Name : Hamada Mohamed Hassan
Function : Survey engineer
Date of birth : 11-08-1981
Address : El Ismailia- Egypt
Mobile phone : 01271700540
Marital status : Married
Military service : Exempted
E- mail address : Hamada.mohamed @ nsfegypt.com
- AGRICULTURE ENGINEER Cairo university
- SURVEYING DEPLOMA Egyptian surveying ministry
- Leica Geosystem
Total station models 1200, 1201, 1203
- I.L.C international language & computer center
English conversation levels 1, 2,3,4,5
- Sokkia Surveying System
Total station model 307
- Preparing all survey works & reports & procedures
- Coordination with the consultant to hand over all survey works
- Dealing with all kinds of survey equipments
Total station
Electronic theodoliets
Automatic levels
- Foreign language read write speak
- English good good very good
- AutoCAD 2D
- MS- Office (word, excel)
- Leica survey office program
PERSONAL INFORMATIONS
EDUCATION INFORMATION
TRAININGS
DUTIES
LANGUAGES
COMPUTER SKILS
Page 1 of 5
1-GRAND EGYPTIAN MUSEUM
Period : from April. 2013 till now
Main contractor : ORASCOM – BESIX J.V
Brief description :
Constructing and erection of all steel buildings & steel roof , check of all
civil works.
2- Cairo air port project (expansion of terminal building no 2 )
Period : from April. 2013 till now
Main contractor : LIMAAK INSEAAT
Brief description :
Constructing and erection of the main buildings 4000 ton
3-EZZ STEEL FACTORY WORK SHOP
Period : from July.2009 to March.2012
Main contractor : ORASCOM construction industries
Brief description :
Constructing and erection of the main work shop 4000 ton with over head
Crane 300 ton capacity, span 23m (3200 m crane rail)
4-SAINT GOBAIN GLASS FACTORY
Period : from June.2009 to Oct. 2011
Main contractor : SAINT GOBAIN GLASS
Brief description :
Constructing and erection of the main buildings , furnace and float with
tolerance 0.2 mm.
PRACTICAL EXPERINCE & EMPLOYMENT RECORD
5-KURIMAT SOLAR ENERGY PLANT
Period : from Dec.2008 to Oct. 2010
Client : FLAGSOL GMPH
Main contractor : ORASCOM construction industries
Brief description :
Constructing and alignment of pylons 80 row, each row consists of 25
pylons must be located in one center line ,on the top of each pylon attached
the bearing block has own tolerance which must not exceed 0.2 mm at any
direction.
6-N.S.F SEUZ FACTORY
Period : from Dec.2007 to Dec. 2008
Main contractor : N.S.F national steel fabrication co.
Brief description :
Constructing and erection of 18 hanger with 62 over head crane , land
escape of all hangers.
7-CAIRO WEST AIR BASE (C130)
Period : from April.2007 to Dec. 2007
Main contractor : ministry of defense, us corps engineers
Brief description :
Construction of steel trusses with span 95 m , 45m ,over head cranes
8-EXPORTING CEMENT SILOS "DAMIETTA"
Period : from Oct. 2006 to april. 2007
Main contractor : ORASCOM construction industries
Brief description :
Constructing of 9 cement silos with height 42 m,15 m Diameter.
9-KORIMAT POWER PLANT
Period : from May. 2006 to Sept. 2006
Main contractor : Siemens , pegasco
Brief description :
Constructing and erection of 2 exhaust units over height 48 m.
10-TALKHA POWER GENERATION "750 MW
Period : from Oct. 2005 to April . 2006
Main contractor : Siemens , pegasco
Brief description :
Constructing and erection of 2 exhaust units over height 48 m, 5 steel tanks
with diameter 30 m,11 .5 m .
11-EAST PORT SAID PORT PROJECT
Period : from June. 2005 to Nov. 2005
Main contractor : Archirodon constructing overseas
Brief description :
Constructing and erection of 3 steel building with over head cranes.
12-AMMONIA/UREA- FIRTELIZER"
Period : from June.2005 to Nov.2005
Main contractor : Alexfert firtilizers, UHDE
Brief description :
Constructing and erection of large "BULK STORAGE.
13-NUBARIA POWER GENERATION
Period : from Jan.2004 to June.2005
Main contractor : Siemens , pegasco
Brief description :
Constructing and erection of 2 exhaust units over height 48 m.
14-FAYED AIR BASE UPGRADE
Period : from Nov.2002 to Dec.2004
Main contractor : Contrack, orascom j.v
Brief description :
Constructing and erection of elevator water tank with highest 72 m, roof
trusses BO3,BO6 air planes maintenance hangar.
15-EL GABAL ASFAR WATER TREATMENT PLANT
Period : from June .2002 to June .2003
Main contractor : Degremont ondeo
Brief description :
Constructing and erection of 12 clarifier tank with weight 1500 ton.
16-EAST PORT SAIED POWER PLANT
Period : from may .2001 to June 2002
Main contractor : S.A.E, ORASCOM J.V
Brief description :
Constructing and erection of steel buildings, pipe racks, over head cranes 28
m span.
17-EL FERDAN BRIDGE (OVER SUEZ CANAL)
Period : from Jan .1998 to April 2001
Main contractor : BESIX, ORASCOM J.V
Brief description :
Constructing all civil & steel works of the bridge over Suez Canal.

More Related Content

Similar to c.v hamada hassan

AHMED GEMEIY CV-26-04
AHMED GEMEIY CV-26-04AHMED GEMEIY CV-26-04
AHMED GEMEIY CV-26-04Ahmed gemeiy
 
eng. khaled sonbol (cv)
eng. khaled sonbol (cv)eng. khaled sonbol (cv)
eng. khaled sonbol (cv)khaled sonbol
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2 Alaa Ammar
 
e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015mahmoud gaber
 
AHMED SAAD ABDULLAH CV 10-15
AHMED SAAD ABDULLAH CV 10-15AHMED SAAD ABDULLAH CV 10-15
AHMED SAAD ABDULLAH CV 10-15AHMED SAAD
 
CV_M ASKAR 2017
CV_M ASKAR 2017CV_M ASKAR 2017
CV_M ASKAR 2017Moh Ask
 
SOC CV - Service Technician - Jan Homan
SOC CV - Service Technician - Jan HomanSOC CV - Service Technician - Jan Homan
SOC CV - Service Technician - Jan HomanJan Homan
 
Eng._Ramy_Hassan_Attia_C.V (11-3-2015)
Eng._Ramy_Hassan_Attia_C.V (11-3-2015)Eng._Ramy_Hassan_Attia_C.V (11-3-2015)
Eng._Ramy_Hassan_Attia_C.V (11-3-2015)Ramy Ahmed
 
emadosmancv-FINAL
emadosmancv-FINALemadosmancv-FINAL
emadosmancv-FINALemad farrag
 
head quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exphead quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years expsameh todary
 
AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015Ahmed Yehia
 

Similar to c.v hamada hassan (20)

AHMED GEMEIY CV-26-04
AHMED GEMEIY CV-26-04AHMED GEMEIY CV-26-04
AHMED GEMEIY CV-26-04
 
eng. khaled sonbol (cv)
eng. khaled sonbol (cv)eng. khaled sonbol (cv)
eng. khaled sonbol (cv)
 
Khaled cv07
Khaled cv07Khaled cv07
Khaled cv07
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2
 
Hesham Elmalah
Hesham ElmalahHesham Elmalah
Hesham Elmalah
 
cv eng.Abdelaleem Badran
cv eng.Abdelaleem Badrancv eng.Abdelaleem Badran
cv eng.Abdelaleem Badran
 
e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015e. mahmoud gaber c.v 8-2015
e. mahmoud gaber c.v 8-2015
 
AHMED SAAD ABDULLAH CV 10-15
AHMED SAAD ABDULLAH CV 10-15AHMED SAAD ABDULLAH CV 10-15
AHMED SAAD ABDULLAH CV 10-15
 
CV_M ASKAR 2017
CV_M ASKAR 2017CV_M ASKAR 2017
CV_M ASKAR 2017
 
C.V. Z. Zografos
C.V.   Z. ZografosC.V.   Z. Zografos
C.V. Z. Zografos
 
Mostafa_El-Iskandarani_CV_FINAL (1)
Mostafa_El-Iskandarani_CV_FINAL (1)Mostafa_El-Iskandarani_CV_FINAL (1)
Mostafa_El-Iskandarani_CV_FINAL (1)
 
SOC CV - Service Technician - Jan Homan
SOC CV - Service Technician - Jan HomanSOC CV - Service Technician - Jan Homan
SOC CV - Service Technician - Jan Homan
 
Eng._Ramy_Hassan_Attia_C.V (11-3-2015)
Eng._Ramy_Hassan_Attia_C.V (11-3-2015)Eng._Ramy_Hassan_Attia_C.V (11-3-2015)
Eng._Ramy_Hassan_Attia_C.V (11-3-2015)
 
Ahmed C.V
Ahmed C.VAhmed C.V
Ahmed C.V
 
emadosmancv-FINAL
emadosmancv-FINALemadosmancv-FINAL
emadosmancv-FINAL
 
head quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exphead quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exp
 
AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015
 
Ahmed el gohary cv
Ahmed el gohary cvAhmed el gohary cv
Ahmed el gohary cv
 
C.V -moh-8-16
C.V -moh-8-16C.V -moh-8-16
C.V -moh-8-16
 
Ahmd Mahmoud c.v
Ahmd Mahmoud c.vAhmd Mahmoud c.v
Ahmd Mahmoud c.v
 

c.v hamada hassan

  • 1. Name : Hamada Mohamed Hassan Function : Survey engineer Date of birth : 11-08-1981 Address : El Ismailia- Egypt Mobile phone : 01271700540 Marital status : Married Military service : Exempted E- mail address : Hamada.mohamed @ nsfegypt.com - AGRICULTURE ENGINEER Cairo university - SURVEYING DEPLOMA Egyptian surveying ministry - Leica Geosystem Total station models 1200, 1201, 1203 - I.L.C international language & computer center English conversation levels 1, 2,3,4,5 - Sokkia Surveying System Total station model 307 - Preparing all survey works & reports & procedures - Coordination with the consultant to hand over all survey works - Dealing with all kinds of survey equipments Total station Electronic theodoliets Automatic levels - Foreign language read write speak - English good good very good - AutoCAD 2D - MS- Office (word, excel) - Leica survey office program PERSONAL INFORMATIONS EDUCATION INFORMATION TRAININGS DUTIES LANGUAGES COMPUTER SKILS
  • 2. Page 1 of 5 1-GRAND EGYPTIAN MUSEUM Period : from April. 2013 till now Main contractor : ORASCOM – BESIX J.V Brief description : Constructing and erection of all steel buildings & steel roof , check of all civil works. 2- Cairo air port project (expansion of terminal building no 2 ) Period : from April. 2013 till now Main contractor : LIMAAK INSEAAT Brief description : Constructing and erection of the main buildings 4000 ton 3-EZZ STEEL FACTORY WORK SHOP Period : from July.2009 to March.2012 Main contractor : ORASCOM construction industries Brief description : Constructing and erection of the main work shop 4000 ton with over head Crane 300 ton capacity, span 23m (3200 m crane rail) 4-SAINT GOBAIN GLASS FACTORY Period : from June.2009 to Oct. 2011 Main contractor : SAINT GOBAIN GLASS Brief description : Constructing and erection of the main buildings , furnace and float with tolerance 0.2 mm. PRACTICAL EXPERINCE & EMPLOYMENT RECORD
  • 3. 5-KURIMAT SOLAR ENERGY PLANT Period : from Dec.2008 to Oct. 2010 Client : FLAGSOL GMPH Main contractor : ORASCOM construction industries Brief description : Constructing and alignment of pylons 80 row, each row consists of 25 pylons must be located in one center line ,on the top of each pylon attached the bearing block has own tolerance which must not exceed 0.2 mm at any direction. 6-N.S.F SEUZ FACTORY Period : from Dec.2007 to Dec. 2008 Main contractor : N.S.F national steel fabrication co. Brief description : Constructing and erection of 18 hanger with 62 over head crane , land escape of all hangers. 7-CAIRO WEST AIR BASE (C130) Period : from April.2007 to Dec. 2007 Main contractor : ministry of defense, us corps engineers Brief description : Construction of steel trusses with span 95 m , 45m ,over head cranes 8-EXPORTING CEMENT SILOS "DAMIETTA" Period : from Oct. 2006 to april. 2007 Main contractor : ORASCOM construction industries Brief description : Constructing of 9 cement silos with height 42 m,15 m Diameter. 9-KORIMAT POWER PLANT Period : from May. 2006 to Sept. 2006 Main contractor : Siemens , pegasco Brief description : Constructing and erection of 2 exhaust units over height 48 m.
  • 4. 10-TALKHA POWER GENERATION "750 MW Period : from Oct. 2005 to April . 2006 Main contractor : Siemens , pegasco Brief description : Constructing and erection of 2 exhaust units over height 48 m, 5 steel tanks with diameter 30 m,11 .5 m . 11-EAST PORT SAID PORT PROJECT Period : from June. 2005 to Nov. 2005 Main contractor : Archirodon constructing overseas Brief description : Constructing and erection of 3 steel building with over head cranes. 12-AMMONIA/UREA- FIRTELIZER" Period : from June.2005 to Nov.2005 Main contractor : Alexfert firtilizers, UHDE Brief description : Constructing and erection of large "BULK STORAGE. 13-NUBARIA POWER GENERATION Period : from Jan.2004 to June.2005 Main contractor : Siemens , pegasco Brief description : Constructing and erection of 2 exhaust units over height 48 m. 14-FAYED AIR BASE UPGRADE Period : from Nov.2002 to Dec.2004 Main contractor : Contrack, orascom j.v Brief description : Constructing and erection of elevator water tank with highest 72 m, roof trusses BO3,BO6 air planes maintenance hangar.
  • 5. 15-EL GABAL ASFAR WATER TREATMENT PLANT Period : from June .2002 to June .2003 Main contractor : Degremont ondeo Brief description : Constructing and erection of 12 clarifier tank with weight 1500 ton. 16-EAST PORT SAIED POWER PLANT Period : from may .2001 to June 2002 Main contractor : S.A.E, ORASCOM J.V Brief description : Constructing and erection of steel buildings, pipe racks, over head cranes 28 m span. 17-EL FERDAN BRIDGE (OVER SUEZ CANAL) Period : from Jan .1998 to April 2001 Main contractor : BESIX, ORASCOM J.V Brief description : Constructing all civil & steel works of the bridge over Suez Canal.