we are giving only idea for making water channel for poor less un economical area for different counties where people need water for drinking we present presentation in univsty CIIT
4. PROJECT INTIATION WHYWE NEED THIS PROJECT ?
1. The oldWater supply scheme had water supply ratio up to 56% and
that was not enough.
2. The existing system was planned to improve so that it could cover
water supply ratio up to 92% .
3. According to the draft final report of the project the target year was
2015 with total target capacity of 357lit/sec comprised of 196lit/sec by
surface water and 161lit/sec by ground water resources.
AREA REQUIRED , PIPES , BORING MACHINES & MOTORS
TEAM IS SELECTED ON BASIS OFTHEIR CAPABIIITY
5. • SURVEYING
THERE IS EXCESS NEED OFTHIS PROJECT FORTHAT PLACE.
1. Selection of the particular study areaThe ATD water supply
scheme covers the vast area so area under ATDTMA is selected
for research purpose.
2. Determination of the required information After the selection of
the particular area, the required information has been
determined (projected population, water demand etc.)
3. Data CollectionThe information such as existing population,
growth rate, water demand, supply hours, piping network,
elevation of hydraulic structures has been collected for the
selected area of the project
6. PROJECT CONTEXT
PROJECT GOAL
(to facilitate people with pure water for drinking and irrigation )
STAKE HOLDERS
Wassca ,over team, and the people who get advantage
BOUDARIES
All of the waters reaching the
.
solution of border sanitation and other border water quality problems.
preservation of the area name as the international boundary
FEASIBILE OR NOT
7. INPUTS FORTHE PROJECT
PROJECT DESCRIPTION
1. SPECIFICATIONS OF OVER ALL PROJECT
2. BUDGET FROM WHICH SOURCE
Waseca is the main source of over project
3. DESIGN
4. COST OF PIPES
8. Basic data for 2015 (AbbottabadTMA)
Existing tanks 08
Total pipe length 1010854ft
Total houses served 7935
Total population served 53720
Total demand (GPM) 1273.24
Total demand 3183.2
Material of pipe Steel pipe 10 years old - 33.80 km - - C=120
Note:The information shown are truly based on available data and distribution pipe
line network map
11. • STRATEGIC LEVEL
1. DESIGN FOR SERVING
2. SERVES GOODWITH LOW COST
3. VISITING DIFFERENT AREAS OF ROOM FOR
THE PROJECT
4. IF NOT SUCCESSFULTHANWHATTO DO ?
13. • HISTORICAL INFORMATION
1. DEPARTMENT IS GOOD IN CLEARANCE OF
BIILS OR NOT
2. RESPONSETOTHE PREVIOUS PROJECT
3. DEFEND THE PROJECT IF FAILS OR NOT
15. COMPARISONOF ENVIRONMENT
WHETHERTHE PLACE IS GOOD FORTHE
PROJECT OR NOT
CONTRIBUTIONTOTHE SOCIETY
PROJECT IS OF ASWATER SCHEMEWHETER IT
IS BENEFITINGTHE SOCIETYOR NOT
16. OUTPUT OF PROJECT INTIATION
PROJECT CHARTER
PMAND KEY STAFF IDENTIFICATION
ASSUMPTIONS
0
20000
40000
60000
80000
100000
120000
140000
2009 2015 2018 2020
Growth rate
papulation by nadra visitor per month student from other areas
18. DEVICING AND DESIGNING
SCHEME
As per research study objectives, the assessment of this water supply scheme would also be done by EPANET.
EPANET is an American freeware software that models the Hydraulic and Water Quality Behavior of Water
Distribution Piping Systems.
This research study will stick to the distribution piping system as per defined objectives.
Working through EPANET
Scanning of Distribution pipe network sheets
Converting of scanned images to BMP files
Using .bmp files as a backdrop image in EPANET
Scaling of backdrop image
Drawing objects on map using drawing tools
Assigning values to objects as per available data
Analyzing pipe network and understanding the results
21. Units used in map
> Consider the highlighted part of the map which contains
theT-17 as a tank
> T17-01,T17(01-02),T17(01-03),T17(03-04),T17(04-05),T >
17(04-06),T17(03-07),T17(07-08) andT17(07-09) pipes
> J1, J2, J3, J4, J5, J6, J7, J8 and J9 as junctions.
The arrows show the direction of flow
23. IMPLEMENTATION PROCEDURE
AS PROJECTION DESCRIPTION IS GIVEN IMPLEMENTATION
PROCEDUREWILL BE ACCORDINGTO IT
PROJECT STRUCTURE
SUPERVISIONAND MONITORING
24. RULESTO FOLLOW
EVERY PROJECT HAS ITS OWNWORK
STANDARDSARE DEFINED
FOLLOWTHE STANDARDANDAVOIDTAKING RISKS.
SHOULD NOT BE DAMAGINGANY PERSONS LANDS ROAD ETC.
BENCHMARKS FORTHE PROJECT
TIME FRAME
QUALITY
25. OUT PUTS FORTHE PROJECT PLANNING
TEAM CONTRACTS
ACCORDINGTOTHEIR POST OR DESGINATIONSCONTRACTSARE SET UP
SCOPE
TIME (TIME FRAMETO PROJECT)
COST ( PROJECT BUDGET )
RESOURCES
26. PROJECT SCHEDULE
As per research study objectives, the assessment
of this water supply scheme would also be done by
EPANET.
EPANET is anAmerican freeware software that
models the Hydraulic andWater Quality Behavior
ofWater Distribution Piping Systems.
This research study will stick to the distribution
piping system as per defined objectives.
WBS
WORK IS DIVIDEDACCORDINGTOTHE
EFFICIENCY OF FOCAL PERSON
28. 1. PARAMETERS FORTHE PROJECT
PMWILL LOOK AFTER
BUDGET
TIME FRAME
QUALITY MATERIALS
DUTIES , RISKS
DUITIES ASSOCIATED
Rule for construction
29. COLLECTING DATA AND REPORTING
DATA FOR SAMPLE OF WATER
DATA FOR SITEVISITING
DATA FOR BORING OF WATER
CHECKINGOUTTHE DEPTH
DATA FOR MARKETING
COST OF PIPES ,TANKS , AGGREGATES , CEMENT
COMMUNICATION AND REPORTING
PM WILL BETHERE ON UPPER LEVEL FOR COLLECTING DATA AND REPORTING ITTO
FUTHER STAKE HOLDERS.
Water sampleSoil sample
30. Risk Management Plan
Risk Probability Impact Owner Mitigation Plan
Budget cuts may
reduce staff, affecting
project scope and
schedule
Medium High
Project
Manager
31. Success Factors
Identify elements that are key to the success of the project, such as:
Satisfied clients or stakeholders
Met project objectives
Completed within budget
Delivered on time
32. Quality Management and Performance Measures
Define quality management plans
How will you monitor and control costs?
How will you monitor and control schedule?
33. EFFECTIVE CO-ORDINATION
MEMBERS SHOUD BE PROACTIVE
SELFISHNESS SHOULD NOT BETHERE
EVERYTHINGTHAT COMES 1ST ISTO BE COMPLETED FIRST
SENERGIZATION
SHARPENYOUR SAW
35. REALIZINGOUR PLAN
DESIGN
SCHEME
LAND SELECTION
DUTIESASSIGNED
FINANCE
TIME FRMAE
36. INPUTS FOR PROJECT EXECUTION
PROJECT PLANNING DOCUMENT
RELATED DOCUMENT
TMA ,WASSCA ,CONTONMENT BOARD
INSITUTIONAL RAGULATION
PROJECT PAPERWILL BE MADEACCORDINGTOTHE DEPARTMENT OFWASSCA
ROOM FORCHANGE
BUDGET
PLAN
37. RECOMMENDATION
SWARMING EFFECT
WORKING EFFECIENTLY IN STARTING
INFORMATION SHARING
EVERY INFORMATION IS SHAREDTHROUGH OUT
STARTING OF PROJECT ISVERY IMPORTANT
REPORTING
39. OUR PROJECT IS PLANNEDTO FOR NORMALCLOSING IF IT IS COMPLTEDON
GIVENTIME FRAME
OUR PROJECT CANNOT BE SETAS PREMATUREDWHETHER ILWILL FAIL ORWILL
BE SUCCESSFUL
ITWILL FAIL IF IS NOT PROPERLY EXECUTED PLANNEDAND COMPLETEDONTIME
40. FOR NORMAL CLOSING
AUDIT
AUDITTEAMEWILL EXAMINE PROJECT as
HOW PROJECTWAS MANAGED ?
HOW PROJECT HASTAKEN HIS BUDGET ?
SATISFYINGTHEIR REQUIREMENTS ?
CONTRIBUTINGTOWARDTHE PURPOSEOR NOT ?
THEWILL BE DECIDEDWHETER IT IS SUCCESSFULOR NOT ?
41. AUDIT LIFECYCLE
AUDIT INTIATION
PURPOSE
OBJECTIVE
PLANNING
SELECTIONOF DATAACCORDINGTO PLAN
PREMILINARYANALYSIS
RECORDS
DEGREE OF COMPLETION