Mohamed Ali Zaki El Tanboli is an Egyptian civil engineer with 30 years of experience. He received his B.Sc. in Civil Engineering from Alexandria University in 1983. Since then, he has worked on numerous construction projects in Egypt, taking on roles such as site engineer, senior engineer, project manager, construction manager, and general construction manager. His areas of expertise include concrete work, steel reinforcement, excavation, and finishing work. His most recent role is as project manager for the Hanging Gardens project in Sokhna, Egypt, which involves constructing villas, infrastructure works, and landscaping.
Sdc verifier 4 preview. iso 19902 tubular members and joint checksSDC Verifier
The strength of tubular members and tubular joints according to ISO 19902 standard is implemented in version 4.0.
For checking of large (offshore) lattice structures according to ISO 19902 the joints and members need to be recognized in the standard FEA model
Лучшие онлайн игры на BMOG.RU
тактические mmo
mmorpg с клиентом лучшие
mmorpg за вампиров
mmorpg подобие uo
mmorpg онлайн игры видео
пашаговые mmorpg
mmorpg лучшее пк 2001
mmorpg бесплатные без клиента
mmorpg с системой no target
sandbox mmo wiki
профессии в mmorpg
free mmo ru
mmorpg для андроид 2 3
лучшие mmorpg игр
скачать mmo экшены
mmo constructor crfxfnm
топ лучших онлайн игр mmo
сайт про mmo rpg
скачать assasins creed mmo
mmo rpg onlline игры
создание русской mmorpg
mmorpg новинки на комп
40 000 warhammer mmo
скачать mmorpg с торрента
драконы новая браузерная mmorpg
neverwinter nights mmo beta key
mmo rpg реитинг
php скрипт mmorpg скачать
shin megami tensei imagine mmorpg
mmorpg rift классы
mmo bs
sci-fi mmorpg 2013
браузерная mmorpg «драконы»
супергеройское mmorpg
топ 10 онлайн mmorpg 2011
fanservice mmo
mmo клинок королевы рассы
mmorpg в стиле животных
mmorpg топ 100 игр
pve mmorpg 2011
mmorpg apocalypse
что такое дпс в mmorpg
скачать mmorpg 2010
седьмой элемент mmorpg видео
стрелялки по сети mmorpg
realtime worlds mmo apb
mmo онлайн топ
mmorpg 2012 года клип
mmo darksun
games of thrones mmo
русские mmorpg игры
1. C . V
Particular Information
Name: Mohamed Ali Zaki El Tanboli.
Position: Civil Engineer.
Date of Birth: 31/ 10/1960.
Nationality: Egyptian.
Phone No: 02/ 38240534 & &01000105891
Years of Experience: 30 Year.
Education: B.Sc.Civil Engineer-Alex. University
1983.
Previous Work History:
Dec. 1985-Sep.1986: MEGICON.
Site Engineer-(Kajima Corporation)
The Education and Cultural Center
(Opera House in Cairo)
Responsible for Formwork &Steel Reinforcement site
Sep.1986-Dec.1987: MEGICON.
Senior Engineer (West Sebaiya Mine Development)
Responsible for Construction of the Primary Crusher,
Conveyors, Sub Station and 11 KV Line.
Dec. 1987-Aug.1988: MEGICON.
Senior Engineer (Grain Silos of Quss)
Responsibilities included the site mobilization.excavation,
Excavation, substructure works, compacting, and concrete patching
Plant, erection of bins. Also was responsible for material
2. Procurement and handing over to the main contractor. (E.P.T)
Aug.1988-Aug.1989: MEGICON.
Project Manager (Grain Silos of Edfu)
Responsibilities included the site mobilization,
Excavation, substructure works, compacting, and
Concrete patching Plant, erection of bins. Also Was
Responsible for material procurement and handing over to
The main contractor. (E.P.T)
Aug.1989-Sep.1990: MEGICON.
Senior Engineer. (Suez Thermal power Station)
Responsible for Construction of the Turbine house, a fair faced
Concrete building 14 meters&a12 meters high steel structure frame.
The concrete basement supports a 2-m thick. Reinforced concrete
Slab to carry the Turbine unit. The house includes a control room
And Maintenance room. All fair faced concrete.
Responsibility included coordinating pipe works and erection with
Aalborg Boilers as a main contractor
Sep.1990-Oct.1991: ARAB INTERNATIONAL COMPANY
Senior Engineer-(New Esna Barrages)
Arab International Company as a main contractor.
Responsible for Navigation locks Formwork, steel
Reinforcement, casting of concrete, finishing and erection
All embedded parts.
Oct.1991-Mar.1992: MEGICON
Megicon Office.
Mar. 1992-Dec.1992: MEGICON.
Construction Manager (Dokki Electrical Sub Station 66/11 KV
Responsible for all construction works of the Sub-Station from the
Excavation up to the handing over including all finishing. Etc.
Main contractor Merlin gerin. (French company).
Jan.1993-Mar.1994: MEGICON:
Project Manager-(Private vela in al –Ahram Street).
Responsible for construction of the Main building,
The swimming pool, service building and the surrounding fence
Including all finishing works and piping works for swimming pool
Apr.1994-Dec.1994: MEGICON.
Project Manager in (Quality control Laboratory.)
Responsibilities included the site mobilization.rebar, concrete patch
Plant. All finishing. Works, erection of center air condition system,
All The piping and fire system works.
3. Main Contractor (VALIO TECHNICAL ENG) Finland Company
Jan.1995-Oct.1995: MEGICON
Project Manager in Hot Strip Mill Modemization.
Main Contractor (Cegelect Company) (French Company)
The Owner. (Egyptian for Iron and Steel Company)
Responsibilities included construction works for the main building
And Ventilation plants, Hydraulic room and Control rooms.
Nov.1995-Apr.1997: MEGICON.
Construction Manager in EL –Kurimat thermal power stations
2X600 M W.
Main Contractor :( Daelim Industrial CO.Ltd.) (Korean Company)
Consultant :( Ebasco Company American)
Responsibilities included construction of the Transformer,
Foundation, boiler feed pump and Turbine building in addition to the
Finishing works for the control building.
May1997-Oct.1997: MEGICON
General Construction Manager in (FLOAT GLASS PLANT)
Main Contractor :( INGLEN ITALIAN COMPANY) .
Consultant (ACE-MOT-MACDONALD) (BRITISH COMPANY)
Responsibilities included construction works for the Raw material
Area, batch house, crushing plant, Dolomite hopper area, belt
Conveyors, sand hopper area, and Mixer structure foundation, the
Industrial flooring, and all embedded parts.
Nov1997-Feb1999: MEGICON.
Project Manager (Canary beatch villa) (investment villa)
In Sues (Ain Al Soukna)
Responsible for Construction of the Building Swimming pool,
Finishing works, Land scap, Roads.
Mar1999-Aug2000: MHDA.
Construction Manager (Sina Cement Company)
(Asic and Aresco Company) as a main contractor.
Responsible for construction of the C.F.Silo (80m height),
Kiln Piers, Breheater, Conveyors, Water Tank, Tunnel, Main
Substation
And all Foundation for Cement Equipment, and all embedded parts.
Sep2000-Oct2002: MHDA.
Project Manager (WEST ZONE ARMY)
4. Construction of R.C Shed and Sport Halls in S ALOM City.
Nov2002-Jan2004: MHDA.
Mhda Office.
Feb2004-Dec2005: SHAMI AL HASNI.
Project Manager (Girl school in King Saudi Arabian)
Construction of Main Building, Finishing work, Land scap,
Roads.
Ape 2006-Mar 2007: DETAC
Site Manager (Al Sharqia Company) 6of October
(Work Shoppe 13)(55000000)LE
Construction of Main Building.Finshing work
Ape 2007-Dec 2007: DETAC.
Project manager (AL ZEINA TISSUE COMPANY)
Construction of main paper mill building. Reel
Building.PulpBuilding
Water Tank. Transformer and Electric Building.Boiller Building
Hand over for all work to Erection Company (37000000) LE
Jan. 2008-Oct.2009;DETAC
Project manager (Complete production Store) 6 of October.
(152000000)LE.Responsible for construction of main Building.
Finishing work. Electric work. Fire alarm System. Duct work.
And hand over for all work to Erection Company.
Oct 2009-Sep 2010: DETAC
Project Manager (Chamber of Commerce Administrative Building)
Construction of Main Building, Finishing work, Electric work,
Pluming work, Fire work, Duct work, Land scab work
Nov 2010-Oct 2013:DETAC
Project Manager(Raya Plaza Building)(Raya Smart Building)
Construction of main Building(pre stresses slab)
Finshing work.Electric work.Duct work.Fire alarm System
And hand over for all work to raya company
NOV 2013-NOW :DETAC
PROJECT MANAGER(Sokhna Projects - Hanging GardensThe project
consists of establishing, executing, and handing over of The contract of
the project which contains 6 items:-
5. Concrete Skeleton for Platform 4 ( 150 villas )
Arch. Finishes work for Platform 2-3-4 ( 450 villas )
Electrical works for Platform 2-3-4 ( 450 villas )
Plumping works for Platform 2-3-4 (450 villas )
Infrastructure works for Platform 2-3-4
Hard Scape works for Platform 2-3-4
Owner : Amer Group
Project
Manager
:
Contractor : DETAC Dar for trading and
construction
6. Concrete Skeleton for Platform 4 ( 150 villas )
Arch. Finishes work for Platform 2-3-4 ( 450 villas )
Electrical works for Platform 2-3-4 ( 450 villas )
Plumping works for Platform 2-3-4 (450 villas )
Infrastructure works for Platform 2-3-4
Hard Scape works for Platform 2-3-4
Owner : Amer Group
Project
Manager
:
Contractor : DETAC Dar for trading and
construction