Buddh International
Circuit
By-Sumit Gupta
 INTRODUCTION
 The Budhh International circuit is an Indian Motor racing circuit situated in Greater
Noida, Uttar Pradesh, 40 kms away from Delhi.
 It is one of the fastest race tracks in the world.
 It was constructed by a leading Civil Engineering company JPSK Sports Pvt. Ltd.
 Herman Tilke, a German designer was appointed as the track designer for BIC.
 The project started in between 2007-2008 and 28th October’11 was the deadline.
 Table of Contents
Project Execution Plan
Some Basic Facts
Construction Of Track
Main Grandstand
Conclusion
Acquisition of land.
Construction of first layer of circuit.
Construction of second layer of circuit.
Construction of Main Grand Stand.
Construction of final layer of circuit.
 PROJECTEXECUTIONPLAN
 SOME BASIC FACTS
 4 million ton of earth was moved.
 The aggregates were imported from 300 Kms away from the race
track.
 325 tons of asphalt and 130,000 cubic metres of concrete were used in
the whole construction.
 450 Kms of optical fiber was used in the “Digital Monitoring and
Control Unit” building.
 Total cost involved in the whole construction was Rs. 20 Billion.
 CONSTRUCTIONOFTRACK
Granular Sub Base (25 cm)
Wet Mix Macadam (20 cm)
Asphalt Base Coarse (9 cm)
Binder coarse (5 cm)
Asphalt Layer (4 cm)
5.14 kms clockwise track with 16 turns and a maximum elevation of 14 m.
 The long stretch records the top speed of over 320 kmph.
 Turn -10 is a long drawn out 215° Parabolic loop.
DIAGRAMATIC SKETCH OF RACE-TRACK
 MAINGRANDSTAND
 Elevation of 30 m and the span length is 438 m, which is 4 times the length of an average
football field.
56 trusses, each weighing around 14 tonnes were placed laterally to each other.
 Trusses of 16 varying specifications were required.
 The 40 m cantilever roof with 50,000 sq. meter of insulated Aluminium sheeting.
40 m long cantilever Truss
Divided into two parts
Double Cover Lap Joint
Lap Joint
 Conclusion
• The Buddh International Circuit had an eminent opening for the first race
of Indian Grand Prix in Oct’11.
• The project was well executed and finished on time in spite of so many
challenges and hurdles.
• The fastest speed achieved on this track has been recorded as 321 Kmph,
which is one of the highest records in the world. Hence, this track has not
only increased the pride of our country, but also made our country stand
among other nations in the field of Civil Engineering.
 THANKYOU

More Related Content

What's hot

school of architecture site study
school of architecture site studyschool of architecture site study
school of architecture site studyMohd Nazim
 
Chhatrapati Shivaji International Airport
Chhatrapati Shivaji International AirportChhatrapati Shivaji International Airport
Chhatrapati Shivaji International AirportRohit Kumar Tiwari
 
The Ascari Private Race Track Resort
The Ascari Private Race Track Resort The Ascari Private Race Track Resort
The Ascari Private Race Track Resort Luxury24seven
 
Case Study : EXHIBITION AND CONVENTION CENTRE
Case Study : EXHIBITION AND CONVENTION CENTRE Case Study : EXHIBITION AND CONVENTION CENTRE
Case Study : EXHIBITION AND CONVENTION CENTRE Siddiq Salim
 
Beijing daxing international airport world's first airport with single terminal
Beijing daxing international airport world's first airport with single terminalBeijing daxing international airport world's first airport with single terminal
Beijing daxing international airport world's first airport with single terminalarchitecturesideas
 
Bye laws of DDA sports complex
Bye laws of DDA sports complexBye laws of DDA sports complex
Bye laws of DDA sports complexmuabz
 
FINAL PROJECT TRAIN STATION
FINAL PROJECT TRAIN STATIONFINAL PROJECT TRAIN STATION
FINAL PROJECT TRAIN STATIONDiaa Hilal
 
Paramount golf foreste
Paramount golf foresteParamount golf foreste
Paramount golf foresteSomya23
 
Terminal 3_Indira Gandhi International Airport
Terminal 3_Indira Gandhi International AirportTerminal 3_Indira Gandhi International Airport
Terminal 3_Indira Gandhi International AirportAnkita Kolamkar
 
Commercial property dadar
Commercial property dadarCommercial property dadar
Commercial property dadarRAAJESH SHETH
 
The capital nomination 31-08-2013
The capital nomination   31-08-2013The capital nomination   31-08-2013
The capital nomination 31-08-2013engineeringwatch
 
Building Bye-Laws of Chandigarh
Building Bye-Laws of ChandigarhBuilding Bye-Laws of Chandigarh
Building Bye-Laws of ChandigarhSumit Ranjan
 
NATIONAL INSITUTE OF DESIGN
NATIONAL INSITUTE OF DESIGN NATIONAL INSITUTE OF DESIGN
NATIONAL INSITUTE OF DESIGN Ar Naveen Naveen
 
presentation on the literature and case study of cricket stadium
presentation on the literature and case study of cricket stadium presentation on the literature and case study of cricket stadium
presentation on the literature and case study of cricket stadium Kathmandu Engineering College
 

What's hot (20)

Yamuna expressway
Yamuna expresswayYamuna expressway
Yamuna expressway
 
school of architecture site study
school of architecture site studyschool of architecture site study
school of architecture site study
 
Chhatrapati Shivaji International Airport
Chhatrapati Shivaji International AirportChhatrapati Shivaji International Airport
Chhatrapati Shivaji International Airport
 
Parking standards
Parking standardsParking standards
Parking standards
 
Yamuna sports complex
Yamuna sports complexYamuna sports complex
Yamuna sports complex
 
The Ascari Private Race Track Resort
The Ascari Private Race Track Resort The Ascari Private Race Track Resort
The Ascari Private Race Track Resort
 
Case Study : EXHIBITION AND CONVENTION CENTRE
Case Study : EXHIBITION AND CONVENTION CENTRE Case Study : EXHIBITION AND CONVENTION CENTRE
Case Study : EXHIBITION AND CONVENTION CENTRE
 
Beijing daxing international airport world's first airport with single terminal
Beijing daxing international airport world's first airport with single terminalBeijing daxing international airport world's first airport with single terminal
Beijing daxing international airport world's first airport with single terminal
 
Bye laws of DDA sports complex
Bye laws of DDA sports complexBye laws of DDA sports complex
Bye laws of DDA sports complex
 
FINAL PROJECT TRAIN STATION
FINAL PROJECT TRAIN STATIONFINAL PROJECT TRAIN STATION
FINAL PROJECT TRAIN STATION
 
Paramount golf foreste
Paramount golf foresteParamount golf foreste
Paramount golf foreste
 
Terminal 3_Indira Gandhi International Airport
Terminal 3_Indira Gandhi International AirportTerminal 3_Indira Gandhi International Airport
Terminal 3_Indira Gandhi International Airport
 
Final
FinalFinal
Final
 
Commercial property dadar
Commercial property dadarCommercial property dadar
Commercial property dadar
 
Sepang International Circuit
Sepang International CircuitSepang International Circuit
Sepang International Circuit
 
The capital nomination 31-08-2013
The capital nomination   31-08-2013The capital nomination   31-08-2013
The capital nomination 31-08-2013
 
Building Bye-Laws of Chandigarh
Building Bye-Laws of ChandigarhBuilding Bye-Laws of Chandigarh
Building Bye-Laws of Chandigarh
 
Jns stadium, Delhi.
Jns stadium, Delhi.Jns stadium, Delhi.
Jns stadium, Delhi.
 
NATIONAL INSITUTE OF DESIGN
NATIONAL INSITUTE OF DESIGN NATIONAL INSITUTE OF DESIGN
NATIONAL INSITUTE OF DESIGN
 
presentation on the literature and case study of cricket stadium
presentation on the literature and case study of cricket stadium presentation on the literature and case study of cricket stadium
presentation on the literature and case study of cricket stadium
 

Similar to Buddh international circuit

Uemc apr 19_2011
Uemc apr 19_2011Uemc apr 19_2011
Uemc apr 19_2011Harith
 
Dcl hdd presentation 9 2-2014
Dcl hdd presentation 9 2-2014Dcl hdd presentation 9 2-2014
Dcl hdd presentation 9 2-2014Mohammed wahab
 
flyover internship 2
flyover internship 2flyover internship 2
flyover internship 2Ravi Mehta
 
EASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORTEASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORTATUL SHUKLA
 
Dismantling of existing ROB, CSB Nagpur, AFCONS
Dismantling of existing ROB, CSB Nagpur, AFCONSDismantling of existing ROB, CSB Nagpur, AFCONS
Dismantling of existing ROB, CSB Nagpur, AFCONSSaritaJoshi5
 
Uemc apr 19_2011
Uemc apr 19_2011Uemc apr 19_2011
Uemc apr 19_2011Harith
 
Presentation on Millau viaduct
Presentation on Millau viaductPresentation on Millau viaduct
Presentation on Millau viaductJayanta Sen
 
Construction of Utility Tunnel phase ll
Construction of Utility Tunnel phase  llConstruction of Utility Tunnel phase  ll
Construction of Utility Tunnel phase llRavi Bhadani
 
Padma multipurpose bridge
Padma multipurpose bridgePadma multipurpose bridge
Padma multipurpose bridgeKaiyumHossain3
 
UHPFRC Bridges -Presentation dated 07052022_221007_074633.pdf
UHPFRC Bridges -Presentation dated 07052022_221007_074633.pdfUHPFRC Bridges -Presentation dated 07052022_221007_074633.pdf
UHPFRC Bridges -Presentation dated 07052022_221007_074633.pdfSatvikAnandSingh
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 
Kolkata metro rail via-duct project
Kolkata metro rail via-duct projectKolkata metro rail via-duct project
Kolkata metro rail via-duct projectrajnish singh
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 

Similar to Buddh international circuit (20)

Uemc apr 19_2011
Uemc apr 19_2011Uemc apr 19_2011
Uemc apr 19_2011
 
Dcl hdd presentation 9 2-2014
Dcl hdd presentation 9 2-2014Dcl hdd presentation 9 2-2014
Dcl hdd presentation 9 2-2014
 
flyover internship 2
flyover internship 2flyover internship 2
flyover internship 2
 
EASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORTEASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORT
 
Dismantling of existing ROB, CSB Nagpur, AFCONS
Dismantling of existing ROB, CSB Nagpur, AFCONSDismantling of existing ROB, CSB Nagpur, AFCONS
Dismantling of existing ROB, CSB Nagpur, AFCONS
 
Metro project in inda
Metro project in indaMetro project in inda
Metro project in inda
 
Bandra worli sea link
Bandra worli sea linkBandra worli sea link
Bandra worli sea link
 
Uemc apr 19_2011
Uemc apr 19_2011Uemc apr 19_2011
Uemc apr 19_2011
 
Presentation on Millau viaduct
Presentation on Millau viaductPresentation on Millau viaduct
Presentation on Millau viaduct
 
Transportation Engineering
Transportation EngineeringTransportation Engineering
Transportation Engineering
 
Mmmodified copy
Mmmodified   copyMmmodified   copy
Mmmodified copy
 
Construction of Utility Tunnel phase ll
Construction of Utility Tunnel phase  llConstruction of Utility Tunnel phase  ll
Construction of Utility Tunnel phase ll
 
Paper
PaperPaper
Paper
 
2020 Hyundai-brochure
2020 Hyundai-brochure2020 Hyundai-brochure
2020 Hyundai-brochure
 
Tekla Global BIM Awards 2012
Tekla Global BIM Awards 2012Tekla Global BIM Awards 2012
Tekla Global BIM Awards 2012
 
Padma multipurpose bridge
Padma multipurpose bridgePadma multipurpose bridge
Padma multipurpose bridge
 
UHPFRC Bridges -Presentation dated 07052022_221007_074633.pdf
UHPFRC Bridges -Presentation dated 07052022_221007_074633.pdfUHPFRC Bridges -Presentation dated 07052022_221007_074633.pdf
UHPFRC Bridges -Presentation dated 07052022_221007_074633.pdf
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
Kolkata metro rail via-duct project
Kolkata metro rail via-duct projectKolkata metro rail via-duct project
Kolkata metro rail via-duct project
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 

Recently uploaded

APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 

Recently uploaded (20)

APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 

Buddh international circuit

  • 2.  INTRODUCTION  The Budhh International circuit is an Indian Motor racing circuit situated in Greater Noida, Uttar Pradesh, 40 kms away from Delhi.  It is one of the fastest race tracks in the world.  It was constructed by a leading Civil Engineering company JPSK Sports Pvt. Ltd.  Herman Tilke, a German designer was appointed as the track designer for BIC.  The project started in between 2007-2008 and 28th October’11 was the deadline.
  • 3.  Table of Contents Project Execution Plan Some Basic Facts Construction Of Track Main Grandstand Conclusion
  • 4. Acquisition of land. Construction of first layer of circuit. Construction of second layer of circuit. Construction of Main Grand Stand. Construction of final layer of circuit.  PROJECTEXECUTIONPLAN
  • 5.  SOME BASIC FACTS  4 million ton of earth was moved.  The aggregates were imported from 300 Kms away from the race track.  325 tons of asphalt and 130,000 cubic metres of concrete were used in the whole construction.  450 Kms of optical fiber was used in the “Digital Monitoring and Control Unit” building.  Total cost involved in the whole construction was Rs. 20 Billion.
  • 6.  CONSTRUCTIONOFTRACK Granular Sub Base (25 cm) Wet Mix Macadam (20 cm) Asphalt Base Coarse (9 cm) Binder coarse (5 cm) Asphalt Layer (4 cm)
  • 7. 5.14 kms clockwise track with 16 turns and a maximum elevation of 14 m.  The long stretch records the top speed of over 320 kmph.  Turn -10 is a long drawn out 215° Parabolic loop. DIAGRAMATIC SKETCH OF RACE-TRACK
  • 8.  MAINGRANDSTAND  Elevation of 30 m and the span length is 438 m, which is 4 times the length of an average football field. 56 trusses, each weighing around 14 tonnes were placed laterally to each other.  Trusses of 16 varying specifications were required.  The 40 m cantilever roof with 50,000 sq. meter of insulated Aluminium sheeting.
  • 9. 40 m long cantilever Truss Divided into two parts Double Cover Lap Joint Lap Joint
  • 10.  Conclusion • The Buddh International Circuit had an eminent opening for the first race of Indian Grand Prix in Oct’11. • The project was well executed and finished on time in spite of so many challenges and hurdles. • The fastest speed achieved on this track has been recorded as 321 Kmph, which is one of the highest records in the world. Hence, this track has not only increased the pride of our country, but also made our country stand among other nations in the field of Civil Engineering.