Gomaa Khamis osman Abd elwahab is seeking a position as a piping supervisor. He has over 20 years of experience in piping construction, fabrication, and erection across various industries. His qualifications include excellent drafting skills, team leadership, and the ability to work under pressure and adapt to new environments.
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
1 c.v gomaa khamis osman
1. Personal Information
Personal Characlteristics
OBJECTIVE
Qualifications
Gomaa Khamis osman Abd elwahabGomaa Khamis osman Abd elwahab
I am seeking a job as " piping Supervisor " and handling
aposition wherein I can explore all my acquired knowledge
up to the optimum Level .
Nationality : Egyptian – " AL Buhayrah – kafar El dawar "
Religion : Muslim
Marital Status : Married
Date Of Birth : 31/ january / 1969
Military Service : Completed
Language Skills : 1- Arabic Language : Mother Tongue
Language Skills : 2- English Language : Good Command Reading & Writing
and speaking
PHONE No. : 002 - 01212002830 ( EGYPT )
: 002 - 01129029066 ( EGYPT )
EMAIL : gomaa.ccc2010@gmail.com
“ industrial diploma “ “Technical High School”
“1990 “
• (Twenty years of experience in the field of piping through which different
departments in different companies enrich my knowledge and helped me to gain
more proficiency and Excellency in doing my job.
• Excellent draft with invitation for tenders or bids.
• Teamwork spirit - Leadership – work under pressure – ability to deal with work
problems.
• Open to widen the scope of knowledge
• Ready to travel if necessary.
• Can easily adapt new companionship, associated and communicate with other
nationality.
• Training and developing the capabilities of new members in the team to become
more proficient and effective in assigned task.
Page 1 : 5
1
2. Work Experience
• Planning, Supervision and Monitoring of the various activities in piping construction
as Erection, Fit-up and Fabrication on site ,as per piping Isometric Drawing, Plant
Drawing and Piping Instrument Drawing (P&ID).
• Working with small bore for utility station pipe lines utility water, nitrogen, steam of
high pressure and low pressure, utility air pipe lines) and large bore pipe for high
pressure DGA lines, Acid hydrocarbon lines (AH), Steam condensate lines (60 psi),
Steam lines (600 psi), Relief lines (RL) of different material as carbon steel, Stainless
steel, Low temperature carbon steel (LTCS), Copper Nickel pipes of different size and
schedule.
• Controlling the material in the site received from Main store and from fabrication shop
as piping spools, pipe supports, fittings, valves, and Bolts and gaskets, giving colure
code for the easy identification and line number on spools and prepare the
requirement list materials which needed & ensure materials as per drawing and
specification.
• Monitoring and Reporting Daily Progress Report (fit up, erection, fabrication of spools
and pipe support) and report to site engineer.
• Following the construction activities as per standards of main client and clearing QC
comments and punch items.
• Construction up to Commissioning including activities such as: Hydro testing,
Reinstatement, Flushing and Air drying.
• Monitoring the safety on the site and organizing weekly tool box meting to follow the
safety orientation.
• Check if the latest revisions of construction drawings are used and prepare As Built
Drawing if required.
• Erection and alignment of static equipments.
• Assign manpower for installation work and training the new members.
..>….klllll
1- From january 2015 untiL july 2015
Working For KharaFi National Company
Project : New Booster Station – BS 171 ( Shutdown )
Location : Kuwait
Position : PiPing Supervisor Page 2 : 5
2
3. 2- From September 2013 untiL january 2015
Working For EPECO petroleum Services - " PETROJET " Company
Project : Ethydco Ethylene project
Location : Alexandria - Egypt
Position : piping Supervisor
3- From January 2013 until August 2013
Working For ACCURate ElectromechanicaL projects.W.L.L
project : Qatar petroleum – “ QP “ – Dukhan city
Location : Qatar
position : piping Supervisor
4 - From july 2011 until August 2012
Working For DSD – FERROMETALCO Company
Project : ABU QiR power plant 2 x 650 MW
Location : Alexandira - Egypt
Position : piping Foreman
5 - From March 2009 until may 2011
Working For Energya Engineering Company
project : Factory Suez steel company
Location : Suiez - Egypt
position : piping Foreman
6 - From july 2007 until january 2009
Working For Consolidated Contractors Company . C.C.C
project : khursaniya Gas plant . KGP . Project
Main contractor . Bechtel /Technip Joint Venture
( B.T.J. V )
Location : Kingdom of Saudia arabia
position : Site piping Foreman
7 - From August 2006 until April 2007
Working For EMSA ITLian Engineering company
project : HeLwan Fertilizer project
Location : HeLwan – Egypt
position : piping Foreman
3
4. Page 3 : 5
8- From February 2006 until july 2006
Working For Arabi Enertech company
project : EL-WAFRA Gas plant project ( shutdown)
Loction : Kuwait
position : piping Foreman
9 - From October 2005 until February 2006
Working For EL-Asaad steel bar Factory
project : construction EL-Asaad steel bar Factory
Location : Sudan
position : piping Foreman
10 - From April 2005 until September 2005
Working For LEDA Contracting LTD Company
project : Qatar petroleum ( Shutdwon )
Loction : Qatar
position : piping Foreman
11 - From May 2004 until March 2005
Working For Bonatti italian Company
project : L.N.G Mallitah Gas plant
Location : Libya
position : piping Foreman
12- From June 2003 until March 2004
Working For Dodsal PTE LTD – Indian Company
project : E.L.N.G Damietta Gas Plant
Location : New Damietta – Egypt
position : piping Foreman
13- From August 2002 until April 2003
Working For DSD - FERROMETALCO Company
project : work shop
Location : Gisr EL- Suez – cairo - Egypt
Position : pipe Fabricator
14- From March 2001 until July 2002
Working For TECHINT CIMIONTUBI Company
project : Maximization of Gas oil
Location : Al exandria – Egypt
Position : pipe Fabricator
4
5. Page 4 : 5
15- From April 2000 until December 2000
Working For DAELIM INDUSTRIAL Company
project : MIDDLE OIL REFINERY ( MIDOR ) project
Location : Alexandria - Egypt
Position : pipe Fabricator
16- From july 1996 until September 1999
Working For EZACO Engineering Company
project : National iron and Steel Company
Location : Alexandria - Egypt
position : pipe Fitter
17- From january 1995 until june 1996
Working For EMSA ITLian Engineering Company
project : Amoc Petroleum
Location : Alexandira - Egypt
position : pipe Fitter
18- From May 1993 until December 1994
Working For PETROJET – Engineering Company
project : Petrochmicals
Location : Aexandria - Egypt
position : pipe Fitter
PERVIOUS EXPERIENCE :
" piping Supervisor " in the field of Hevay Fabrication , Erection , expertise in
project oil & gas Refinery , Petrochemicals , Power plant , steel industries ,
Cement plant , Fertilizer plant , Desalination plant , water treatment plant ,
Metro project , Food and medicine industries , Fire Fighting , pipelines oil & gas .
" With many Company Like "
5