly a material for the
114466
receiving department. To complete the
product (or further process it), additional ma-
terials and conversion costs are added by
the receiving department.
13. The work-in-process account of the receiv-
ing department is debited, and the work-in-
process account of the transferring depart-
ment is credited. The finished goods ac-
count is debited, and the work-in-process
account of the final department is credited
upon completion of the product.
14. The first step is the preparation of a physical
flow schedule. This schedule identifies the
physical units that must be accounted for
and provides an accounting. The second
step is the equivalent unit schedule. This
schedule computes the equivalent whole
output for the period. The schedule’s com-
putations rely on information from the physi-
cal flow schedule. The next step is computa-
tion of the unit cost. To compute the unit
cost, the manufacturing costs of the period
for the process are divided by the period’s
output. The output is obtained from the
equivalent unit schedule. The fourth step
uses the unit cost to value goods transferred
out and those remaining in work in process.
The final step checks to see if the costs as-
signed in step 4 equal the total costs to ac-
count for.
15. The weighted average method uses the
same unit cost for all goods transferred out.
The FIFO method divides goods transferred
out into two categories: units started and
completed and units from beginning work in
process. The period’s unit cost is used to
value goods started and completed. The
cost of goods transferred out from beginning
work in process is obtained by (1) assigning
them all costs carried over from the prior pe-
riod and (2) using the current period’s unit
cost to value the equivalent units completed
this period.
16. Service firms generally do not have work-in-
process inventories, and so equivalent units
of production are not needed. An important
factor in process costing for services is de-
termining just what constitutes a unit of out-
put.
114477
EXERCISES
6–1
Job-Order Process
a. Paint manufacturing X
b. Auto manufacturing X
c. Toy manufacturing X
d. Custom cabinet making X
e. Airplane manufacturing X
f. Personal computer assembly X
g. Furniture making X
h. Custom furniture making X
i. Dental services X
j. Hospital services X
k. Paper manufacturing X
l. Auto repair X
m. Architectural services X
n. Landscape design services X
o. Light bulb manufacturing X
6–2
1. Auto manufacturing: A job-order example might be Rolls Royce, in which the
cars are made to order. A process-costing example might be Ford Motor
Company.
2. Dental services: A job-order example might be a local, full-service dentist. A
process-costing example might be a denturist (someone who makes only
dentures).
3. Auto repair: A job-order example might be a local mechanic or the service
department of an automobile dealership. A process-costing example might be
a shop that is dedicated to oil changes.
4. Costume making: A job-order example might be a local seamstress who will
make the costumes for children in a junior high school play. A process-
costing example might be a firm dedicated to the manufacture of dance cos-
tumes that are sold nationwide. The designs are preset.
114488
6–3
1. Job #614 Job #615 Job #616 Job #617
Beginning balance $10,200 $ 9,670 $ 0 $ 0
Direct materials 4,200 9,500 1,000 3,150
Direct labor 1,800 4,000 150 800
Applied overhead 1,080 2,400 90 480
Total cost $17,280 $25,570 $1,240 $4,430
2. Ending balance in Work in Process = Job #614 + Job #616 + Job #617
= $17,280 + $1,240 + $4,430 = $22,950
3. Cost of Goods Sold = Job #615 = $25,570
Price of Job #615 = $25,570 + (0.4)($25,570) = $35,798
6–4
1. Overhead applied in October:
Job #265: 0.75 × $15,000 = $11,250
Job #266: 0.75 × $12,000 = $9,000
Job #267: 0.75 × $1,900 = $1,425
Job #268: 0.75 × $7,000 = $5,250
2. Job #265 Job #266 Job #267 Job #268
Beginning balance $30,330 $62,170 $ 0 $ 0
Direct materials 13,000 7,000 3,500 4,750
Direct labor 15,000 12,000 1,900 7,000
Applied overhead 11,250 9,000 1,425 5,250
Total cost $69,580 $90,170 $6,825 $17,000
3. Ending balance in Work in Process = Job #266 + Job #267 + Job #268
= $90,170 + $6,825 + $17,000 = $113,995
4. Cost of Goods Sold = Job #265 = $69,580
Price of Job #265 = $69,580 + (0.30)($69,580) = $90,454
114499
6–5
1. Direct materials $ 3,400
Direct labor (50 hours × $10) 500
Overhead (50 hours × $4) 200
Total cost $ 4,100
Units ÷ 10
Unit cost $ 410
2. Price per home = 1.5 × $410 = $615
3. Jordan would need to prepare a simple form that included columns for the
date, the beginning time, the ending time, the total number of hours worked,
and the job name (or number). She could have a separate page for each day.
This would be especially helpful if she hired other employees from time to
time to work on jobs.
6–6
1. Ending balance in
Work in Process = Job #902 + Job #906 + Job #908 + Job #909
= $400 + $750 + $700 + $905 = $2,755
2. Ending balance in Finished Goods = Job #901 + Job #903 + Job #905 + Job #910
= $650 + $550 + $860 + $803 = $2,863
3. Cost of Goods Sold = Job #904 + Job #907 = $695 + $180 = $875
115500
6–7
1. Job #70 Job #71 Job #72
Balance, 7/1 $25,000 $ 0 $ 0
Direct materials 12,900 9,900 35,350
Direct labor 20,000 6,500 13,000
Applied overhead:
Power1
500 400 2,400
Material handling2
1,250 250 5,000
Purchasing3
400 1,600 400
Total cost $60,050 $18,650 $56,150
1
Job#70:$2 per mh × 250
Job#71:$2 per mh × 200
Job#72:$2 per mh × 1,200
2 Job#70:$25 per move × 50 moves
Job#71:$25 per move × 10 moves
Job#72:$25 per move × 200 moves
3 Job#70: $40 per PO × 10 PO’s
Job#71:$40 per PO × 40 PO’s
Job#72: $40 per PO × 10 PO’s
2. Ending balance in Work in Process = Job #72 = $56,150
3. Ending balance in Finished Goods = Job #71 = $18,650
4. Cost of Goods Sold = Job #70 = $60,050
6–8
Bosserman Company
Income Statement
For the Month Ended July 31, 20XX
Sales ($60,050 × 1.40)................................................. $84,070
Cost of goods sold ..................................................... 60,050
Gross margin .............................................................. $24,020
Selling expenses (0.10 × $84,070 + $4,100) .............. 12,507
Administrative expenses ........................................... 3,900
Operating income ....................................................... $ 7,613
115511
6–9
1. Applied overhead = Direct labor cost × Overhead rate
$140,000= $80,000 × Overhead rate
Overhead rate= 1.75 or 175% of direct labor cost
2. $140,000 Applied overhead
138,500 Actual overhead
$ 1,500 Overapplied overhead
3. Direct materials $ 40,000
Direct labor 80,000
Overhead applied 140,000
$ 260,000
Add: Beginning work in process 17,000
Less: Ending work in process (32,000)
Cost of goods manufactured $ 245,000
4. Overhead Control...................................... 1,500
Cost of Goods Sold ............................. 1,500
Adjusted cost of goods sold:
$ 210,000
(1,500)
$ 208,500
5. Direct materials ($32,000 – $10,000 – $17,500) $ 4,500
Direct labor (1,000 × $10) 10,000
Overhead applied (175% × $10,000) 17,500
Ending work in process $32,000
115522
6–10
1. Overhead rate = $180,000/20,000 = $9 per DLH
2. Direct materials $ 4,140
Direct labor 4,000
Applied overhead 3,600*
Total cost $11,740
*$3,600 = $9 × ($4,000/$10)
3. Overhead Control...................................... 189,300
Lease Payable ........................................... 5,000
Accumulated Depreciation....................... 20,000
Wages Payable.......................................... 101,300
Utilities Payable ........................................ 18,000
Other Payables.......................................... 45,000
Work in Process ($9 × 21,000).................. 189,000
Overhead Control...................................... 189,000
4. Actual overhead $189,300
Applied overhead 189,000
Underapplied overhead $ 300
5. Normal cost of goods sold $740,000
Add: Underapplied overhead 300
Adjusted cost of goods sold $740,300
6–11
1. Cutting Sewing Packaging
Department Department Department
Direct materials $5,400 $ 900 $ 225
Direct labor 150 1,800 900
Applied overhead 750 3,600 900
Transferred-in cost:
From cutting 6,300
From sewing 12,600
Total manufacturing cost $6,300 $12,600 $14,625
2. a. Transferred from Cutting to Sewing $6,300
b. Transferred from Sewing to Packaging $12,600
c. Transferred from Packaging to Finished Goods $14,625
115533
3. Unit cost = $14,625/600 = $24.38* per pair
*Rounded
6–12
1. Equivalent unit, Ending work in process = 300 × 0.20 = 60
2. Equivalent units in Total = 60 + 600 = 660
6–13
1. Physical flow schedule:
Units in beginning work in process 14,000
Units started during the period 40,000
Total units to account for 54,000
Units transferred out 45,500
Units in ending work in process 8,500
Total units accounted for 54,000
2. Equivalent units of production:
Materials Conversion
Units completed 45,500 45,500
Add: Units in ending work in process:
(8,500 × 100%) 8,500
(8,500 × 25%) 2,125
Equivalent units of output 54,000 47,625
115544
6–14
1. Cost of ending work in process:
Materials ($1.30 × 0) $ 0
Conversion ($0.50 × 4,800) 2,400
Total cost $2,400
Cost of goods transferred out: $1.80 × 45,000 = $81,000
2. Physical flow schedule:
Units to account for: Units accounted for:
Units in beginning WIP ? Units completed 45,000
Units started ? Units in ending WIP 8,000
Total units 53,000 Total units 53,000
The schedule of equivalent units using the weighted average method does
not give sufficient information to reconstruct the complete physical flow
schedule. Units in beginning work in process are embedded in units com-
pleted.
115555
6–15
1. Department 1:
a. Units transferred to Department 2 = Total units* – Ending WIP
= 6,480 – 3,600
= 2,880
*Total units = Beginning WIP + Units started = 0 + 6,480 = 6,480
b. Materials Conversion
Units completed 2,880 2,880
Add: Units in ending work in process:
3,600 × 100% 3,600
3,600 × 50% 1,800
Equivalent units of output 6,480 4,680
2. Department 2:
a. Units transferred out = Total units* – Ending WIP = 4,080 – 600 = 3,480
*Total units = Beginning WIP + Units transferred in = 1,200 + 2,880 = 4,080
b. Materials Conversion
Units completed 3,480 3,480
Add: Units in ending work in process:
600 × 0% 0
600 × 40% 240
Equivalent units of output 3,480 3,720
115566
6–16
1. Physical flow schedule:
Units to account for:
Units in beginning work in process 60,000
Units started during the period 220,000
Total units to account for 280,000
Units accounted for:
Units completed and transferred out:
Started and completed 180,000
From beginning work in process 60,000 240,000
Units in ending work in process 40,000
Total units accounted for 280,000
2. Units completed 240,000
Add: Units in ending WIP × Fraction complete
(40,000 × 20%) 8,000
Equivalent units of output 248,000
3. Unit cost = ($1,171,800 + $390,600)/248,000 = $6.30
4. Cost transferred out = 240,000 × $6.30 = $1,512,000
Cost of ending WIP = 8,000 × $6.30 = $50,400
5. Costs to account for:
Beginning work in process $ 390,600
Incurred during June 1,171,800
Total costs to account for $ 1,562,400
Costs accounted for:
Goods transferred out $1,512,000
Goods in ending work in process 50,400
Total costs accounted for $1,562,400
115577
6–17 Cocolots Company
Mixing Department
Production Report
For the Month of June 20XX
(Weighted Average Method)
Unit Information
Physical flow:
Units to account for: Units accounted for:
Units in beginning WIP 60,000 Units completed 240,000
Units started 220,000 Units in ending WIP 40,000
Total units to account for 280,000 Total units accounted for 280,000
Equivalent units:
Units completed 240,000
Units in ending work in process 8,000
Total equivalent units 248,000
Cost Information
Costs to account for:
Beginning work in process $390,600
Incurred during March 1,171,800
Total costs to account for $1,562,400
Cost per equivalent unit $ 6.30
Costs accounted for:
Transferred Ending
Out Work in Process Total
Goods transferred out
($6.30 × 240,000) $1,512,000 — $1,512,000
Goods in ending WIP
($6.30 × 8,000) — $50,400 50,400
Total costs accounted for $1,512,000 $50,400 $1,562,400
115588
6–18
A B C D
Completed 16,200a
24,000c
31,000d
60,000f
Ending WIP 1,000b
0 900e
2,500g
Equivalent units 17,200 24,000 31,900 62,500
a
(3,200 + 17,000 – 4,000) e
(9,000 × 0.10)
b
(4,000 × 0.25) f
(30,000 + 40,000 – 10,000)
c
(1,000 + 23,000 – 0) g
(10,000 × 0.25)
d
(40,000 – 9,000)
6–19
A B C D
Completed* 16,200 24,000 31,000 60,000
Add: Ending WIP* 1,000 0 900 2,500
Less: Beginning WIP** 960 400 0 22,500
Equivalent units 16,240 23,600 31,900 40,000
*See solution to Exercise 6–18.
**Beginning WIP for A: 3,200 × 0.30 = 960
Beginning WIP for B: 1,000 × 0.40 = 400
Beginning WIP for C: 0 × 0 = 0
Beginning WIP for D: 30,000 × 0.75 = 22,500
6–20
1. Physical flow schedule:
Units to account for:
Units in beginning work in process 10,000
Units started during the period 70,000
Total units to account for 80,000
Units accounted for:
Units completed and transferred out:
Started and completed 50,000
From beginning work in process 10,000 60,000
Units in ending work in process (60% complete) 20,000
Total units accounted for 80,000
115599
6–20 Concluded
2. Materials Conversion
Units completed 60,000 60,000
Add: Units in ending WIP ×
Fraction complete (20,000 × 100%; 20,000 × 60%) 20,000 12,000
Equivalent units of output 80,000 72,000
3. Unit materials cost ($49,000 + $351,000)/80,000 = $5.00
Unit conversion cost ($2,625 + $78,735)/72,000 = 1.13
Total unit cost $6.13
4. Cost transferred out: 60,000 × $6.13 = $367,800
Cost of ending WIP:
Materials: 20,000 × $5.00 = $100,000
Conversion: 12,000 × $1.13 = 13,560
Total ending WIP cost $113,560
5. Costs to account for:
Beginning WIP $ 51,625
Incurred during August 429,735
Total costs to account for $481,360
Costs accounted for:
Goods transferred out $367,800
Goods in ending WIP 113,560
Total costs accounted for $481,360
116600
6–21
Bath Linens Department
Production Report
For the Month of August 20XX
(Weighted Average Method)
Unit Information
Physical flow:
Units to account for: Units accounted for:
Units in beginning WIP 10,000 Units completed 60,000
Units started 70,000 Units in ending WIP 20,000
Total units to account for 80,000 Total units accounted for 80,000
Equivalent units:
Materials Conversion
Units completed 60,000 60,000
Units in ending work in process 20,000 12,000
Total equivalent units 80,000 72,000
Cost Information
Costs to account for:
Materials Conversion Total
Beginning WIP $ 49,000 $ 2,625 $ 51,625
Incurred during August 351,000 78,735 429,735
Total costs to account for $400,000 $81,360 $481,360
Cost per equivalent unit $ 5.00 $ 1.13 $ 6.13
Costs accounted for:
Transferred Ending
Out Work in Process Total
Goods transferred out
($6.13 × 60,000) $367,800 — $367,800
Goods in ending WIP:
Materials ($5 × 20,000) — $100,000 100,000
Conversion costs
($1.13 × 12,000) — 13,560 13,560
Total costs accounted for $367,800 $113,560 $481,360
116611
6–22
1. b
2. d
3. b
4. b
5. a
6. c
7. c
8. e
Supporting computations:
Materials Conversion
Units completed 92,000 92,000
Units in ending WIP
(24,000 × 90%) 21,600
(24,000 × 40%) 9,600
Equivalent units (WA) 113,600 101,600
Less EU in BWIP
(16,000 × 60%) (9,600)
(16,000 × 20%) (3,200)
Equivalent units (FIFO) 104,000 98,400
Unit cost:
FIFO: $468,000/104,000 $573,040/98,400
$4.50 $5.82
WA: ($468,000 + $54,560)/113,600 ($573,040 + $35,560)/101,600
$4.60 $5.99
EWIP:
FIFO: ($4.50 × 21,600) + ($5.82 × 9,600) = $153,072
WA: ($4.60 × 21,600) + ($5.99 × 9,600) = $156,864
116622
6–23
1. Physical flow schedule:
Units to account for:
Units in beginning work in process (75% complete) 120,000
Units started during August 370,000
Total units to account for 490,000
Units accounted for:
Units completed and transferred out:
Started and completed 280,000
From beginning work in process 120,000 400,000
Units in ending work in process (25% complete) 90,000
Total units accounted for 490,000
2. Units started and completed 280,000
Add: Units to complete beginning WIP (120,000 × 25%) 30,000
Add: Units ending WIP × Fraction completed (90,000 × 30%) 27,000
Equivalent units of output 337,000
3. FIFO unit cost = $1,516,500/337,000 = $4.50
4. Costs transferred out:
Costs from beginning WIP $ 340,600
Costs to complete beginning WIP (30,000 × $4.50) 135,000
Started and completed (280,000 × $4.50) 1,260,000
Total costs transferred out $ 1,735,600
Cost of ending WIP = 27,000 × $4.50 = $121,500
5. Costs to account for: Costs accounted for:
Beginning WIP $ 340,600 Transferred out $1,735,600
Added in August 1,516,500 Ending WIP 121,500
Total $ 1,857,100 Total $1,857,100
116633
6–24
Nogaleen Company
Blending Department
Production Report
For the Month of August 20XX
(FIFO Method)
Unit Information
Physical flow:
Units to account for:
Units in beginning work in process 120,000
Units started during August 370,000
Total units to account for 490,000
Units accounted for: Physical Flow Equivalent Units
Units started and completed 280,000 280,000
Units completed from beginning
work in process 120,000 30,000
Units in ending work in process 90,000 27,000
Total units accounted for 490,000 337,000
Cost Information
Costs to account for:
Beginning work in process $ 340,600
Incurred during August 1,516,500
Total costs to account for $1,857,100
Cost per equivalent unit $ 4.50
Costs accounted for:
Transferred Ending
Out Work in Process Total
Units in beginning work
in process:
From prior period $ 340,600 — $ 340,600
From current period
(30,000 × $4.50) 135,000 — 135,000
Units started and completed
(280,000 × $4.50) 1,260,000 — 1,260,000
Goods in ending work
in process (27,000 × $4.50) — $121,500 121,500
Total costs accounted for $1,735,600 $121,500 $1,857,100
116644
6–25
1. Job #64:
Direct materials $ 1,240
Direct labor 6,150
Overhead ($12 × 410) 4,920
$12,310
Unit cost = $12,310/50 = $246.20
2. Ending Work in Process = Cost of Job #65
= $985 + $8,745 + ($12 × 583) = $16,726
3. Finished Goods ......................................... 12,310
Work in Process .................................. 12,310
Cost of Goods Sold................................... 12,310
Finished Goods ................................... 12,310
Accounts Receivable................................ 19,696*
Sales Revenue ..................................... 19,696
*(160% × $12,310 = $19,696)
116655
PROBLEMS
6–26
1. Overhead rate = $270/$900 = 0.30 or 30% of direct labor dollars.
(This rate was calculated using information from the Fazel job; however, the
Myron and Patton jobs would give the same answer.)
2. Fazel Myron Patton Raider Willis
Beginning WIP $ 1,730 $1,180 $2,500 $ 0 $ 0
Direct materials 600 350 260 780 725
Direct labor 1,200 980 650 1,350 900
Applied overhead 360 294 195 405 270
Total $ 3,890 $2,804 $3,605 $ 2,535 $ 1,895
Note: This is just one way of setting up the job-order cost sheets. You might
prefer to keep the detail on the materials, labor, and overhead in beginning
inventory costs.
3. Since the Fazel and Myron jobs were completed, the others must still be in
process. Therefore, the ending balance in Work in Process is the sum of the
costs of the Patton, Raider, and Willis jobs.
Patton $3,605
Raider 2,535
Willis 1,895
Ending Work in Process $8,035
Cost of Goods Sold = Fazel job + Myron job = $3,890 + $2,804 = $6,694
4. Aldrin Company
Income Statement
For the Month Ended June 30, 20XX
Sales (1.4 × $6,694) ................................................................... $9,372
Cost of goods sold.................................................................... 6,694
Gross margin............................................................................. $2,678
Marketing and administrative expenses................................. 1,200
Operating income...................................................................... $1,478
116666
6–27
1. Overhead rate = $90,000/10,000 = $9 per MHr
Overhead costs = $30,000 + 15,000 + 20,000 + 25,000 = $90,000
Job #1 Job #2
Direct materials $4,500 $ 8,600
Direct labor 1,000 2,000
Overhead ($9 × 200 MHrs.) 1,800 1,800
Total manufacturing cost $7,300 $12,400
Plus 30% markup 2,190 3,720
Bid price $9,490 $16,120
2. Purchasing rate = $30,000/5,000 = $6 per purchase order
Setup cost rate = $15,000/1,000 = $15 per setup
Engineering rate = $20,000/500 = $40 per engineering hour
Other cost rate = $25,000/10,000 = $2.50 per MHr
Job #1 Job #2
Direct materials $4,500 $ 8,600
Direct labor 1,000 2,000
Overhead:
Purchasing ($6 × 15); ($6 × 20) 90 120
Setups ($15 × 2); ($15 × 3) 30 45
Engineering ($40 × 25); ($40 × 10) 1,000 400
Other ($2.50 × 200); ($2.50 × 200) 500 500
Total manufacturing cost $7,120 $11,665
Plus 30% markup 2,136 3,500
Bid price $9,256 $15,165
3. The activity-based approach to assigning overhead gives a more accurate
cost figure because so much of the overhead is non unit-level and there is
product diversity.
116677
6–28
1. a. Materials ............................................... 44,200
Accounts Payable......................... 44,200
b. Work in Process .................................. 27,000
Materials ........................................ 27,000
c. Work in Process .................................. 28,200
Wages Payable.............................. 28,200
d. Overhead Control ................................ 19,950
Cash ............................................... 19,950
e. Work in Process .................................. 18,800
Overhead Control.......................... 18,800
2. Job #703
Beginning balance, Work in Process $13,000
Direct materials 12,500
Direct labor 11,700
Overhead applied 7,800
Total $45,000
Job #704
Direct materials $14,500
Direct labor 16,500
Overhead applied 11,000
Total $42,000
3. f. Finished Goods ................................... 45,000
Work in Process............................ 45,000
h. Cost of Goods Sold ............................. 6,240
Finished Goods............................. 6,240
Accounts Receivable .......................... 8,736
Sales Revenue............................... 8,736
4. a. Materials:
Beginning balance $ 6,070
Add: Purchases 44,200
Less: Materials requisitioned (27,000)
Ending balance $ 23,270
116688
6–28 Concluded
b. Work in Process:
Beginning balance $ 13,000
Add: Materials requisitioned 27,000
Direct labor 28,200
Overhead applied 18,800
Less: Jobs completed (45,000)
Ending balance $ 42,000
c. Finished Goods:
Beginning balance $ 6,240
Add: Jobs completed 45,000
Less: Jobs sold (6,240)
Ending balance $ 45,000
6–29
1. a. Materials ............................................... 3,000
Accounts Payable......................... 3,000
b. Work in Process .................................. 1,700
Materials ........................................ 1,700
c. Work in Process [$8 × (50 + 100)]....... 1,200
Wages Payable.............................. 1,200
d. Work in Process ($7.50 × 150) ............ 1,125
Overhead Control.......................... 1,125
e. Overhead Control ................................ 1,230
Cash ............................................... 1,230
2. Job #443 Job #444
Direct materials $ 500 Direct materials $1,200
Direct labor 400 Direct labor 800
Applied overhead 375 Applied overhead 750
Total $1,275 Total $2,750
f. Finished Goods ................................... 1,275
Work in Process............................ 1,275
g. Cost of Goods Sold ............................. 2,000
Finished Goods............................. 2,000
Accounts Receivable .......................... 2,500
Sales Revenue............................... 2,500
116699
6–29 Concluded
3. Kearney Company
Statement of Cost of Goods Manufactured
For the Month Ended April 30, 20XX
Direct materials:
Beginning materials inventory ...................... $1,400
Purchases of materials .................................. 3,000
Total materials available ................................ $4,400
Ending materials............................................. 2,700
Materials used................................................. $1,700
Direct labor ........................................................... 1,200
Overhead............................................................... $1,230
Less: Underapplied overhead............................. 105
Overhead applied................................................. 1,125
Current manufacturing costs.............................. $4,025
Add: Beginning work in process........................ 0
Total manufacturing costs .................................. $4,025
Less: Ending work in process ............................ 2,750
Cost of goods manufactured .............................. $1,275
117700
6–30
Debroux Company
Assembly Department
Production Report
For the Month of February 20XX
(Weighted Average Method)
Unit Information
Units to account for: Units accounted for:
Units in beginning WIP 12,000 Units completed 34,600
Units started 28,000 Units in ending WIP 5,400
Total units 40,000 Total units 40,000
Equivalent units:
Units completed 34,600
Units in ending WIP (5,400 × 70%) 3,780
Total equivalent units 38,380
Cost Information
Costs to account for:
Costs in beginning WIP $142,760
Costs added by department 333,152
Total costs to account for $475,912
Cost per equivalent unit ($475,912/38,380) $ 12.40
Costs accounted for:
Goods transferred out (34,600 × $12.40) $429,040
Ending work in process (3,780 × $12.40) 46,872
Total costs accounted for $475,912
117711
6–31
Debroux Company
Assembly Department
Production Report
For the Month of February 20XX
(FIFO Method)
Unit Information
Units to account for: Units accounted for:
Started and completed 22,600
Units in beginning WIP 12,000 From beginning WIP 12,000
Units started 28,000 From ending WIP 5,400
Total units 40,000 Total units 40,000
Equivalent units:
Started and completed 22,600
To complete beginning WIP (12,000 × 40%) 4,800
Units in ending WIP (5,400 × 70%) 3,780
Total equivalent units 31,180
Cost Information
Costs to account for:
Costs in beginning WIP $142,760
Costs added by department 333,152
Total costs to account for $475,912
Cost per equivalent unit ($333,152/31,180) $10.6848
Costs accounted for:
Transferred out:
Units started and completed (22,600 × $10.6848) $241,476
Units in beginning work in process:
From prior period 142,760
From current period (4,800 × $10.6848) 51,287
Total cost transferred out $435,523
Goods in ending work in process (3,780 × $10.6848) 40,389
Total costs accounted for $475,912
117722
6–32
1. a. Physical flow schedule:
Units to account for: Units accounted for:
Started and completed 480,000
Units in BWIP 20,000 From BWIP 20,000
Units started 510,000 From EWIP 30,000
Total units 530,000 Total units 530,000
b. Equivalent unit schedule:
Paraffin Pigment Conversion
Units completed 500,000 500,000 500,000
Units in ending WIP 30,000 30,000 21,000*
Total equivalent units 530,000 530,000 521,000
*(30,000 × 70%)
2. Unit cost computation:
Paraffin Pigment Conversion Total
Costs in BWIP $ 120,000 $ 100,000 $ 40,000 $ 260,000
Costs added 3,060,000 2,550,000 5,170,000 10,780,000
Total costs $3,180,000 $2,650,000 $5,210,000 $11,040,000
Unit cost = Unit paraffin cost + Unit pigment cost + Unit conversion cost
= ($3,180,000/530,000) + ($2,650,000/530,000) +
($5,210,000/521,000)
= $6 + $5 + $10 = $21
3. Ending work in process
= (30,000 × $6) + (30,000 × $5) + (21,000 × $10)
= $180,000 + $150,000 + $210,000
= $540,000
Cost of goods transferred out: 500,000 × $21 = $10,500,000
4. Cost reconciliation:
Costs to account for: Costs accounted for:
Beginning WIP $ 260,000 Transferred out $10,500,000
August costs 10,780,000 Ending WIP 540,000
Total to account for $11,040,000 Total accounted for $11,040,000
117733
6–33
Grace Sauces, Inc.
Mixing Department
Production Report
For the First Quarter 20XX
(FIFO Method)
Unit Information
Units to account for: Units accounted for:
Units in beginning WIP 144,000 Units transferred out 292,500*
Units started 180,000 Units in ending WIP 31,500
Units to account for 324,000 Units accounted for 324,000
* Started and completed = 148,500 + B-WIP 144,000 = 292,500
Equivalent Units
Transferred In Materials Conversion
Units started and completed 148,500 148,500 148,500
Units in BWIP (to complete) — — 36,000
Units in EWIP 31,500 31,500 6,300
Total units accounted for 180,000 180,000 190,800
Cost Information
Costs to account for: Transferred In Materials Conversion Total
Beginning WIP $ 45,600 $ 6,432 $14,400 $ 66,432
Incurred during quarter 230,400 33,500 72,640 336,540
Total costs to account for $276,000 $39,932 $87,040 $402,972
Equivalent units 180,000 180,000 190,800
Cost incurred during quarter
÷ Equivalent units $ 1.28 $ 0.1861 $0.3807 $ 1.8468
Costs accounted for: Transferred Out EWIP Total
Started/complete (148,500 × $1.8468) $274,250 — $274,250
Units in beginning WIP:
From prior period 66,432 — 66,432
Current period (36,000 × $0.3807) 13,705 — 13,705
Units in ending WIP:
Transferred in (31,500 × $1.28) — $40,320 40,320
Materials (31,500 × $0.1861) — 5,862 5,862
Conversion (6,300 × $0.3807) — 2,398 2,398
Total costs accounted for $354,387 $48,580 $402,967*
*Difference due to rounding.
117744
6–34
Grace Sauces, Inc.
Mixing Department
Production Report
For the First Quarter 20XX
(Weighted Average Method)
Unit Information
Units to account for: Units accounted for:
Units in beginning WIP 144,000 Units transferred out 292,500
Units started 180,000 Units in ending WIP 31,500
Units to account for 324,000 Units accounted for 324,000
Equivalent Units
Transferred In Materials Conversion
Units completed 292,500 292,500 292,500
Units in ending WIP 31,500 31,500 6,300
Total units accounted for 324,000 324,000 298,800
Cost Information
Costs to account for: Transferred In Materials Conversion Total
Beginning WIP $ 45,600 $ 6,432 $14,400 $ 66,432
Incurred during quarter 230,400 33,500 72,640 336,540
Total costs to account for $276,000 $ 39,932 $87,040 $402,972
÷ Equivalent units 324,000 324,000 298,800
Cost per equivalent unit $ 0.852 $ 0.12 $ 0.291 $ 1.27
Costs accounted for: Transferred Out EWIP Total
Goods transferred out
(292,500 × $1.27) $370,421 — $370,421
Ending work in process:
Transferred in (31,500 × $0.852) — $26,838 26,838
Materials (31,500 × $0.12) — 3,780 3,780
Conversion (6,300 × $0.291) — 1,835 1,835
Total costs accounted for $370,421 $32,453 $402,874*
*Difference due to rounding.
117755
6–35
1. Department A
a. Physical flow schedule:
Units in beginning WIP 5,000
Units started in November 25,000
Total units to account for 30,000
Units completed and transferred out:
Started and completed 23,000
From beginning WIP 5,000
Units in ending WIP 2,000
Total units accounted for 30,000
Costs charged to the department:
Materials Conversion Total
Beginning WIP $10,000 $ 6,900 $ 16,900
Incurred during November 57,800 95,220 153,020
Total costs $67,800 $102,120 $169,920
b. Equivalent unit calculation:
Materials Conversion
Units completed 28,000 28,000
Add: Equivalent units in ending WIP 2,000 1,600
Total equivalent units 30,000 29,600
c. Unit cost calculation:
Unit cost = Unit material cost + Unit conversion cost
= $67,800/30,000 + $102,120/29,600
= $2.26 + $3.45
= $5.71
117766
6–35 Continued
d. and e. Cost reconciliation:
Total costs accounted for:
Goods transferred out (28,000 × $5.71) .................. $159,880
Costs in ending WIP:
Materials (2,000 × $2.26) ..................................... $4,520
Conversion (1,600 × $3.45) ................................. 5,520 10,040
Total costs accounted for .................................. $169,920
Costs to account for:
Beginning work in process ................................ $ 16,900
Costs incurred during November...................... 153,020
Total costs to account for .................................. $169,920
2. Journal entries:
Work in Process—Dept. A ....................... 57,800
Materials Inventory.............................. 57,800
Work in Process—Dept. A ....................... 95,220
Conversion Costs—Dept. A ............... 95,220*
Work in Process—Dept. B ....................... 159,880
Work in Process—Dept. A.................. 159,880
*When conversion costs are not broken into labor and overhead components,
a control account for conversion costs is used. Some firms now combine
overhead and direct labor costs into one category. This practice is develop-
ing because direct labor is becoming a small percentage of total manufactur-
ing costs.
117777
6–35 Continued
3. Department B
a. Physical flow schedule:
Units in beginning WIP 8,000
Units started in November (transferred in) 28,000
Total units to account for 36,000
Units completed and transferred out:
Started and completed 25,000
From beginning WIP 8,000
Units in ending WIP 3,000
Total units accounted for 36,000
Costs charged to the department:
Transferred
Materials Conversion In Total
Beginning WIP $ 0 $ 16,800 $ 45,320 $ 62,120
Incurred in Nov. 37,950 128,100 159,880 325,930
Total costs $37,950 $144,900 $205,200 $388,050
b. Equivalent unit calculation:
Transferred
Materials Conversion In
Units completed 33,000 33,000 33,000
Add: Equivalent units in EWIP 0 1,500 3,000
Total equivalent units 33,000 34,500 36,000
c. Unit cost calculation:
Unit cost = Unit material cost + Unit conversion cost + Unit
transferred in cost
= ($37,950/33,000) + ($144,900/34,500) + ($205,200/36,000)
= $1.15 + $4.20 + $5.70
= $11.05
117788
6–35 Concluded
d. and e. Cost reconciliation:
Total costs accounted for:
Goods transferred out (33,000 × $11.05) ................ $364,650
Costs in ending WIP:
Materials............................................................... $ 0
Conversion (1,500 × $4.20) ................................. 6,300
Transferred in (3,000 × $5.70)............................. 17,100
Total costs in ending WIP........................................ 23,400
Total costs accounted for .................................. $388,050
Costs to account for:
Beginning work in process ................................ $ 62,120
Costs incurred during November...................... 325,930
Total costs to account for .................................. $388,050
Journal entries for Department B:
Work in Process—Dept. B.................. 159,880
Work in Process—Dept. A........... 159,880
Work in Process—Dept. B .................. 37,950
Materials Inventory ....................... 37,950
Work in Process—Dept. B .................. 128,100
Conversion Costs—Dept. B......... 128,100*
Finished Goods ................................... 364,650
Work in Process—Dept. B ........... 364,650
*Because conversion costs are not broken into labor and overhead com-
ponents, a control account for conversion costs is used. Some firms are
now combining overhead and direct labor costs into one category. This
practice is developing because direct labor is becoming a small percen-
tage of total manufacturing costs.
117799
6–36
1. Department A
a. Physical flow schedule:
Units in beginning WIP 5,000
Units started in November 25,000
Total units to account for 30,000
Units completed and transferred out:
Started and completed 23,000
From beginning WIP 5,000
Units in ending WIP 2,000
Total units accounted for 30,000
Costs charged to the department:
Materials Conversion Total
Beginning WIP $10,000 $ 6,900 $ 16,900
Incurred during November 57,800 95,220 153,020
Total costs $67,800 $102,120 $169,920
b. Equivalent unit calculation:
Materials Conversion
Units started and completed 23,000 23,000
Equivalent units in beginning WIP — 3,000
Equivalent units in ending WIP 2,000 1,600
Total equivalent units 25,000 27,600
c. Unit cost calculation:
Unit cost = Unit material cost + Unit conversion cost
= ($57,800/25,000) + ($95,220/27,600)
= $2.312 + $3.45
= $5.762
118800
6–36 Continued
d. and e. Cost reconciliation:
Cost of units started and completed (23,000 × $5.762) $132,526
Cost of units in beginning WIP:
Prior-period costs ............................................... 16,900
Current cost to finish units (3,000 × $3.45)....... 10,350
Total cost of units transferred out .......................... $159,776
Costs in ending WIP:
Materials (2,000 × $2.312) ................................... $4,624
Conversion (1,600 × $3.45) ................................. 5,520
Total costs in ending WIP........................................ 10,144
Total costs accounted for .................................. $169,920
Costs to account for:
Beginning WIP..................................................... $ 16,900
Costs incurred..................................................... 153,020
Total costs to account for .................................. $169,920
2. Journal entries:
Work in Process—Dept. A ....................... 57,800
Materials Inventory.............................. 57,800
Work in Process—Dept. A ....................... 95,220
Conversion Costs—Dept. A ............... 95,220*
Work in Process—Dept. A ....................... 159,776
Work in Process—Dept. A.................. 159,776
*Because conversion costs are not broken into labor and overhead com-
ponents, a control account for conversion costs is used. Some firms are
now combining overhead and direct labor costs into one category. This
practice is developing because direct labor is becoming a small percen-
tage of total manufacturing costs.
118811
6–36 Continued
3. Department B
a. Physical flow schedule:
Units in beginning WIP 8,000
Units started in November (transferred in) 28,000
Total units to account for 36,000
Units completed and transferred out:
Started and completed 25,000
From beginning WIP 8,000
Units in ending WIP 3,000
Total units accounted for 36,000
Costs charged to the department:
Transferred
Materials Conversion In Total
Beginning WIP $ 0 $ 16,800 $ 45,320 $ 62,120
Incurred during Nov. 37,950 128,100 159,776 325,826
Total costs $37,950 $144,900 $205,096 $387,946
b. Equivalent unit calculation:
Transferred
Materials Conversion In
Units started and completed 25,000 25,000 25,000
Equivalent units in BWIP 8,000 4,000 0
Equivalent units in EWIP 0 1,500 3,000
Total equivalent units 33,000 30,500 28,000
c. Unit cost calculation:
Unit cost = Unit material cost + Unit conversion cost + Unit
transferred in cost
= $37,950/33,000 + $128,100/30,500 + $159,776/28,000
= $1.15 + $4.20 + $5.706
= $11.056
118822
6–36 Concluded
d. and e. Cost reconciliation:
Cost of units started and completed (25,000 × $11.056) $276,400
Cost of units in beginning WIP:
Prior-period costs ............................................... 62,120
Current cost to finish units:
Materials (8,000 × $1.15) ..................................... 9,200
Conversion (4,000 × $4.20) ................................. 16,800
Total costs of goods transferred out...................... $364,520
Costs in ending WIP:
Conversion (1,500 × $4.20) ................................. $ 6,300
Transferred in (3,000 × $5.706)........................... 17,118
Total costs in ending WIP........................................ 23,418
Total costs accounted for .................................. $387,938*
Costs to account for:
Beginning work in process ................................ $ 62,120
Costs incurred during November...................... 325,826
Total costs to account for .................................. $387,946*
*Difference due to rounding.
Journal entries for Department B:
Work in Process—Dept. B.................. 159,776
Work in Process—Dept. A........... 159,776
Work in Process—Dept. B.................. 37,950
Materials Inventory ....................... 37,950
Work in Process—Dept. B.................. 128,100
Conversion Costs—Dept. B ........ 128,100*
Finished Goods ................................... 364,520
Work in Process—Dept. B........... 364,520
*As before, a control account for conversion cost is used to combine over-
head and direct labor cost into one category.
118833
6–37
1. a. Molding
Units to account for: Units accounted for:
Beginning WIP 500 Transferred out 1,300
Started 1,000 Ending WIP 200
1,500 1,500
b. Assembly
Units to account for: Units accounted for:
Beginning WIP 0 Transferred out 900
Started 1,300 Ending WIP 400
1,300 1,300
c. Packaging
Units to account for: Units accounted for:
Beginning WIP 150 Transferred out 1,050
Started 900 Ending WIP 0
1,050 1,050
2. Equivalent units:
Molding Assembly Packaging
Mat. Conv. Tr. In Mat. Conv. Tr. In Mat. Conv.
Trans. out 1,300 1,300 900 900 900 1,050 1,050 1,050
EWIP 200 40 400 160 160 0 0 0
1,500 1,340 1,300 1,060 1,060 1,050 1,050 1,050
3. Molding Assembly Packaging
Unit prior department cost — $11.50 $13.06
Unit materials cost $ 5.00 0.46 2.65
Unit conversion cost 6.50 1.10 3.05
Total unit cost $11.50 $13.06 $18.76
Molding:
Unit materials cost: ($2,500 + $5,000)/1,500 = $5.00
Unit conversion cost: ($1,050 + $7,660)/1,340 = $6.50
118844
6–37 Concluded
Assembly:
Unit transferred-in cost: (0 + $14,950)/1,300 = $11.50
Unit materials cost: (0 + $487.60)/1,060 = $0.46
Unit conversion cost: (0 + $1,166)/1,060 = $1.10
Packaging:
Unit transferred-in cost: ($1,959 + $11,754)/1,050 = $13.06
Unit materials cost: ($375 + $2,407.50)/1,050 = $2.65
Unit conversion cost: ($225 + $2,977.50)/1,050 = $3.05
4. Molding:
Transferred out: (1,300 × $11.50) = $14,950
Ending WIP: (200 × $5) + (40 × $6.50) = $1,260
Assembly:
Transferred out: (900 × $13.06) = $11,754
Ending WIP: (400 × $11.50) + (160 × $1.56) = $4,849.60
Packaging:
Transferred out: (1,050 × $18.76) = $19,698
Ending WIP: 0
5. Costs to account for:
BWIP + Current = Total
Molding $3,550.00 $12,660.00 $16,210.00
Assembly 0.00 16,603.60 16,603.60
Packaging 2,559.00 17,139.00 19,698.00
Costs accounted for:
Trans. Out + EWIP = Total
Molding $14,950.00 $1,260.00 $16,210.00
Assembly 11,754.00 4,849.60 16,603.60
Packaging 19,698.00 0.00 19,698.00
118855
6–38
1. Equivalent units:
Molding Assembly Packaging
Mat. Conv. Tr. In Mat. Conv. Tr. In Mat. Conv.
Started and
completed 800 800 900 900 900 900 900 900
BWIP 0 350 0 0 0 0 0 75
EWIP 200 40 400 160 160 0 0 0
1,000 1,190 1,300 1,060 1,060 900 900 975
2. Molding:
Unit materials cost: $5,000/1,000 = $ 5.000
Unit conversion cost: $7,660/1,190 = 6.437
Total unit cost $11.437
Assembly:
Unit transferred-in cost: $14,950/1,300 = $11.500
Unit materials cost: $487.60/1,060 = 0.460
Unit conversion cost: $1,166/1,060 = 1.100
Total unit cost $13.060
Packaging:
Unit transferred-in cost: $11,754/900 = $13.060
Unit materials cost: $2,407.50/900 = 2.675
Unit conversion cost: $2,977.50/975 = 3.054
Total unit cost $18.789
3. Molding:
Transferred out:
Started and completed (800 × $11.437) $ 9,149.60
Prior-period cost 3,550.00
Complete beginning WIP (350 × $6.437) 2,252.95
Total transferred out $ 14,952.55
Ending WIP: (200 × $5) + (40 × $6.437) $ 1,257.48
118866
6–38 Concluded
Assembly:
Transferred out:
Started and completed (900 × $13.06) $ 11,754.00
Prior-period cost 0.00
Complete beginning WIP 0.00
Total transferred out $ 11,754.00
Ending WIP: (400 × $11.50) + (160 × $1.56) $ 4,849.60
Packaging:
Transferred out:
Started and completed (900 × $18.789) $ 16,910.10
Prior period cost 2,559.00
Complete beginning WIP (75 × $3.054) 229.05
Total transferred out $ 19,698.15
Ending WIP: $ 0
4. Cost reconciliation:
Costs to account for:
BWIP + Current = Total
Molding $3,550.00 $12,660.00 $16,210.00
Assembly 0.00 16,603.60 16,603.60
Packaging 2,559.00 17,139.00 19,698.00
Costs accounted for:
Trans. Out + EWIP = Total
Molding $14,952.55 $1,257.48 $16,210.03*
Assembly 11,754.00 4,849.60 16,603.60
Packaging 19,698.15 0.00 19,698.15*
*Difference due to rounding.
118877
MANAGERIAL DECISION CASES
6–39
1. Gary’s proposal requires Donna to falsify the equivalent unit calculation so
that income and assets can be inflated and reported incorrectly. Falsification
of the production report would be a violation of at least two major ethical
standards: integrity and objectivity. Falsification does not allow the organiza-
tion to attain its legitimate and ethical objectives. Moreover, if Donna agrees
to the proposal, she would be taking action that would discredit her profes-
sion. Finally, Donna has an ethical obligation to communicate information
fairly and objectively, disclosing all information that would be needed for the
loan officer to fairly assess the merits of the company’s request for a loan.
Clearly, Donna should not agree to falsify the production report.
2. Donna has an obligation to report Gary to a superior only if an actual ethical
problem exists. If Gary decides that the course of action he is suggesting is
not really in his or the company’s best interests, then no ethical problem ex-
ists, and no action by Donna is needed.
3. If Gary insists on his idea of falsification of the division’s reports, Donna
should attempt to resolve the conflict by appealing to Gary’s immediate su-
pervisor (and on up, if necessary, until a satisfactory resolution is achieved).
If no satisfactory resolution is possible, then Donna should resign and sub-
mit an informative memo to a representative of the organization.
4. In this situation, the ethical dilemma is complicated by two factors: Donna’s
age and a low likelihood of resolution by appealing to higher-level authorities.
Donna’s age may make it more difficult to find alternative employment (at
least at the same level and pay), and it may mean possible forfeiture of re-
tirement benefits. Many students will likely respond that Donna should still
resign (assuming that resolution is not likely), recommending the ideal out-
come. While Donna’s ultimate resignation is the right choice if resolution
fails, students should realize that ethical behavior may often carry with it
some very significant personal sacrifices. It could be argued, however, that
the costs of unethical behavior are even greater.
Another possibility is to encourage Donna to see a lawyer. She has the option
of fighting back, and at her age (with retirement benefits at stake), a good of-
fense may be her best defense.
118888
RESEARCH ASSIGNMENT
6–40
Answers will vary.
6–41
Answers will vary.

More Related Content

What's hot

Chapter 11 Cost Volume Profit Analysis : A Managerial Planning Tool
Chapter 11 Cost Volume Profit Analysis : A Managerial Planning ToolChapter 11 Cost Volume Profit Analysis : A Managerial Planning Tool
Chapter 11 Cost Volume Profit Analysis : A Managerial Planning ToolYesica Adicondro
 
Chapter 10 Segmented Reporting, Investment Center Evaluation, And Transfer Pr...
Chapter 10 Segmented Reporting, Investment Center Evaluation, And Transfer Pr...Chapter 10 Segmented Reporting, Investment Center Evaluation, And Transfer Pr...
Chapter 10 Segmented Reporting, Investment Center Evaluation, And Transfer Pr...Yesica Adicondro
 
solusi manual advanced acc zy Chap016
solusi manual advanced acc zy Chap016solusi manual advanced acc zy Chap016
solusi manual advanced acc zy Chap016Suzie Lestari
 
Manajemen keuangan bab 06
Manajemen keuangan bab 06Manajemen keuangan bab 06
Manajemen keuangan bab 06Lia Ivvana
 
34020 7-853463552856
34020 7-85346355285634020 7-853463552856
34020 7-853463552856Sefri Yunita
 
Chapter 8 Budgeting For Planning and Control
Chapter 8 Budgeting For Planning and ControlChapter 8 Budgeting For Planning and Control
Chapter 8 Budgeting For Planning and ControlYesica Adicondro
 
Absorption and Variable Cost
Absorption and Variable CostAbsorption and Variable Cost
Absorption and Variable CostPT Lion Air
 
Metode harga pokok proses (pengantar)
Metode harga pokok proses (pengantar)Metode harga pokok proses (pengantar)
Metode harga pokok proses (pengantar)jhumanangshare
 
Bab. 16 Lean Accounting Perhitungan Biaya Target dan Balanced Scorecard
Bab. 16 Lean Accounting Perhitungan Biaya Target dan Balanced ScorecardBab. 16 Lean Accounting Perhitungan Biaya Target dan Balanced Scorecard
Bab. 16 Lean Accounting Perhitungan Biaya Target dan Balanced ScorecardFitri Ayu Kusuma Wijayanti
 
Ppt akuntansi differensial
Ppt akuntansi differensialPpt akuntansi differensial
Ppt akuntansi differensialYoshita Elsyanti
 
Analisis leverage
Analisis leverageAnalisis leverage
Analisis leveragetitikefnita
 
Activity Based Costing (ABC)
Activity Based Costing (ABC)Activity Based Costing (ABC)
Activity Based Costing (ABC)Indra Yu
 
Memahami Logika Laporan Arus Kas
Memahami Logika Laporan Arus KasMemahami Logika Laporan Arus Kas
Memahami Logika Laporan Arus KasAli Wafa
 
3 manajemen-kas materi 21 04 2013
3 manajemen-kas materi 21 04 20133 manajemen-kas materi 21 04 2013
3 manajemen-kas materi 21 04 2013Cep Fathurrahman
 
Bab 2 akuntansi biaya
Bab 2 akuntansi biayaBab 2 akuntansi biaya
Bab 2 akuntansi biayaNugroho Adi
 

What's hot (20)

Chapter 11 Cost Volume Profit Analysis : A Managerial Planning Tool
Chapter 11 Cost Volume Profit Analysis : A Managerial Planning ToolChapter 11 Cost Volume Profit Analysis : A Managerial Planning Tool
Chapter 11 Cost Volume Profit Analysis : A Managerial Planning Tool
 
Chapter 10 Segmented Reporting, Investment Center Evaluation, And Transfer Pr...
Chapter 10 Segmented Reporting, Investment Center Evaluation, And Transfer Pr...Chapter 10 Segmented Reporting, Investment Center Evaluation, And Transfer Pr...
Chapter 10 Segmented Reporting, Investment Center Evaluation, And Transfer Pr...
 
solusi manual advanced acc zy Chap016
solusi manual advanced acc zy Chap016solusi manual advanced acc zy Chap016
solusi manual advanced acc zy Chap016
 
Manajemen keuangan bab 06
Manajemen keuangan bab 06Manajemen keuangan bab 06
Manajemen keuangan bab 06
 
34020 7-853463552856
34020 7-85346355285634020 7-853463552856
34020 7-853463552856
 
Chapter 8 Budgeting For Planning and Control
Chapter 8 Budgeting For Planning and ControlChapter 8 Budgeting For Planning and Control
Chapter 8 Budgeting For Planning and Control
 
Absorption and Variable Cost
Absorption and Variable CostAbsorption and Variable Cost
Absorption and Variable Cost
 
Metode harga pokok proses (pengantar)
Metode harga pokok proses (pengantar)Metode harga pokok proses (pengantar)
Metode harga pokok proses (pengantar)
 
Ch05
Ch05Ch05
Ch05
 
Akuntansi biaya
Akuntansi biayaAkuntansi biaya
Akuntansi biaya
 
Bab. 16 Lean Accounting Perhitungan Biaya Target dan Balanced Scorecard
Bab. 16 Lean Accounting Perhitungan Biaya Target dan Balanced ScorecardBab. 16 Lean Accounting Perhitungan Biaya Target dan Balanced Scorecard
Bab. 16 Lean Accounting Perhitungan Biaya Target dan Balanced Scorecard
 
Capital Budgeting
Capital Budgeting Capital Budgeting
Capital Budgeting
 
Ppt akuntansi differensial
Ppt akuntansi differensialPpt akuntansi differensial
Ppt akuntansi differensial
 
Analisis leverage
Analisis leverageAnalisis leverage
Analisis leverage
 
Activity Based Costing (ABC)
Activity Based Costing (ABC)Activity Based Costing (ABC)
Activity Based Costing (ABC)
 
Memahami Logika Laporan Arus Kas
Memahami Logika Laporan Arus KasMemahami Logika Laporan Arus Kas
Memahami Logika Laporan Arus Kas
 
3 manajemen-kas materi 21 04 2013
3 manajemen-kas materi 21 04 20133 manajemen-kas materi 21 04 2013
3 manajemen-kas materi 21 04 2013
 
Ch04
Ch04Ch04
Ch04
 
Proses Strategi
Proses StrategiProses Strategi
Proses Strategi
 
Bab 2 akuntansi biaya
Bab 2 akuntansi biayaBab 2 akuntansi biaya
Bab 2 akuntansi biaya
 

Similar to Chapter 6 Job Order and Process Costing

Jiambalvo text book solutions (1)
Jiambalvo text book solutions (1)Jiambalvo text book solutions (1)
Jiambalvo text book solutions (1)Mvs Krishna
 
Job costing power point show
Job costing power point showJob costing power point show
Job costing power point showMaliha Jahan
 
cost accounting chapter 6, fundamentals of product and service design
cost accounting chapter 6, fundamentals of product and service designcost accounting chapter 6, fundamentals of product and service design
cost accounting chapter 6, fundamentals of product and service designBeaDelaPenia1
 
Chapter 5 Costing Methods Part 1 (1).pptx
Chapter 5 Costing Methods Part 1 (1).pptxChapter 5 Costing Methods Part 1 (1).pptx
Chapter 5 Costing Methods Part 1 (1).pptxshawalhamzah
 
16-02-2023 accounting presentation.pptx
16-02-2023 accounting presentation.pptx16-02-2023 accounting presentation.pptx
16-02-2023 accounting presentation.pptxAqsaJaved52
 
Complete Cost Accumulation Procedures in Manufacturing Organizations
Complete Cost Accumulation Procedures in Manufacturing OrganizationsComplete Cost Accumulation Procedures in Manufacturing Organizations
Complete Cost Accumulation Procedures in Manufacturing Organizationsoptiplex7866
 
Bus 7800 week 6 absorption costing
Bus 7800 week 6 absorption costingBus 7800 week 6 absorption costing
Bus 7800 week 6 absorption costingOUHainesM
 
Ch06 Managerial accounting aiou mba mcom 8508
Ch06 Managerial accounting aiou mba mcom 8508Ch06 Managerial accounting aiou mba mcom 8508
Ch06 Managerial accounting aiou mba mcom 8508Ali Imran Awan MBA (IT)
 
4 Activity-Based Costing and Just-In-Time CostinghoudreiS.docx
4 Activity-Based Costing and Just-In-Time CostinghoudreiS.docx4 Activity-Based Costing and Just-In-Time CostinghoudreiS.docx
4 Activity-Based Costing and Just-In-Time CostinghoudreiS.docxtamicawaysmith
 
Job costing
Job costingJob costing
Job costingLucky
 
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptxCost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptxObsaKamil
 
WHY IS THE ALLOCATION METHOD USED IN ACCOUNTING FOR THE DIFFERENCE BETWEEN AP...
WHY IS THE ALLOCATION METHOD USED IN ACCOUNTING FOR THE DIFFERENCE BETWEEN AP...WHY IS THE ALLOCATION METHOD USED IN ACCOUNTING FOR THE DIFFERENCE BETWEEN AP...
WHY IS THE ALLOCATION METHOD USED IN ACCOUNTING FOR THE DIFFERENCE BETWEEN AP...Mashfiq Albartross
 

Similar to Chapter 6 Job Order and Process Costing (20)

Jiambalvo text book solutions (1)
Jiambalvo text book solutions (1)Jiambalvo text book solutions (1)
Jiambalvo text book solutions (1)
 
Costing system
Costing systemCosting system
Costing system
 
JOB BATCH COSTING
JOB BATCH COSTINGJOB BATCH COSTING
JOB BATCH COSTING
 
Sample powerpoint
Sample powerpointSample powerpoint
Sample powerpoint
 
Job costing power point show
Job costing power point showJob costing power point show
Job costing power point show
 
cost accounting chapter 6, fundamentals of product and service design
cost accounting chapter 6, fundamentals of product and service designcost accounting chapter 6, fundamentals of product and service design
cost accounting chapter 6, fundamentals of product and service design
 
Job costing and batch costing
Job costing and batch costingJob costing and batch costing
Job costing and batch costing
 
jobe.ppt
jobe.pptjobe.ppt
jobe.ppt
 
Job and batch costing
Job and batch costingJob and batch costing
Job and batch costing
 
Chapter 5 Costing Methods Part 1 (1).pptx
Chapter 5 Costing Methods Part 1 (1).pptxChapter 5 Costing Methods Part 1 (1).pptx
Chapter 5 Costing Methods Part 1 (1).pptx
 
Job order costing
Job order costingJob order costing
Job order costing
 
16-02-2023 accounting presentation.pptx
16-02-2023 accounting presentation.pptx16-02-2023 accounting presentation.pptx
16-02-2023 accounting presentation.pptx
 
Complete Cost Accumulation Procedures in Manufacturing Organizations
Complete Cost Accumulation Procedures in Manufacturing OrganizationsComplete Cost Accumulation Procedures in Manufacturing Organizations
Complete Cost Accumulation Procedures in Manufacturing Organizations
 
Bus 7800 week 6 absorption costing
Bus 7800 week 6 absorption costingBus 7800 week 6 absorption costing
Bus 7800 week 6 absorption costing
 
Ch06 Managerial accounting aiou mba mcom 8508
Ch06 Managerial accounting aiou mba mcom 8508Ch06 Managerial accounting aiou mba mcom 8508
Ch06 Managerial accounting aiou mba mcom 8508
 
4 Activity-Based Costing and Just-In-Time CostinghoudreiS.docx
4 Activity-Based Costing and Just-In-Time CostinghoudreiS.docx4 Activity-Based Costing and Just-In-Time CostinghoudreiS.docx
4 Activity-Based Costing and Just-In-Time CostinghoudreiS.docx
 
Activity Based Costing
Activity Based CostingActivity Based Costing
Activity Based Costing
 
Job costing
Job costingJob costing
Job costing
 
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptxCost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
 
WHY IS THE ALLOCATION METHOD USED IN ACCOUNTING FOR THE DIFFERENCE BETWEEN AP...
WHY IS THE ALLOCATION METHOD USED IN ACCOUNTING FOR THE DIFFERENCE BETWEEN AP...WHY IS THE ALLOCATION METHOD USED IN ACCOUNTING FOR THE DIFFERENCE BETWEEN AP...
WHY IS THE ALLOCATION METHOD USED IN ACCOUNTING FOR THE DIFFERENCE BETWEEN AP...
 

More from Yesica Adicondro

Konsep Balanced Score Card
Konsep Balanced Score Card Konsep Balanced Score Card
Konsep Balanced Score Card Yesica Adicondro
 
Makalah kelompok Analisis Taksi Bakri
Makalah kelompok Analisis Taksi BakriMakalah kelompok Analisis Taksi Bakri
Makalah kelompok Analisis Taksi BakriYesica Adicondro
 
Makalah kelompok Analisis Taksi Bakri
Makalah kelompok Analisis Taksi BakriMakalah kelompok Analisis Taksi Bakri
Makalah kelompok Analisis Taksi BakriYesica Adicondro
 
Makalah Analisis PT Kereta API Indonesia
Makalah Analisis PT Kereta API Indonesia Makalah Analisis PT Kereta API Indonesia
Makalah Analisis PT Kereta API Indonesia Yesica Adicondro
 
Makalah Analisis PT Kereta API Indonesia
Makalah Analisis PT Kereta API Indonesia Makalah Analisis PT Kereta API Indonesia
Makalah Analisis PT Kereta API Indonesia Yesica Adicondro
 
Makalah kelompok 3 gudang garam
Makalah kelompok 3 gudang garamMakalah kelompok 3 gudang garam
Makalah kelompok 3 gudang garamYesica Adicondro
 
Makalah Perusahaan Gudang Garam
Makalah Perusahaan Gudang GaramMakalah Perusahaan Gudang Garam
Makalah Perusahaan Gudang GaramYesica Adicondro
 
Makalah kelompok 2 garuda citilink PPT
Makalah kelompok 2 garuda citilink PPTMakalah kelompok 2 garuda citilink PPT
Makalah kelompok 2 garuda citilink PPTYesica Adicondro
 
Makalah kelompok 2 garuda citilink
Makalah kelompok 2 garuda citilinkMakalah kelompok 2 garuda citilink
Makalah kelompok 2 garuda citilinkYesica Adicondro
 
Makalah kinerja operasi Indonesia PPT
Makalah kinerja operasi Indonesia PPT Makalah kinerja operasi Indonesia PPT
Makalah kinerja operasi Indonesia PPT Yesica Adicondro
 
Makalah kinerja operasi Indonesia
Makalah kinerja operasi IndonesiaMakalah kinerja operasi Indonesia
Makalah kinerja operasi IndonesiaYesica Adicondro
 
Business process reengineering PPT
Business process reengineering PPTBusiness process reengineering PPT
Business process reengineering PPTYesica Adicondro
 
Business process reengineering Makalah
Business process reengineering Makalah Business process reengineering Makalah
Business process reengineering Makalah Yesica Adicondro
 
Makalah Balanced Scorecard
Makalah Balanced Scorecard Makalah Balanced Scorecard
Makalah Balanced Scorecard Yesica Adicondro
 
Analisis Manajemen strategik PT garuda citilink
Analisis Manajemen strategik PT garuda citilinkAnalisis Manajemen strategik PT garuda citilink
Analisis Manajemen strategik PT garuda citilinkYesica Adicondro
 

More from Yesica Adicondro (20)

Strategi Tata Letak
Strategi Tata LetakStrategi Tata Letak
Strategi Tata Letak
 
Konsep Balanced Score Card
Konsep Balanced Score Card Konsep Balanced Score Card
Konsep Balanced Score Card
 
Makalah kelompok Analisis Taksi Bakri
Makalah kelompok Analisis Taksi BakriMakalah kelompok Analisis Taksi Bakri
Makalah kelompok Analisis Taksi Bakri
 
Makalah kelompok Analisis Taksi Bakri
Makalah kelompok Analisis Taksi BakriMakalah kelompok Analisis Taksi Bakri
Makalah kelompok Analisis Taksi Bakri
 
Makalah Analisis PT Kereta API Indonesia
Makalah Analisis PT Kereta API Indonesia Makalah Analisis PT Kereta API Indonesia
Makalah Analisis PT Kereta API Indonesia
 
Makalah Analisis PT Kereta API Indonesia
Makalah Analisis PT Kereta API Indonesia Makalah Analisis PT Kereta API Indonesia
Makalah Analisis PT Kereta API Indonesia
 
Makalah kelompok 3 gudang garam
Makalah kelompok 3 gudang garamMakalah kelompok 3 gudang garam
Makalah kelompok 3 gudang garam
 
Makalah Perusahaan Gudang Garam
Makalah Perusahaan Gudang GaramMakalah Perusahaan Gudang Garam
Makalah Perusahaan Gudang Garam
 
Makalah kelompok 2 garuda citilink PPT
Makalah kelompok 2 garuda citilink PPTMakalah kelompok 2 garuda citilink PPT
Makalah kelompok 2 garuda citilink PPT
 
Makalah kelompok 2 garuda citilink
Makalah kelompok 2 garuda citilinkMakalah kelompok 2 garuda citilink
Makalah kelompok 2 garuda citilink
 
Dmfi leaflet indonesian
Dmfi leaflet indonesianDmfi leaflet indonesian
Dmfi leaflet indonesian
 
Dmfi booklet indonesian
Dmfi booklet indonesian Dmfi booklet indonesian
Dmfi booklet indonesian
 
Makalah kinerja operasi Indonesia PPT
Makalah kinerja operasi Indonesia PPT Makalah kinerja operasi Indonesia PPT
Makalah kinerja operasi Indonesia PPT
 
Makalah kinerja operasi Indonesia
Makalah kinerja operasi IndonesiaMakalah kinerja operasi Indonesia
Makalah kinerja operasi Indonesia
 
Business process reengineering PPT
Business process reengineering PPTBusiness process reengineering PPT
Business process reengineering PPT
 
Business process reengineering Makalah
Business process reengineering Makalah Business process reengineering Makalah
Business process reengineering Makalah
 
PPT Balanced Scorecard
PPT Balanced Scorecard PPT Balanced Scorecard
PPT Balanced Scorecard
 
Makalah Balanced Scorecard
Makalah Balanced Scorecard Makalah Balanced Scorecard
Makalah Balanced Scorecard
 
Analisis Manajemen strategik PT garuda citilink
Analisis Manajemen strategik PT garuda citilinkAnalisis Manajemen strategik PT garuda citilink
Analisis Manajemen strategik PT garuda citilink
 
analisis PPT PT Japfa
analisis PPT PT Japfaanalisis PPT PT Japfa
analisis PPT PT Japfa
 

Recently uploaded

Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...Call Girls in Nagpur High Profile
 
Chapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th editionChapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th editionMuhammadHusnain82237
 
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikHigh Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...Suhani Kapoor
 
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxOAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxhiddenlevers
 
Quantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector CompaniesQuantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector Companiesprashantbhati354
 
Quarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingQuarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingMaristelaRamos12
 
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...Suhani Kapoor
 
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
fca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdffca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdfHenry Tapper
 
Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]Commonwealth
 
Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Modelshematsharma006
 
Stock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfStock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfMichael Silva
 
How Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of ReportingHow Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of ReportingAggregage
 
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Delhi Call girls
 
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance CompanyInterimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance CompanyTyöeläkeyhtiö Elo
 
VIP Call Girls in Saharanpur Aarohi 8250192130 Independent Escort Service Sah...
VIP Call Girls in Saharanpur Aarohi 8250192130 Independent Escort Service Sah...VIP Call Girls in Saharanpur Aarohi 8250192130 Independent Escort Service Sah...
VIP Call Girls in Saharanpur Aarohi 8250192130 Independent Escort Service Sah...Suhani Kapoor
 
20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdfAdnet Communications
 

Recently uploaded (20)

Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
 
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
 
Chapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th editionChapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th edition
 
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikHigh Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
 
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Saharanpur Anushka 8250192130 Independent Escort Se...
 
Monthly Economic Monitoring of Ukraine No 231, April 2024
Monthly Economic Monitoring of Ukraine No 231, April 2024Monthly Economic Monitoring of Ukraine No 231, April 2024
Monthly Economic Monitoring of Ukraine No 231, April 2024
 
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxOAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
 
Quantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector CompaniesQuantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector Companies
 
Quarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingQuarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of Marketing
 
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
 
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
fca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdffca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdf
 
Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]
 
Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Models
 
Stock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfStock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdf
 
How Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of ReportingHow Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of Reporting
 
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
 
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance CompanyInterimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
 
VIP Call Girls in Saharanpur Aarohi 8250192130 Independent Escort Service Sah...
VIP Call Girls in Saharanpur Aarohi 8250192130 Independent Escort Service Sah...VIP Call Girls in Saharanpur Aarohi 8250192130 Independent Escort Service Sah...
VIP Call Girls in Saharanpur Aarohi 8250192130 Independent Escort Service Sah...
 
20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf
 

Chapter 6 Job Order and Process Costing

  • 1. 114455 CHAPTER 6 JOB ORDER AND PROCESS COSTING QUESTIONS FOR WRITING AND DISCUSSION 1. Job-order costing accumulates costs by jobs, and process costing accumulates costs by processes. Job-order costing is suitable for operations that produce custom-made products that receive different doses of manufacturing costs. Process costing, on the other hand, is suitable for operations that produce homogeneous products that receive equal doses of manufacturing costs in each process. 2. More paperwork is required. Labor and ma- terials are assigned to departments in a process-costing system. In a job-order cost- ing system, labor and materials must be tracked to each job, requiring time tickets and more use of materials requisitions. Addi- tionally, a job-order costing system requires a separate job-order cost sheet for each job. 3. Job-order costing is appropriate for many service firms. The key factor is that differing amounts of resources must be used for dif- ferent jobs. Examples of service firms that use job-order costing are law firms, account- ing firms, dentists, automobile repair, and architectural firms. 4. Unless all your jobs (lawns) are the same size and require the same services, you will need to use a job-order costing system. At minimum, you will need job-order cost sheets for each customer. You will need la- bor time tickets to record the amount of time spent on each job, both to cost the job and to pay the individual doing the work. A mate- rials requisition form may be needed if ferti- lizer or weed control products are used (al- ternatively, it may be possible to just list the amount of product used directly on the job- order cost sheet). The more complicated your business becomes (e.g., mowing, trimming, fertilizing, trimming shrubbery, and planting shrubs and trees), the more source documents will be needed to keep track of time, materials, and use of capital equip- ment (e.g., trimmers and brushhogs). 5. The cost of a job is often strongly related to the price charged. Logically enough, the higher the cost of the job, the higher the price charged to the customer. This relation- ship makes sense not only to the business but also to the customer. By comparing the cost of the individual job with the price charged, the firm can determine the profit at- tributable to each job. Then, the firm can de- cide whether the profit is sufficient to contin- ue offering the product or service under the current terms. 6. Materials requisition forms serve as the source documents for posting materials usage and costs to individual jobs. Time or work tickets serve a similar function for la- bor. Predetermined overhead rates are used to allocate overhead to jobs. 7. In sequential processing, products pass through a series of processes, one after another (i.e., in a given sequence). In paral- lel processing, products pass through two or more different sequences at the same time, merging eventually at the final process. 8. Equivalent units are the number of whole units that could have been produced, given the amount of materials, labor, and over- head used. Equivalent units are the meas- ure of a period’s output, a necessary input for the computation of unit costs in a process-costing system. 9. In calculating this period’s unit cost, the weighted average method treats prior-period output and costs carried over to the current period as belonging to the current period. The FIFO method excludes any costs and output carried over from this period’s unit cost computation. 10. If the per-unit cost of the prior period is the same as the per-unit cost of the current pe- riod, there will be no difference between the results of the weighted average and FIFO methods. Additionally, if no beginning work- in-process inventory exists, both the FIFO and weighted average methods give the same results. 11. Separate equivalent units must be calcu- lated for materials and conversion costs. 12. Transferred-in units represent partially com- pleted units and are clearly a material for the
  • 2. 114466 receiving department. To complete the product (or further process it), additional ma- terials and conversion costs are added by the receiving department. 13. The work-in-process account of the receiv- ing department is debited, and the work-in- process account of the transferring depart- ment is credited. The finished goods ac- count is debited, and the work-in-process account of the final department is credited upon completion of the product. 14. The first step is the preparation of a physical flow schedule. This schedule identifies the physical units that must be accounted for and provides an accounting. The second step is the equivalent unit schedule. This schedule computes the equivalent whole output for the period. The schedule’s com- putations rely on information from the physi- cal flow schedule. The next step is computa- tion of the unit cost. To compute the unit cost, the manufacturing costs of the period for the process are divided by the period’s output. The output is obtained from the equivalent unit schedule. The fourth step uses the unit cost to value goods transferred out and those remaining in work in process. The final step checks to see if the costs as- signed in step 4 equal the total costs to ac- count for. 15. The weighted average method uses the same unit cost for all goods transferred out. The FIFO method divides goods transferred out into two categories: units started and completed and units from beginning work in process. The period’s unit cost is used to value goods started and completed. The cost of goods transferred out from beginning work in process is obtained by (1) assigning them all costs carried over from the prior pe- riod and (2) using the current period’s unit cost to value the equivalent units completed this period. 16. Service firms generally do not have work-in- process inventories, and so equivalent units of production are not needed. An important factor in process costing for services is de- termining just what constitutes a unit of out- put.
  • 3. 114477 EXERCISES 6–1 Job-Order Process a. Paint manufacturing X b. Auto manufacturing X c. Toy manufacturing X d. Custom cabinet making X e. Airplane manufacturing X f. Personal computer assembly X g. Furniture making X h. Custom furniture making X i. Dental services X j. Hospital services X k. Paper manufacturing X l. Auto repair X m. Architectural services X n. Landscape design services X o. Light bulb manufacturing X 6–2 1. Auto manufacturing: A job-order example might be Rolls Royce, in which the cars are made to order. A process-costing example might be Ford Motor Company. 2. Dental services: A job-order example might be a local, full-service dentist. A process-costing example might be a denturist (someone who makes only dentures). 3. Auto repair: A job-order example might be a local mechanic or the service department of an automobile dealership. A process-costing example might be a shop that is dedicated to oil changes. 4. Costume making: A job-order example might be a local seamstress who will make the costumes for children in a junior high school play. A process- costing example might be a firm dedicated to the manufacture of dance cos- tumes that are sold nationwide. The designs are preset.
  • 4. 114488 6–3 1. Job #614 Job #615 Job #616 Job #617 Beginning balance $10,200 $ 9,670 $ 0 $ 0 Direct materials 4,200 9,500 1,000 3,150 Direct labor 1,800 4,000 150 800 Applied overhead 1,080 2,400 90 480 Total cost $17,280 $25,570 $1,240 $4,430 2. Ending balance in Work in Process = Job #614 + Job #616 + Job #617 = $17,280 + $1,240 + $4,430 = $22,950 3. Cost of Goods Sold = Job #615 = $25,570 Price of Job #615 = $25,570 + (0.4)($25,570) = $35,798 6–4 1. Overhead applied in October: Job #265: 0.75 × $15,000 = $11,250 Job #266: 0.75 × $12,000 = $9,000 Job #267: 0.75 × $1,900 = $1,425 Job #268: 0.75 × $7,000 = $5,250 2. Job #265 Job #266 Job #267 Job #268 Beginning balance $30,330 $62,170 $ 0 $ 0 Direct materials 13,000 7,000 3,500 4,750 Direct labor 15,000 12,000 1,900 7,000 Applied overhead 11,250 9,000 1,425 5,250 Total cost $69,580 $90,170 $6,825 $17,000 3. Ending balance in Work in Process = Job #266 + Job #267 + Job #268 = $90,170 + $6,825 + $17,000 = $113,995 4. Cost of Goods Sold = Job #265 = $69,580 Price of Job #265 = $69,580 + (0.30)($69,580) = $90,454
  • 5. 114499 6–5 1. Direct materials $ 3,400 Direct labor (50 hours × $10) 500 Overhead (50 hours × $4) 200 Total cost $ 4,100 Units ÷ 10 Unit cost $ 410 2. Price per home = 1.5 × $410 = $615 3. Jordan would need to prepare a simple form that included columns for the date, the beginning time, the ending time, the total number of hours worked, and the job name (or number). She could have a separate page for each day. This would be especially helpful if she hired other employees from time to time to work on jobs. 6–6 1. Ending balance in Work in Process = Job #902 + Job #906 + Job #908 + Job #909 = $400 + $750 + $700 + $905 = $2,755 2. Ending balance in Finished Goods = Job #901 + Job #903 + Job #905 + Job #910 = $650 + $550 + $860 + $803 = $2,863 3. Cost of Goods Sold = Job #904 + Job #907 = $695 + $180 = $875
  • 6. 115500 6–7 1. Job #70 Job #71 Job #72 Balance, 7/1 $25,000 $ 0 $ 0 Direct materials 12,900 9,900 35,350 Direct labor 20,000 6,500 13,000 Applied overhead: Power1 500 400 2,400 Material handling2 1,250 250 5,000 Purchasing3 400 1,600 400 Total cost $60,050 $18,650 $56,150 1 Job#70:$2 per mh × 250 Job#71:$2 per mh × 200 Job#72:$2 per mh × 1,200 2 Job#70:$25 per move × 50 moves Job#71:$25 per move × 10 moves Job#72:$25 per move × 200 moves 3 Job#70: $40 per PO × 10 PO’s Job#71:$40 per PO × 40 PO’s Job#72: $40 per PO × 10 PO’s 2. Ending balance in Work in Process = Job #72 = $56,150 3. Ending balance in Finished Goods = Job #71 = $18,650 4. Cost of Goods Sold = Job #70 = $60,050 6–8 Bosserman Company Income Statement For the Month Ended July 31, 20XX Sales ($60,050 × 1.40)................................................. $84,070 Cost of goods sold ..................................................... 60,050 Gross margin .............................................................. $24,020 Selling expenses (0.10 × $84,070 + $4,100) .............. 12,507 Administrative expenses ........................................... 3,900 Operating income ....................................................... $ 7,613
  • 7. 115511 6–9 1. Applied overhead = Direct labor cost × Overhead rate $140,000= $80,000 × Overhead rate Overhead rate= 1.75 or 175% of direct labor cost 2. $140,000 Applied overhead 138,500 Actual overhead $ 1,500 Overapplied overhead 3. Direct materials $ 40,000 Direct labor 80,000 Overhead applied 140,000 $ 260,000 Add: Beginning work in process 17,000 Less: Ending work in process (32,000) Cost of goods manufactured $ 245,000 4. Overhead Control...................................... 1,500 Cost of Goods Sold ............................. 1,500 Adjusted cost of goods sold: $ 210,000 (1,500) $ 208,500 5. Direct materials ($32,000 – $10,000 – $17,500) $ 4,500 Direct labor (1,000 × $10) 10,000 Overhead applied (175% × $10,000) 17,500 Ending work in process $32,000
  • 8. 115522 6–10 1. Overhead rate = $180,000/20,000 = $9 per DLH 2. Direct materials $ 4,140 Direct labor 4,000 Applied overhead 3,600* Total cost $11,740 *$3,600 = $9 × ($4,000/$10) 3. Overhead Control...................................... 189,300 Lease Payable ........................................... 5,000 Accumulated Depreciation....................... 20,000 Wages Payable.......................................... 101,300 Utilities Payable ........................................ 18,000 Other Payables.......................................... 45,000 Work in Process ($9 × 21,000).................. 189,000 Overhead Control...................................... 189,000 4. Actual overhead $189,300 Applied overhead 189,000 Underapplied overhead $ 300 5. Normal cost of goods sold $740,000 Add: Underapplied overhead 300 Adjusted cost of goods sold $740,300 6–11 1. Cutting Sewing Packaging Department Department Department Direct materials $5,400 $ 900 $ 225 Direct labor 150 1,800 900 Applied overhead 750 3,600 900 Transferred-in cost: From cutting 6,300 From sewing 12,600 Total manufacturing cost $6,300 $12,600 $14,625 2. a. Transferred from Cutting to Sewing $6,300 b. Transferred from Sewing to Packaging $12,600 c. Transferred from Packaging to Finished Goods $14,625
  • 9. 115533 3. Unit cost = $14,625/600 = $24.38* per pair *Rounded 6–12 1. Equivalent unit, Ending work in process = 300 × 0.20 = 60 2. Equivalent units in Total = 60 + 600 = 660 6–13 1. Physical flow schedule: Units in beginning work in process 14,000 Units started during the period 40,000 Total units to account for 54,000 Units transferred out 45,500 Units in ending work in process 8,500 Total units accounted for 54,000 2. Equivalent units of production: Materials Conversion Units completed 45,500 45,500 Add: Units in ending work in process: (8,500 × 100%) 8,500 (8,500 × 25%) 2,125 Equivalent units of output 54,000 47,625
  • 10. 115544 6–14 1. Cost of ending work in process: Materials ($1.30 × 0) $ 0 Conversion ($0.50 × 4,800) 2,400 Total cost $2,400 Cost of goods transferred out: $1.80 × 45,000 = $81,000 2. Physical flow schedule: Units to account for: Units accounted for: Units in beginning WIP ? Units completed 45,000 Units started ? Units in ending WIP 8,000 Total units 53,000 Total units 53,000 The schedule of equivalent units using the weighted average method does not give sufficient information to reconstruct the complete physical flow schedule. Units in beginning work in process are embedded in units com- pleted.
  • 11. 115555 6–15 1. Department 1: a. Units transferred to Department 2 = Total units* – Ending WIP = 6,480 – 3,600 = 2,880 *Total units = Beginning WIP + Units started = 0 + 6,480 = 6,480 b. Materials Conversion Units completed 2,880 2,880 Add: Units in ending work in process: 3,600 × 100% 3,600 3,600 × 50% 1,800 Equivalent units of output 6,480 4,680 2. Department 2: a. Units transferred out = Total units* – Ending WIP = 4,080 – 600 = 3,480 *Total units = Beginning WIP + Units transferred in = 1,200 + 2,880 = 4,080 b. Materials Conversion Units completed 3,480 3,480 Add: Units in ending work in process: 600 × 0% 0 600 × 40% 240 Equivalent units of output 3,480 3,720
  • 12. 115566 6–16 1. Physical flow schedule: Units to account for: Units in beginning work in process 60,000 Units started during the period 220,000 Total units to account for 280,000 Units accounted for: Units completed and transferred out: Started and completed 180,000 From beginning work in process 60,000 240,000 Units in ending work in process 40,000 Total units accounted for 280,000 2. Units completed 240,000 Add: Units in ending WIP × Fraction complete (40,000 × 20%) 8,000 Equivalent units of output 248,000 3. Unit cost = ($1,171,800 + $390,600)/248,000 = $6.30 4. Cost transferred out = 240,000 × $6.30 = $1,512,000 Cost of ending WIP = 8,000 × $6.30 = $50,400 5. Costs to account for: Beginning work in process $ 390,600 Incurred during June 1,171,800 Total costs to account for $ 1,562,400 Costs accounted for: Goods transferred out $1,512,000 Goods in ending work in process 50,400 Total costs accounted for $1,562,400
  • 13. 115577 6–17 Cocolots Company Mixing Department Production Report For the Month of June 20XX (Weighted Average Method) Unit Information Physical flow: Units to account for: Units accounted for: Units in beginning WIP 60,000 Units completed 240,000 Units started 220,000 Units in ending WIP 40,000 Total units to account for 280,000 Total units accounted for 280,000 Equivalent units: Units completed 240,000 Units in ending work in process 8,000 Total equivalent units 248,000 Cost Information Costs to account for: Beginning work in process $390,600 Incurred during March 1,171,800 Total costs to account for $1,562,400 Cost per equivalent unit $ 6.30 Costs accounted for: Transferred Ending Out Work in Process Total Goods transferred out ($6.30 × 240,000) $1,512,000 — $1,512,000 Goods in ending WIP ($6.30 × 8,000) — $50,400 50,400 Total costs accounted for $1,512,000 $50,400 $1,562,400
  • 14. 115588 6–18 A B C D Completed 16,200a 24,000c 31,000d 60,000f Ending WIP 1,000b 0 900e 2,500g Equivalent units 17,200 24,000 31,900 62,500 a (3,200 + 17,000 – 4,000) e (9,000 × 0.10) b (4,000 × 0.25) f (30,000 + 40,000 – 10,000) c (1,000 + 23,000 – 0) g (10,000 × 0.25) d (40,000 – 9,000) 6–19 A B C D Completed* 16,200 24,000 31,000 60,000 Add: Ending WIP* 1,000 0 900 2,500 Less: Beginning WIP** 960 400 0 22,500 Equivalent units 16,240 23,600 31,900 40,000 *See solution to Exercise 6–18. **Beginning WIP for A: 3,200 × 0.30 = 960 Beginning WIP for B: 1,000 × 0.40 = 400 Beginning WIP for C: 0 × 0 = 0 Beginning WIP for D: 30,000 × 0.75 = 22,500 6–20 1. Physical flow schedule: Units to account for: Units in beginning work in process 10,000 Units started during the period 70,000 Total units to account for 80,000 Units accounted for: Units completed and transferred out: Started and completed 50,000 From beginning work in process 10,000 60,000 Units in ending work in process (60% complete) 20,000 Total units accounted for 80,000
  • 15. 115599 6–20 Concluded 2. Materials Conversion Units completed 60,000 60,000 Add: Units in ending WIP × Fraction complete (20,000 × 100%; 20,000 × 60%) 20,000 12,000 Equivalent units of output 80,000 72,000 3. Unit materials cost ($49,000 + $351,000)/80,000 = $5.00 Unit conversion cost ($2,625 + $78,735)/72,000 = 1.13 Total unit cost $6.13 4. Cost transferred out: 60,000 × $6.13 = $367,800 Cost of ending WIP: Materials: 20,000 × $5.00 = $100,000 Conversion: 12,000 × $1.13 = 13,560 Total ending WIP cost $113,560 5. Costs to account for: Beginning WIP $ 51,625 Incurred during August 429,735 Total costs to account for $481,360 Costs accounted for: Goods transferred out $367,800 Goods in ending WIP 113,560 Total costs accounted for $481,360
  • 16. 116600 6–21 Bath Linens Department Production Report For the Month of August 20XX (Weighted Average Method) Unit Information Physical flow: Units to account for: Units accounted for: Units in beginning WIP 10,000 Units completed 60,000 Units started 70,000 Units in ending WIP 20,000 Total units to account for 80,000 Total units accounted for 80,000 Equivalent units: Materials Conversion Units completed 60,000 60,000 Units in ending work in process 20,000 12,000 Total equivalent units 80,000 72,000 Cost Information Costs to account for: Materials Conversion Total Beginning WIP $ 49,000 $ 2,625 $ 51,625 Incurred during August 351,000 78,735 429,735 Total costs to account for $400,000 $81,360 $481,360 Cost per equivalent unit $ 5.00 $ 1.13 $ 6.13 Costs accounted for: Transferred Ending Out Work in Process Total Goods transferred out ($6.13 × 60,000) $367,800 — $367,800 Goods in ending WIP: Materials ($5 × 20,000) — $100,000 100,000 Conversion costs ($1.13 × 12,000) — 13,560 13,560 Total costs accounted for $367,800 $113,560 $481,360
  • 17. 116611 6–22 1. b 2. d 3. b 4. b 5. a 6. c 7. c 8. e Supporting computations: Materials Conversion Units completed 92,000 92,000 Units in ending WIP (24,000 × 90%) 21,600 (24,000 × 40%) 9,600 Equivalent units (WA) 113,600 101,600 Less EU in BWIP (16,000 × 60%) (9,600) (16,000 × 20%) (3,200) Equivalent units (FIFO) 104,000 98,400 Unit cost: FIFO: $468,000/104,000 $573,040/98,400 $4.50 $5.82 WA: ($468,000 + $54,560)/113,600 ($573,040 + $35,560)/101,600 $4.60 $5.99 EWIP: FIFO: ($4.50 × 21,600) + ($5.82 × 9,600) = $153,072 WA: ($4.60 × 21,600) + ($5.99 × 9,600) = $156,864
  • 18. 116622 6–23 1. Physical flow schedule: Units to account for: Units in beginning work in process (75% complete) 120,000 Units started during August 370,000 Total units to account for 490,000 Units accounted for: Units completed and transferred out: Started and completed 280,000 From beginning work in process 120,000 400,000 Units in ending work in process (25% complete) 90,000 Total units accounted for 490,000 2. Units started and completed 280,000 Add: Units to complete beginning WIP (120,000 × 25%) 30,000 Add: Units ending WIP × Fraction completed (90,000 × 30%) 27,000 Equivalent units of output 337,000 3. FIFO unit cost = $1,516,500/337,000 = $4.50 4. Costs transferred out: Costs from beginning WIP $ 340,600 Costs to complete beginning WIP (30,000 × $4.50) 135,000 Started and completed (280,000 × $4.50) 1,260,000 Total costs transferred out $ 1,735,600 Cost of ending WIP = 27,000 × $4.50 = $121,500 5. Costs to account for: Costs accounted for: Beginning WIP $ 340,600 Transferred out $1,735,600 Added in August 1,516,500 Ending WIP 121,500 Total $ 1,857,100 Total $1,857,100
  • 19. 116633 6–24 Nogaleen Company Blending Department Production Report For the Month of August 20XX (FIFO Method) Unit Information Physical flow: Units to account for: Units in beginning work in process 120,000 Units started during August 370,000 Total units to account for 490,000 Units accounted for: Physical Flow Equivalent Units Units started and completed 280,000 280,000 Units completed from beginning work in process 120,000 30,000 Units in ending work in process 90,000 27,000 Total units accounted for 490,000 337,000 Cost Information Costs to account for: Beginning work in process $ 340,600 Incurred during August 1,516,500 Total costs to account for $1,857,100 Cost per equivalent unit $ 4.50 Costs accounted for: Transferred Ending Out Work in Process Total Units in beginning work in process: From prior period $ 340,600 — $ 340,600 From current period (30,000 × $4.50) 135,000 — 135,000 Units started and completed (280,000 × $4.50) 1,260,000 — 1,260,000 Goods in ending work in process (27,000 × $4.50) — $121,500 121,500 Total costs accounted for $1,735,600 $121,500 $1,857,100
  • 20. 116644 6–25 1. Job #64: Direct materials $ 1,240 Direct labor 6,150 Overhead ($12 × 410) 4,920 $12,310 Unit cost = $12,310/50 = $246.20 2. Ending Work in Process = Cost of Job #65 = $985 + $8,745 + ($12 × 583) = $16,726 3. Finished Goods ......................................... 12,310 Work in Process .................................. 12,310 Cost of Goods Sold................................... 12,310 Finished Goods ................................... 12,310 Accounts Receivable................................ 19,696* Sales Revenue ..................................... 19,696 *(160% × $12,310 = $19,696)
  • 21. 116655 PROBLEMS 6–26 1. Overhead rate = $270/$900 = 0.30 or 30% of direct labor dollars. (This rate was calculated using information from the Fazel job; however, the Myron and Patton jobs would give the same answer.) 2. Fazel Myron Patton Raider Willis Beginning WIP $ 1,730 $1,180 $2,500 $ 0 $ 0 Direct materials 600 350 260 780 725 Direct labor 1,200 980 650 1,350 900 Applied overhead 360 294 195 405 270 Total $ 3,890 $2,804 $3,605 $ 2,535 $ 1,895 Note: This is just one way of setting up the job-order cost sheets. You might prefer to keep the detail on the materials, labor, and overhead in beginning inventory costs. 3. Since the Fazel and Myron jobs were completed, the others must still be in process. Therefore, the ending balance in Work in Process is the sum of the costs of the Patton, Raider, and Willis jobs. Patton $3,605 Raider 2,535 Willis 1,895 Ending Work in Process $8,035 Cost of Goods Sold = Fazel job + Myron job = $3,890 + $2,804 = $6,694 4. Aldrin Company Income Statement For the Month Ended June 30, 20XX Sales (1.4 × $6,694) ................................................................... $9,372 Cost of goods sold.................................................................... 6,694 Gross margin............................................................................. $2,678 Marketing and administrative expenses................................. 1,200 Operating income...................................................................... $1,478
  • 22. 116666 6–27 1. Overhead rate = $90,000/10,000 = $9 per MHr Overhead costs = $30,000 + 15,000 + 20,000 + 25,000 = $90,000 Job #1 Job #2 Direct materials $4,500 $ 8,600 Direct labor 1,000 2,000 Overhead ($9 × 200 MHrs.) 1,800 1,800 Total manufacturing cost $7,300 $12,400 Plus 30% markup 2,190 3,720 Bid price $9,490 $16,120 2. Purchasing rate = $30,000/5,000 = $6 per purchase order Setup cost rate = $15,000/1,000 = $15 per setup Engineering rate = $20,000/500 = $40 per engineering hour Other cost rate = $25,000/10,000 = $2.50 per MHr Job #1 Job #2 Direct materials $4,500 $ 8,600 Direct labor 1,000 2,000 Overhead: Purchasing ($6 × 15); ($6 × 20) 90 120 Setups ($15 × 2); ($15 × 3) 30 45 Engineering ($40 × 25); ($40 × 10) 1,000 400 Other ($2.50 × 200); ($2.50 × 200) 500 500 Total manufacturing cost $7,120 $11,665 Plus 30% markup 2,136 3,500 Bid price $9,256 $15,165 3. The activity-based approach to assigning overhead gives a more accurate cost figure because so much of the overhead is non unit-level and there is product diversity.
  • 23. 116677 6–28 1. a. Materials ............................................... 44,200 Accounts Payable......................... 44,200 b. Work in Process .................................. 27,000 Materials ........................................ 27,000 c. Work in Process .................................. 28,200 Wages Payable.............................. 28,200 d. Overhead Control ................................ 19,950 Cash ............................................... 19,950 e. Work in Process .................................. 18,800 Overhead Control.......................... 18,800 2. Job #703 Beginning balance, Work in Process $13,000 Direct materials 12,500 Direct labor 11,700 Overhead applied 7,800 Total $45,000 Job #704 Direct materials $14,500 Direct labor 16,500 Overhead applied 11,000 Total $42,000 3. f. Finished Goods ................................... 45,000 Work in Process............................ 45,000 h. Cost of Goods Sold ............................. 6,240 Finished Goods............................. 6,240 Accounts Receivable .......................... 8,736 Sales Revenue............................... 8,736 4. a. Materials: Beginning balance $ 6,070 Add: Purchases 44,200 Less: Materials requisitioned (27,000) Ending balance $ 23,270
  • 24. 116688 6–28 Concluded b. Work in Process: Beginning balance $ 13,000 Add: Materials requisitioned 27,000 Direct labor 28,200 Overhead applied 18,800 Less: Jobs completed (45,000) Ending balance $ 42,000 c. Finished Goods: Beginning balance $ 6,240 Add: Jobs completed 45,000 Less: Jobs sold (6,240) Ending balance $ 45,000 6–29 1. a. Materials ............................................... 3,000 Accounts Payable......................... 3,000 b. Work in Process .................................. 1,700 Materials ........................................ 1,700 c. Work in Process [$8 × (50 + 100)]....... 1,200 Wages Payable.............................. 1,200 d. Work in Process ($7.50 × 150) ............ 1,125 Overhead Control.......................... 1,125 e. Overhead Control ................................ 1,230 Cash ............................................... 1,230 2. Job #443 Job #444 Direct materials $ 500 Direct materials $1,200 Direct labor 400 Direct labor 800 Applied overhead 375 Applied overhead 750 Total $1,275 Total $2,750 f. Finished Goods ................................... 1,275 Work in Process............................ 1,275 g. Cost of Goods Sold ............................. 2,000 Finished Goods............................. 2,000 Accounts Receivable .......................... 2,500 Sales Revenue............................... 2,500
  • 25. 116699 6–29 Concluded 3. Kearney Company Statement of Cost of Goods Manufactured For the Month Ended April 30, 20XX Direct materials: Beginning materials inventory ...................... $1,400 Purchases of materials .................................. 3,000 Total materials available ................................ $4,400 Ending materials............................................. 2,700 Materials used................................................. $1,700 Direct labor ........................................................... 1,200 Overhead............................................................... $1,230 Less: Underapplied overhead............................. 105 Overhead applied................................................. 1,125 Current manufacturing costs.............................. $4,025 Add: Beginning work in process........................ 0 Total manufacturing costs .................................. $4,025 Less: Ending work in process ............................ 2,750 Cost of goods manufactured .............................. $1,275
  • 26. 117700 6–30 Debroux Company Assembly Department Production Report For the Month of February 20XX (Weighted Average Method) Unit Information Units to account for: Units accounted for: Units in beginning WIP 12,000 Units completed 34,600 Units started 28,000 Units in ending WIP 5,400 Total units 40,000 Total units 40,000 Equivalent units: Units completed 34,600 Units in ending WIP (5,400 × 70%) 3,780 Total equivalent units 38,380 Cost Information Costs to account for: Costs in beginning WIP $142,760 Costs added by department 333,152 Total costs to account for $475,912 Cost per equivalent unit ($475,912/38,380) $ 12.40 Costs accounted for: Goods transferred out (34,600 × $12.40) $429,040 Ending work in process (3,780 × $12.40) 46,872 Total costs accounted for $475,912
  • 27. 117711 6–31 Debroux Company Assembly Department Production Report For the Month of February 20XX (FIFO Method) Unit Information Units to account for: Units accounted for: Started and completed 22,600 Units in beginning WIP 12,000 From beginning WIP 12,000 Units started 28,000 From ending WIP 5,400 Total units 40,000 Total units 40,000 Equivalent units: Started and completed 22,600 To complete beginning WIP (12,000 × 40%) 4,800 Units in ending WIP (5,400 × 70%) 3,780 Total equivalent units 31,180 Cost Information Costs to account for: Costs in beginning WIP $142,760 Costs added by department 333,152 Total costs to account for $475,912 Cost per equivalent unit ($333,152/31,180) $10.6848 Costs accounted for: Transferred out: Units started and completed (22,600 × $10.6848) $241,476 Units in beginning work in process: From prior period 142,760 From current period (4,800 × $10.6848) 51,287 Total cost transferred out $435,523 Goods in ending work in process (3,780 × $10.6848) 40,389 Total costs accounted for $475,912
  • 28. 117722 6–32 1. a. Physical flow schedule: Units to account for: Units accounted for: Started and completed 480,000 Units in BWIP 20,000 From BWIP 20,000 Units started 510,000 From EWIP 30,000 Total units 530,000 Total units 530,000 b. Equivalent unit schedule: Paraffin Pigment Conversion Units completed 500,000 500,000 500,000 Units in ending WIP 30,000 30,000 21,000* Total equivalent units 530,000 530,000 521,000 *(30,000 × 70%) 2. Unit cost computation: Paraffin Pigment Conversion Total Costs in BWIP $ 120,000 $ 100,000 $ 40,000 $ 260,000 Costs added 3,060,000 2,550,000 5,170,000 10,780,000 Total costs $3,180,000 $2,650,000 $5,210,000 $11,040,000 Unit cost = Unit paraffin cost + Unit pigment cost + Unit conversion cost = ($3,180,000/530,000) + ($2,650,000/530,000) + ($5,210,000/521,000) = $6 + $5 + $10 = $21 3. Ending work in process = (30,000 × $6) + (30,000 × $5) + (21,000 × $10) = $180,000 + $150,000 + $210,000 = $540,000 Cost of goods transferred out: 500,000 × $21 = $10,500,000 4. Cost reconciliation: Costs to account for: Costs accounted for: Beginning WIP $ 260,000 Transferred out $10,500,000 August costs 10,780,000 Ending WIP 540,000 Total to account for $11,040,000 Total accounted for $11,040,000
  • 29. 117733 6–33 Grace Sauces, Inc. Mixing Department Production Report For the First Quarter 20XX (FIFO Method) Unit Information Units to account for: Units accounted for: Units in beginning WIP 144,000 Units transferred out 292,500* Units started 180,000 Units in ending WIP 31,500 Units to account for 324,000 Units accounted for 324,000 * Started and completed = 148,500 + B-WIP 144,000 = 292,500 Equivalent Units Transferred In Materials Conversion Units started and completed 148,500 148,500 148,500 Units in BWIP (to complete) — — 36,000 Units in EWIP 31,500 31,500 6,300 Total units accounted for 180,000 180,000 190,800 Cost Information Costs to account for: Transferred In Materials Conversion Total Beginning WIP $ 45,600 $ 6,432 $14,400 $ 66,432 Incurred during quarter 230,400 33,500 72,640 336,540 Total costs to account for $276,000 $39,932 $87,040 $402,972 Equivalent units 180,000 180,000 190,800 Cost incurred during quarter ÷ Equivalent units $ 1.28 $ 0.1861 $0.3807 $ 1.8468 Costs accounted for: Transferred Out EWIP Total Started/complete (148,500 × $1.8468) $274,250 — $274,250 Units in beginning WIP: From prior period 66,432 — 66,432 Current period (36,000 × $0.3807) 13,705 — 13,705 Units in ending WIP: Transferred in (31,500 × $1.28) — $40,320 40,320 Materials (31,500 × $0.1861) — 5,862 5,862 Conversion (6,300 × $0.3807) — 2,398 2,398 Total costs accounted for $354,387 $48,580 $402,967* *Difference due to rounding.
  • 30. 117744 6–34 Grace Sauces, Inc. Mixing Department Production Report For the First Quarter 20XX (Weighted Average Method) Unit Information Units to account for: Units accounted for: Units in beginning WIP 144,000 Units transferred out 292,500 Units started 180,000 Units in ending WIP 31,500 Units to account for 324,000 Units accounted for 324,000 Equivalent Units Transferred In Materials Conversion Units completed 292,500 292,500 292,500 Units in ending WIP 31,500 31,500 6,300 Total units accounted for 324,000 324,000 298,800 Cost Information Costs to account for: Transferred In Materials Conversion Total Beginning WIP $ 45,600 $ 6,432 $14,400 $ 66,432 Incurred during quarter 230,400 33,500 72,640 336,540 Total costs to account for $276,000 $ 39,932 $87,040 $402,972 ÷ Equivalent units 324,000 324,000 298,800 Cost per equivalent unit $ 0.852 $ 0.12 $ 0.291 $ 1.27 Costs accounted for: Transferred Out EWIP Total Goods transferred out (292,500 × $1.27) $370,421 — $370,421 Ending work in process: Transferred in (31,500 × $0.852) — $26,838 26,838 Materials (31,500 × $0.12) — 3,780 3,780 Conversion (6,300 × $0.291) — 1,835 1,835 Total costs accounted for $370,421 $32,453 $402,874* *Difference due to rounding.
  • 31. 117755 6–35 1. Department A a. Physical flow schedule: Units in beginning WIP 5,000 Units started in November 25,000 Total units to account for 30,000 Units completed and transferred out: Started and completed 23,000 From beginning WIP 5,000 Units in ending WIP 2,000 Total units accounted for 30,000 Costs charged to the department: Materials Conversion Total Beginning WIP $10,000 $ 6,900 $ 16,900 Incurred during November 57,800 95,220 153,020 Total costs $67,800 $102,120 $169,920 b. Equivalent unit calculation: Materials Conversion Units completed 28,000 28,000 Add: Equivalent units in ending WIP 2,000 1,600 Total equivalent units 30,000 29,600 c. Unit cost calculation: Unit cost = Unit material cost + Unit conversion cost = $67,800/30,000 + $102,120/29,600 = $2.26 + $3.45 = $5.71
  • 32. 117766 6–35 Continued d. and e. Cost reconciliation: Total costs accounted for: Goods transferred out (28,000 × $5.71) .................. $159,880 Costs in ending WIP: Materials (2,000 × $2.26) ..................................... $4,520 Conversion (1,600 × $3.45) ................................. 5,520 10,040 Total costs accounted for .................................. $169,920 Costs to account for: Beginning work in process ................................ $ 16,900 Costs incurred during November...................... 153,020 Total costs to account for .................................. $169,920 2. Journal entries: Work in Process—Dept. A ....................... 57,800 Materials Inventory.............................. 57,800 Work in Process—Dept. A ....................... 95,220 Conversion Costs—Dept. A ............... 95,220* Work in Process—Dept. B ....................... 159,880 Work in Process—Dept. A.................. 159,880 *When conversion costs are not broken into labor and overhead components, a control account for conversion costs is used. Some firms now combine overhead and direct labor costs into one category. This practice is develop- ing because direct labor is becoming a small percentage of total manufactur- ing costs.
  • 33. 117777 6–35 Continued 3. Department B a. Physical flow schedule: Units in beginning WIP 8,000 Units started in November (transferred in) 28,000 Total units to account for 36,000 Units completed and transferred out: Started and completed 25,000 From beginning WIP 8,000 Units in ending WIP 3,000 Total units accounted for 36,000 Costs charged to the department: Transferred Materials Conversion In Total Beginning WIP $ 0 $ 16,800 $ 45,320 $ 62,120 Incurred in Nov. 37,950 128,100 159,880 325,930 Total costs $37,950 $144,900 $205,200 $388,050 b. Equivalent unit calculation: Transferred Materials Conversion In Units completed 33,000 33,000 33,000 Add: Equivalent units in EWIP 0 1,500 3,000 Total equivalent units 33,000 34,500 36,000 c. Unit cost calculation: Unit cost = Unit material cost + Unit conversion cost + Unit transferred in cost = ($37,950/33,000) + ($144,900/34,500) + ($205,200/36,000) = $1.15 + $4.20 + $5.70 = $11.05
  • 34. 117788 6–35 Concluded d. and e. Cost reconciliation: Total costs accounted for: Goods transferred out (33,000 × $11.05) ................ $364,650 Costs in ending WIP: Materials............................................................... $ 0 Conversion (1,500 × $4.20) ................................. 6,300 Transferred in (3,000 × $5.70)............................. 17,100 Total costs in ending WIP........................................ 23,400 Total costs accounted for .................................. $388,050 Costs to account for: Beginning work in process ................................ $ 62,120 Costs incurred during November...................... 325,930 Total costs to account for .................................. $388,050 Journal entries for Department B: Work in Process—Dept. B.................. 159,880 Work in Process—Dept. A........... 159,880 Work in Process—Dept. B .................. 37,950 Materials Inventory ....................... 37,950 Work in Process—Dept. B .................. 128,100 Conversion Costs—Dept. B......... 128,100* Finished Goods ................................... 364,650 Work in Process—Dept. B ........... 364,650 *Because conversion costs are not broken into labor and overhead com- ponents, a control account for conversion costs is used. Some firms are now combining overhead and direct labor costs into one category. This practice is developing because direct labor is becoming a small percen- tage of total manufacturing costs.
  • 35. 117799 6–36 1. Department A a. Physical flow schedule: Units in beginning WIP 5,000 Units started in November 25,000 Total units to account for 30,000 Units completed and transferred out: Started and completed 23,000 From beginning WIP 5,000 Units in ending WIP 2,000 Total units accounted for 30,000 Costs charged to the department: Materials Conversion Total Beginning WIP $10,000 $ 6,900 $ 16,900 Incurred during November 57,800 95,220 153,020 Total costs $67,800 $102,120 $169,920 b. Equivalent unit calculation: Materials Conversion Units started and completed 23,000 23,000 Equivalent units in beginning WIP — 3,000 Equivalent units in ending WIP 2,000 1,600 Total equivalent units 25,000 27,600 c. Unit cost calculation: Unit cost = Unit material cost + Unit conversion cost = ($57,800/25,000) + ($95,220/27,600) = $2.312 + $3.45 = $5.762
  • 36. 118800 6–36 Continued d. and e. Cost reconciliation: Cost of units started and completed (23,000 × $5.762) $132,526 Cost of units in beginning WIP: Prior-period costs ............................................... 16,900 Current cost to finish units (3,000 × $3.45)....... 10,350 Total cost of units transferred out .......................... $159,776 Costs in ending WIP: Materials (2,000 × $2.312) ................................... $4,624 Conversion (1,600 × $3.45) ................................. 5,520 Total costs in ending WIP........................................ 10,144 Total costs accounted for .................................. $169,920 Costs to account for: Beginning WIP..................................................... $ 16,900 Costs incurred..................................................... 153,020 Total costs to account for .................................. $169,920 2. Journal entries: Work in Process—Dept. A ....................... 57,800 Materials Inventory.............................. 57,800 Work in Process—Dept. A ....................... 95,220 Conversion Costs—Dept. A ............... 95,220* Work in Process—Dept. A ....................... 159,776 Work in Process—Dept. A.................. 159,776 *Because conversion costs are not broken into labor and overhead com- ponents, a control account for conversion costs is used. Some firms are now combining overhead and direct labor costs into one category. This practice is developing because direct labor is becoming a small percen- tage of total manufacturing costs.
  • 37. 118811 6–36 Continued 3. Department B a. Physical flow schedule: Units in beginning WIP 8,000 Units started in November (transferred in) 28,000 Total units to account for 36,000 Units completed and transferred out: Started and completed 25,000 From beginning WIP 8,000 Units in ending WIP 3,000 Total units accounted for 36,000 Costs charged to the department: Transferred Materials Conversion In Total Beginning WIP $ 0 $ 16,800 $ 45,320 $ 62,120 Incurred during Nov. 37,950 128,100 159,776 325,826 Total costs $37,950 $144,900 $205,096 $387,946 b. Equivalent unit calculation: Transferred Materials Conversion In Units started and completed 25,000 25,000 25,000 Equivalent units in BWIP 8,000 4,000 0 Equivalent units in EWIP 0 1,500 3,000 Total equivalent units 33,000 30,500 28,000 c. Unit cost calculation: Unit cost = Unit material cost + Unit conversion cost + Unit transferred in cost = $37,950/33,000 + $128,100/30,500 + $159,776/28,000 = $1.15 + $4.20 + $5.706 = $11.056
  • 38. 118822 6–36 Concluded d. and e. Cost reconciliation: Cost of units started and completed (25,000 × $11.056) $276,400 Cost of units in beginning WIP: Prior-period costs ............................................... 62,120 Current cost to finish units: Materials (8,000 × $1.15) ..................................... 9,200 Conversion (4,000 × $4.20) ................................. 16,800 Total costs of goods transferred out...................... $364,520 Costs in ending WIP: Conversion (1,500 × $4.20) ................................. $ 6,300 Transferred in (3,000 × $5.706)........................... 17,118 Total costs in ending WIP........................................ 23,418 Total costs accounted for .................................. $387,938* Costs to account for: Beginning work in process ................................ $ 62,120 Costs incurred during November...................... 325,826 Total costs to account for .................................. $387,946* *Difference due to rounding. Journal entries for Department B: Work in Process—Dept. B.................. 159,776 Work in Process—Dept. A........... 159,776 Work in Process—Dept. B.................. 37,950 Materials Inventory ....................... 37,950 Work in Process—Dept. B.................. 128,100 Conversion Costs—Dept. B ........ 128,100* Finished Goods ................................... 364,520 Work in Process—Dept. B........... 364,520 *As before, a control account for conversion cost is used to combine over- head and direct labor cost into one category.
  • 39. 118833 6–37 1. a. Molding Units to account for: Units accounted for: Beginning WIP 500 Transferred out 1,300 Started 1,000 Ending WIP 200 1,500 1,500 b. Assembly Units to account for: Units accounted for: Beginning WIP 0 Transferred out 900 Started 1,300 Ending WIP 400 1,300 1,300 c. Packaging Units to account for: Units accounted for: Beginning WIP 150 Transferred out 1,050 Started 900 Ending WIP 0 1,050 1,050 2. Equivalent units: Molding Assembly Packaging Mat. Conv. Tr. In Mat. Conv. Tr. In Mat. Conv. Trans. out 1,300 1,300 900 900 900 1,050 1,050 1,050 EWIP 200 40 400 160 160 0 0 0 1,500 1,340 1,300 1,060 1,060 1,050 1,050 1,050 3. Molding Assembly Packaging Unit prior department cost — $11.50 $13.06 Unit materials cost $ 5.00 0.46 2.65 Unit conversion cost 6.50 1.10 3.05 Total unit cost $11.50 $13.06 $18.76 Molding: Unit materials cost: ($2,500 + $5,000)/1,500 = $5.00 Unit conversion cost: ($1,050 + $7,660)/1,340 = $6.50
  • 40. 118844 6–37 Concluded Assembly: Unit transferred-in cost: (0 + $14,950)/1,300 = $11.50 Unit materials cost: (0 + $487.60)/1,060 = $0.46 Unit conversion cost: (0 + $1,166)/1,060 = $1.10 Packaging: Unit transferred-in cost: ($1,959 + $11,754)/1,050 = $13.06 Unit materials cost: ($375 + $2,407.50)/1,050 = $2.65 Unit conversion cost: ($225 + $2,977.50)/1,050 = $3.05 4. Molding: Transferred out: (1,300 × $11.50) = $14,950 Ending WIP: (200 × $5) + (40 × $6.50) = $1,260 Assembly: Transferred out: (900 × $13.06) = $11,754 Ending WIP: (400 × $11.50) + (160 × $1.56) = $4,849.60 Packaging: Transferred out: (1,050 × $18.76) = $19,698 Ending WIP: 0 5. Costs to account for: BWIP + Current = Total Molding $3,550.00 $12,660.00 $16,210.00 Assembly 0.00 16,603.60 16,603.60 Packaging 2,559.00 17,139.00 19,698.00 Costs accounted for: Trans. Out + EWIP = Total Molding $14,950.00 $1,260.00 $16,210.00 Assembly 11,754.00 4,849.60 16,603.60 Packaging 19,698.00 0.00 19,698.00
  • 41. 118855 6–38 1. Equivalent units: Molding Assembly Packaging Mat. Conv. Tr. In Mat. Conv. Tr. In Mat. Conv. Started and completed 800 800 900 900 900 900 900 900 BWIP 0 350 0 0 0 0 0 75 EWIP 200 40 400 160 160 0 0 0 1,000 1,190 1,300 1,060 1,060 900 900 975 2. Molding: Unit materials cost: $5,000/1,000 = $ 5.000 Unit conversion cost: $7,660/1,190 = 6.437 Total unit cost $11.437 Assembly: Unit transferred-in cost: $14,950/1,300 = $11.500 Unit materials cost: $487.60/1,060 = 0.460 Unit conversion cost: $1,166/1,060 = 1.100 Total unit cost $13.060 Packaging: Unit transferred-in cost: $11,754/900 = $13.060 Unit materials cost: $2,407.50/900 = 2.675 Unit conversion cost: $2,977.50/975 = 3.054 Total unit cost $18.789 3. Molding: Transferred out: Started and completed (800 × $11.437) $ 9,149.60 Prior-period cost 3,550.00 Complete beginning WIP (350 × $6.437) 2,252.95 Total transferred out $ 14,952.55 Ending WIP: (200 × $5) + (40 × $6.437) $ 1,257.48
  • 42. 118866 6–38 Concluded Assembly: Transferred out: Started and completed (900 × $13.06) $ 11,754.00 Prior-period cost 0.00 Complete beginning WIP 0.00 Total transferred out $ 11,754.00 Ending WIP: (400 × $11.50) + (160 × $1.56) $ 4,849.60 Packaging: Transferred out: Started and completed (900 × $18.789) $ 16,910.10 Prior period cost 2,559.00 Complete beginning WIP (75 × $3.054) 229.05 Total transferred out $ 19,698.15 Ending WIP: $ 0 4. Cost reconciliation: Costs to account for: BWIP + Current = Total Molding $3,550.00 $12,660.00 $16,210.00 Assembly 0.00 16,603.60 16,603.60 Packaging 2,559.00 17,139.00 19,698.00 Costs accounted for: Trans. Out + EWIP = Total Molding $14,952.55 $1,257.48 $16,210.03* Assembly 11,754.00 4,849.60 16,603.60 Packaging 19,698.15 0.00 19,698.15* *Difference due to rounding.
  • 43. 118877 MANAGERIAL DECISION CASES 6–39 1. Gary’s proposal requires Donna to falsify the equivalent unit calculation so that income and assets can be inflated and reported incorrectly. Falsification of the production report would be a violation of at least two major ethical standards: integrity and objectivity. Falsification does not allow the organiza- tion to attain its legitimate and ethical objectives. Moreover, if Donna agrees to the proposal, she would be taking action that would discredit her profes- sion. Finally, Donna has an ethical obligation to communicate information fairly and objectively, disclosing all information that would be needed for the loan officer to fairly assess the merits of the company’s request for a loan. Clearly, Donna should not agree to falsify the production report. 2. Donna has an obligation to report Gary to a superior only if an actual ethical problem exists. If Gary decides that the course of action he is suggesting is not really in his or the company’s best interests, then no ethical problem ex- ists, and no action by Donna is needed. 3. If Gary insists on his idea of falsification of the division’s reports, Donna should attempt to resolve the conflict by appealing to Gary’s immediate su- pervisor (and on up, if necessary, until a satisfactory resolution is achieved). If no satisfactory resolution is possible, then Donna should resign and sub- mit an informative memo to a representative of the organization. 4. In this situation, the ethical dilemma is complicated by two factors: Donna’s age and a low likelihood of resolution by appealing to higher-level authorities. Donna’s age may make it more difficult to find alternative employment (at least at the same level and pay), and it may mean possible forfeiture of re- tirement benefits. Many students will likely respond that Donna should still resign (assuming that resolution is not likely), recommending the ideal out- come. While Donna’s ultimate resignation is the right choice if resolution fails, students should realize that ethical behavior may often carry with it some very significant personal sacrifices. It could be argued, however, that the costs of unethical behavior are even greater. Another possibility is to encourage Donna to see a lawyer. She has the option of fighting back, and at her age (with retirement benefits at stake), a good of- fense may be her best defense.
  • 44. 118888 RESEARCH ASSIGNMENT 6–40 Answers will vary. 6–41 Answers will vary.