SlideShare a Scribd company logo
1 of 2
Download to read offline
Haywood N. Highberg
1880 Egret Bay Blvd. Apt. 108, Houston, TX 77058 • 713-503-9957• highberghn@gmail.com
SUMMARY
- Associates of Science Degree Mathematical Science.
- 20+ yrs. Experience as a Planner/Scheduler on IMS/IPMP structured projects within EVMS Programs.
- Proficient with Open Plan Professional, Cobra, MS Project, Milestones Professional and Primavera
applications.
- Held Top Secret Security Clearance with the Department of Defense (DOD).
- Current Secret Security Clearance with the Department of Defense (DOD).
- Integrated Schedule Specialist. Commercial Crew Transportation System (CCTS) Program. Houston Texas.
- Sr. Scheduling Analyst. The National Team, Ballistic Missile Defense System (BMDS) Program. Washington DC.
- Supplier Management Schedule Analyst. KC-46 New Gen Tanker Program. BCA, Everett. WA.
- Integrated Scheduling Specialist. Ground Based Missile Defense (GMD) Contract. Huntsville, Alabama.
- Integrated Scheduler. International Space Station (ISS) Contract, NASA, Johnson Space Center, Houston, TX
WORK EXPERIENCE
The Boeing Company (2001- to Present)
Commercial Crew Transportation System (CCTS) Program, Houston, Texas
• Developed and maintained schedules, working within a Work Breakdown Structure (WBS), Statement of Work (SOW), and Work
Package project system.
• Supported the Integrated Project Teams: Subsystems, Mission Operations and Crew & Mission Systems. Worked with Teams to
create, develop and maintain the schedules within an Integrated Master Schedule.
• Developed and coordinated data for complex integrated schedules, and resource plans.
• Developed and maintained integrated Cost and Schedule information and networks using Earned-Value Management criteria and
automated tools. Coordinated and consolidated source data into management information presentations.
• Performed analysis to forecast schedule impacts and corrective measures. Participated in Green Rooms, Rolling Wave and
Change Management exercises.
• Analyzed the weekly schedule to provide cost and performance status feedback to the Project Manager and project participants
NASA Docking Systems Program, Houston, Texas
• Developed and maintained schedules IMS/IPMP Schedules within an EVMS.
• Performed analysis to forecast schedule impacts and corrective measures. Responsible for analyzing the weekly schedule to
provide cost and performance status feedback to the Project Manager and project participants
• Participated in Green Rooms, Rolling Wave and Change Management exercises.
New Gen Tanker KC-46 Program. Everett, Washington.
• Developed and maintained supplier and Boeing Integrated Product Team schedules with networked logical relationships.
• Prepared Schedule and other data to meet EV metrics and support audits with DCMA, IBR’s and other reviews
• Interfaced with internal and external industry and government representatives. Supported team leaders. Developed and adapted
integrated planning and scheduling techniques and process improvements.
• Traveled to and met with Supplier Counterparts to access and further develop supplier side scheduling.
The National Team, Ballistic Missile Defense Systems Program, Washington DC.
• Developed and maintained Integrated Product Team schedules with networked logical relationships for Boeing’s Integrated
Defenses Systems (IDS) Division. Maintained Earned Value resource loaded time phased schedules on a DOD contract.
• Developed project schedules based upon interaction with, and inputs from, the project teams. Developed, integrated, and analyzed
and presented data to support unit, program, division, projects, or processes.
• Developed reports that calculated and analyzed BCWS, BCWP, ACWP, CPI, SPI, CV, SV and TCPI, as well as other EV health
indicators. Prepared Schedule and other data to meet EV metrics and support audits with DCMA, IBR’s and other reviews.
• Interfaced with internal and external industry and government representatives. Supported team leaders. Developed and adapted
Integrated Planning and Scheduling techniques and process improvements.
Ground Based Missile Defense (GMD), Ground Based Mid-Course Program. HSV.
• Developed and maintained schedules for the GMD Interceptor team, working within a WBS, SOW and Work Package project
system. Responsible for development of project schedule(s) based upon interaction with and inputs from the project teams.
• Performed analysis to forecast schedule impacts and corrective measures. Responsible for analyzing the weekly schedule to
provide cost and performance status feedback to the Project Manager and project participants
• Maintained DCMA, DOD, EV and ISO requirements.
• Created Cost Schedule Technical Review packages reporting Budget analysis (EAC), Performance to Operating Plan, BCWS etc.
International Space Station (ISS) Program. Houston, Texas.
• Developed and maintained schedules for the Boeing Houston, Space and Communications, International Space Station; working
within a WBS, SOW and Work Package project system. Responsible for development of project schedule(s) based upon
interaction with and inputs from the project teams.
• Performed analysis to forecast schedule impacts and corrective measures. Responsible for analyzing the weekly schedule to
provide cost and performance status feedback to the Project Manager and project participants
Petro Chemical Industry (1994-2001)
Harmony Construction, Houston, Texas.
• Developed piping and I&E schedules.
• Performed schedule analysis to forecast impacts and managed resources to ensure that the projects would be completed on time.
• Instrument Fitter 3 yrs. installed piping and tubing, instruments and control valves. QA/QC numerical Analysis 3yrs.
Brown and Root, (KBR), Houston, Texas.
• Performed analysis to forecast schedule impacts and corrective measures. Responsible for analyzing the weekly schedule to
provide cost and performance status feedback to the Project Manager and project participants
Bechtel Construction, Houston, Texas.
• Performed analysis to forecast schedule impacts and corrective measures. Responsible for analyzing the weekly schedule to
provide cost and performance status feedback to the Project Manager and project participants
Flour Daniels, Houston, Texas.
• Journeyman Instrument fitter. Exxon Plant project, Baytown, TX.
United States Marine Corps (1980-86)
Combat Infantry Rifleman
Good Conduct Medal.
Overseas Deployment Service Ribbon.
Honorable Discharge.
Education
• Associates of Science Degree in Mathematical Science San Jacinto College.2004.
• Completed courses in the PMBOK towards PM certification through Villanova University.
• References available upon request.

More Related Content

What's hot

Resume - Suzanne Pearce
Resume - Suzanne PearceResume - Suzanne Pearce
Resume - Suzanne Pearce
Suzanne Pearce
 
Lecture 8 monitoring & controlling (1)
Lecture 8  monitoring & controlling (1)Lecture 8  monitoring & controlling (1)
Lecture 8 monitoring & controlling (1)
Nur Azwin
 
Modul 2 proses agregasi dan peramlan i
Modul 2 proses agregasi dan peramlan iModul 2 proses agregasi dan peramlan i
Modul 2 proses agregasi dan peramlan i
Amalia Syafitri
 
CS4 - Project planning
CS4 - Project planningCS4 - Project planning
CS4 - Project planning
Jesse Estoque
 
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJCOST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
Tapesh Ajmera
 

What's hot (18)

Project schedule- What, How, Tools & Techniques
Project schedule- What, How, Tools & TechniquesProject schedule- What, How, Tools & Techniques
Project schedule- What, How, Tools & Techniques
 
PMBoK V5 changes
PMBoK V5 changesPMBoK V5 changes
PMBoK V5 changes
 
Wade Murphy
Wade MurphyWade Murphy
Wade Murphy
 
PEG M&E Tool
PEG M&E ToolPEG M&E Tool
PEG M&E Tool
 
Resume - Suzanne Pearce
Resume - Suzanne PearceResume - Suzanne Pearce
Resume - Suzanne Pearce
 
Resume
ResumeResume
Resume
 
David Fitzsimmons Resume
David Fitzsimmons ResumeDavid Fitzsimmons Resume
David Fitzsimmons Resume
 
Project control & Monitoring
Project control & MonitoringProject control & Monitoring
Project control & Monitoring
 
CE Partners meeting Nrb enos_Swahili version
CE Partners meeting Nrb enos_Swahili versionCE Partners meeting Nrb enos_Swahili version
CE Partners meeting Nrb enos_Swahili version
 
Lecture 8 monitoring & controlling (1)
Lecture 8  monitoring & controlling (1)Lecture 8  monitoring & controlling (1)
Lecture 8 monitoring & controlling (1)
 
Modul 2 proses agregasi dan peramlan i
Modul 2 proses agregasi dan peramlan iModul 2 proses agregasi dan peramlan i
Modul 2 proses agregasi dan peramlan i
 
CS4 - Project planning
CS4 - Project planningCS4 - Project planning
CS4 - Project planning
 
Risk management plan tyre recycling plant
Risk management plan  tyre recycling plantRisk management plan  tyre recycling plant
Risk management plan tyre recycling plant
 
Vignesh Nagarajan CV
Vignesh Nagarajan CVVignesh Nagarajan CV
Vignesh Nagarajan CV
 
3.3 metrics of effective adaptation
3.3 metrics of effective adaptation 3.3 metrics of effective adaptation
3.3 metrics of effective adaptation
 
Brian Nicholls resume 2016-08-11
Brian Nicholls resume   2016-08-11Brian Nicholls resume   2016-08-11
Brian Nicholls resume 2016-08-11
 
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJCOST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
 
Edg resume 06.2016
Edg resume 06.2016Edg resume 06.2016
Edg resume 06.2016
 

Similar to Res Highberg HN 030816

Resume_McColgin_Quentin_Master_Scheduling
Resume_McColgin_Quentin_Master_SchedulingResume_McColgin_Quentin_Master_Scheduling
Resume_McColgin_Quentin_Master_Scheduling
Quentin McColgin
 
jamesdahlbergturnaroundcoordinator
jamesdahlbergturnaroundcoordinatorjamesdahlbergturnaroundcoordinator
jamesdahlbergturnaroundcoordinator
James Dahlberg
 
Matthew J Rockey Resume
Matthew J Rockey ResumeMatthew J Rockey Resume
Matthew J Rockey Resume
Matthew Rockey
 
Christian B Wunsch - Resume V2.1 Linked In
Christian B Wunsch - Resume V2.1 Linked InChristian B Wunsch - Resume V2.1 Linked In
Christian B Wunsch - Resume V2.1 Linked In
Christian Wunsch
 
Andrew Stephens Resume 7.29.16
Andrew Stephens Resume 7.29.16Andrew Stephens Resume 7.29.16
Andrew Stephens Resume 7.29.16
Andrew. Stephens
 
Julio Rodriguez Resume_Occupancy_linkedin
Julio Rodriguez Resume_Occupancy_linkedinJulio Rodriguez Resume_Occupancy_linkedin
Julio Rodriguez Resume_Occupancy_linkedin
Julio Rodriguez
 
Lakshmi_Reddy_Resume
Lakshmi_Reddy_ResumeLakshmi_Reddy_Resume
Lakshmi_Reddy_Resume
Lakshmi Reddy
 
T. Story resume 2016
T. Story resume 2016T. Story resume 2016
T. Story resume 2016
Terrell Story
 
Resume - Nermeen Atef sam
Resume - Nermeen Atef samResume - Nermeen Atef sam
Resume - Nermeen Atef sam
Nermeen gerges
 

Similar to Res Highberg HN 030816 (20)

Resume_McColgin_Quentin_Master_Scheduling
Resume_McColgin_Quentin_Master_SchedulingResume_McColgin_Quentin_Master_Scheduling
Resume_McColgin_Quentin_Master_Scheduling
 
jamesdahlbergturnaroundcoordinator
jamesdahlbergturnaroundcoordinatorjamesdahlbergturnaroundcoordinator
jamesdahlbergturnaroundcoordinator
 
RINAL_PATEL
RINAL_PATELRINAL_PATEL
RINAL_PATEL
 
B Nicholls resume 2016-07-17
B Nicholls resume   2016-07-17B Nicholls resume   2016-07-17
B Nicholls resume 2016-07-17
 
Matthew J Rockey Resume
Matthew J Rockey ResumeMatthew J Rockey Resume
Matthew J Rockey Resume
 
Mike Goodlander Resume
Mike Goodlander ResumeMike Goodlander Resume
Mike Goodlander Resume
 
Edg resume 06.2016
Edg resume 06.2016Edg resume 06.2016
Edg resume 06.2016
 
EDG Resume 06.2016
EDG Resume 06.2016EDG Resume 06.2016
EDG Resume 06.2016
 
Mac Buzanowski Resume
Mac Buzanowski ResumeMac Buzanowski Resume
Mac Buzanowski Resume
 
project monitoring and evaluation
 project monitoring and evaluation project monitoring and evaluation
project monitoring and evaluation
 
Christian B Wunsch - Resume V2.1 Linked In
Christian B Wunsch - Resume V2.1 Linked InChristian B Wunsch - Resume V2.1 Linked In
Christian B Wunsch - Resume V2.1 Linked In
 
Andrew Stephens Resume 7.29.16
Andrew Stephens Resume 7.29.16Andrew Stephens Resume 7.29.16
Andrew Stephens Resume 7.29.16
 
Julio Rodriguez Resume_Occupancy_linkedin
Julio Rodriguez Resume_Occupancy_linkedinJulio Rodriguez Resume_Occupancy_linkedin
Julio Rodriguez Resume_Occupancy_linkedin
 
Lakshmi_Reddy_Resume
Lakshmi_Reddy_ResumeLakshmi_Reddy_Resume
Lakshmi_Reddy_Resume
 
Jon fontenot 0120
Jon fontenot 0120Jon fontenot 0120
Jon fontenot 0120
 
T. Story resume 2016
T. Story resume 2016T. Story resume 2016
T. Story resume 2016
 
Resume - Nermeen Atef sam
Resume - Nermeen Atef samResume - Nermeen Atef sam
Resume - Nermeen Atef sam
 
Ast geo 2016 c
Ast geo 2016 cAst geo 2016 c
Ast geo 2016 c
 
Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...
Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...
Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...
 
Cost Management PMBOK
Cost Management PMBOKCost Management PMBOK
Cost Management PMBOK
 

Res Highberg HN 030816

  • 1. Haywood N. Highberg 1880 Egret Bay Blvd. Apt. 108, Houston, TX 77058 • 713-503-9957• highberghn@gmail.com SUMMARY - Associates of Science Degree Mathematical Science. - 20+ yrs. Experience as a Planner/Scheduler on IMS/IPMP structured projects within EVMS Programs. - Proficient with Open Plan Professional, Cobra, MS Project, Milestones Professional and Primavera applications. - Held Top Secret Security Clearance with the Department of Defense (DOD). - Current Secret Security Clearance with the Department of Defense (DOD). - Integrated Schedule Specialist. Commercial Crew Transportation System (CCTS) Program. Houston Texas. - Sr. Scheduling Analyst. The National Team, Ballistic Missile Defense System (BMDS) Program. Washington DC. - Supplier Management Schedule Analyst. KC-46 New Gen Tanker Program. BCA, Everett. WA. - Integrated Scheduling Specialist. Ground Based Missile Defense (GMD) Contract. Huntsville, Alabama. - Integrated Scheduler. International Space Station (ISS) Contract, NASA, Johnson Space Center, Houston, TX WORK EXPERIENCE The Boeing Company (2001- to Present) Commercial Crew Transportation System (CCTS) Program, Houston, Texas • Developed and maintained schedules, working within a Work Breakdown Structure (WBS), Statement of Work (SOW), and Work Package project system. • Supported the Integrated Project Teams: Subsystems, Mission Operations and Crew & Mission Systems. Worked with Teams to create, develop and maintain the schedules within an Integrated Master Schedule. • Developed and coordinated data for complex integrated schedules, and resource plans. • Developed and maintained integrated Cost and Schedule information and networks using Earned-Value Management criteria and automated tools. Coordinated and consolidated source data into management information presentations. • Performed analysis to forecast schedule impacts and corrective measures. Participated in Green Rooms, Rolling Wave and Change Management exercises. • Analyzed the weekly schedule to provide cost and performance status feedback to the Project Manager and project participants NASA Docking Systems Program, Houston, Texas • Developed and maintained schedules IMS/IPMP Schedules within an EVMS. • Performed analysis to forecast schedule impacts and corrective measures. Responsible for analyzing the weekly schedule to provide cost and performance status feedback to the Project Manager and project participants • Participated in Green Rooms, Rolling Wave and Change Management exercises. New Gen Tanker KC-46 Program. Everett, Washington. • Developed and maintained supplier and Boeing Integrated Product Team schedules with networked logical relationships. • Prepared Schedule and other data to meet EV metrics and support audits with DCMA, IBR’s and other reviews • Interfaced with internal and external industry and government representatives. Supported team leaders. Developed and adapted integrated planning and scheduling techniques and process improvements. • Traveled to and met with Supplier Counterparts to access and further develop supplier side scheduling. The National Team, Ballistic Missile Defense Systems Program, Washington DC. • Developed and maintained Integrated Product Team schedules with networked logical relationships for Boeing’s Integrated Defenses Systems (IDS) Division. Maintained Earned Value resource loaded time phased schedules on a DOD contract. • Developed project schedules based upon interaction with, and inputs from, the project teams. Developed, integrated, and analyzed and presented data to support unit, program, division, projects, or processes. • Developed reports that calculated and analyzed BCWS, BCWP, ACWP, CPI, SPI, CV, SV and TCPI, as well as other EV health indicators. Prepared Schedule and other data to meet EV metrics and support audits with DCMA, IBR’s and other reviews.
  • 2. • Interfaced with internal and external industry and government representatives. Supported team leaders. Developed and adapted Integrated Planning and Scheduling techniques and process improvements. Ground Based Missile Defense (GMD), Ground Based Mid-Course Program. HSV. • Developed and maintained schedules for the GMD Interceptor team, working within a WBS, SOW and Work Package project system. Responsible for development of project schedule(s) based upon interaction with and inputs from the project teams. • Performed analysis to forecast schedule impacts and corrective measures. Responsible for analyzing the weekly schedule to provide cost and performance status feedback to the Project Manager and project participants • Maintained DCMA, DOD, EV and ISO requirements. • Created Cost Schedule Technical Review packages reporting Budget analysis (EAC), Performance to Operating Plan, BCWS etc. International Space Station (ISS) Program. Houston, Texas. • Developed and maintained schedules for the Boeing Houston, Space and Communications, International Space Station; working within a WBS, SOW and Work Package project system. Responsible for development of project schedule(s) based upon interaction with and inputs from the project teams. • Performed analysis to forecast schedule impacts and corrective measures. Responsible for analyzing the weekly schedule to provide cost and performance status feedback to the Project Manager and project participants Petro Chemical Industry (1994-2001) Harmony Construction, Houston, Texas. • Developed piping and I&E schedules. • Performed schedule analysis to forecast impacts and managed resources to ensure that the projects would be completed on time. • Instrument Fitter 3 yrs. installed piping and tubing, instruments and control valves. QA/QC numerical Analysis 3yrs. Brown and Root, (KBR), Houston, Texas. • Performed analysis to forecast schedule impacts and corrective measures. Responsible for analyzing the weekly schedule to provide cost and performance status feedback to the Project Manager and project participants Bechtel Construction, Houston, Texas. • Performed analysis to forecast schedule impacts and corrective measures. Responsible for analyzing the weekly schedule to provide cost and performance status feedback to the Project Manager and project participants Flour Daniels, Houston, Texas. • Journeyman Instrument fitter. Exxon Plant project, Baytown, TX. United States Marine Corps (1980-86) Combat Infantry Rifleman Good Conduct Medal. Overseas Deployment Service Ribbon. Honorable Discharge. Education • Associates of Science Degree in Mathematical Science San Jacinto College.2004. • Completed courses in the PMBOK towards PM certification through Villanova University. • References available upon request.