Name : Sobhey Ahmed
Address : Elhosinea,El Sharkea, Egypt.
Date of Birth : March 10th
, 1978.
Cellular : +20 100 419 54 23
E-mail : sobheyahmed2@yahoo.com
sobheyahmed2@gmail.com
Qualification Highlights:
10 years' experience between last 5 years quantity surveyor for pipelines, compression station and crude
oil station extension.
Responsibilities have been included monitoring and record site progress, follow up payments, all activates
of mechanical construction projects.
And the previous 5 years acts as mechanical site engineering, mechanical completion, piping, construction,
and pre-commissioning support for oil & gas and petrochemical projects.
Responsibilities have been included administering, organizing, delivering and executing different phases of
construction projects.
Education:
B.Sc. in Mechanical Power Engineer, Faculty of Engineering, May 2003
Graduation Project : Desalination of water, (Grade: Excellent).
Experience:
 Preparation of cost estimation, Material Take Off, Carry out site surveys of all mechanical services (piping,
pipelines steel structure, rotary and static equipments).
 To check the Bill of Material (Material Take Off) as per drawing for ensuring requirements are realistically
quantified as per scope, budget and follow up the delivery of the project construction materials.
 Preparing material requisition, technical evaluations, liaise with procurement and material management
team to ensure that material delivery according to the schedule time.
 Act as key liaison with engineers, clients, subcontractors and suppliers to achieve desired results within
project budget and timeframe.
 Able to control, supervise, monitor the activities progress, construction crew performance and sub-
contractors to make early adjustments to plans if there are any obstructions.
 Valuing completed work and arranging subcontractor payments, producing monthly post contract cost
reports and presenting to the client.
 Behaves in a co-operative, share for information willingly, helps others when required, supports team
decisions and feels accountable for the performance of the team.
 To execute overall piping fabrication, erection works, tank and steel structure.
 Professional in executing the construction method statements and procedures of fabrication, installation,
testing of pipelines and installation of Equipment (Static and Rotating) etc.
 Assist for the NDT, hydro testing, pre-commissioning and commissioning activities of piping systems
include flange joints leakage test, air flushing, water flushing, nitrogen purging etc.
 To liaise with engineering team for the completion of approved construction (AFC) drawing and ensures
complete transmittal to the site.
 Coordinator for the installation, stringing, welding, lowering, coating, brush cleaning, testing, valve rooms
and commissioning activities of pipeline.
 To coordinate for the installation of mechanical static and rotary equipments (vessels, pumps, blower,
shaker cleaner, coolers, compressors, gas turbines, auxiliary turbines and organizing for arrival to the site .
 Participate in daily meeting for the progress, arrange the works with Civil, Electrical, Instrumentation,
discipline head, and participate weekly meeting with client.
Page 2 of 4
Professional Experience:
2005 To Present: (PetroJet) Petroleum Projects & Technical Consultations Co.
1- KARAMA Primary Refining Crude Station (BAPETCO) - May 2012 to Present.
Extension of existing facilities to accommodate the new production adding heat exchangers, two
furnaces, air compressor, closed and open drain systems, separators, flare system, fire fitting
system, tanks, heat insulation, fire proofing and steel structures.
 Acting as senior quantity surveyor Engineer.
 Preparing Material Take-Off, and material requisition.
 Preparing material requisition, technical evaluations, liaise with procurement and client material team to
ensure that material and equipment delivery according to the schedule time.
 Carry out site surveys of all mechanical services (piping, painting, thermal insulations, GRE network, steel
structure, grating, vessels, open drain, close drain, gas boot, water degasser, rotary and static equipment's).
 Receiving steel structure drawing, follow up fabrication central workshop to transport steel and
equipment's to the site and reporting the progress of erection and final receiving by the consultant
management.
 Participate in weekly site meeting to provide the site demands.
 Valuing completed work and arranging subcontractor payments.
 Producing monthly post contract cost reports and presenting to the client.
2- QOUS& DESHNA Gas Pipeline (24") 25 km (GASCO) - Feb, 2011 to May, 2012
Construction a new two branches of natural gas pipeline (24") 25 km to feed two sugar factories.
 Acting as site quantity surveyor Engineer.
 Preparing material requisition, technical evaluations, liaise with procurement and client material team to
ensure that material and equipment delivery according to the schedule time.
 Act as key liaison with engineers, clients, subcontractors and suppliers to achieve desired results within
project budget and timeframe.
 Carry out site surveys and daily reporting of all activates (stringing, welding, lowering, coating, brush
cleaning, hydro-test, initial backfilling, final backfilling, boring and HDD of River Nile and valve rooms.
 Valuing completed work and arranging subcontractor payments.
 Producing monthly post contract cost reports and presenting to the client.
3- DAHSHOUR COMPRESSION STATION (GASCO) – Jan, 2010 to Feb, 2011.
Construction a new station for compression natural gas form 25 bar to 75 bars in Upper Egypt
pipeline 36" Reducing to 8" along 700 km. Four main compressors, steam turbines, auxiliary
turbines, vessels, tanks, steel structure, piping, heat insulation, heat treatment, flare,4 coolers, and
fire fitting system.
 Acting as site quantity surveyor Engineer.
 Preparing Material Take-Off, and material requisition.
 Preparing material requisition, technical evaluations, liaise with procurement and client material team to
ensure that material and equipment delivery according to the schedule time.
 Carry out site surveys of all mechanical services (piping, painting, thermal insulations, piping heat
treatment GRE network, steel structure, grating, vessels, tanks, coolers, compressors, gas turbines,
auxiliary turbines, and static equipment's).
 Participate in weekly site meeting to provide the site demands.
 Valuing completed work and arranging subcontractor payments.
 Producing monthly post contract cost reports and presenting to the client.
Page 3 of 4
4- Upper Egypt Gas Pipeline (GASCO) - Apr, 2009 to Jan, 2010.
Construction a new natural gas pipeline (30"-100 km &24"-25 km and 8"-25 km) Upper Egypt
main line.
 Acting as Mechanical Site Engineer.
 Supervise of stringing, welding, lowering, coating, brush cleaning and hydro-test.
 Supervise of Fabrication, installation, and erection of valve rooms according to isometric drawings.
 Supervise of stringing, welding, coating, brush cleaning and hydro-test for Boring and HDD (under River
Nile).
5-Petro Gas Assiut (Petro Gas) - Jan, 2009 to Apr, 2009.
Construction extension pipe rack 15 ton , gas piping network and fire fitting (8"-400 m &4"-100
m) for charging vessel trucks.
 Acting as Mechanical Site Engineer.
 Supervise of piping workshop fabrication, welding, erection, brush cleaning, hydro-test, sand blasting and
painting.
 Supervise of Fabrication, sand blasting, erection of steel structure.
 Conduct daily meeting for the progress and concern related to the works with Civil and participate weekly
meeting with client.
6- Silos Complex project (E.H.C.S.S). El Minya - Feb, 2007 to Apr, 2009
Egyptian Holding Company for Silos and Storage Construct a new silos project for grain storage
contain 20 silos full capacity 100,000 tons. 3 delivery silos each106 tons capacity .8 Levels steel
structure machine tower (shaker cleaner, filters, aspiration system, dust bin, 4 elevators), chain
conveyors, underground tunnel, truck pit ,intake ,intake shed, blowers, pneumatic control system
,motors,120 ton weight bridge, fire fitting system.
 Acting as Mechanical Site Engineer.
 Supervise of fabrication, sand blasting, erection of steel structure.
 Supervise of erection of chain conveyors, elevators, aspiration network and silos galvanized sheets.
 To coordinate for the installation of Mechanical rotary equipments like rotary magnet clean, blower, filters,
shaker cleaner, compressors, organizing vendor arrival to the site at the time of commissioning,
coordination for the dry test and commissioning activities with vendors.
 Supervise of fire fitting pump room installation, piping network fabrication, sand blasting, painting and
installation of piping.
 Conduct daily meeting for the progress and concern related to the works with Civil, Electrical, and
Instrumentation and participate weekly meeting with client.
7- Silos Complex project (E.H.C.S.S). Giza - may, 2005 to Feb, 2007.
Egyptian Holding Company for Silos and Storage Construct a new silos project for grain storage
contain 6 silos full capacity 30,000 tons, 3 delivery silos each 106 tons capacity .6 levels steel
structure machine tower (shaker cleaner, filters, aspiration system, dust bin, 3 elevators), chain
conveyors, underground tunnel, truck pit, intake, intake shed, blowers, pneumatic control system,
motors, 80 ton weight bridge, fire fitting system.
 Acting as Mechanical Site Engineer.
 Supervise of fabrication, sand blasting, erection of steel structure.
Page 4 of 4
 Supervise of erection of chain conveyors, elevators, aspiration network and silos galvanized sheets.
 To coordinate for the installation of Mechanical rotary equipments like rotary magnet clean, blower, filters,
shaker cleaner, compressors, organizing vendor arrival to the site at the time of commissioning,
coordination for the dry test and commissioning activities with vendors.
 Supervise of fire fitting pump room installation, piping network fabrication, sand blasting, painting and
installation of piping.
 Conduct daily meeting for the progress and concern related to the works with Civil, Electrical, and
Instrumentation and participate weekly meeting with client.
Skills:
 Excellent communication and interpersonal skills.
 Ability to build and maintain client relationships.
 Language skills:
- Arabic (mother tongue), Fluent English (spoken and written)
 Computer skills:
- Excellent command of Microsoft operating systems (XP) and Microsoft office tools.
Professional Memberships:
Engineering Syndicate Cairo, Egypt

More Related Content

What's hot

Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHesham Fathy, PMP
 
Vause Wayne - 6829
Vause Wayne - 6829Vause Wayne - 6829
Vause Wayne - 6829wayne vause
 
Resume shyamal kr sahu-
Resume shyamal kr sahu-Resume shyamal kr sahu-
Resume shyamal kr sahu-Shyamal Sahu
 
Cv mr. orhan degermenci (lead pipeline engineer)
Cv   mr. orhan degermenci (lead pipeline engineer)Cv   mr. orhan degermenci (lead pipeline engineer)
Cv mr. orhan degermenci (lead pipeline engineer)Dr Orhan Degermenci
 
Resume Thad Gilbert
Resume Thad GilbertResume Thad Gilbert
Resume Thad GilbertThad Gilbert
 
Method of Statement - Pavement works
Method of Statement - Pavement worksMethod of Statement - Pavement works
Method of Statement - Pavement worksMohd Nizam Mohd Zan
 
LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015Larry Smock
 
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015Mohd Murtaza
 
Tim Rathsam Work History
Tim Rathsam Work HistoryTim Rathsam Work History
Tim Rathsam Work HistoryTim Rathsam
 
Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)Nitin Lonkar
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerTarun Sharna
 
Method statement for structure excavation
Method statement for structure excavationMethod statement for structure excavation
Method statement for structure excavationAl-Amin Ahmed Nabin
 

What's hot (19)

Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
 
Muhammed RAFI 2016 SD
Muhammed RAFI 2016 SDMuhammed RAFI 2016 SD
Muhammed RAFI 2016 SD
 
Vause Wayne - 6829
Vause Wayne - 6829Vause Wayne - 6829
Vause Wayne - 6829
 
Resume shyamal kr sahu-
Resume shyamal kr sahu-Resume shyamal kr sahu-
Resume shyamal kr sahu-
 
Cv mr. orhan degermenci (lead pipeline engineer)
Cv   mr. orhan degermenci (lead pipeline engineer)Cv   mr. orhan degermenci (lead pipeline engineer)
Cv mr. orhan degermenci (lead pipeline engineer)
 
Tushar resume
Tushar resumeTushar resume
Tushar resume
 
Resume Thad Gilbert
Resume Thad GilbertResume Thad Gilbert
Resume Thad Gilbert
 
Nazmy Markos
Nazmy MarkosNazmy Markos
Nazmy Markos
 
Method of Statement - Pavement works
Method of Statement - Pavement worksMethod of Statement - Pavement works
Method of Statement - Pavement works
 
Mohamed Behiry CV
Mohamed Behiry CVMohamed Behiry CV
Mohamed Behiry CV
 
LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015
 
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
 
Tim Rathsam Work History
Tim Rathsam Work HistoryTim Rathsam Work History
Tim Rathsam Work History
 
Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-Welding
 
Kpr resume tunnel engineer
Kpr resume tunnel engineerKpr resume tunnel engineer
Kpr resume tunnel engineer
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineer
 
Method statement for structure excavation
Method statement for structure excavationMethod statement for structure excavation
Method statement for structure excavation
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 

Viewers also liked (20)

recent cv
recent cvrecent cv
recent cv
 
Mohamed Ibrahim c.v New
Mohamed Ibrahim c.v NewMohamed Ibrahim c.v New
Mohamed Ibrahim c.v New
 
Areas of expertise resume for stephanie jones
Areas of expertise resume for stephanie jonesAreas of expertise resume for stephanie jones
Areas of expertise resume for stephanie jones
 
mohamed C V
mohamed C Vmohamed C V
mohamed C V
 
C.V_1
C.V_1C.V_1
C.V_1
 
Qaffaf cv updated
Qaffaf cv updated Qaffaf cv updated
Qaffaf cv updated
 
updated CV of Reo
updated CV of Reoupdated CV of Reo
updated CV of Reo
 
recommendation letter
recommendation letterrecommendation letter
recommendation letter
 
Ahmed's CV- May, 2015
Ahmed's CV- May, 2015Ahmed's CV- May, 2015
Ahmed's CV- May, 2015
 
Mohammad-Darweesh_CV
Mohammad-Darweesh_CVMohammad-Darweesh_CV
Mohammad-Darweesh_CV
 
lefty new cv
lefty new cvlefty new cv
lefty new cv
 
ofentse cv
ofentse cvofentse cv
ofentse cv
 
THE_CURRICULUM_VITAE_OF_Reinette
THE_CURRICULUM_VITAE_OF_ReinetteTHE_CURRICULUM_VITAE_OF_Reinette
THE_CURRICULUM_VITAE_OF_Reinette
 
PF Buthelezi CV
PF Buthelezi CVPF Buthelezi CV
PF Buthelezi CV
 
CVJ_23989477_20141215073305
CVJ_23989477_20141215073305CVJ_23989477_20141215073305
CVJ_23989477_20141215073305
 
Ingles
InglesIngles
Ingles
 
CV OF M.P
CV OF M.PCV OF M.P
CV OF M.P
 
Reitu's CV
Reitu's CVReitu's CV
Reitu's CV
 
Irene Nkwe CV- Project Management
Irene Nkwe CV- Project ManagementIrene Nkwe CV- Project Management
Irene Nkwe CV- Project Management
 
cv radwan
cv radwancv radwan
cv radwan
 

Similar to Sobhy C V 2015 Rev Q S

CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)amr mahrous
 
Cv.eslam elsnosy.update
Cv.eslam elsnosy.updateCv.eslam elsnosy.update
Cv.eslam elsnosy.updateEslam Elsnosy
 
CV.Eslam-ELSNOSY.update
CV.Eslam-ELSNOSY.updateCV.Eslam-ELSNOSY.update
CV.Eslam-ELSNOSY.updateEslam Elsnosy
 
- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)NABIL NASSAR
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1Mohamed Hashim
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghalyaladin ghaly
 
Eslam cv final 2016
Eslam cv final 2016Eslam cv final 2016
Eslam cv final 2016eslam orabi
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa Omar
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)Ahmed Kamal
 
Mohamed osama cv piping
Mohamed osama cv pipingMohamed osama cv piping
Mohamed osama cv pipingMohamedZidan85
 

Similar to Sobhy C V 2015 Rev Q S (20)

CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
 
QA QC CIVIL
QA QC CIVILQA QC CIVIL
QA QC CIVIL
 
Cv.eslam elsnosy.update
Cv.eslam elsnosy.updateCv.eslam elsnosy.update
Cv.eslam elsnosy.update
 
CV.Eslam-ELSNOSY.update
CV.Eslam-ELSNOSY.updateCV.Eslam-ELSNOSY.update
CV.Eslam-ELSNOSY.update
 
- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
Eng Ahmed Afifi final CV
Eng Ahmed Afifi final CVEng Ahmed Afifi final CV
Eng Ahmed Afifi final CV
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
THARANG A KUTTY
THARANG A KUTTYTHARANG A KUTTY
THARANG A KUTTY
 
Eslam cv final 2016
Eslam cv final 2016Eslam cv final 2016
Eslam cv final 2016
 
wsa
wsawsa
wsa
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cv
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)
 
Eng.mamdouh azab.
Eng.mamdouh azab.Eng.mamdouh azab.
Eng.mamdouh azab.
 
khizar hayat cv.
khizar hayat cv.khizar hayat cv.
khizar hayat cv.
 
MANOJ RESUME
MANOJ RESUMEMANOJ RESUME
MANOJ RESUME
 
Mohamed osama cv piping
Mohamed osama cv pipingMohamed osama cv piping
Mohamed osama cv piping
 

Sobhy C V 2015 Rev Q S

  • 1. Page 1 of 4 Name : Sobhey Ahmed Address : Elhosinea,El Sharkea, Egypt. Date of Birth : March 10th , 1978. Cellular : +20 100 419 54 23 E-mail : sobheyahmed2@yahoo.com sobheyahmed2@gmail.com Qualification Highlights: 10 years' experience between last 5 years quantity surveyor for pipelines, compression station and crude oil station extension. Responsibilities have been included monitoring and record site progress, follow up payments, all activates of mechanical construction projects. And the previous 5 years acts as mechanical site engineering, mechanical completion, piping, construction, and pre-commissioning support for oil & gas and petrochemical projects. Responsibilities have been included administering, organizing, delivering and executing different phases of construction projects. Education: B.Sc. in Mechanical Power Engineer, Faculty of Engineering, May 2003 Graduation Project : Desalination of water, (Grade: Excellent). Experience:  Preparation of cost estimation, Material Take Off, Carry out site surveys of all mechanical services (piping, pipelines steel structure, rotary and static equipments).  To check the Bill of Material (Material Take Off) as per drawing for ensuring requirements are realistically quantified as per scope, budget and follow up the delivery of the project construction materials.  Preparing material requisition, technical evaluations, liaise with procurement and material management team to ensure that material delivery according to the schedule time.  Act as key liaison with engineers, clients, subcontractors and suppliers to achieve desired results within project budget and timeframe.  Able to control, supervise, monitor the activities progress, construction crew performance and sub- contractors to make early adjustments to plans if there are any obstructions.  Valuing completed work and arranging subcontractor payments, producing monthly post contract cost reports and presenting to the client.  Behaves in a co-operative, share for information willingly, helps others when required, supports team decisions and feels accountable for the performance of the team.  To execute overall piping fabrication, erection works, tank and steel structure.  Professional in executing the construction method statements and procedures of fabrication, installation, testing of pipelines and installation of Equipment (Static and Rotating) etc.  Assist for the NDT, hydro testing, pre-commissioning and commissioning activities of piping systems include flange joints leakage test, air flushing, water flushing, nitrogen purging etc.  To liaise with engineering team for the completion of approved construction (AFC) drawing and ensures complete transmittal to the site.  Coordinator for the installation, stringing, welding, lowering, coating, brush cleaning, testing, valve rooms and commissioning activities of pipeline.  To coordinate for the installation of mechanical static and rotary equipments (vessels, pumps, blower, shaker cleaner, coolers, compressors, gas turbines, auxiliary turbines and organizing for arrival to the site .  Participate in daily meeting for the progress, arrange the works with Civil, Electrical, Instrumentation, discipline head, and participate weekly meeting with client.
  • 2. Page 2 of 4 Professional Experience: 2005 To Present: (PetroJet) Petroleum Projects & Technical Consultations Co. 1- KARAMA Primary Refining Crude Station (BAPETCO) - May 2012 to Present. Extension of existing facilities to accommodate the new production adding heat exchangers, two furnaces, air compressor, closed and open drain systems, separators, flare system, fire fitting system, tanks, heat insulation, fire proofing and steel structures.  Acting as senior quantity surveyor Engineer.  Preparing Material Take-Off, and material requisition.  Preparing material requisition, technical evaluations, liaise with procurement and client material team to ensure that material and equipment delivery according to the schedule time.  Carry out site surveys of all mechanical services (piping, painting, thermal insulations, GRE network, steel structure, grating, vessels, open drain, close drain, gas boot, water degasser, rotary and static equipment's).  Receiving steel structure drawing, follow up fabrication central workshop to transport steel and equipment's to the site and reporting the progress of erection and final receiving by the consultant management.  Participate in weekly site meeting to provide the site demands.  Valuing completed work and arranging subcontractor payments.  Producing monthly post contract cost reports and presenting to the client. 2- QOUS& DESHNA Gas Pipeline (24") 25 km (GASCO) - Feb, 2011 to May, 2012 Construction a new two branches of natural gas pipeline (24") 25 km to feed two sugar factories.  Acting as site quantity surveyor Engineer.  Preparing material requisition, technical evaluations, liaise with procurement and client material team to ensure that material and equipment delivery according to the schedule time.  Act as key liaison with engineers, clients, subcontractors and suppliers to achieve desired results within project budget and timeframe.  Carry out site surveys and daily reporting of all activates (stringing, welding, lowering, coating, brush cleaning, hydro-test, initial backfilling, final backfilling, boring and HDD of River Nile and valve rooms.  Valuing completed work and arranging subcontractor payments.  Producing monthly post contract cost reports and presenting to the client. 3- DAHSHOUR COMPRESSION STATION (GASCO) – Jan, 2010 to Feb, 2011. Construction a new station for compression natural gas form 25 bar to 75 bars in Upper Egypt pipeline 36" Reducing to 8" along 700 km. Four main compressors, steam turbines, auxiliary turbines, vessels, tanks, steel structure, piping, heat insulation, heat treatment, flare,4 coolers, and fire fitting system.  Acting as site quantity surveyor Engineer.  Preparing Material Take-Off, and material requisition.  Preparing material requisition, technical evaluations, liaise with procurement and client material team to ensure that material and equipment delivery according to the schedule time.  Carry out site surveys of all mechanical services (piping, painting, thermal insulations, piping heat treatment GRE network, steel structure, grating, vessels, tanks, coolers, compressors, gas turbines, auxiliary turbines, and static equipment's).  Participate in weekly site meeting to provide the site demands.  Valuing completed work and arranging subcontractor payments.  Producing monthly post contract cost reports and presenting to the client.
  • 3. Page 3 of 4 4- Upper Egypt Gas Pipeline (GASCO) - Apr, 2009 to Jan, 2010. Construction a new natural gas pipeline (30"-100 km &24"-25 km and 8"-25 km) Upper Egypt main line.  Acting as Mechanical Site Engineer.  Supervise of stringing, welding, lowering, coating, brush cleaning and hydro-test.  Supervise of Fabrication, installation, and erection of valve rooms according to isometric drawings.  Supervise of stringing, welding, coating, brush cleaning and hydro-test for Boring and HDD (under River Nile). 5-Petro Gas Assiut (Petro Gas) - Jan, 2009 to Apr, 2009. Construction extension pipe rack 15 ton , gas piping network and fire fitting (8"-400 m &4"-100 m) for charging vessel trucks.  Acting as Mechanical Site Engineer.  Supervise of piping workshop fabrication, welding, erection, brush cleaning, hydro-test, sand blasting and painting.  Supervise of Fabrication, sand blasting, erection of steel structure.  Conduct daily meeting for the progress and concern related to the works with Civil and participate weekly meeting with client. 6- Silos Complex project (E.H.C.S.S). El Minya - Feb, 2007 to Apr, 2009 Egyptian Holding Company for Silos and Storage Construct a new silos project for grain storage contain 20 silos full capacity 100,000 tons. 3 delivery silos each106 tons capacity .8 Levels steel structure machine tower (shaker cleaner, filters, aspiration system, dust bin, 4 elevators), chain conveyors, underground tunnel, truck pit ,intake ,intake shed, blowers, pneumatic control system ,motors,120 ton weight bridge, fire fitting system.  Acting as Mechanical Site Engineer.  Supervise of fabrication, sand blasting, erection of steel structure.  Supervise of erection of chain conveyors, elevators, aspiration network and silos galvanized sheets.  To coordinate for the installation of Mechanical rotary equipments like rotary magnet clean, blower, filters, shaker cleaner, compressors, organizing vendor arrival to the site at the time of commissioning, coordination for the dry test and commissioning activities with vendors.  Supervise of fire fitting pump room installation, piping network fabrication, sand blasting, painting and installation of piping.  Conduct daily meeting for the progress and concern related to the works with Civil, Electrical, and Instrumentation and participate weekly meeting with client. 7- Silos Complex project (E.H.C.S.S). Giza - may, 2005 to Feb, 2007. Egyptian Holding Company for Silos and Storage Construct a new silos project for grain storage contain 6 silos full capacity 30,000 tons, 3 delivery silos each 106 tons capacity .6 levels steel structure machine tower (shaker cleaner, filters, aspiration system, dust bin, 3 elevators), chain conveyors, underground tunnel, truck pit, intake, intake shed, blowers, pneumatic control system, motors, 80 ton weight bridge, fire fitting system.  Acting as Mechanical Site Engineer.  Supervise of fabrication, sand blasting, erection of steel structure.
  • 4. Page 4 of 4  Supervise of erection of chain conveyors, elevators, aspiration network and silos galvanized sheets.  To coordinate for the installation of Mechanical rotary equipments like rotary magnet clean, blower, filters, shaker cleaner, compressors, organizing vendor arrival to the site at the time of commissioning, coordination for the dry test and commissioning activities with vendors.  Supervise of fire fitting pump room installation, piping network fabrication, sand blasting, painting and installation of piping.  Conduct daily meeting for the progress and concern related to the works with Civil, Electrical, and Instrumentation and participate weekly meeting with client. Skills:  Excellent communication and interpersonal skills.  Ability to build and maintain client relationships.  Language skills: - Arabic (mother tongue), Fluent English (spoken and written)  Computer skills: - Excellent command of Microsoft operating systems (XP) and Microsoft office tools. Professional Memberships: Engineering Syndicate Cairo, Egypt