Sameer Rasmi AL-Khoury is a Jordanian surveyor born in 1959 with over 30 years of experience. He has worked on numerous infrastructure projects in Jordan, Oman, Qatar, and the UAE, specializing in roads, bridges, airports, dams, sewage systems, and water networks. He is proficient in AutoCAD, surveying software, and Microsoft Office. Currently he works as the survey section head on the Mahaje R/A interchange and Saiwan farha station projects in Oman.
Intertech Science Park Master Plan overviewKim Mitchell
PowerPoint presentation overview of the Intertech Science Park Master Plan, Shreveport Louisiana, prepared for the Biomedical Research Foundation of Northwest Louisiana (BRF)
This presentation is a visual demonstration of my
experience.
It contains photographs of some of the exciting projects
I have had the privilege of being involved in and details
of some of the employers I have had the pleasure to
work for.
Intertech Science Park Master Plan overviewKim Mitchell
PowerPoint presentation overview of the Intertech Science Park Master Plan, Shreveport Louisiana, prepared for the Biomedical Research Foundation of Northwest Louisiana (BRF)
This presentation is a visual demonstration of my
experience.
It contains photographs of some of the exciting projects
I have had the privilege of being involved in and details
of some of the employers I have had the pleasure to
work for.
• To look for a position in a reputable organization where I can contribute and add value utilizing my acquired skills. As a student at the Yarmouk University I was taught to plan, perform, and develop projects in a way agreed with international and local companies.
1. Study, review (as Consultant) or prepare (as Contractor) Shop Drawings according to Design.
2. Coordination and prepare Composite drawing for all activities.
3. Follow up the construction (as Consultant) or construct (as Contractor) the Surveying works for all activities.
4. Quantities survey for excavations & backfilling by computer programs.
Autodesk Land Desktop program
AutoCAD AutoCAD Civil3D
TERRAMODEL Surfer program
Microsoft windows Microsoft Office
1. NAME: Sameer Rasmi AL-Khoury
BORN: 1959, Zarka (tel 0096898125921)
NATIONALITY: Jordanian
MARITAL STATUS: Married
LANGUAGES: Arabic, English
EDUCATION:Special SM Eng. . Surveying / Beirut .
Software Packages: AutoCAD,Soft disk 8, Surfer 8, Lieca LGO, Autodesk Land
Desktop 2006,AutoCAD Civil 3D 2010 Imperial, Microsoft Office, Bentely In-
Roads.
PROFRSSIONAL EXPERIENCE:-
AUG.08- UP TO DATE with CCC-TAV-JV – OMAN/Survey Section Head (Band 9,
Badge no. 52100):
Working on construction of mahaje R/A interchange project (CMI).
1.Road & Brigdes.
Working on saiwan farha station project (SFS).
1.Block 3 & 4 Development project (phase II)-Oman.
2. Ductile pipes (Dia 16", 10") length 125 km
3.Farha+Saiwan+Alem Stations+Roads+Foundation+Culvert+Signbored+ building
works.
Working on Development of Muscat International Airport Project (DMIA): Data
Preparation, Cross-scetion/Profiles Drafting, Forecasts/Budgets Preparation, Progress
Volumes calculations
1.Runway+Taxiway+AirField.
2.Road & Brigdes.
Working on daj project.
1.Road & Brigdes.
July.06- Aug. 08 with GALEB ABU JRAS COMPANE &CO Jordan/ Survey Section
Head:
Working on Amman to almwager Roads Network + Box culvert
Dec.05 – July.06: with UNIVERSAL SURVEY OFFICE:
Studying ,Design and Drawing Projects.
1. queen alia int. airport.
2. king hussen int.airport.
3. Development of Community Infrastructure for Martyr Azmi AL-Mufti Camp.
4. king faisal air base
sept.03- Dec.05 with GALEB ABU JRAS COMPANE &CO Jordan/ Survey Section
Head:
Working on sahab Updating Roads Network + Storm water.
Mar. 02 – sept.03:With Dar al-Handasah Consultants (Shair & Partners), Jordan
/ Shief Surveyor
Working on Pavement Repair and Protective Overlay for Ras El-Naqab Aqaba Back Road
Junction Highway project.
The work consists of the repair of existing defective road areas, aggregate base course,
binder and wearing courses and the construction of the S.B.S. modified asphalt
protective overlay.Duties including the supervision of all survey works.
Working on Harad Sa’ada Road Project.
Oct. 01 – Jan. 02: With Jordan Mechanical Construction Establishment / Shief
1
2. Surveyor
Working on Development of Community Infrastructure for Martyr Azmi AL-Mufti Camp.
New roads, foot baths, sewerage, storm water, electrical network, telephone network,
retaining wall, water network, H.C + DIP network.
Feb.01 – Sep.t 01: With (L&H) Leameyer & Hamza international Inc. (ACE)
Associated Consulting Engineers, Amman – Jordan / Surveyor and Consultant
Working on Mujib DAM Project, Jordan + new roads.
Aug. 00 – Feb. 01: With Ali AL-Zabi CONTRA ETING Co. / Surveyor
Working on Wadi Mousa Updating Roads Network + Storm water.
March 99 - July00:With (ASCO) AL-Beer AL-Suroje Contracting Co.
Studying and surveying sewage networks and house connection of AL-Nayma
city.
June 98 – Jan.99: With (CDM) Camp Dresser & McKee international Inc.(ACE)
Associated Consulting Engineers – Amman.
* Surveyor and Consultant at Wade Mousa Water Supply and Wastewater Project.
* Water terminal reservoirs .* Supporting pumping station .*Ductile pipes.*Opening
new roads for station with box culverts.
* Constructing a galvanized network. *Reconstructing and restoring (asphalt + tiles
and concrete).
Sept.97 – April 98:With ITAL CONSULT - QATAR BRANCH / Surveyor & Site
Inspector Consultant
* Working on International Roads Network Project.
Jan. 96 – Aug.97:With HADDAD ENGINEERING & CONTRACTING CO NETWORK
SURVEYOR
* Mafrag city water supplies network.
* Studying and implementing the whole project.
* Constructing a polyethylene network .*Constructing ductile pipes.*Constructing a
galvanized network.*Reconstructing and
restoring (asphalt + tiles and concrete).
May 95 – Jan.96:With INTERKNELAS SPANISH CO./IORDAN UNIVERSITY
SCIENCE & TECHNOLOGY. BUILDING SURVEYOR
Execution of king Abduallah Hospital Project and this involved , gas station, car
parking , sewage, water pipes, power line, sidewalks,water terminal reservoir,
helicopter airfield.
Feb.93 – Feb.95:With HUSSEIN ABU TA,A CONTRACTING CO. network SURVYOR
Water supply networks of Irbid & Ramtha. Work involved: -
* lrbid City : studying and implementing the project including:
* Works of polyethylene and its networks on the main lines .*Laying ductile
pipes .*Building a galvanized network .*Restoring
(asphalt + tiles and concrete).
Oct.92 - March93:With JOINED ISSAM SIIUQUM CO. SURVEYOR, FOREMAN
* Preparing precasts (group foreman) .
Jan. 89 – Sept.92:With ADNAN SAFFARINI - ENGINEER OFFICE/UNITED ARAB
EMIRATES / SURVEYOR & FOREMAN
* Implementing building works, infrastructure, sewage, water, rainwater channels.
Nov.87 – Dec.88:With JOINED HABIB ASSOCIATES CONSULTING CO./SURVEYOR
2
3. & FOREMAN
* Zarka city sewage projects.*Studying and implementing all pipes of various Dias.
Oct.86 – Oct.87:With ENGINEER HASAN JARADAT CONTRACTING OFFICE /
SURVEYOR & SEWAGE FOREMAN
* Various works + house connections of lrbid city.
Aug.85 – Oct. 86:With JORDANIAN ENGINEER CONSULTANT / SURVEYOR &
FOREMAN
* Qusmeh city sewage project ( Dia 6"+ 8" ) .
Nov.84 – June 85:With M.R.M. ENGINEERING CONSULTANTS CO. STUDIES /
SURVEYOR
* Studying and surveying sewage networks and house Connections of irbid
city.
Aug. 82 – Nov. 84:With STANLEY FOR ENGINEERING DESIGNS AND
CONSULTATIONS /SURVEYOR & FOREMAN
* Consultant at Wadi AL - Arab Dam Project. Work involved
* Ductile pipes (Dia 16", 32") length 35 km.
* Network of power towers from Irbid to Wadi AL – Arab (99 towers).
* Supporting pumping stations at Makhraba, Sama & Tayba.
* Water terminal reservoir at Irbid and Zabda Farkowh .
* Opening new roads for stations with box culverts .
* Refinery station at Wadi AL - Arab.
COURSES:
* 26/10/1996 - 25/12/1996: A course of English Language - Level 1 &
2 , At Al- Bayt University.
NOTES :
* I received a productivity competence certificate from Refco for Insurance
Company.
3