1. WASEEM A. KHAN, PG, RG
Phone: 480.206.1246 Email: waseemkhan85268@gmail.com
RELEVANT EXPERIENCE
RELEVANT EXPERIENCE
Plains All American Pipeline, L.P. Red River Pipeline Project Oklahoma and Texas –
Designated Project Manager for facilities development for this 358 mile long 16-inch crude pipeline
between Cushing, Oklahoma and Longview, Texas. Responsible for project management,
coordination and oversight of all engineering and design activities associated with tie-ins /
interconnects at origination, termination and two intermediate pumping stations (Hewitt, Oklahoma
and Sherman, Texas) with breakout storage facility (two 150k barrel tanks; Hewitt, Oklahoma).
Responsibilities include budget tracking, schedule tracking, project coordination and oversight,
project meetings and project reporting.
Oxy Midstream Strategic Development, LLC – Levelland Pipeline Project, Levelland, Texas -
Designated Project Manager for this pipeline replacement project. The scope of work includes but
not limited to project management and coordination, budget control, schedule development and
updates, weekly construction progress reports preparation and overall technical and administrative
oversight.
DCP Midstream – Antelope Hills NGL Pipeline Project – Texas and Oklahoma - Designated
Project Manager for this new pipeline project. The scope of work included but not limited to project
management and coordination, budget control, schedule development and updates, project permitting,
weekly survey progress reports preparation and overall technical and administrative oversight.
DCP Midstream – WTS Low Pressure Crude Pipeline Project – Texas - Designated Project
Manager for this new pipeline project. The scope of work included but not limited to project
management and coordination, budget control, schedule development and updates, project permitting,
weekly survey progress reports preparation, acquisition plats and road crossing permit drawings
preparation oversight and overall technical and administrative management.
TransCanada Pipelines – 2013 ECDA Digs Program – Mid Continent; Louisiana and
Mississippi - Designated Project Manager for this compliance verification pipeline digs project at 12
project locations in Louisiana and Mississippi. Responsibilities include, project planning,
coordination and management activities and technical and administrative oversight.
DCP Midstream – Southern Hills Pipeline Project – Providing individual Task Management and
Assistant Project Management duties as directed. Responsibilities include but not limited to weekly
project status reporting to DCP and other project related activities.
Spectra Energy – Armaugh, Entriken and Delmont Compressor Stations, Pennsylvania –
Assisted with Procurement Services including but not limited to weekly Action Item list updates,
Material Tracking Sheet and Material Tracker updates. Assisted Procurement Manager in data
compilation and reporting. Attended weekly Procurement Tracking conference calls.
Dimension Energy – South Louisiana Methanol – Assisted with procurement budgetary project
cost estimating for this Front End Engineering Design study project. The scope of work included
evaluating the feasibility of engineering and constructing a new Transmission Pipeline from existing
methanol plant to a new Storage Facility and Truck and Rail Loading Terminal, and a Barge Jetty
designed to facilitate methanol export.