1. CURRICULUM VITAE
Surname : Eid
First Name : Mhd. Yasser
Place and Date of Birth : Damascus 1965
Education : Civil Engineer Graduated from Damascus University 1988
Registered at Damascus Engineers order as consultant engineer
Language : Arabic and English
Special Skill : Knowledge of Computer Programs ( MS Office Word, Excel ,Win
Project ,AutoCAD 2011 , and Etabs 9.72 ).
Place of Residence : Lebanon Beirut Ain Alromaneh Cel. 0096176597479
Damascus – Syria
Kaboun ,main road ,Bldg. No
.1402, Ground floor
cel. No
, 00963 933634700
E-mail : Yasser-e@scs-net.org or yaseraid444@gmail.com
Experiences :
1-6-2014 To 30-6-2016 COMPINED GROUP
Subcontractor : South for Construction (SFC)
Position senior site engineer
Project : UPGRADING OF HAZMIEH – SOUFAR
Execution of Bhamdoun Tunnel , with all related works
Executing piles. Roads, cap beams , retaining walls
Geogride walls…etc.
2001 – 2/2013 Private Company
Position : Studying, Execution, Supervision and
Contracting
Project : Constructing
1. Four Floors residential buildings with All Finishing
works at kaboun Area Bldg. No
. 1401,
Damascus – Syria
2. Resedentional and commercial Four Floors
blds.,with All Finishing works at kaboun Area
Bldgs. No
. ,1402, 1109, 1097, 1555, 1375,1624,
1606, and 1610
As well , 1888/1 , 1308 and 1399 kaboun which are
still in progress
Damascus – Syria
As well during this period I was cooperating partially with Moustafa Al Amine company
handling correspondences with foreign companies to present offers to the
governmental company sectors to supply materials for gas and oil sectors involved with
the relevant required legal , financial , and technical offers
For instance we supplied oil counters through the Italian company Petrol instruments
, compressors though the Canadian company Lake Superior,
And various lubricant through the French company Nyco s.a. and many other supplies.
2. 9/2000 – 8/2001 Quais company the Subcontractor for Kvoerner U.S.A. Co.
Position : Supervising , execution
Project : executing six block valve stations from Der Alzor to
Homs for the 18” pipeline
Every block valve station included control room supplied with earthing system ,pre
cast concrete fence ,shut down valve ‘s shelter , well for cathodic protection and solar
cells system
3/ 1999 – 4/ 2000 Bentini Costruzioni Co.(Italy)
Position : Assistant for project Manager
Responsible for Quality Control for all Civil and
Mechanical , E & I Activities, Preparing Works
Procedures
Project : Palmyra Gas Gathering Station Phase II
Najeeb -Palmyra – Syria
The project included excavation ,installing Flowlines from the wells ,as well
executing concrete foundations , installing the equipments , instruments , vessels
and steel structure for gas gathering station with Al Amine Unit ( for gas
sweetening ) and finally excavation ,and transporting the liquidated gas through
pipeline to Arak Site.
2/1998 – 2 / 1999 Daadoosh Co.
Position : Suppervisor Engineer
Responsible for Civil Works
Project : Constructing and Finishing works for four floors
Bldg. 1145 Salhieh Jadah
Damascus – Syria
2/ 1998 – 4/1994 Eid And Jabee Co.
Partner : Yasser Eid
Position : Studying, Execution, Supervision and
Contracting
Project : Building up
At : 1. Five Floors And All Finishing For Living Aims at
Rakn Al Deen Area No
. Akrad 863 .
2. Four Floors with Finishing at Alkaboun Area No
.
Kaboun 1350
3. Six Floors at Honeh Area No
. 162 Al Tal 22 / 7
Damascus – Syria
Position : Site Engineer
Project : Building up at Akrad Area No
.1380
Al Kweafy Co.
Position : Execution Engineer
Project : Making Internal Road and Squares , Laying Asphalt
and all relevant activities at Dear Ali Area
Damascus - SYRIA
11/1988 – 3/ 1994 Ministry of Defence.
Administration of Engineers
Studying and Technical Department
Position : Supervisor Engineer
Project : Stores, Bldgs, and Several Structures
Syria.
To be issued upon request.