SlideShare a Scribd company logo
C . V
Particular Information
Name: Mohamed Ali Zaki El Tanboli.
Position: Civil Engineer.
Date of Birth: 31/ 10/1960.
Nationality: Egyptian.
Phone No: 02/ 38240534 & &01000105891
Years of Experience: 30 Year.
Education: B.Sc.Civil Engineer-Alex. University
1983.
Previous Work History:
Dec. 1985-Sep.1986: MEGICON.
Site Engineer-(Kajima Corporation)
The Education and Cultural Center
(Opera House in Cairo)
Responsible for Formwork &Steel Reinforcement site
Sep.1986-Dec.1987: MEGICON.
Senior Engineer (West Sebaiya Mine Development)
Responsible for Construction of the Primary Crusher,
Conveyors, Sub Station and 11 KV Line.
Dec. 1987-Aug.1988: MEGICON.
Senior Engineer (Grain Silos of Quss)
Responsibilities included the site mobilization.excavation,
Excavation, substructure works, compacting, and concrete patching
Plant, erection of bins. Also was responsible for material
Procurement and handing over to the main contractor. (E.P.T)
Aug.1988-Aug.1989: MEGICON.
Project Manager (Grain Silos of Edfu)
Responsibilities included the site mobilization,
Excavation, substructure works, compacting, and
Concrete patching Plant, erection of bins. Also Was
Responsible for material procurement and handing over to
The main contractor. (E.P.T)
Aug.1989-Sep.1990: MEGICON.
Senior Engineer. (Suez Thermal power Station)
Responsible for Construction of the Turbine house, a fair faced
Concrete building 14 meters&a12 meters high steel structure frame.
The concrete basement supports a 2-m thick. Reinforced concrete
Slab to carry the Turbine unit. The house includes a control room
And Maintenance room. All fair faced concrete.
Responsibility included coordinating pipe works and erection with
Aalborg Boilers as a main contractor
Sep.1990-Oct.1991: ARAB INTERNATIONAL COMPANY
Senior Engineer-(New Esna Barrages)
Arab International Company as a main contractor.
Responsible for Navigation locks Formwork, steel
Reinforcement, casting of concrete, finishing and erection
All embedded parts.
Oct.1991-Mar.1992: MEGICON
Megicon Office.
Mar. 1992-Dec.1992: MEGICON.
Construction Manager (Dokki Electrical Sub Station 66/11 KV
Responsible for all construction works of the Sub-Station from the
Excavation up to the handing over including all finishing. Etc.
Main contractor Merlin gerin. (French company).
Jan.1993-Mar.1994: MEGICON:
Project Manager-(Private vela in al –Ahram Street).
Responsible for construction of the Main building,
The swimming pool, service building and the surrounding fence
Including all finishing works and piping works for swimming pool
Apr.1994-Dec.1994: MEGICON.
Project Manager in (Quality control Laboratory.)
Responsibilities included the site mobilization.rebar, concrete patch
Plant. All finishing. Works, erection of center air condition system,
All The piping and fire system works.
Main Contractor (VALIO TECHNICAL ENG) Finland Company
Jan.1995-Oct.1995: MEGICON
Project Manager in Hot Strip Mill Modemization.
Main Contractor (Cegelect Company) (French Company)
The Owner. (Egyptian for Iron and Steel Company)
Responsibilities included construction works for the main building
And Ventilation plants, Hydraulic room and Control rooms.
Nov.1995-Apr.1997: MEGICON.
Construction Manager in EL –Kurimat thermal power stations
2X600 M W.
Main Contractor :( Daelim Industrial CO.Ltd.) (Korean Company)
Consultant :( Ebasco Company American)
Responsibilities included construction of the Transformer,
Foundation, boiler feed pump and Turbine building in addition to the
Finishing works for the control building.
May1997-Oct.1997: MEGICON
General Construction Manager in (FLOAT GLASS PLANT)
Main Contractor :( INGLEN ITALIAN COMPANY) .
Consultant (ACE-MOT-MACDONALD) (BRITISH COMPANY)
Responsibilities included construction works for the Raw material
Area, batch house, crushing plant, Dolomite hopper area, belt
Conveyors, sand hopper area, and Mixer structure foundation, the
Industrial flooring, and all embedded parts.
Nov1997-Feb1999: MEGICON.
Project Manager (Canary beatch villa) (investment villa)
In Sues (Ain Al Soukna)
Responsible for Construction of the Building Swimming pool,
Finishing works, Land scap, Roads.
Mar1999-Aug2000: MHDA.
Construction Manager (Sina Cement Company)
(Asic and Aresco Company) as a main contractor.
Responsible for construction of the C.F.Silo (80m height),
Kiln Piers, Breheater, Conveyors, Water Tank, Tunnel, Main
Substation
And all Foundation for Cement Equipment, and all embedded parts.
Sep2000-Oct2002: MHDA.
Project Manager (WEST ZONE ARMY)
Construction of R.C Shed and Sport Halls in S ALOM City.
Nov2002-Jan2004: MHDA.
Mhda Office.
Feb2004-Dec2005: SHAMI AL HASNI.
Project Manager (Girl school in King Saudi Arabian)
Construction of Main Building, Finishing work, Land scap,
Roads.
Ape 2006-Mar 2007: DETAC
Site Manager (Al Sharqia Company) 6of October
(Work Shoppe 13)(55000000)LE
Construction of Main Building.Finshing work
Ape 2007-Dec 2007: DETAC.
Project manager (AL ZEINA TISSUE COMPANY)
Construction of main paper mill building. Reel
Building.PulpBuilding
Water Tank. Transformer and Electric Building.Boiller Building
Hand over for all work to Erection Company (37000000) LE
Jan. 2008-Oct.2009;DETAC
Project manager (Complete production Store) 6 of October.
(152000000)LE.Responsible for construction of main Building.
Finishing work. Electric work. Fire alarm System. Duct work.
And hand over for all work to Erection Company.
Oct 2009-Sep 2010: DETAC
Project Manager (Chamber of Commerce Administrative Building)
Construction of Main Building, Finishing work, Electric work,
Pluming work, Fire work, Duct work, Land scab work
Nov 2010-Oct 2013:DETAC
Project Manager(Raya Plaza Building)(Raya Smart Building)
Construction of main Building(pre stresses slab)
Finshing work.Electric work.Duct work.Fire alarm System
And hand over for all work to raya company
NOV 2013-NOW :DETAC
PROJECT MANAGER(Sokhna Projects - Hanging GardensThe project
consists of establishing, executing, and handing over of The contract of
the project which contains 6 items:-
 Concrete Skeleton for Platform 4 ( 150 villas )
 Arch. Finishes work for Platform 2-3-4 ( 450 villas )
 Electrical works for Platform 2-3-4 ( 450 villas )
 Plumping works for Platform 2-3-4 (450 villas )
 Infrastructure works for Platform 2-3-4
 Hard Scape works for Platform 2-3-4
Owner : Amer Group
Project
Manager
:
Contractor : DETAC Dar for trading and
construction
 Concrete Skeleton for Platform 4 ( 150 villas )
 Arch. Finishes work for Platform 2-3-4 ( 450 villas )
 Electrical works for Platform 2-3-4 ( 450 villas )
 Plumping works for Platform 2-3-4 (450 villas )
 Infrastructure works for Platform 2-3-4
 Hard Scape works for Platform 2-3-4
Owner : Amer Group
Project
Manager
:
Contractor : DETAC Dar for trading and
construction

More Related Content

What's hot

eng. khaled sonbol (cv)
eng. khaled sonbol (cv)eng. khaled sonbol (cv)
eng. khaled sonbol (cv)khaled sonbol
 
Karl james davis cv new
Karl james davis cv newKarl james davis cv new
Karl james davis cv new
karl davis
 
CV - H&S - Joe Childs MIDE
CV - H&S - Joe Childs MIDECV - H&S - Joe Childs MIDE
CV - H&S - Joe Childs MIDEJoe Childs
 
AH CCM 5.11.20
AH CCM 5.11.20AH CCM 5.11.20
AH CCM 5.11.20
ahcitycouncil
 
Michael Dismore Resume 24-04-14
Michael Dismore Resume 24-04-14Michael Dismore Resume 24-04-14
Michael Dismore Resume 24-04-14Michael Dismore
 
Dave Arkell Latest CV
Dave Arkell Latest CVDave Arkell Latest CV
Dave Arkell Latest CVDave Arkell
 
walls construction
walls constructionwalls construction
walls constructionGary Elliott
 
Smith, Simon- Resume - Master
Smith, Simon- Resume - MasterSmith, Simon- Resume - Master
Smith, Simon- Resume - Mastersimon smith
 
Thomas Sanicki1306 Castalia Drive
Thomas Sanicki1306 Castalia DriveThomas Sanicki1306 Castalia Drive
Thomas Sanicki1306 Castalia DriveThomas Sanicki
 
David Goodwin Resume 2015 LP
David Goodwin Resume 2015 LPDavid Goodwin Resume 2015 LP
David Goodwin Resume 2015 LPDavid Goodwin
 
Stephen Groombridge-CV-1 (1)
Stephen Groombridge-CV-1 (1)Stephen Groombridge-CV-1 (1)
Stephen Groombridge-CV-1 (1)Steve Groombridge
 
ArthurResume06-08-12
ArthurResume06-08-12ArthurResume06-08-12
ArthurResume06-08-12Arthur Halson
 

What's hot (20)

eng. khaled sonbol (cv)
eng. khaled sonbol (cv)eng. khaled sonbol (cv)
eng. khaled sonbol (cv)
 
Resume_Wizard
Resume_WizardResume_Wizard
Resume_Wizard
 
Karl james davis cv new
Karl james davis cv newKarl james davis cv new
Karl james davis cv new
 
CV - H&S - Joe Childs MIDE
CV - H&S - Joe Childs MIDECV - H&S - Joe Childs MIDE
CV - H&S - Joe Childs MIDE
 
AH CCM 5.11.20
AH CCM 5.11.20AH CCM 5.11.20
AH CCM 5.11.20
 
Michael Dismore Resume 24-04-14
Michael Dismore Resume 24-04-14Michael Dismore Resume 24-04-14
Michael Dismore Resume 24-04-14
 
Simon Murphy CV
Simon Murphy CVSimon Murphy CV
Simon Murphy CV
 
Dave Arkell Latest CV
Dave Arkell Latest CVDave Arkell Latest CV
Dave Arkell Latest CV
 
walls construction
walls constructionwalls construction
walls construction
 
Smith, Simon- Resume - Master
Smith, Simon- Resume - MasterSmith, Simon- Resume - Master
Smith, Simon- Resume - Master
 
Thomas Sanicki1306 Castalia Drive
Thomas Sanicki1306 Castalia DriveThomas Sanicki1306 Castalia Drive
Thomas Sanicki1306 Castalia Drive
 
AnthonyCurrent HTR
AnthonyCurrent HTRAnthonyCurrent HTR
AnthonyCurrent HTR
 
David Goodwin Resume 2015 LP
David Goodwin Resume 2015 LPDavid Goodwin Resume 2015 LP
David Goodwin Resume 2015 LP
 
Stephen Groombridge-CV-1 (1)
Stephen Groombridge-CV-1 (1)Stephen Groombridge-CV-1 (1)
Stephen Groombridge-CV-1 (1)
 
Mohan 3
Mohan 3Mohan 3
Mohan 3
 
fpbcurrent1
fpbcurrent1fpbcurrent1
fpbcurrent1
 
Hady Sawaya CV
Hady Sawaya CVHady Sawaya CV
Hady Sawaya CV
 
CV
CVCV
CV
 
Amboss-E&ZProjectExperience
Amboss-E&ZProjectExperienceAmboss-E&ZProjectExperience
Amboss-E&ZProjectExperience
 
ArthurResume06-08-12
ArthurResume06-08-12ArthurResume06-08-12
ArthurResume06-08-12
 

Viewers also liked

WONDERLAND INDONESIA 2015
WONDERLAND INDONESIA 2015WONDERLAND INDONESIA 2015
WONDERLAND INDONESIA 2015Agung p
 
BK Line Sheet
BK Line SheetBK Line Sheet
BK Line SheetMatt Hurt
 
Mf0015 international financial management
Mf0015 international financial managementMf0015 international financial management
Mf0015 international financial management
consult4solutions
 
Sdc verifier 4 preview. iso 19902 tubular members and joint checks
Sdc verifier 4 preview. iso 19902 tubular members and joint checksSdc verifier 4 preview. iso 19902 tubular members and joint checks
Sdc verifier 4 preview. iso 19902 tubular members and joint checks
SDC Verifier
 
Aula inclusiva
Aula inclusivaAula inclusiva
Aula inclusiva
KarlaDanielaOrtega
 
Mmorpg rise
Mmorpg riseMmorpg rise
Mmorpg rise
tieliderve1987
 
AnewAmerica VITA 2016 (Spanish)
AnewAmerica VITA 2016 (Spanish)AnewAmerica VITA 2016 (Spanish)
AnewAmerica VITA 2016 (Spanish)
AnewAmerica Community Corporation
 

Viewers also liked (8)

WONDERLAND INDONESIA 2015
WONDERLAND INDONESIA 2015WONDERLAND INDONESIA 2015
WONDERLAND INDONESIA 2015
 
BK Line Sheet
BK Line SheetBK Line Sheet
BK Line Sheet
 
Mf0015 international financial management
Mf0015 international financial managementMf0015 international financial management
Mf0015 international financial management
 
Sdc verifier 4 preview. iso 19902 tubular members and joint checks
Sdc verifier 4 preview. iso 19902 tubular members and joint checksSdc verifier 4 preview. iso 19902 tubular members and joint checks
Sdc verifier 4 preview. iso 19902 tubular members and joint checks
 
Aula inclusiva
Aula inclusivaAula inclusiva
Aula inclusiva
 
Mmorpg rise
Mmorpg riseMmorpg rise
Mmorpg rise
 
AnewAmerica VITA 2016 (Spanish)
AnewAmerica VITA 2016 (Spanish)AnewAmerica VITA 2016 (Spanish)
AnewAmerica VITA 2016 (Spanish)
 
Pôster congresso IPA
Pôster congresso IPAPôster congresso IPA
Pôster congresso IPA
 

Similar to C.V for M.ZAKI

Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015Muhammad Hegazy
 
AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015Ahmed Yehia
 
Sabah Jereige CV 2016
Sabah Jereige CV 2016Sabah Jereige CV 2016
Sabah Jereige CV 2016Sabah JEREIGE
 
HASSAN ELESAYED ELEMAM PMP
HASSAN ELESAYED ELEMAM PMPHASSAN ELESAYED ELEMAM PMP
HASSAN ELESAYED ELEMAM PMPhassan elemam
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2 Alaa Ammar
 
Ahmed el gohary cv
Ahmed el gohary cvAhmed el gohary cv
Ahmed el gohary cv
Ahmed El gohary
 
PANOU-eng_cv_DRAFT
PANOU-eng_cv_DRAFTPANOU-eng_cv_DRAFT
PANOU-eng_cv_DRAFTkostas panou
 
CURRICULAM VITAE
CURRICULAM VITAECURRICULAM VITAE
CURRICULAM VITAEMagdy Fahny
 
Cv & projects updated
Cv & projects updatedCv & projects updated
Cv & projects updated
Charalambos Dimitrakopoulos
 
Ghassan Hamati CV April 2016
Ghassan Hamati CV April 2016Ghassan Hamati CV April 2016
Ghassan Hamati CV April 2016Ghassan Hamati∴
 

Similar to C.V for M.ZAKI (20)

Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015
 
AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015
 
Sabah Jereige CV 2016
Sabah Jereige CV 2016Sabah Jereige CV 2016
Sabah Jereige CV 2016
 
cv1[1]
cv1[1]cv1[1]
cv1[1]
 
Eng - GFM- 04.15 +photo
Eng - GFM- 04.15 +photoEng - GFM- 04.15 +photo
Eng - GFM- 04.15 +photo
 
HASSAN ELESAYED ELEMAM PMP
HASSAN ELESAYED ELEMAM PMPHASSAN ELESAYED ELEMAM PMP
HASSAN ELESAYED ELEMAM PMP
 
cv بدون
cv بدونcv بدون
cv بدون
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2
 
Ahmed el gohary cv
Ahmed el gohary cvAhmed el gohary cv
Ahmed el gohary cv
 
PANOU-eng_cv_DRAFT
PANOU-eng_cv_DRAFTPANOU-eng_cv_DRAFT
PANOU-eng_cv_DRAFT
 
CV_Rizeq 2016
CV_Rizeq 2016CV_Rizeq 2016
CV_Rizeq 2016
 
OguzErciyas-CV-2015
OguzErciyas-CV-2015OguzErciyas-CV-2015
OguzErciyas-CV-2015
 
CV_mohammed-abdulrahman
CV_mohammed-abdulrahmanCV_mohammed-abdulrahman
CV_mohammed-abdulrahman
 
Abd El-Rahman Wakeb CV
Abd El-Rahman Wakeb CVAbd El-Rahman Wakeb CV
Abd El-Rahman Wakeb CV
 
CURRICULAM VITAE
CURRICULAM VITAECURRICULAM VITAE
CURRICULAM VITAE
 
Cv & projects updated
Cv & projects updatedCv & projects updated
Cv & projects updated
 
Ahmed Jamal 2
Ahmed Jamal 2Ahmed Jamal 2
Ahmed Jamal 2
 
Ghassan Hamati CV April 2016
Ghassan Hamati CV April 2016Ghassan Hamati CV April 2016
Ghassan Hamati CV April 2016
 
Marwan Bou Antoun
Marwan Bou AntounMarwan Bou Antoun
Marwan Bou Antoun
 
C.V-Ayman
C.V-Ayman  C.V-Ayman
C.V-Ayman
 

C.V for M.ZAKI

  • 1. C . V Particular Information Name: Mohamed Ali Zaki El Tanboli. Position: Civil Engineer. Date of Birth: 31/ 10/1960. Nationality: Egyptian. Phone No: 02/ 38240534 & &01000105891 Years of Experience: 30 Year. Education: B.Sc.Civil Engineer-Alex. University 1983. Previous Work History: Dec. 1985-Sep.1986: MEGICON. Site Engineer-(Kajima Corporation) The Education and Cultural Center (Opera House in Cairo) Responsible for Formwork &Steel Reinforcement site Sep.1986-Dec.1987: MEGICON. Senior Engineer (West Sebaiya Mine Development) Responsible for Construction of the Primary Crusher, Conveyors, Sub Station and 11 KV Line. Dec. 1987-Aug.1988: MEGICON. Senior Engineer (Grain Silos of Quss) Responsibilities included the site mobilization.excavation, Excavation, substructure works, compacting, and concrete patching Plant, erection of bins. Also was responsible for material
  • 2. Procurement and handing over to the main contractor. (E.P.T) Aug.1988-Aug.1989: MEGICON. Project Manager (Grain Silos of Edfu) Responsibilities included the site mobilization, Excavation, substructure works, compacting, and Concrete patching Plant, erection of bins. Also Was Responsible for material procurement and handing over to The main contractor. (E.P.T) Aug.1989-Sep.1990: MEGICON. Senior Engineer. (Suez Thermal power Station) Responsible for Construction of the Turbine house, a fair faced Concrete building 14 meters&a12 meters high steel structure frame. The concrete basement supports a 2-m thick. Reinforced concrete Slab to carry the Turbine unit. The house includes a control room And Maintenance room. All fair faced concrete. Responsibility included coordinating pipe works and erection with Aalborg Boilers as a main contractor Sep.1990-Oct.1991: ARAB INTERNATIONAL COMPANY Senior Engineer-(New Esna Barrages) Arab International Company as a main contractor. Responsible for Navigation locks Formwork, steel Reinforcement, casting of concrete, finishing and erection All embedded parts. Oct.1991-Mar.1992: MEGICON Megicon Office. Mar. 1992-Dec.1992: MEGICON. Construction Manager (Dokki Electrical Sub Station 66/11 KV Responsible for all construction works of the Sub-Station from the Excavation up to the handing over including all finishing. Etc. Main contractor Merlin gerin. (French company). Jan.1993-Mar.1994: MEGICON: Project Manager-(Private vela in al –Ahram Street). Responsible for construction of the Main building, The swimming pool, service building and the surrounding fence Including all finishing works and piping works for swimming pool Apr.1994-Dec.1994: MEGICON. Project Manager in (Quality control Laboratory.) Responsibilities included the site mobilization.rebar, concrete patch Plant. All finishing. Works, erection of center air condition system, All The piping and fire system works.
  • 3. Main Contractor (VALIO TECHNICAL ENG) Finland Company Jan.1995-Oct.1995: MEGICON Project Manager in Hot Strip Mill Modemization. Main Contractor (Cegelect Company) (French Company) The Owner. (Egyptian for Iron and Steel Company) Responsibilities included construction works for the main building And Ventilation plants, Hydraulic room and Control rooms. Nov.1995-Apr.1997: MEGICON. Construction Manager in EL –Kurimat thermal power stations 2X600 M W. Main Contractor :( Daelim Industrial CO.Ltd.) (Korean Company) Consultant :( Ebasco Company American) Responsibilities included construction of the Transformer, Foundation, boiler feed pump and Turbine building in addition to the Finishing works for the control building. May1997-Oct.1997: MEGICON General Construction Manager in (FLOAT GLASS PLANT) Main Contractor :( INGLEN ITALIAN COMPANY) . Consultant (ACE-MOT-MACDONALD) (BRITISH COMPANY) Responsibilities included construction works for the Raw material Area, batch house, crushing plant, Dolomite hopper area, belt Conveyors, sand hopper area, and Mixer structure foundation, the Industrial flooring, and all embedded parts. Nov1997-Feb1999: MEGICON. Project Manager (Canary beatch villa) (investment villa) In Sues (Ain Al Soukna) Responsible for Construction of the Building Swimming pool, Finishing works, Land scap, Roads. Mar1999-Aug2000: MHDA. Construction Manager (Sina Cement Company) (Asic and Aresco Company) as a main contractor. Responsible for construction of the C.F.Silo (80m height), Kiln Piers, Breheater, Conveyors, Water Tank, Tunnel, Main Substation And all Foundation for Cement Equipment, and all embedded parts. Sep2000-Oct2002: MHDA. Project Manager (WEST ZONE ARMY)
  • 4. Construction of R.C Shed and Sport Halls in S ALOM City. Nov2002-Jan2004: MHDA. Mhda Office. Feb2004-Dec2005: SHAMI AL HASNI. Project Manager (Girl school in King Saudi Arabian) Construction of Main Building, Finishing work, Land scap, Roads. Ape 2006-Mar 2007: DETAC Site Manager (Al Sharqia Company) 6of October (Work Shoppe 13)(55000000)LE Construction of Main Building.Finshing work Ape 2007-Dec 2007: DETAC. Project manager (AL ZEINA TISSUE COMPANY) Construction of main paper mill building. Reel Building.PulpBuilding Water Tank. Transformer and Electric Building.Boiller Building Hand over for all work to Erection Company (37000000) LE Jan. 2008-Oct.2009;DETAC Project manager (Complete production Store) 6 of October. (152000000)LE.Responsible for construction of main Building. Finishing work. Electric work. Fire alarm System. Duct work. And hand over for all work to Erection Company. Oct 2009-Sep 2010: DETAC Project Manager (Chamber of Commerce Administrative Building) Construction of Main Building, Finishing work, Electric work, Pluming work, Fire work, Duct work, Land scab work Nov 2010-Oct 2013:DETAC Project Manager(Raya Plaza Building)(Raya Smart Building) Construction of main Building(pre stresses slab) Finshing work.Electric work.Duct work.Fire alarm System And hand over for all work to raya company NOV 2013-NOW :DETAC PROJECT MANAGER(Sokhna Projects - Hanging GardensThe project consists of establishing, executing, and handing over of The contract of the project which contains 6 items:-
  • 5.  Concrete Skeleton for Platform 4 ( 150 villas )  Arch. Finishes work for Platform 2-3-4 ( 450 villas )  Electrical works for Platform 2-3-4 ( 450 villas )  Plumping works for Platform 2-3-4 (450 villas )  Infrastructure works for Platform 2-3-4  Hard Scape works for Platform 2-3-4 Owner : Amer Group Project Manager : Contractor : DETAC Dar for trading and construction
  • 6.  Concrete Skeleton for Platform 4 ( 150 villas )  Arch. Finishes work for Platform 2-3-4 ( 450 villas )  Electrical works for Platform 2-3-4 ( 450 villas )  Plumping works for Platform 2-3-4 (450 villas )  Infrastructure works for Platform 2-3-4  Hard Scape works for Platform 2-3-4 Owner : Amer Group Project Manager : Contractor : DETAC Dar for trading and construction