Hassan Elesayed Elemam is a civil engineer from Egypt with over 15 years of experience in construction project management in Egypt and Saudi Arabia. He holds a B.Sc. in Civil Engineering and is PMP certified. Currently he works as a project manager for Gulf Construction Company in Dammam, Saudi Arabia, overseeing the AlSalplaza and Dispensary of Ministry of Helth projects. He has extensive experience supervising and managing the implementation of various infrastructure, residential, commercial and government building projects throughout his career.
1. HASSAN ELESAYED ELEMAM – Civil Engineer- PMP CERTIFIED
DMMAM – KSA with transferable resident permit
Mobile: +201125462354 / +966568989634
helemam77@gmail.com
PROFILE
A Skilled Civil Engineer with strong practical background in Construction and all Finishing works.
An extensive knowledge of several civil Software, strong proactive attitude to work along with team
works.
EDUCATION AND PROFESSIONAL QUALIFICATIONS
B. Sc., Civil Engineering, Ain Shams University, Egypt 2001.
Member of the Egyptian Syndicate of Engineers.
Member of the Saudi Council of Engineers.
Pmp certified
EXPERIENCE / EMPLOYMENT HISTORY
PROJECT MANAGER, MARCH 2014 – UNTIL NOW
GULF CONSTRUCTION COMPANY
Assigned to ALSALPLAZA project in DAMMAM (SAUDI ARABIA)
Assigned to DISPENSARY OFMINISTRY OF HELTH Project in DAMMAM (SAUDI ARABIA)
TECHNICAL SUPPORT ENGINEER, JULY 2011 – OCTOBER 2013
ALMUHAID (CONSULTING ENGINEERS) - KSA
Assigned to project technical support to municipalities the central region of Saudi Arabia
SUPERVISE THE IMPLEMENTATION OF THE FOLLOWING PROJECTS:
1. Projects ward off the dangers of flooding and storm water drainage project number 2 contains
phrases and phrases tubular box- and phrases discharge Seoul Dolly walls and reinforced concrete
cladding.
2. Construction of a garage and municipal depots and has armed and Medat the foundations and
columns necks and origin of the metal workshops, warehouse and office building.
3. Roads Projects (asphalt pavements and lighting area municipalities) 2 Projects.
4. Sports arena project (2 projects).
5. Project to develop the old neighborhoods.
6. Municipal Services Offices Project Tumair (2 projects).
AS WELL AS STUDY PROJECTS:
1. Project ward off the dangers of flooding (2 projects).
2. The popular market Pettmar project.
3. Public park project.
4. Municipal Services Offices Project Tumair.
SENIOR SITE ENGINEER DECEMBER, 2008 - MAY 2011
INDUSTRIAL CONSTRUCTION &ENGINEERING COMPANY (SIAC) - EGYPT
SITE MANAGER (melting furnace and pour molds pallet) 2nd line of the factory Suez Steel Company.
The site is reinforced concrete heat resistance have been implemented business until the delivery of the project
through the guidance of team w ork and direct phases of construction and estimating quantities of materials, equipment
and labor required for the construction phases, as well as to monitor progress The completion of the project according to
the schedule of the project and the preparation of reports and delivery business consultant and the owner .
SITE MANAGER Villas the Cairo Festival City
The project in New Cairo integrated project as a residential villas of varying sizes have been implemented business
through team w ork and delivery of civil and architectural works (finishes)
2. HASSAN ELESAYED ELEMAM – Civil Engineer- PMP CERTIFIED
DMMAM – KSA with transferable resident permit
Mobile: +201125462354 / +966568989634
helemam77@gmail.com
PROJECTS MANAGER, FEBRUARY 2006 – NOVEMBER 2008
NEVADA CO. FOR CONSTRUCTION & TRADING - EGYPT
Execution of several government projects start of drilling projects and even delivered to the
consultant and the owner was delivered all construction works and architectural finishes through
cooperation with the team and project a statement as follows:
1. Construction of the SSI building in Damietta and the building is a 6 floor and has to RFT armed
based on piles armed 32 - meter - long project was handed over to the consultant and the owner
2. Police Task Force project in Hamoul Kafr El-Sheikh and the building consists of 4 floors were handed
over the project to the consultant and the owner.
3. The construction of a police station Motobas Kafr El-Sheikh and the building consists of 4 floors and
has a building extension of the ash project was handed over to the consultant and the owner.
4. Building a central prison Mitt Slsell Dakahlia Governorate The building consists of two floors has 4
wards prisoners and office building and a yard for exercise and wards prisoners a wall armed thickness
of 25 cm and the whole building has foundations is to Bashh armed based on piles armed length of
32 m was handed over the project to the consultant and the owner.
SITE ENGINEER, MAY 2003 – JANUARY 2006
NEVADA CO. FOR CONSTRUCTION & TRADING - EGYPT
1. Police Hospital in Alexandria Project is a comprehensive project (civil works and finishes) and the
building component of the armed Piling 4 floors the project was delivered through cooperation with
the team in the implementation of civil works as well as finishes and delivered to the consultant and
the owner.
2. Kotama Police Office, the building consists of two floors and has a supplement to the ash project was
handed over to the consultant and the owner.
3. Renovation and restoration project Edco police station in Beheira project was handed over to the
consultant and the owner.
CONSULTANT OFFICE EN GINEER, SEPTEMBER 2001 - APRIL 2003
DR. / MOHAMED TAHA CONSULTANT OFFICE - EGYPT
Supervise the implementation the 22 building consisting of basement, ground floor and 11
recurring role of the project was delivered through the supervision of the implementation of the
civil works and the preparation of reports to the owner .
LANGUAGES AND COMPUTER SKILLS
Arabic: Native language
English: good
AutoCAD (2D)
WORD, EXECL, POWERPOINT.
Primavera p6
Sap 2000
PERSONAL DATA
Date of Birth: 3/12/1977
Nationality: Egyptian
Marital Status: Married.
Driving license: Saudi & Egyptian