CURRICULUM VITAE: S J LANDOLT Pr Eng Cell +27 798735044
Name : Steve Landolt
Date of Birth : 23/11/1952
Marital Status : Divorced
Professional Registration : Professional Engineer (20030165)
Engineering Council of South Africa (ECSA)
Nationality : British
Years experience : 37
Accreditations : Registered with the Department of Water and Sanitation
(RSA)as an APP for Dam Safety
Registered as a Mentor with ECSA
Registered as a Construction Mentor with UOFS (RSA)
KEY QUALIFICATIONS
"General Practitioner" with a wide range of experience:-
10 years Contracting experience in Europe, the Middle East and Southern Africa.
27 years Consulting experience in Southern Africa.
Extensive experience in Municipal Infrastructure, particularly water supply and related projects,
EMPLOYMENT RECORD
2014 - 2015 Project Manager (Rapid Response Unit - Dept. Water and Sanitation (RSA)
The RRU is a specialist unit required to respond to a directive from the
Department of Water and Sanitation (RSA) at short notice. The scope of
services provided by the RRU and managed by the Candidate include but are
not limited to the following:-
Implementation and project management of water services capital
infrastructure projects, feasibility studies, infrastructure master plans
The elimination of externalities and spill over due to water services related
emergencies or crises
The augmentation the DWS’s capacity in responding to disasters i.e. floods’
droughts and pollution of water
The design and implementation of proactive interventions aimed at pre-empting
crises before they occur;
The development of a diagnostic toolbox to facilitate the resolution of
emergencies and crises
The alignment of interventions with other stakeholders for long term
sustainability
The building of the capacity/transfer of skills to local government through the
sharing of experience through interventions.
2012 - 2013 Sabbatical
2009 – 2012 Unit Manager/Technical Director : Aurecon South Africa (Pty) Ltd
Responsible for the Border and Transkei Regions of the Eastern Cape incorporating the
East London and Mthatha offices, comprising approximately 70 staff members.
2003 – 2009 Director: Ninham Shand Holdings (now Aurecon)
Director : Amanz’ Abantu Services
Business Unit Head : Ninham Shand : East London and Mthatha Offices
Responsible for the Border and Transkei Regions of the Eastern Cape incorporating the
East London and Mthatha offices, comprising approximately 35 staff members.
1998 - 2003 Director, Ninham Shand (East) (Pty) Ltd.(now Aurecon)
Director, Cahi De Vries (Central) Inc.
Technical director for the Border and Transkei Regions of the Eastern Cape
1991 - 1998 Senior Partner, Cahi De Vries.(now Aurecon)
Responsible for the Border, Ciskei and Transkei Regions of the Eastern Cape
incorporating the East London and Bhisho offices.
1984 - 1991 Engineer and Associate Partner, Cahi De Vries.(now Aurecon)
1981 - 1984 Contracts Manager, Murray and Roberts
1980 - 1981 Design Engineer, UK
1975 - 1979 Planning Officer/Technical Office Manager, Saudi Arabia
1974 – 1975 Site Engineer – Gleeson Civil Engineering, U.K
EXPERIENCE RECORD
1984 – 2012 Technical Director and Unit Manager, Aurecon South Africa (Pty)Ltd
Unit Manager responsible for the Border Region of the Eastern Cape (RSA)
originally for Cahi de Vries until 2003, then after their merger with Ninham Shand
until 2009 and after a further incorporation into Aurecon, a technical director and
the Unit Manager for the same region, incorporating offices in East London and
Umtata, and comprising approximately 70 staff members.
In addition to the responsibilities of running a regional office which included all
aspects of management dealing with corporate governance, business
development, business planning, financial management, human resources, health
and safety, quality management and general office administration, Mr Landolt
continued working in the technical field throughout his tenure as Unit Manager.
The specific line management and technical work carried out by Mr. Landolt during
this period included the following:
- Management of 6 Technical Directors
- Providing mentorship to engineering and technical staff
- Tendering for work on projects with values of $10 - $150 million.
- Planning and design of institutional water supply schemes, including for raw
water storage, raw water distribution, water treatment works, clear water
storage reservoirs and clear water distribution
- Planning and design of new Municipal Infrastructure including for roads,
stormwater disposal, water treatment and reticulation, sewage treatment and
reticulation, also on projects with value up to $ 100 million.
- Planning and implementation of water conservation and demand
management measures
- Responsible for reviewing all water sector design and documentation issued
- Contract administration and acting as the Engineer on projects with values up
to $ 100 million.
Mr. Landolt had various roles on many projects during this period, a few of which
are recorded in detail below.
2009 –2013 Fort Beaufort Bulk Water Services Upgrading
This project (12000m³/day) encompasses a raw water river abstraction facility on
the Kat River, a new earth dam off-channel storage facility, both high and low lift
raw water transfer pump stations and associated distribution pipelines, a new
water treatment works and clear water storage and distribution facilities for the
town of Fort Beaufort in the Eastern cape, RSA..
Personal responsibilities on this project included:-
 Carrying out the feasibility study
 Liaison with Employer and statutory authorities
 Arranging for survey, the geotechnical investigation, environmental impact
assessment, water quality tests, licences for raw water abstraction,
impoundment and storage, wayleaves and servitudes etc.
 Reviewing the feasibility study/planning and preparing the preliminary
design and design reports
 detail design of the river abstraction pump station, the earth embankment
off-channel storage dam
 detail design of the rising mains and gravity pipelines
 detail design of the water treatment works
 detail design of the clear water reservoirs
 detail design of the clear water distribution mains
 drawing up of tender and contract documentation
 adjudication of Tenders
 project management, including for management of the engineering site
staff and contract administration acting as the Engineer
 dealing with claims
 overall responsibility for the project including for quality control, testing and
commissioning of the works
 quality management
 health and safety
 provision of construction and of record drawings,.
2009 –2012 Idutywa East Regional Water Supply Scheme
This project provides for the supply of clear water to a rural area (c.300 sq.km) in
the Eastern Cape, RSA.
Personal responsibilities on this project included:-
 Preparing the Tender submission for the provision of consulting services
 Carrying out the feasibility study
 Liaison with Employer and statutory authorities
 Arranging for survey, the geotechnical investigation, environmental impact
assessment, water quality tests, licences for raw water abstraction,
impoundment and storage, wayleaves and servitudes etc.
 Carrying out the feasibility study/planning and drawing up the necessary
reports
 detail design of the clear water reservoirs
 detail design of the clear water distribution mains
 drawing up of tender and contract documentation
 adjudication of Tenders
 project management, including for management of the engineering site
staff and contract administration acting as the Engineer
 overall responsibility for the project including for quality control, testing and
commissioning of the works
 quality management
 health and safety
 provision of construction and of record drawings,.Liaison with Employer
and statutory authorities
 Carrying out feasibility study/Planning
 Review of Designs carried out by technical staff
 Review of contract documentation
 Safety
2007 – 2010 Ncera Macadamia Bulk Water Supply
This project provides for the supply and storage of bulk raw water for the irrigation
of macadamia nut trees in the Ncera area, west of East London and included for
the inter-catchment transfer of raw water to a balancing dam serving the orchard.
The works include for the provision of the river abstraction pumpstation, pumps,
rising and gravity mains and the 50Ml storage dam. Mr Landolt was the project
director and had similar responsibilities to those outlined in the projects above.
2008 – 2012 Ngqamakwe Regional Water Supply Scheme
Ninham Shand as Lead Consultant in a joint venture partnership with Arcus Gibb,
Sontinga Consulting Services and Sizo Engineering & Management Services,
after a successful bid submission, were appointed to provide all engineering
services for the Ngqamakwe Regional Water Supply Project (c. 500 sq.km) for
Amathole District Municipality.
This rural project encompasses an inter-basin transfer scheme consisting of a
raw water river abstraction pump station, an off-channel storage facility, a raw
water transfer pump station and a rising main delivering to a new water treatment
works at Tsomo, the provision of a clear water pumps and a rising main
delivering to a new regional reservoir and thereafter the bulk distribution of water
to various reservoirs serving 118 villages in the region, together with the
reticulation of the villages.
Mr. Landolt was the project and design team leader responsible for delivering the
scope of services which included the initial feasibility study, the hydrological
assessment, geotechnical investigation, strategic environmental impact
assessment, detail design of the river abstraction pump station, the raw water
transfer pump station and pipelines including for water hammer analysis, the
design of the new water treatment works, clear water pump stations, rising
mains, storage reservoirs and both bulk and distribution pipework. Thereafter the
drawing up of tender documentation, adjudicating of tenders, arranging of
wayleaves, servitudes and environmental input assessment, contract
administration, provision of construction and of record drawings, quality control and
testing and commissioning.
2009 – 2011 Qongqotha (30Ml) and Berlin (6Ml) Reservoirs
This project consisted of the detail design of a post-tensioned 30 Ml and a
conventional reinforced concrete 6 Ml reservoir for Amatola Water.
Mr. Landolt acted as the project leader on this project and was responsible for all
aspects of the project from inception through to commissioning.
1993 – 2012 Mdantsane Urban Renewal/Services/Housing
Mdantsane is a town of some 300 000 inhabitants situated to the north-west of
East London. An urban renewal project was embarked upon in 1993 to upgrade
and rehabilitate the services in the area and Cahi De Vries/Ninham
Shand/Aurecon have since that date been involved on the following projects which
were all under Mr Landolt’s control.
The services provided included the following:
 Assisting the Buffalo City Municipality with project management of the Urban
Renewal Programme
 Development of 850 housing units in Manyano and Thembelishle
 An assessment of the condition and capacity of the bulk water supply
infrastructure, the water reticulation network, the sewer reticulation network
including the bulk outfall sewers and the water and wastewater treatment
works.
 Identifying and reporting on the rehabilitation required
 Modelling of the water reticulation network
 Identifying and reporting on the upgrade requirements.
 An assessment of the volume of unaccounted for water in the town
 Implementation of water conservation and demand management measures
 Project Management, Planning, design, drawing up of tender documentation,
adjudicating of tenders, arranging of wayleaves, servitudes and environmental
input assessments, contract administration, provision of construction and of
record drawings, quality control, testing and commissioning and generally
assisting the Employer with reports and other controls.
The following Contracts for which these and other services were provided either in
whole or in part include the following:-
New Bulk Water Supply Pipelines (400mm dia.-600mm dia.)
New R.C.Clear Water Reservoirs (6 No)
Provision of Rudimentary Services to Informal Settlements
Supply and Installation of Fire Hydrants in Mdantsane
Supply and Installation of Pressure Management
Supply and Installation of District/Zonal Water Meters
Leak Detection
Leaks Repair and Maintenance
Replacement of life-expired Pipes
Sealing of Reservoirs
Replacement of Pumpsets
New Township Development (civil services and housing)
New Interceptor Sewers including for Inverted Sewer Syphons
Replacement of Sewers
Refurbishment of 300 Sewer Pipe Bridges (150mm dia. – 1050mm dia.)
2002 – 2004 East London Industrial Development Zone
The East London Industrial Development Zone is situated to the south and east
of the city centre ideally sited between the harbour port of East London and the
airport.
The project includes for the upgrading of the arterial road links to and from the
national and provincial roads, the airport and harbour, and the development of
400 hectares of industrial land to a world class standard.
Of particular interest in the project were the studies carried out for traffic and
transportation due to the major impact that the IDZ would have in the area,
together with the approach by the Development Zone Corporation to the
institutional requirements, environmental and health and safety concerns.
Personal responsibilities included :-
Liaison with local authorities
Design team leader responsible for:
 Arterial roads
 Internal roads
 Stormwater drainage
 Attenuation dams
 Sewer Reticulation
 Sewer outfall and pumpstation
 Water reticulation
 Minor structures
1998 – 2001 Umtata Waste Water Treatment Works and Northern Sewers Upgrade
This project includes for the complete refurbishment of the 20,0 Mℓ/d waste water
treatment plant at Umtata and the construction of a 20kms of new outfall sewer
with pipe diameters varying from 350mm to 800mm dia.
Personal responsibilities on this project included:-
 Review of the planning, design criteria and proposals and providing overall
guidance to the project manager and his team.
1997-1998 Zwelitsha Water Tower
Personal responsibilities included the preparation of the feasibility study,
“architectural” design of several proposals for the tower, review of all the design
criteria, geotechnical assessment, drawing up tender documentation, adjudicating
of tenders, contract administration, provision of construction and of record
drawings, quality control, testing and commissioning.
1996-1997 New Sewer Reticulation and Wastewater Treatment Works – Cathcart
The project included for the upgrading of a “bucket” system at Cathcart in the
Eastern Cape to a conventional water-borne sewerage system and for the
planning, design and construction of a new activated sludge treatment plant.
Personal responsibilities on this project included:-
 Liaison with Employer and statutory authorities
 Carrying out feasibility study/planning
 Design team leader
 Drawing up of contract documentation
 Contract administration
 Project management
1994-1996 Extension to Fort Jackson Industrial Area
The project provided for an 80 hectare extension to an existing industrial area in
Fort Jackson in the Eastern Cape, and included for the design and construction of
the roads, stormwater drainage, water supply and reticulation, sewer reticulation
and the electrical installation.
Personal responsibilities included :-
 Design team leader responsible for:
 Arterial roads
 Internal roads
 Stormwater drainage including attenuation dams
 Internal servicing
 Sewer outfall and pumpstation
 Internal water reticulation
 Minor structures
 Project management
1993-1994 Bridge Over Buffalo River
The project provided for a new road and bridge access across the Buffalo River at
King William’s Town in the Eastern Cape.
The scope of services provided included for the feasibility study including for the
hydrological assessment, geotechnical investigation, detail design and thereafter
the drawing up of tender documentation, adjudicating of tenders, arranging of
wayleaves, servitudes and environmental impact assessment, contract
administration, provision of construction and of record drawings, quality control and
testing and commissioning.
1991-2011 Urban and Rural Development – General
More than 50 other individual projects were carried out during this period. The
projects ranged from new water supply schemes for towns and providing
engineering services to “greenfields” township developments of 2000-3000
housing sites through to relatively small projects.
Most of the work was for Municipalities and included for the planning, feasibility,
design, implementation of projects including for adjudicating of tenders, arranging
of wayleaves, servitudes and environmental impact assessment, contract
administration, provision of construction and of record drawings and quality control
for all types of work, including but not limited to provision of access roads and
bridges, urban streets, stormwater management, bulk water supply, storage,
treatment, distribution and demand management, sewer reticulation, outfall and
treatment, solid waste management, development of sports fields and stadia,
erosion control etc.
Earth Dam Experience
2005 – 2012 Bridle Drift Dam (Category III)
Mr Landolt’s most recent experience (2005-2012) has been on the Bridle Drift
Dam in East London, a major Category III dam providing for the bulk of East
London’s raw water storage needs. Mr Landolt has assisted in the regular and 5
yearly inspections required in terms of the Dam Safety Act and has been
responsible for identifying, and reporting on the remedial measures required to
upgrade the dam to conform with the recognised dam safety regulations and
thereafter to arrange and have the remedial works carried out on behalf of the
registered owner of the dam. The remedial works required have in the most part
been on the outlet works where all pipework and valves have been refurbished
and relining of the outlet pipe connecting the tunnel to the outlet tower. Minor
works have also been carried out to repair spalling concrete on the spillway.
2000 – 2003 Port St Johns Water Supply Scheme
This rural project (4000m³/day) encompasses an inter-basin transfer scheme
consisting of a raw water river abstraction pumpstation, an off-channel storage
facility, a raw water transfer pump station and various pipelines delivering to a
new water treatment works at Port St Johns in the Eastern Cape.
The scope of services provided included the initial feasibility study, the
hydrological assessment, geotechnical investigation, environmental impact
assessment, detail design of the river abstraction pump station, the water
treatment works, the earth embankment off-channel storage dam, the raw water
transfer pump station and pipelines including for water hammer analysis.
Thereafter the drawing up of tender documentation, adjudicating of tenders,
arranging of wayleaves, servitudes and environmental input assessment, contract
administration, provision of construction and of record drawings, quality control and
testing and commissioning.
Personal responsibilities on this project included:-
 Liaison with Employer and statutory authorities
 Carrying out feasibility study/Planning
 Design team leader
 Design of on-channel raw water intake pumpstation
 Design of earth embankment dam and spillway
 Design of Water Treatment Works
 Drawing up of contract documentation
 Contract administration
2002-2003 Koch Dams – Cathcart
Mr. Landolt assisted in the initial dam safety inspection and was responsible for
the inspection, drawing up the report and recommending the remedial works
required in terms of dam safety requirements, and tfereafter arranging and
having the Works carried out on behalf of the Employer. These included for
increasing the capacity of the spillway of both the upper and lower dams,
construction of toe-drains and measuring weirs and the repair of a slope failure in
the lower dam.
2003-2006 Jamestown Off-Channel Dam (Category II)
Mr Landolt has been involved in all aspects of the project including for the
feasibility study, planning and design of the proposed earth embankment off-
channel dam and spillway and thereafter having the works carried out on behalf
of the Employer.
The project includes for a river abstraction pumpstation, the off-channel storage
dam, a raw water transfer pipeline, water treatment plant and for clear water
distribution and storage facilities.
2000–2002 Raising of Sam Meyer Dam (Category II)
The project included for the raising of an existing earth embankment dam at
Cathcart in the Eastern Cape to augment the raw water storage capacity,
together with the implementation of the remedial measures required in terms of
the dam safety report submitted by Mr D Cahi.
Mr Landolt was intimately involved in this project and was responsible for the
investigation, planning and design of the raised structure.
The works included for raising the embankment dam by 3,1m and for the
construction of a new straight drop arch-buttress spillway together with other
associated works.
1994-1995 Anderson Dam, Dordrecht (Category III)
This project included for the construction of a new earth embankment dam and a
smaller transfer structure on an adjoining tributary.
Mr Landolt was involved in the design of the earth embankment dam and acted
as the Engineer’s Representative for the construction.
1984-1994 Earth Embankment Dams – Other
Mr Landolt also acted as Engineer’s Representative for the construction of new
earth embankment dams at Winburg and Clocolan, and was exposed to the
planning and design of similar dams at Marquard and Reitz.
Mr Landolt has also been involved in investigating the mode of failure of 3
substantial farm dams
Construction Mentoring
2004 – 2006 Eastern Cape Development Corporation – Kei Rail Project
The Eastern Cape Development Corporation provides finance for entrepreneurial
projects. As part of this service, the ECDC provides mentorship to previously
disadvantaged Contractor’s to enable them to advance their knowledge and
capability.
Mr Landolt is a registered Mentor and was appointed by the ECDC to provide
this mentorship on the Kei Rail Refurbishment Project. The project includes for
the refurbishment of the earthworks, stormwater drainage features and
structures, access roads, level crossings, the trackwork and fencing of 110kms of
track between Idutywa and Mthata in the Eastern Cape.
The mentor’s responsibilities included for
 Guiding and advising the Contractor in areas where skills need to be
improved and in particular developing the Contractor’s technical,
managerial, administrative and commercial knowledge
 Assisting the Contractor to set up and/or improve business system
Construction Monitoring
1985-1989 As mentioned under the earth dam section above, Mr. Landolt has had significant
experience acting as the Engineer"s representative (RE) on contracts involving the
construction of earth dams and associated works. Mr. Landolt also held the position of
Resident Engineer on a 20Ml/day extension to the Bloemfontein Wastewater Treatment
Works during this period.
CONTRACTING EXPERIENCE
1983-1984 Construction of 100 houses at Botshabelo in three month period (± 5500m²).
Contracts Manager
1982-1983 Extension to Harrismith Sewage Treatment Works
Road and Bridge at Warden
Contracts Manager
1981-1982 Construction of a road over river bridge in Lesotho
Site Agent
1978-1981 Construction of stage IV of the Port of Jeddah, Saudi Arabia
Member of management team of six people, comprising two from each of the joint
venture participants
additional responsibilities.
Management of technical office with responsibility for planning and programming of
all works including dredging and hydraulic fill operations, landfill, quay wall
construction, transit shed and warehouse construction, building construction, roads
and services etc. All of the above using critical path analysis and hand generation
of cash flow forecasts, resourcing requirements for plant, labour and materials,
development of S-curves etc.
Implementation of a cost control system in conjunction with a team of management
consultants and thereafter production of monthly cost reports.
Temporary Works Design
Ordering all imported material
Sub-contractor co-ordination
1975-1978 Construction of Stages II and III of the Port of Jeddah, Saudi Arabia
Manager of section responsible for the construction of the bulk water supply
infrastructure, water reticulation, fire mains (saltwater), stormwater channels and
pipes etc. Structures included a 46 000m³ R.C. reservoir, an 800m³ water tower
and five pumpstations.
Responsibilities included management of personnel, planning and programming,
construction, liaison with client/consulting engineer.
Estimating and tendering on new works.
Measurement
Claims
1974-1975 Construction of Access Roads for Dinowic pumped storage hydroelectric
scheme, UK
Setting out of roads through mountainous terrain. Selection and testing of materials
for layerworks.
1972-1973 Construction of Hoddesdon ByPass
Setting out of roads, stormwater, subsoil drainage.
Setting out of R.C. bridges and culverts.
Supervision of formwork erection, steel fixing and concrete placement.
EDUCATION
BSc(Hons.) (Civ.Eng) University of Surrey, UK (1970-1974)
CAREER ENHANCING COURSES
University of Pretoria July 1987 Planning and Operation of Water
Resource Development Projects
University of Pretoria July 1988 Flood Hydrology
University of Pretoria
University of Witwatersrand
University of Pretoria
Various
November 1988
April 1992
March 2011
Various
Dam Design
Advanced Water Treatment
Pump Station Design
Construction management
General Conditions of Contract (GCC)
RC design
Soil stability
Pipeline design
LANGUAGES
Reading Writing Speaking
English Excellent Excellent Excellent
By my signature below I certify the correctness of the information above and my availability to
undertake this assignment.
_____________________ ______________
SJ Landolt Date

More Related Content

What's hot

2016 Wesley Plaisted
2016 Wesley Plaisted2016 Wesley Plaisted
2016 Wesley PlaistedWes Plaisted
 
NwankwoIkennaCV
NwankwoIkennaCVNwankwoIkennaCV
NwankwoIkennaCVIkenna Qs
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2Rodney Taylor
 
Resume JW ENG City 01-12
Resume JW ENG City 01-12Resume JW ENG City 01-12
Resume JW ENG City 01-12Jerry Williams
 
Van Dyk H - WSP PB Master CV
Van Dyk H - WSP PB Master CVVan Dyk H - WSP PB Master CV
Van Dyk H - WSP PB Master CVHenk van Dyk
 
Leisa Boos Resume 2016doc
Leisa Boos  Resume 2016docLeisa Boos  Resume 2016doc
Leisa Boos Resume 2016docLeisa B
 
CV- Ho Xuan Minh Huu
CV- Ho Xuan Minh HuuCV- Ho Xuan Minh Huu
CV- Ho Xuan Minh Huuhuu ho
 
Robin dargavel consutant mechanical - facilities engineer
Robin dargavel   consutant mechanical - facilities engineerRobin dargavel   consutant mechanical - facilities engineer
Robin dargavel consutant mechanical - facilities engineerRobin Dargavel BEng (Hons)
 
Wincy L CV Apr2015a
Wincy L CV Apr2015aWincy L CV Apr2015a
Wincy L CV Apr2015aWincy Ho
 
Raymond Guo 2016
Raymond Guo 2016Raymond Guo 2016
Raymond Guo 2016Raymond Guo
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
Amjad survey inspector
Amjad survey inspectorAmjad survey inspector
Amjad survey inspectorMuhammad Amjad
 
G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15Greg Clifford
 

What's hot (20)

2016 Wesley Plaisted
2016 Wesley Plaisted2016 Wesley Plaisted
2016 Wesley Plaisted
 
CV of CCEquibal
CV of CCEquibalCV of CCEquibal
CV of CCEquibal
 
Saeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer UtilitiesSaeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer Utilities
 
NwankwoIkennaCV
NwankwoIkennaCVNwankwoIkennaCV
NwankwoIkennaCV
 
Dec14CV
Dec14CVDec14CV
Dec14CV
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2
 
Resume JW ENG City 01-12
Resume JW ENG City 01-12Resume JW ENG City 01-12
Resume JW ENG City 01-12
 
Van Dyk H - WSP PB Master CV
Van Dyk H - WSP PB Master CVVan Dyk H - WSP PB Master CV
Van Dyk H - WSP PB Master CV
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
Darrell Resume2014
Darrell Resume2014Darrell Resume2014
Darrell Resume2014
 
Leisa Boos Resume 2016doc
Leisa Boos  Resume 2016docLeisa Boos  Resume 2016doc
Leisa Boos Resume 2016doc
 
CV- Ho Xuan Minh Huu
CV- Ho Xuan Minh HuuCV- Ho Xuan Minh Huu
CV- Ho Xuan Minh Huu
 
Robin dargavel consutant mechanical - facilities engineer
Robin dargavel   consutant mechanical - facilities engineerRobin dargavel   consutant mechanical - facilities engineer
Robin dargavel consutant mechanical - facilities engineer
 
RESUME JULY 2016
RESUME JULY 2016RESUME JULY 2016
RESUME JULY 2016
 
Wincy L CV Apr2015a
Wincy L CV Apr2015aWincy L CV Apr2015a
Wincy L CV Apr2015a
 
Raymond Guo 2016
Raymond Guo 2016Raymond Guo 2016
Raymond Guo 2016
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
CV1
CV1CV1
CV1
 
Amjad survey inspector
Amjad survey inspectorAmjad survey inspector
Amjad survey inspector
 
G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15
 

Viewers also liked

Metamorfosis hacia una empresa ágil
Metamorfosis hacia una empresa ágilMetamorfosis hacia una empresa ágil
Metamorfosis hacia una empresa ágilTIDChile
 
Developmental stability of grape leaf morphometrics: allometry, heteroblasty,...
Developmental stability of grape leaf morphometrics: allometry, heteroblasty,...Developmental stability of grape leaf morphometrics: allometry, heteroblasty,...
Developmental stability of grape leaf morphometrics: allometry, heteroblasty,...DanChitwood
 
Портфолио воспитателя
Портфолио воспитателяПортфолио воспитателя
Портфолио воспитателяvasko253
 
คำสั่งภัยพิบัติน้ำท่วม 1
คำสั่งภัยพิบัติน้ำท่วม 1คำสั่งภัยพิบัติน้ำท่วม 1
คำสั่งภัยพิบัติน้ำท่วม 1mantanwa22
 
E twinning happy bearthday!
E twinning happy bearthday!E twinning happy bearthday!
E twinning happy bearthday!megikatq
 
презентац форми страхува
презентац форми страхувапрезентац форми страхува
презентац форми страхуваRudInna
 
турция
турциятурция
турцияmegikatq
 
игри белгия
игри  белгияигри  белгия
игри белгияmegikatq
 
Kolumbina
Kolumbina Kolumbina
Kolumbina megikatq
 
Fiware IoT Proposal & Community
Fiware IoT Proposal & Community Fiware IoT Proposal & Community
Fiware IoT Proposal & Community TIDChile
 
еко рали щури сладури
еко рали щури сладуриеко рали щури сладури
еко рали щури сладуриmegikatq
 
Panduan pengutipan metode apa 2011
Panduan pengutipan metode apa   2011Panduan pengutipan metode apa   2011
Panduan pengutipan metode apa 2011Agus Muliadi
 
Portfolio-PDF_v01-lowres
Portfolio-PDF_v01-lowresPortfolio-PDF_v01-lowres
Portfolio-PDF_v01-lowresCaitlin Bouey
 
Permanenthiring
PermanenthiringPermanenthiring
PermanenthiringNeuhiring
 
Plant architecture without multicellularity: an intracellular transcriptomic ...
Plant architecture without multicellularity: an intracellular transcriptomic ...Plant architecture without multicellularity: an intracellular transcriptomic ...
Plant architecture without multicellularity: an intracellular transcriptomic ...DanChitwood
 

Viewers also liked (18)

Metamorfosis hacia una empresa ágil
Metamorfosis hacia una empresa ágilMetamorfosis hacia una empresa ágil
Metamorfosis hacia una empresa ágil
 
Developmental stability of grape leaf morphometrics: allometry, heteroblasty,...
Developmental stability of grape leaf morphometrics: allometry, heteroblasty,...Developmental stability of grape leaf morphometrics: allometry, heteroblasty,...
Developmental stability of grape leaf morphometrics: allometry, heteroblasty,...
 
Портфолио воспитателя
Портфолио воспитателяПортфолио воспитателя
Портфолио воспитателя
 
คำสั่งภัยพิบัติน้ำท่วม 1
คำสั่งภัยพิบัติน้ำท่วม 1คำสั่งภัยพิบัติน้ำท่วม 1
คำสั่งภัยพิบัติน้ำท่วม 1
 
Energy
EnergyEnergy
Energy
 
E twinning happy bearthday!
E twinning happy bearthday!E twinning happy bearthday!
E twinning happy bearthday!
 
презентац форми страхува
презентац форми страхувапрезентац форми страхува
презентац форми страхува
 
турция
турциятурция
турция
 
The Beatles monument in Rostov-on-Don project
The Beatles monument in Rostov-on-Don projectThe Beatles monument in Rostov-on-Don project
The Beatles monument in Rostov-on-Don project
 
игри белгия
игри  белгияигри  белгия
игри белгия
 
Kolumbina
Kolumbina Kolumbina
Kolumbina
 
Valeria 22 3
Valeria 22 3 Valeria 22 3
Valeria 22 3
 
Fiware IoT Proposal & Community
Fiware IoT Proposal & Community Fiware IoT Proposal & Community
Fiware IoT Proposal & Community
 
еко рали щури сладури
еко рали щури сладуриеко рали щури сладури
еко рали щури сладури
 
Panduan pengutipan metode apa 2011
Panduan pengutipan metode apa   2011Panduan pengutipan metode apa   2011
Panduan pengutipan metode apa 2011
 
Portfolio-PDF_v01-lowres
Portfolio-PDF_v01-lowresPortfolio-PDF_v01-lowres
Portfolio-PDF_v01-lowres
 
Permanenthiring
PermanenthiringPermanenthiring
Permanenthiring
 
Plant architecture without multicellularity: an intracellular transcriptomic ...
Plant architecture without multicellularity: an intracellular transcriptomic ...Plant architecture without multicellularity: an intracellular transcriptomic ...
Plant architecture without multicellularity: an intracellular transcriptomic ...
 

Similar to CURRICULUM VITAE

Similar to CURRICULUM VITAE (20)

Ugeshan Naidoo1
Ugeshan Naidoo1Ugeshan Naidoo1
Ugeshan Naidoo1
 
CV_Long_STENSON Adrian 26-11-2015
CV_Long_STENSON Adrian 26-11-2015CV_Long_STENSON Adrian 26-11-2015
CV_Long_STENSON Adrian 26-11-2015
 
Thomas Mensah - CV GE
Thomas Mensah - CV  GEThomas Mensah - CV  GE
Thomas Mensah - CV GE
 
Richard Parkinson CV
Richard Parkinson CVRichard Parkinson CV
Richard Parkinson CV
 
CV~PW~02-02-16 Opus
CV~PW~02-02-16 OpusCV~PW~02-02-16 Opus
CV~PW~02-02-16 Opus
 
Wrink - Company Profile
Wrink - Company ProfileWrink - Company Profile
Wrink - Company Profile
 
New cv muhammad
New cv muhammadNew cv muhammad
New cv muhammad
 
New cv muhammad
New cv muhammadNew cv muhammad
New cv muhammad
 
Cv marinda le roux sept 2015
Cv marinda le roux sept 2015Cv marinda le roux sept 2015
Cv marinda le roux sept 2015
 
Khan.CV
Khan.CVKhan.CV
Khan.CV
 
CV of F Verschueren - 11-04-2016
CV of F Verschueren - 11-04-2016CV of F Verschueren - 11-04-2016
CV of F Verschueren - 11-04-2016
 
Highways experince
Highways experinceHighways experince
Highways experince
 
Company Profile_Hydro-Utilities
Company Profile_Hydro-UtilitiesCompany Profile_Hydro-Utilities
Company Profile_Hydro-Utilities
 
INDIAZI CV
INDIAZI CVINDIAZI CV
INDIAZI CV
 
piete resume and list of projects.2 Dec 15
piete resume and list of projects.2 Dec 15piete resume and list of projects.2 Dec 15
piete resume and list of projects.2 Dec 15
 
Jamie Morien CV FEB 2016
Jamie Morien CV FEB 2016Jamie Morien CV FEB 2016
Jamie Morien CV FEB 2016
 
- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
 
yousef_cv_mk
yousef_cv_mk yousef_cv_mk
yousef_cv_mk
 
Andrew Theobald - 2015 Resume Rev0
Andrew Theobald - 2015 Resume Rev0Andrew Theobald - 2015 Resume Rev0
Andrew Theobald - 2015 Resume Rev0
 

CURRICULUM VITAE

  • 1. CURRICULUM VITAE: S J LANDOLT Pr Eng Cell +27 798735044 Name : Steve Landolt Date of Birth : 23/11/1952 Marital Status : Divorced Professional Registration : Professional Engineer (20030165) Engineering Council of South Africa (ECSA) Nationality : British Years experience : 37 Accreditations : Registered with the Department of Water and Sanitation (RSA)as an APP for Dam Safety Registered as a Mentor with ECSA Registered as a Construction Mentor with UOFS (RSA) KEY QUALIFICATIONS "General Practitioner" with a wide range of experience:- 10 years Contracting experience in Europe, the Middle East and Southern Africa. 27 years Consulting experience in Southern Africa. Extensive experience in Municipal Infrastructure, particularly water supply and related projects, EMPLOYMENT RECORD 2014 - 2015 Project Manager (Rapid Response Unit - Dept. Water and Sanitation (RSA) The RRU is a specialist unit required to respond to a directive from the Department of Water and Sanitation (RSA) at short notice. The scope of services provided by the RRU and managed by the Candidate include but are not limited to the following:- Implementation and project management of water services capital infrastructure projects, feasibility studies, infrastructure master plans The elimination of externalities and spill over due to water services related emergencies or crises The augmentation the DWS’s capacity in responding to disasters i.e. floods’ droughts and pollution of water The design and implementation of proactive interventions aimed at pre-empting crises before they occur; The development of a diagnostic toolbox to facilitate the resolution of emergencies and crises The alignment of interventions with other stakeholders for long term sustainability The building of the capacity/transfer of skills to local government through the sharing of experience through interventions.
  • 2. 2012 - 2013 Sabbatical 2009 – 2012 Unit Manager/Technical Director : Aurecon South Africa (Pty) Ltd Responsible for the Border and Transkei Regions of the Eastern Cape incorporating the East London and Mthatha offices, comprising approximately 70 staff members. 2003 – 2009 Director: Ninham Shand Holdings (now Aurecon) Director : Amanz’ Abantu Services Business Unit Head : Ninham Shand : East London and Mthatha Offices Responsible for the Border and Transkei Regions of the Eastern Cape incorporating the East London and Mthatha offices, comprising approximately 35 staff members. 1998 - 2003 Director, Ninham Shand (East) (Pty) Ltd.(now Aurecon) Director, Cahi De Vries (Central) Inc. Technical director for the Border and Transkei Regions of the Eastern Cape 1991 - 1998 Senior Partner, Cahi De Vries.(now Aurecon) Responsible for the Border, Ciskei and Transkei Regions of the Eastern Cape incorporating the East London and Bhisho offices. 1984 - 1991 Engineer and Associate Partner, Cahi De Vries.(now Aurecon) 1981 - 1984 Contracts Manager, Murray and Roberts 1980 - 1981 Design Engineer, UK 1975 - 1979 Planning Officer/Technical Office Manager, Saudi Arabia 1974 – 1975 Site Engineer – Gleeson Civil Engineering, U.K EXPERIENCE RECORD 1984 – 2012 Technical Director and Unit Manager, Aurecon South Africa (Pty)Ltd Unit Manager responsible for the Border Region of the Eastern Cape (RSA) originally for Cahi de Vries until 2003, then after their merger with Ninham Shand until 2009 and after a further incorporation into Aurecon, a technical director and the Unit Manager for the same region, incorporating offices in East London and Umtata, and comprising approximately 70 staff members. In addition to the responsibilities of running a regional office which included all aspects of management dealing with corporate governance, business development, business planning, financial management, human resources, health and safety, quality management and general office administration, Mr Landolt continued working in the technical field throughout his tenure as Unit Manager. The specific line management and technical work carried out by Mr. Landolt during this period included the following: - Management of 6 Technical Directors - Providing mentorship to engineering and technical staff - Tendering for work on projects with values of $10 - $150 million. - Planning and design of institutional water supply schemes, including for raw water storage, raw water distribution, water treatment works, clear water storage reservoirs and clear water distribution - Planning and design of new Municipal Infrastructure including for roads, stormwater disposal, water treatment and reticulation, sewage treatment and reticulation, also on projects with value up to $ 100 million.
  • 3. - Planning and implementation of water conservation and demand management measures - Responsible for reviewing all water sector design and documentation issued - Contract administration and acting as the Engineer on projects with values up to $ 100 million. Mr. Landolt had various roles on many projects during this period, a few of which are recorded in detail below. 2009 –2013 Fort Beaufort Bulk Water Services Upgrading This project (12000m³/day) encompasses a raw water river abstraction facility on the Kat River, a new earth dam off-channel storage facility, both high and low lift raw water transfer pump stations and associated distribution pipelines, a new water treatment works and clear water storage and distribution facilities for the town of Fort Beaufort in the Eastern cape, RSA.. Personal responsibilities on this project included:-  Carrying out the feasibility study  Liaison with Employer and statutory authorities  Arranging for survey, the geotechnical investigation, environmental impact assessment, water quality tests, licences for raw water abstraction, impoundment and storage, wayleaves and servitudes etc.  Reviewing the feasibility study/planning and preparing the preliminary design and design reports  detail design of the river abstraction pump station, the earth embankment off-channel storage dam  detail design of the rising mains and gravity pipelines  detail design of the water treatment works  detail design of the clear water reservoirs  detail design of the clear water distribution mains  drawing up of tender and contract documentation  adjudication of Tenders  project management, including for management of the engineering site staff and contract administration acting as the Engineer  dealing with claims  overall responsibility for the project including for quality control, testing and commissioning of the works  quality management  health and safety  provision of construction and of record drawings,. 2009 –2012 Idutywa East Regional Water Supply Scheme This project provides for the supply of clear water to a rural area (c.300 sq.km) in the Eastern Cape, RSA. Personal responsibilities on this project included:-  Preparing the Tender submission for the provision of consulting services  Carrying out the feasibility study  Liaison with Employer and statutory authorities  Arranging for survey, the geotechnical investigation, environmental impact assessment, water quality tests, licences for raw water abstraction, impoundment and storage, wayleaves and servitudes etc.  Carrying out the feasibility study/planning and drawing up the necessary reports  detail design of the clear water reservoirs  detail design of the clear water distribution mains
  • 4.  drawing up of tender and contract documentation  adjudication of Tenders  project management, including for management of the engineering site staff and contract administration acting as the Engineer  overall responsibility for the project including for quality control, testing and commissioning of the works  quality management  health and safety  provision of construction and of record drawings,.Liaison with Employer and statutory authorities  Carrying out feasibility study/Planning  Review of Designs carried out by technical staff  Review of contract documentation  Safety 2007 – 2010 Ncera Macadamia Bulk Water Supply This project provides for the supply and storage of bulk raw water for the irrigation of macadamia nut trees in the Ncera area, west of East London and included for the inter-catchment transfer of raw water to a balancing dam serving the orchard. The works include for the provision of the river abstraction pumpstation, pumps, rising and gravity mains and the 50Ml storage dam. Mr Landolt was the project director and had similar responsibilities to those outlined in the projects above. 2008 – 2012 Ngqamakwe Regional Water Supply Scheme Ninham Shand as Lead Consultant in a joint venture partnership with Arcus Gibb, Sontinga Consulting Services and Sizo Engineering & Management Services, after a successful bid submission, were appointed to provide all engineering services for the Ngqamakwe Regional Water Supply Project (c. 500 sq.km) for Amathole District Municipality. This rural project encompasses an inter-basin transfer scheme consisting of a raw water river abstraction pump station, an off-channel storage facility, a raw water transfer pump station and a rising main delivering to a new water treatment works at Tsomo, the provision of a clear water pumps and a rising main delivering to a new regional reservoir and thereafter the bulk distribution of water to various reservoirs serving 118 villages in the region, together with the reticulation of the villages. Mr. Landolt was the project and design team leader responsible for delivering the scope of services which included the initial feasibility study, the hydrological assessment, geotechnical investigation, strategic environmental impact assessment, detail design of the river abstraction pump station, the raw water transfer pump station and pipelines including for water hammer analysis, the design of the new water treatment works, clear water pump stations, rising mains, storage reservoirs and both bulk and distribution pipework. Thereafter the drawing up of tender documentation, adjudicating of tenders, arranging of wayleaves, servitudes and environmental input assessment, contract administration, provision of construction and of record drawings, quality control and testing and commissioning. 2009 – 2011 Qongqotha (30Ml) and Berlin (6Ml) Reservoirs
  • 5. This project consisted of the detail design of a post-tensioned 30 Ml and a conventional reinforced concrete 6 Ml reservoir for Amatola Water. Mr. Landolt acted as the project leader on this project and was responsible for all aspects of the project from inception through to commissioning. 1993 – 2012 Mdantsane Urban Renewal/Services/Housing Mdantsane is a town of some 300 000 inhabitants situated to the north-west of East London. An urban renewal project was embarked upon in 1993 to upgrade and rehabilitate the services in the area and Cahi De Vries/Ninham Shand/Aurecon have since that date been involved on the following projects which were all under Mr Landolt’s control. The services provided included the following:  Assisting the Buffalo City Municipality with project management of the Urban Renewal Programme  Development of 850 housing units in Manyano and Thembelishle  An assessment of the condition and capacity of the bulk water supply infrastructure, the water reticulation network, the sewer reticulation network including the bulk outfall sewers and the water and wastewater treatment works.  Identifying and reporting on the rehabilitation required  Modelling of the water reticulation network  Identifying and reporting on the upgrade requirements.  An assessment of the volume of unaccounted for water in the town  Implementation of water conservation and demand management measures  Project Management, Planning, design, drawing up of tender documentation, adjudicating of tenders, arranging of wayleaves, servitudes and environmental input assessments, contract administration, provision of construction and of record drawings, quality control, testing and commissioning and generally assisting the Employer with reports and other controls. The following Contracts for which these and other services were provided either in whole or in part include the following:- New Bulk Water Supply Pipelines (400mm dia.-600mm dia.) New R.C.Clear Water Reservoirs (6 No) Provision of Rudimentary Services to Informal Settlements Supply and Installation of Fire Hydrants in Mdantsane Supply and Installation of Pressure Management Supply and Installation of District/Zonal Water Meters Leak Detection Leaks Repair and Maintenance Replacement of life-expired Pipes Sealing of Reservoirs Replacement of Pumpsets New Township Development (civil services and housing) New Interceptor Sewers including for Inverted Sewer Syphons Replacement of Sewers Refurbishment of 300 Sewer Pipe Bridges (150mm dia. – 1050mm dia.) 2002 – 2004 East London Industrial Development Zone The East London Industrial Development Zone is situated to the south and east of the city centre ideally sited between the harbour port of East London and the airport.
  • 6. The project includes for the upgrading of the arterial road links to and from the national and provincial roads, the airport and harbour, and the development of 400 hectares of industrial land to a world class standard. Of particular interest in the project were the studies carried out for traffic and transportation due to the major impact that the IDZ would have in the area, together with the approach by the Development Zone Corporation to the institutional requirements, environmental and health and safety concerns. Personal responsibilities included :- Liaison with local authorities Design team leader responsible for:  Arterial roads  Internal roads  Stormwater drainage  Attenuation dams  Sewer Reticulation  Sewer outfall and pumpstation  Water reticulation  Minor structures 1998 – 2001 Umtata Waste Water Treatment Works and Northern Sewers Upgrade This project includes for the complete refurbishment of the 20,0 Mℓ/d waste water treatment plant at Umtata and the construction of a 20kms of new outfall sewer with pipe diameters varying from 350mm to 800mm dia. Personal responsibilities on this project included:-  Review of the planning, design criteria and proposals and providing overall guidance to the project manager and his team. 1997-1998 Zwelitsha Water Tower Personal responsibilities included the preparation of the feasibility study, “architectural” design of several proposals for the tower, review of all the design criteria, geotechnical assessment, drawing up tender documentation, adjudicating of tenders, contract administration, provision of construction and of record drawings, quality control, testing and commissioning. 1996-1997 New Sewer Reticulation and Wastewater Treatment Works – Cathcart The project included for the upgrading of a “bucket” system at Cathcart in the Eastern Cape to a conventional water-borne sewerage system and for the planning, design and construction of a new activated sludge treatment plant. Personal responsibilities on this project included:-  Liaison with Employer and statutory authorities  Carrying out feasibility study/planning  Design team leader  Drawing up of contract documentation  Contract administration  Project management 1994-1996 Extension to Fort Jackson Industrial Area The project provided for an 80 hectare extension to an existing industrial area in Fort Jackson in the Eastern Cape, and included for the design and construction of
  • 7. the roads, stormwater drainage, water supply and reticulation, sewer reticulation and the electrical installation. Personal responsibilities included :-  Design team leader responsible for:  Arterial roads  Internal roads  Stormwater drainage including attenuation dams  Internal servicing  Sewer outfall and pumpstation  Internal water reticulation  Minor structures  Project management 1993-1994 Bridge Over Buffalo River The project provided for a new road and bridge access across the Buffalo River at King William’s Town in the Eastern Cape. The scope of services provided included for the feasibility study including for the hydrological assessment, geotechnical investigation, detail design and thereafter the drawing up of tender documentation, adjudicating of tenders, arranging of wayleaves, servitudes and environmental impact assessment, contract administration, provision of construction and of record drawings, quality control and testing and commissioning. 1991-2011 Urban and Rural Development – General More than 50 other individual projects were carried out during this period. The projects ranged from new water supply schemes for towns and providing engineering services to “greenfields” township developments of 2000-3000 housing sites through to relatively small projects. Most of the work was for Municipalities and included for the planning, feasibility, design, implementation of projects including for adjudicating of tenders, arranging of wayleaves, servitudes and environmental impact assessment, contract administration, provision of construction and of record drawings and quality control for all types of work, including but not limited to provision of access roads and bridges, urban streets, stormwater management, bulk water supply, storage, treatment, distribution and demand management, sewer reticulation, outfall and treatment, solid waste management, development of sports fields and stadia, erosion control etc. Earth Dam Experience 2005 – 2012 Bridle Drift Dam (Category III) Mr Landolt’s most recent experience (2005-2012) has been on the Bridle Drift Dam in East London, a major Category III dam providing for the bulk of East London’s raw water storage needs. Mr Landolt has assisted in the regular and 5 yearly inspections required in terms of the Dam Safety Act and has been responsible for identifying, and reporting on the remedial measures required to upgrade the dam to conform with the recognised dam safety regulations and thereafter to arrange and have the remedial works carried out on behalf of the registered owner of the dam. The remedial works required have in the most part been on the outlet works where all pipework and valves have been refurbished and relining of the outlet pipe connecting the tunnel to the outlet tower. Minor works have also been carried out to repair spalling concrete on the spillway.
  • 8. 2000 – 2003 Port St Johns Water Supply Scheme This rural project (4000m³/day) encompasses an inter-basin transfer scheme consisting of a raw water river abstraction pumpstation, an off-channel storage facility, a raw water transfer pump station and various pipelines delivering to a new water treatment works at Port St Johns in the Eastern Cape. The scope of services provided included the initial feasibility study, the hydrological assessment, geotechnical investigation, environmental impact assessment, detail design of the river abstraction pump station, the water treatment works, the earth embankment off-channel storage dam, the raw water transfer pump station and pipelines including for water hammer analysis. Thereafter the drawing up of tender documentation, adjudicating of tenders, arranging of wayleaves, servitudes and environmental input assessment, contract administration, provision of construction and of record drawings, quality control and testing and commissioning. Personal responsibilities on this project included:-  Liaison with Employer and statutory authorities  Carrying out feasibility study/Planning  Design team leader  Design of on-channel raw water intake pumpstation  Design of earth embankment dam and spillway  Design of Water Treatment Works  Drawing up of contract documentation  Contract administration 2002-2003 Koch Dams – Cathcart Mr. Landolt assisted in the initial dam safety inspection and was responsible for the inspection, drawing up the report and recommending the remedial works required in terms of dam safety requirements, and tfereafter arranging and having the Works carried out on behalf of the Employer. These included for increasing the capacity of the spillway of both the upper and lower dams, construction of toe-drains and measuring weirs and the repair of a slope failure in the lower dam. 2003-2006 Jamestown Off-Channel Dam (Category II) Mr Landolt has been involved in all aspects of the project including for the feasibility study, planning and design of the proposed earth embankment off- channel dam and spillway and thereafter having the works carried out on behalf of the Employer. The project includes for a river abstraction pumpstation, the off-channel storage dam, a raw water transfer pipeline, water treatment plant and for clear water distribution and storage facilities. 2000–2002 Raising of Sam Meyer Dam (Category II) The project included for the raising of an existing earth embankment dam at Cathcart in the Eastern Cape to augment the raw water storage capacity, together with the implementation of the remedial measures required in terms of the dam safety report submitted by Mr D Cahi.
  • 9. Mr Landolt was intimately involved in this project and was responsible for the investigation, planning and design of the raised structure. The works included for raising the embankment dam by 3,1m and for the construction of a new straight drop arch-buttress spillway together with other associated works. 1994-1995 Anderson Dam, Dordrecht (Category III) This project included for the construction of a new earth embankment dam and a smaller transfer structure on an adjoining tributary. Mr Landolt was involved in the design of the earth embankment dam and acted as the Engineer’s Representative for the construction. 1984-1994 Earth Embankment Dams – Other Mr Landolt also acted as Engineer’s Representative for the construction of new earth embankment dams at Winburg and Clocolan, and was exposed to the planning and design of similar dams at Marquard and Reitz. Mr Landolt has also been involved in investigating the mode of failure of 3 substantial farm dams Construction Mentoring 2004 – 2006 Eastern Cape Development Corporation – Kei Rail Project The Eastern Cape Development Corporation provides finance for entrepreneurial projects. As part of this service, the ECDC provides mentorship to previously disadvantaged Contractor’s to enable them to advance their knowledge and capability. Mr Landolt is a registered Mentor and was appointed by the ECDC to provide this mentorship on the Kei Rail Refurbishment Project. The project includes for the refurbishment of the earthworks, stormwater drainage features and structures, access roads, level crossings, the trackwork and fencing of 110kms of track between Idutywa and Mthata in the Eastern Cape. The mentor’s responsibilities included for  Guiding and advising the Contractor in areas where skills need to be improved and in particular developing the Contractor’s technical, managerial, administrative and commercial knowledge  Assisting the Contractor to set up and/or improve business system Construction Monitoring 1985-1989 As mentioned under the earth dam section above, Mr. Landolt has had significant experience acting as the Engineer"s representative (RE) on contracts involving the construction of earth dams and associated works. Mr. Landolt also held the position of Resident Engineer on a 20Ml/day extension to the Bloemfontein Wastewater Treatment Works during this period.
  • 10. CONTRACTING EXPERIENCE 1983-1984 Construction of 100 houses at Botshabelo in three month period (± 5500m²). Contracts Manager 1982-1983 Extension to Harrismith Sewage Treatment Works Road and Bridge at Warden Contracts Manager 1981-1982 Construction of a road over river bridge in Lesotho Site Agent 1978-1981 Construction of stage IV of the Port of Jeddah, Saudi Arabia Member of management team of six people, comprising two from each of the joint venture participants additional responsibilities. Management of technical office with responsibility for planning and programming of all works including dredging and hydraulic fill operations, landfill, quay wall construction, transit shed and warehouse construction, building construction, roads and services etc. All of the above using critical path analysis and hand generation of cash flow forecasts, resourcing requirements for plant, labour and materials, development of S-curves etc. Implementation of a cost control system in conjunction with a team of management consultants and thereafter production of monthly cost reports. Temporary Works Design Ordering all imported material Sub-contractor co-ordination 1975-1978 Construction of Stages II and III of the Port of Jeddah, Saudi Arabia Manager of section responsible for the construction of the bulk water supply infrastructure, water reticulation, fire mains (saltwater), stormwater channels and pipes etc. Structures included a 46 000m³ R.C. reservoir, an 800m³ water tower and five pumpstations. Responsibilities included management of personnel, planning and programming, construction, liaison with client/consulting engineer. Estimating and tendering on new works. Measurement Claims 1974-1975 Construction of Access Roads for Dinowic pumped storage hydroelectric scheme, UK Setting out of roads through mountainous terrain. Selection and testing of materials for layerworks. 1972-1973 Construction of Hoddesdon ByPass Setting out of roads, stormwater, subsoil drainage. Setting out of R.C. bridges and culverts. Supervision of formwork erection, steel fixing and concrete placement. EDUCATION
  • 11. BSc(Hons.) (Civ.Eng) University of Surrey, UK (1970-1974) CAREER ENHANCING COURSES University of Pretoria July 1987 Planning and Operation of Water Resource Development Projects University of Pretoria July 1988 Flood Hydrology University of Pretoria University of Witwatersrand University of Pretoria Various November 1988 April 1992 March 2011 Various Dam Design Advanced Water Treatment Pump Station Design Construction management General Conditions of Contract (GCC) RC design Soil stability Pipeline design LANGUAGES Reading Writing Speaking English Excellent Excellent Excellent By my signature below I certify the correctness of the information above and my availability to undertake this assignment. _____________________ ______________ SJ Landolt Date