SlideShare a Scribd company logo
1 of 22
5-1
Chapter 5
New Product
Development
5-2
Key Concepts
• The Design Process
» The Investigation or Concept Formation Phase
» The Development Phase
» The Production Phase
» Value Engineering Vis-à-vis Value Analysis
• Engineering Change Management
• How to Expand Supply Management's
Contributions
» Design or Project Teams
» Materials Engineers
» Co-location
• Buyers Supply Management Professionals Who
Interface Successfully with Engineers
5-3
Overview
• Four Key Issues
» Early supply management and supplier
involvement
» Design and development process of new
products
» Approaches to increasing supply
management’s role in the new product
development process
» Description of supply management
professionals who interface successfully with
engineers
5-4
The Design Process
• The Investigation or Concept Formation
Phase
• The Development Phase
• The Production Phase
• Value Engineering Vis-à-vis Value
Analysis
5-5
Investigation Phase
• Defining the New Product
• Statement of Objectives
• Key Technology
• Development of Alternatives
» Suitability
» Produceaibility
» Component availability
» Customer acceptability
Figure 5-1,
Upper Half
Define new product
Set objectives: price, cost, performance,
market availability, quality, & reliability
Develop alternative conceptual solutions
Study make-or-
buy implicationsOutsource
Consider
Outsourcing
Is a key technology
involved?
Yes
No
No
Yes
5-6
Investigation Phase Continued
• Development of
Alternatives
» Make-or-Buy and
Outsourcing
Analysis
» Select
Components,
Technologies, and
Supplies
» Stress Testing and
Failure Analysis
Select components, technology, and
suppliers for most attractive
alternative concepts
Stress analysis
Failure analysis
Meet
objectives?
To development phase
Yes
No
Decision is to
make the product
Reconsider
Outsourcing
Figure 5-1,
Lower Half
5-7
Questions to Ask Prior to Inviting a Supplier into
the Design Process
• Will the supplier be able to meet our cost, quality,
and product performance requirements?
• Does the supplier possess the required
engineering capability?
• Will the supplier be able to meet our development
and production needs?
• Does it have the necessary physical process and
quality capabilities required?
• Does the supplier have both the resources and
the reputation of being able to overcome
problems and obstacles as they arise?
5-8
Questions to Ask Prior to Inviting a Supplier into
the Design Process
• Is the supplier financially viable?
• Are the supplier's short and long term
business objectives compatible with
ours?
• If a long term relationship appears
desirable, are the technology plans of the
two firms compatible?
• If a long term relationship appears
desirable, is it likely that we can build a
trusting relationship?
5-9
The Development Phase
• Prototypes
• Design Reviews
• Qualification Testing
» margin tests
» life tests
• Failure Analysis
• Meet Objectives?
• Value Engineering
Design and build prototype
Design review
Qualification testing
Failure analysis
To Value
engineering
Potential
downstream
design
changes
Meet
objectives?
Meet
technological
objectives?
No
Yes
No
Yes
Figure 5-2,
Upper Half
5-10
The Development Phase
• Design Analysis
• The Value
Engineering
Checklist
• Viability Qualification
testing
Value engineer
Design
changes
To production phase
Yes
After
technological
objectives
have been
met?
Financial
review
No Cancel or
Redesign
Yes
Figure 5-2,
Lower Half
5-11
Value Engineering
• Value engineering is a systematic study of
every element of cost in a material, item of
equipment, service or construction project
to ensure that every element of cost fulfills
a necessary function and at the lowest
possible total cost
• Value engineering is focused on the
design stage
5-12
What is Value?
• Value can be defined as the lowest end cost at
which the function can be accomplished at the
time and place and with the quality required
• Some items/services/processes which cost less
than a similar item/service/process may
accomplish the function in a superior or equal
manner
• Value cannot be determined exclusively by an
examination of the item/service/process being
evaluated
• The value of any service, material, or product is
established by the minimum cost of the other
alternatives that will perform the same function
5-13
Generalized Procedure for VA/VE
Information Phase
Analysis Phase
Decision Phase
Speculation Phase
Evaluation Phase
What is it?
What does it do?
What does it cost?
How else can the job be
done?
At what cost?
Is the change better?
How much better?
Why?
Review with depts and
suppliers
Select best alternative
Get approval
Prepare specificationsAudit effectiveness
Use experience
Provide feedback
Figure 5-3, Adapted
5-14
Analysis of Each Component
• Can any part be eliminated without impairing the
operation of the complete unit?
• Can the design of the part be simplified to reduce
its basic cost?
• Can the design of the part be changed to permit
the use of simplified or less costly production
methods?
• Can less expensive but equally satisfactory
materials be used in the part?
• Design simplifications frequently are more
apparent than is possible under the original
design
5-15
The Value Engineering Checklist
1. Can the item be eliminated?
2. If the item is not standard, can a standard item
be used?
3. If it is a standard item, does it completely fit the
application, or is it a misfit?
4. Does the item have greater capacity than
required?
5. Can the weight be reduced?
6. Is there a similar item in inventory that could be
substituted?
7. Are closer tolerances specified than are
necessary?
5-16
The Value Engineering Checklist
8. Is unnecessary machining performed on the
item?
9. Are unnecessarily fine finishes specified?
10. Is "commercial quality" specified?
11. Can you make the item less expensively in your
plant? If you are making it now, can you buy it
for less?
12. Is the item properly classified for shipping
purposes to obtain lowest transportation rates?
13. Can cost of packaging be reduced?
14. Are suppliers contributing suggestions to
reduce cost?
5-17
The Production Phase
• Manufacturing and
Production Plans
• Knowledge
Transfer
• Process Control
• In-Process and
Final Testing
» adjust or calibrate
the performance
» eliminate defects
before much value
is added to the
product
Finalize and implement manufacturing
and supply plans
Knowledge transfer
Process control
In-process testing
To Final Test
Figure5-4,
Upper Half
5-18
Production Phase Continued
Failure analysis
Purchased
components?
Supplier fault
Yes
Meet
objectives?
Equipment or
procedures?
Yes
Final test
Ship
Return
to Dev.
No
Yes
No
Revise
Manuf.
Plan
Figure 5-4,
Lower Half
5-19
Engineering Change Management
• Material control involvement:
» provide input on the purchased materials
implications of a proposed change,
» discuss the timing of proposed changes in
order to minimize costs associated with
unusable incoming materials,
» to be aware of forthcoming changes so that
appropriate action can be taken with affected
suppliers.
5-20
How to Expand Supply Management’s
Contributions
• Design or Project Teams
• Materials Engineers
» materials engineering and
» supply management activities of sourcing,
pricing, and negotiating
• Co-Location (Harley-Davidson)
» Faster to market,
» reduced total cost,
» improved quality
5-21
Supply Management Professionals Who Interface
Successfully with Engineers
• Early Supply Management Involvement is part of the
culture and policy of the firm
» Formerly called Early Purchasing Involvement (EPI)
» Often requires policy development from upper management to
ensure initial involvement
• Engineers view Supply Management involvement as an
asset, not a nuisance
» Supply Managers must acquire skills and knowledge
» Learn how to read engineering drawings
» Learn technical terms
» Meet with supplier’s sales personnel to review technical
information about products
» Visit suppliers
5-22
Concluding Remarks
• The design stage provides the greatest
opportunity to reduce costs the life cycle
costs of products
• Supply management and the firm's
suppliers have major contributions to
make during this process
• Analysis of adding value is not limited to a
firm’s services and products, supply
managers themselves must add value to
the design process in order to become a
viable and lasting member of the design
team

More Related Content

What's hot

Cost of-poor-quality - juran institute
Cost of-poor-quality - juran instituteCost of-poor-quality - juran institute
Cost of-poor-quality - juran instituteManish Chaurasia
 
Product design and development
Product design and developmentProduct design and development
Product design and developmentVishal Kachhdiya
 
House of quality matrix
House of quality matrixHouse of quality matrix
House of quality matrixRohit K.
 
Quality control in construction
Quality control in construction Quality control in construction
Quality control in construction Thanigaivel Asokan
 
Factors affecting quality
Factors affecting qualityFactors affecting quality
Factors affecting qualityRaziya Hameed
 
Types of production system (production and operation management)
Types of production system (production and operation management)Types of production system (production and operation management)
Types of production system (production and operation management)Yamini Kahaliya
 
Quality Management In Construction
Quality Management In ConstructionQuality Management In Construction
Quality Management In ConstructionIsidro Sid Calayag
 
Organization Quality Culture Development by STAC
Organization Quality Culture Development by STACOrganization Quality Culture Development by STAC
Organization Quality Culture Development by STACSwapnil Karale
 
Product and service design
Product and service designProduct and service design
Product and service designGrace Falcis
 
Reduction of cost in construction
Reduction of cost in constructionReduction of cost in construction
Reduction of cost in constructionSaravana murthy
 
10.resources measurement and its utilization
10.resources measurement and its utilization10.resources measurement and its utilization
10.resources measurement and its utilizationSelva Prakash
 
The Advantages Of Operations Management By Jason LeDay
The Advantages Of Operations Management By Jason LeDayThe Advantages Of Operations Management By Jason LeDay
The Advantages Of Operations Management By Jason LeDayJason LeDay
 
Om quality dimensions process
Om quality dimensions processOm quality dimensions process
Om quality dimensions processKarthik Yadav
 
Quality definition
Quality  definitionQuality  definition
Quality definitionMohit Singla
 

What's hot (20)

Cost of-poor-quality - juran institute
Cost of-poor-quality - juran instituteCost of-poor-quality - juran institute
Cost of-poor-quality - juran institute
 
Product design and development
Product design and developmentProduct design and development
Product design and development
 
House of quality matrix
House of quality matrixHouse of quality matrix
House of quality matrix
 
Quality control in construction
Quality control in construction Quality control in construction
Quality control in construction
 
Factors affecting quality
Factors affecting qualityFactors affecting quality
Factors affecting quality
 
Benchmarking
BenchmarkingBenchmarking
Benchmarking
 
Types of production system (production and operation management)
Types of production system (production and operation management)Types of production system (production and operation management)
Types of production system (production and operation management)
 
Quality Management In Construction
Quality Management In ConstructionQuality Management In Construction
Quality Management In Construction
 
Organization Quality Culture Development by STAC
Organization Quality Culture Development by STACOrganization Quality Culture Development by STAC
Organization Quality Culture Development by STAC
 
Project cost management
Project cost management Project cost management
Project cost management
 
Product and service design
Product and service designProduct and service design
Product and service design
 
Part 1 - Water Supply in Buildings.pdf
Part 1 - Water Supply in Buildings.pdfPart 1 - Water Supply in Buildings.pdf
Part 1 - Water Supply in Buildings.pdf
 
Reduction of cost in construction
Reduction of cost in constructionReduction of cost in construction
Reduction of cost in construction
 
10.resources measurement and its utilization
10.resources measurement and its utilization10.resources measurement and its utilization
10.resources measurement and its utilization
 
Operations management
Operations managementOperations management
Operations management
 
The Advantages Of Operations Management By Jason LeDay
The Advantages Of Operations Management By Jason LeDayThe Advantages Of Operations Management By Jason LeDay
The Advantages Of Operations Management By Jason LeDay
 
Value engineering
Value engineeringValue engineering
Value engineering
 
Om quality dimensions process
Om quality dimensions processOm quality dimensions process
Om quality dimensions process
 
Project Planning and Development
Project Planning and DevelopmentProject Planning and Development
Project Planning and Development
 
Quality definition
Quality  definitionQuality  definition
Quality definition
 

Similar to Chapter 5 New Product Development

VA-VE Presentation.pptx
VA-VE Presentation.pptxVA-VE Presentation.pptx
VA-VE Presentation.pptxDevenJally1
 
Value engineering _2_
Value engineering _2_Value engineering _2_
Value engineering _2_Swetlina .
 
Value Engineering and Value Analysis.pptx
Value Engineering and Value Analysis.pptxValue Engineering and Value Analysis.pptx
Value Engineering and Value Analysis.pptxvirshit
 
Designing Product for the Customer,House of quality matrix and design for man...
Designing Product for the Customer,House of quality matrix and design for man...Designing Product for the Customer,House of quality matrix and design for man...
Designing Product for the Customer,House of quality matrix and design for man...Rohit K.
 
3.2 Managing Engineering Design.ppt
3.2 Managing Engineering Design.ppt3.2 Managing Engineering Design.ppt
3.2 Managing Engineering Design.pptKrishnaGupta191
 
Computer Integrated Manufacturing, Concurrent Engineering, Sequential Enginee...
Computer Integrated Manufacturing, Concurrent Engineering, Sequential Enginee...Computer Integrated Manufacturing, Concurrent Engineering, Sequential Enginee...
Computer Integrated Manufacturing, Concurrent Engineering, Sequential Enginee...SUNDHARAVADIVELR1
 
Product innovation & process innovation
Product innovation & process innovationProduct innovation & process innovation
Product innovation & process innovationVijayKrKhurana
 
Value analysis -2
Value analysis -2Value analysis -2
Value analysis -2Nitin Jain
 
572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...
572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...
572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...ssuser149600
 
Stevenson9e Ch04
Stevenson9e Ch04Stevenson9e Ch04
Stevenson9e Ch04ajithsrc
 
Sdec10 lean package implementation
Sdec10 lean package implementationSdec10 lean package implementation
Sdec10 lean package implementationTerry Bunio
 
OM CHAPTER lecture notes - Introduction,
OM CHAPTER lecture notes - Introduction,OM CHAPTER lecture notes - Introduction,
OM CHAPTER lecture notes - Introduction,HakamSinghDiwakar2
 

Similar to Chapter 5 New Product Development (20)

VA-VE Presentation.pptx
VA-VE Presentation.pptxVA-VE Presentation.pptx
VA-VE Presentation.pptx
 
Value engineering _2_
Value engineering _2_Value engineering _2_
Value engineering _2_
 
Value Engineering and Value Analysis.pptx
Value Engineering and Value Analysis.pptxValue Engineering and Value Analysis.pptx
Value Engineering and Value Analysis.pptx
 
Benchmarking (1)
Benchmarking (1)Benchmarking (1)
Benchmarking (1)
 
Designing Product for the Customer,House of quality matrix and design for man...
Designing Product for the Customer,House of quality matrix and design for man...Designing Product for the Customer,House of quality matrix and design for man...
Designing Product for the Customer,House of quality matrix and design for man...
 
3.2 Managing Engineering Design.ppt
3.2 Managing Engineering Design.ppt3.2 Managing Engineering Design.ppt
3.2 Managing Engineering Design.ppt
 
Leading a Lean Implementation
Leading a Lean ImplementationLeading a Lean Implementation
Leading a Lean Implementation
 
Computer Integrated Manufacturing, Concurrent Engineering, Sequential Enginee...
Computer Integrated Manufacturing, Concurrent Engineering, Sequential Enginee...Computer Integrated Manufacturing, Concurrent Engineering, Sequential Enginee...
Computer Integrated Manufacturing, Concurrent Engineering, Sequential Enginee...
 
Lean Design Sample
Lean Design SampleLean Design Sample
Lean Design Sample
 
Lean_Design_sample
Lean_Design_sampleLean_Design_sample
Lean_Design_sample
 
Product innovation & process innovation
Product innovation & process innovationProduct innovation & process innovation
Product innovation & process innovation
 
Value analysis
Value analysisValue analysis
Value analysis
 
Value analysis
Value analysisValue analysis
Value analysis
 
Value analysis -2
Value analysis -2Value analysis -2
Value analysis -2
 
572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...
572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...
572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...
 
Stevenson9e Ch04
Stevenson9e Ch04Stevenson9e Ch04
Stevenson9e Ch04
 
chap 3-1.PPT
chap 3-1.PPTchap 3-1.PPT
chap 3-1.PPT
 
unit 4.ppt
unit 4.pptunit 4.ppt
unit 4.ppt
 
Sdec10 lean package implementation
Sdec10 lean package implementationSdec10 lean package implementation
Sdec10 lean package implementation
 
OM CHAPTER lecture notes - Introduction,
OM CHAPTER lecture notes - Introduction,OM CHAPTER lecture notes - Introduction,
OM CHAPTER lecture notes - Introduction,
 

More from Tran Thang

Chapter 21 Demand Management and Logistics
Chapter 21  Demand Management and LogisticsChapter 21  Demand Management and Logistics
Chapter 21 Demand Management and LogisticsTran Thang
 
Chapter 20 Production and Inventory Control
Chapter 20 Production and Inventory ControlChapter 20 Production and Inventory Control
Chapter 20 Production and Inventory ControlTran Thang
 
Chapter 19 Ethics and Social Responsibilities
Chapter 19 Ethics and Social ResponsibilitiesChapter 19 Ethics and Social Responsibilities
Chapter 19 Ethics and Social ResponsibilitiesTran Thang
 
Chapter 18 Contract and Relationship Management
Chapter 18 Contract and Relationship ManagementChapter 18 Contract and Relationship Management
Chapter 18 Contract and Relationship ManagementTran Thang
 
Chapter 17 Contract Formation and Legal Issues
Chapter 17  Contract Formation and Legal IssuesChapter 17  Contract Formation and Legal Issues
Chapter 17 Contract Formation and Legal IssuesTran Thang
 
Chapter 16 Negotiation
Chapter 16 NegotiationChapter 16 Negotiation
Chapter 16 NegotiationTran Thang
 
Chapter 15 Methods of Compensation
Chapter 15 Methods of CompensationChapter 15 Methods of Compensation
Chapter 15 Methods of CompensationTran Thang
 
Chapter 14 Price and Cost Analysis
Chapter 14 Price and Cost AnalysisChapter 14 Price and Cost Analysis
Chapter 14 Price and Cost AnalysisTran Thang
 
Chapter 13 Total Cost of Ownership
Chapter 13 Total Cost of OwnershipChapter 13 Total Cost of Ownership
Chapter 13 Total Cost of OwnershipTran Thang
 
Chapter 11 Sourcing
Chapter 11 SourcingChapter 11 Sourcing
Chapter 11 SourcingTran Thang
 
Chapter 10 Outsourcing
Chapter 10 OutsourcingChapter 10 Outsourcing
Chapter 10 OutsourcingTran Thang
 
Chapter 9 Purchasing Services
Chapter 9 Purchasing ServicesChapter 9 Purchasing Services
Chapter 9 Purchasing ServicesTran Thang
 
Chapter 8 The Procurement of Equipment
Chapter 8 The Procurement of EquipmentChapter 8 The Procurement of Equipment
Chapter 8 The Procurement of EquipmentTran Thang
 
Chapter 6 Purchasing Descriptions and Specifications
Chapter 6 Purchasing Descriptions and SpecificationsChapter 6 Purchasing Descriptions and Specifications
Chapter 6 Purchasing Descriptions and SpecificationsTran Thang
 
Chapter 4 A Portfolio of Relationships
Chapter 4 A Portfolio of RelationshipsChapter 4 A Portfolio of Relationships
Chapter 4 A Portfolio of RelationshipsTran Thang
 
Chapter 3 Supply Management: An Organization Spanning Activity
Chapter 3 Supply Management:  An Organization Spanning ActivityChapter 3 Supply Management:  An Organization Spanning Activity
Chapter 3 Supply Management: An Organization Spanning ActivityTran Thang
 
Chapter 2 Organizational Issues
Chapter 2 Organizational IssuesChapter 2 Organizational Issues
Chapter 2 Organizational IssuesTran Thang
 
Chapter 1 The Progression to Professional Supply Management
Chapter 1 The Progression to Professional Supply ManagementChapter 1 The Progression to Professional Supply Management
Chapter 1 The Progression to Professional Supply ManagementTran Thang
 
A management thinking to solving material outsourcing problems
A management thinking to solving material outsourcing problemsA management thinking to solving material outsourcing problems
A management thinking to solving material outsourcing problemsTran Thang
 
Research report the driver of supply management capability
Research report the driver of supply management capability Research report the driver of supply management capability
Research report the driver of supply management capability Tran Thang
 

More from Tran Thang (20)

Chapter 21 Demand Management and Logistics
Chapter 21  Demand Management and LogisticsChapter 21  Demand Management and Logistics
Chapter 21 Demand Management and Logistics
 
Chapter 20 Production and Inventory Control
Chapter 20 Production and Inventory ControlChapter 20 Production and Inventory Control
Chapter 20 Production and Inventory Control
 
Chapter 19 Ethics and Social Responsibilities
Chapter 19 Ethics and Social ResponsibilitiesChapter 19 Ethics and Social Responsibilities
Chapter 19 Ethics and Social Responsibilities
 
Chapter 18 Contract and Relationship Management
Chapter 18 Contract and Relationship ManagementChapter 18 Contract and Relationship Management
Chapter 18 Contract and Relationship Management
 
Chapter 17 Contract Formation and Legal Issues
Chapter 17  Contract Formation and Legal IssuesChapter 17  Contract Formation and Legal Issues
Chapter 17 Contract Formation and Legal Issues
 
Chapter 16 Negotiation
Chapter 16 NegotiationChapter 16 Negotiation
Chapter 16 Negotiation
 
Chapter 15 Methods of Compensation
Chapter 15 Methods of CompensationChapter 15 Methods of Compensation
Chapter 15 Methods of Compensation
 
Chapter 14 Price and Cost Analysis
Chapter 14 Price and Cost AnalysisChapter 14 Price and Cost Analysis
Chapter 14 Price and Cost Analysis
 
Chapter 13 Total Cost of Ownership
Chapter 13 Total Cost of OwnershipChapter 13 Total Cost of Ownership
Chapter 13 Total Cost of Ownership
 
Chapter 11 Sourcing
Chapter 11 SourcingChapter 11 Sourcing
Chapter 11 Sourcing
 
Chapter 10 Outsourcing
Chapter 10 OutsourcingChapter 10 Outsourcing
Chapter 10 Outsourcing
 
Chapter 9 Purchasing Services
Chapter 9 Purchasing ServicesChapter 9 Purchasing Services
Chapter 9 Purchasing Services
 
Chapter 8 The Procurement of Equipment
Chapter 8 The Procurement of EquipmentChapter 8 The Procurement of Equipment
Chapter 8 The Procurement of Equipment
 
Chapter 6 Purchasing Descriptions and Specifications
Chapter 6 Purchasing Descriptions and SpecificationsChapter 6 Purchasing Descriptions and Specifications
Chapter 6 Purchasing Descriptions and Specifications
 
Chapter 4 A Portfolio of Relationships
Chapter 4 A Portfolio of RelationshipsChapter 4 A Portfolio of Relationships
Chapter 4 A Portfolio of Relationships
 
Chapter 3 Supply Management: An Organization Spanning Activity
Chapter 3 Supply Management:  An Organization Spanning ActivityChapter 3 Supply Management:  An Organization Spanning Activity
Chapter 3 Supply Management: An Organization Spanning Activity
 
Chapter 2 Organizational Issues
Chapter 2 Organizational IssuesChapter 2 Organizational Issues
Chapter 2 Organizational Issues
 
Chapter 1 The Progression to Professional Supply Management
Chapter 1 The Progression to Professional Supply ManagementChapter 1 The Progression to Professional Supply Management
Chapter 1 The Progression to Professional Supply Management
 
A management thinking to solving material outsourcing problems
A management thinking to solving material outsourcing problemsA management thinking to solving material outsourcing problems
A management thinking to solving material outsourcing problems
 
Research report the driver of supply management capability
Research report the driver of supply management capability Research report the driver of supply management capability
Research report the driver of supply management capability
 

Recently uploaded

Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 

Recently uploaded (20)

Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 

Chapter 5 New Product Development

  • 2. 5-2 Key Concepts • The Design Process » The Investigation or Concept Formation Phase » The Development Phase » The Production Phase » Value Engineering Vis-à-vis Value Analysis • Engineering Change Management • How to Expand Supply Management's Contributions » Design or Project Teams » Materials Engineers » Co-location • Buyers Supply Management Professionals Who Interface Successfully with Engineers
  • 3. 5-3 Overview • Four Key Issues » Early supply management and supplier involvement » Design and development process of new products » Approaches to increasing supply management’s role in the new product development process » Description of supply management professionals who interface successfully with engineers
  • 4. 5-4 The Design Process • The Investigation or Concept Formation Phase • The Development Phase • The Production Phase • Value Engineering Vis-à-vis Value Analysis
  • 5. 5-5 Investigation Phase • Defining the New Product • Statement of Objectives • Key Technology • Development of Alternatives » Suitability » Produceaibility » Component availability » Customer acceptability Figure 5-1, Upper Half Define new product Set objectives: price, cost, performance, market availability, quality, & reliability Develop alternative conceptual solutions Study make-or- buy implicationsOutsource Consider Outsourcing Is a key technology involved? Yes No No Yes
  • 6. 5-6 Investigation Phase Continued • Development of Alternatives » Make-or-Buy and Outsourcing Analysis » Select Components, Technologies, and Supplies » Stress Testing and Failure Analysis Select components, technology, and suppliers for most attractive alternative concepts Stress analysis Failure analysis Meet objectives? To development phase Yes No Decision is to make the product Reconsider Outsourcing Figure 5-1, Lower Half
  • 7. 5-7 Questions to Ask Prior to Inviting a Supplier into the Design Process • Will the supplier be able to meet our cost, quality, and product performance requirements? • Does the supplier possess the required engineering capability? • Will the supplier be able to meet our development and production needs? • Does it have the necessary physical process and quality capabilities required? • Does the supplier have both the resources and the reputation of being able to overcome problems and obstacles as they arise?
  • 8. 5-8 Questions to Ask Prior to Inviting a Supplier into the Design Process • Is the supplier financially viable? • Are the supplier's short and long term business objectives compatible with ours? • If a long term relationship appears desirable, are the technology plans of the two firms compatible? • If a long term relationship appears desirable, is it likely that we can build a trusting relationship?
  • 9. 5-9 The Development Phase • Prototypes • Design Reviews • Qualification Testing » margin tests » life tests • Failure Analysis • Meet Objectives? • Value Engineering Design and build prototype Design review Qualification testing Failure analysis To Value engineering Potential downstream design changes Meet objectives? Meet technological objectives? No Yes No Yes Figure 5-2, Upper Half
  • 10. 5-10 The Development Phase • Design Analysis • The Value Engineering Checklist • Viability Qualification testing Value engineer Design changes To production phase Yes After technological objectives have been met? Financial review No Cancel or Redesign Yes Figure 5-2, Lower Half
  • 11. 5-11 Value Engineering • Value engineering is a systematic study of every element of cost in a material, item of equipment, service or construction project to ensure that every element of cost fulfills a necessary function and at the lowest possible total cost • Value engineering is focused on the design stage
  • 12. 5-12 What is Value? • Value can be defined as the lowest end cost at which the function can be accomplished at the time and place and with the quality required • Some items/services/processes which cost less than a similar item/service/process may accomplish the function in a superior or equal manner • Value cannot be determined exclusively by an examination of the item/service/process being evaluated • The value of any service, material, or product is established by the minimum cost of the other alternatives that will perform the same function
  • 13. 5-13 Generalized Procedure for VA/VE Information Phase Analysis Phase Decision Phase Speculation Phase Evaluation Phase What is it? What does it do? What does it cost? How else can the job be done? At what cost? Is the change better? How much better? Why? Review with depts and suppliers Select best alternative Get approval Prepare specificationsAudit effectiveness Use experience Provide feedback Figure 5-3, Adapted
  • 14. 5-14 Analysis of Each Component • Can any part be eliminated without impairing the operation of the complete unit? • Can the design of the part be simplified to reduce its basic cost? • Can the design of the part be changed to permit the use of simplified or less costly production methods? • Can less expensive but equally satisfactory materials be used in the part? • Design simplifications frequently are more apparent than is possible under the original design
  • 15. 5-15 The Value Engineering Checklist 1. Can the item be eliminated? 2. If the item is not standard, can a standard item be used? 3. If it is a standard item, does it completely fit the application, or is it a misfit? 4. Does the item have greater capacity than required? 5. Can the weight be reduced? 6. Is there a similar item in inventory that could be substituted? 7. Are closer tolerances specified than are necessary?
  • 16. 5-16 The Value Engineering Checklist 8. Is unnecessary machining performed on the item? 9. Are unnecessarily fine finishes specified? 10. Is "commercial quality" specified? 11. Can you make the item less expensively in your plant? If you are making it now, can you buy it for less? 12. Is the item properly classified for shipping purposes to obtain lowest transportation rates? 13. Can cost of packaging be reduced? 14. Are suppliers contributing suggestions to reduce cost?
  • 17. 5-17 The Production Phase • Manufacturing and Production Plans • Knowledge Transfer • Process Control • In-Process and Final Testing » adjust or calibrate the performance » eliminate defects before much value is added to the product Finalize and implement manufacturing and supply plans Knowledge transfer Process control In-process testing To Final Test Figure5-4, Upper Half
  • 18. 5-18 Production Phase Continued Failure analysis Purchased components? Supplier fault Yes Meet objectives? Equipment or procedures? Yes Final test Ship Return to Dev. No Yes No Revise Manuf. Plan Figure 5-4, Lower Half
  • 19. 5-19 Engineering Change Management • Material control involvement: » provide input on the purchased materials implications of a proposed change, » discuss the timing of proposed changes in order to minimize costs associated with unusable incoming materials, » to be aware of forthcoming changes so that appropriate action can be taken with affected suppliers.
  • 20. 5-20 How to Expand Supply Management’s Contributions • Design or Project Teams • Materials Engineers » materials engineering and » supply management activities of sourcing, pricing, and negotiating • Co-Location (Harley-Davidson) » Faster to market, » reduced total cost, » improved quality
  • 21. 5-21 Supply Management Professionals Who Interface Successfully with Engineers • Early Supply Management Involvement is part of the culture and policy of the firm » Formerly called Early Purchasing Involvement (EPI) » Often requires policy development from upper management to ensure initial involvement • Engineers view Supply Management involvement as an asset, not a nuisance » Supply Managers must acquire skills and knowledge » Learn how to read engineering drawings » Learn technical terms » Meet with supplier’s sales personnel to review technical information about products » Visit suppliers
  • 22. 5-22 Concluding Remarks • The design stage provides the greatest opportunity to reduce costs the life cycle costs of products • Supply management and the firm's suppliers have major contributions to make during this process • Analysis of adding value is not limited to a firm’s services and products, supply managers themselves must add value to the design process in order to become a viable and lasting member of the design team