UEM CONSTRUCTION SDN BHD   http://www.uembuilders.com/uemc_n/
CORPORATE STRUCTURE       UEM Builders       UEM Builders-Ansal    (Singapore) Pte Ltd      API Pvt Ltd
Buildings -   Hospitals -   Airports -   Townships -   Stadiums -   Industrial Parks -   Residential & Commercial         ...
500              400              300USD Million              200              100                0                    200...
   40 years’ experience in engineering & construction   880 experienced professional staff (Engineers, Architects, QS,  ...
LANDMARK PROJECTShttp://www.uembuilders.com/uemc_n/
NORTH SOUTH EXPRESSWAY     848 km of tolled expressway     Completed in 1993     Project cost: USD 1.8 bil.     Role: ...
KUALA LUMPUR INTERNATIONAL AIRPORTIntegrated Development                         Development Area                100 km2  ...
NATIONAL SPORTS COMPLEX   100,000 seat capacity National Stadium (outdoor stadium)    16,000 seat Putra Stadium (indoor s...
KUALA LUMPUR LIGHT RAIL TRANSIT Total length: 29 km (22 km elevated, 5 km underground and 2 km  at-grade) First world’s ...
COMPLETED PROJECTShttp://www.uembuilders.com/uemc_n/
EXPRESSWAYS                                                                                    NORTH SOUTH                ...
NORTH-SOUTH EXPRESSWAY     Construction of several packages amounting to 203 km dual      two lanes tolled expressway.  ...
NORTH SOUTH EXPRESSWAY CENTRAL LINK        Construction of 45 km of tolled expressway linking NKVE to         Nilai North...
MALAYSIA-SINGAPORE SECOND CROSSING BRIDGE   Construction of 44 km of dual two/three lane tolled    expressway and 2 km of...
NORTH-SOUTH EXPRESSWAY- THIRD LANE WIDENING North South Expressway – Proposed Third    Lane Widening and Modification for...
PENANG BRIDGE WIDENING   Construction of widening of the existing Penang Bridge.   Involvement of rejuvenation of the ex...
COMPLETED HIGHWAYS IN INDIA
MAJOR HIGHWAYS COMPLETED IN INDIA   Construction & Maintenance (for 15 years) of    Tuni - Anakapalli, NH 5, Andhra Prade...
MAJOR HIGHWAYS COMPLETED IN INDIA Bhiwandi-Kalyan-Shil   Phata, Maharastra     Length                 : 25 km.     Proj...
MANILA-CAVITE TOLL EXPRESSWAY PKG 1, PHILIPPINES                     Upgrading of existing R1 Expressway                 ...
PROJECT IN QATAR         Qatar Primary Routes - Salwa Road Phase 1         Upgrading 81 km dual 4 lane highway linking  ...
TRANSPORTATION                                                              ELECTRIFIED DOUBLE TRACK                      ...
PUTRA LIGHT RAIL TRANSIT STATIONS, KUALA LUMPUR      Completed: 1999      Value: USD 494.3 millionProject involved the c...
IPOH-RAWANG ELECTRIFIED DOUBLE TRACKING            Construction of 155 bridge crossings for the 182 km             electr...
BUILDINGS & FACILITIESMARDI Agriculture CentreConstruction of National Stadium,aquatic centre and indoor stadium          ...
NATIONAL SPORTS COMPLEX, BUKIT JALIL, KUALA LUMPUR    Completed: 1998    Value: USD 286 million100,000 capacity National...
COMMONWEALTH GAMES VILLAGE, BUKIT JALIL, KUALA LUMPUR     Completed: 1998     Value: USD 77.7 million     Gross Floor A...
KUALA LUMPUR INTERNATIONAL AIRPORT,                SATELLITE BUILDING, SEPANG     Completed: 1998     Value: USD 157 mil...
EAST MALAYSIA HOSPITALS      Completed: 2005      Value: USD 256 million     The planning, design, construction, equippi...
EAST MALAYSIA HOSPITALS                                                   Sarikei, Sarawak                                ...
EAST MALAYSIA HOSPITALS                                                    Kuala Penyu, Sabah                             ...
EAST MALAYSIA HOSPITALSKeningau, Sabah                                       Completed: September 2002                   ...
EAST MALAYSIA HOSPITALSLahad Datu, Sabah                                     Completed: January 2002                     ...
EAST MALAYSIA HOSPITALSSarikei Hospital, Malaysia (268 Beds)   Completed: December 2003   Value: USD 74 million   Total...
UNIVERSITY OF TECHNOLOGY PETRONAS (UTP) MOSQUE,                 TRONOH, PERAK                        Completed: October 2...
DANAU VILLA LINK HOME, TAMAN DESA, KUALA LUMPUR• Commenced: 10 September 2004• Completion: 6 November 2005• Value: USD90.5...
MINISTRY OF FINANCE BUILDING 2, PUTRAJAYA                 Commenced: 4 December 2002                 Completed: 30 April...
CASA DESA CONDOMINIUM, KUALA LUMPURCommenced: 11 July 2005Completed : 31 March 2008    For the 410-unit Casa Desa Condom...
AGRICULTURE EXPOSITION CENTRE (PHASE 2)-MARDI, SERDANG Project : Agriculture Exposition Centre (Phase 2) –   MARDI, Serda...
JOHOR STATE NEW ADMINISTRATIVE CENTRE (JSNAC),                          PHASE 1, JOHOR    Commenced: November 2005    Co...
STATE DEPARTMENT COMPLEX (JSNAC), NUSAJAYACommenced: November 2005Completed: February 2009Value: USD 63 million
UEM GROUP NEW CORPORATE OFFICE, KUALA LUMPUR                         Commenced: 1 June 2005                         Comp...
PLUS HEADQUARTERS, SUBANG              Development of one block of 10-storey               office tower at Subang Toll, P...
NATIONAL HEART INSTITUTE, KUALA LUMPURCommenced: 5 September 2005Completed: March 2009Value: USD 64.6 millionGross Flo...
COLLEGE OF TECHNOLOGY (COT), DOHA, QATAR Constructionof 21 multidisciplinary buildings comprisingclassrooms, workshops/la...
GOVERNMENT APARTMENTS, PUTRAJAYA             Project : 548 Units (5 Blocks) Apartment             Using Industrialised B...
RESORTS WORLD AT SENTOSA, SINGAPORE Proposed Basement Structural Works for   Universal Studio Commenced: March 2008     ...
ON-GOING PROJECTShttp://www.uembuilders.com/uemc_n/
BANK KERJASAMA RAKYAT HEADQUARTERS, KUALA LUMPUR    Design, construction and completion of 2 office      towers (32 and 3...
PENANG SECOND BRIDGE Project : Design, Construction and Completion of the  Penang Second Bridge.    Package 2 : Super-st...
PHG’-S’GOR RAW WATER TRANSFER PROJECT                       Pahang - Selangor Raw Water Transfer                         ...
   1,765-acre Sushant Golf City Project in Lucknow, Uttar Pradesh                                          Project : Con...
4000 UNITS HOUSING PROJECT, BRUNEI Project : 4000 units Housing Project for the   National Housing Scheme, Brunei. Comme...
NEW LCC TERMINAL AT KLIA, SEPANG               Project : Design, Construction and Completion,                 Testing, Co...
Thank YouThis document is the property of United Engineers (Malaysia) Berhad. Neither the whole nor any part of this docum...
Upcoming SlideShare
Loading in …5
×

Uemc apr 19_2011

1,691 views

Published on

UEMC Co Profile

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,691
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
19
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Uemc apr 19_2011

  1. 1. UEM CONSTRUCTION SDN BHD http://www.uembuilders.com/uemc_n/
  2. 2. CORPORATE STRUCTURE UEM Builders UEM Builders-Ansal (Singapore) Pte Ltd API Pvt Ltd
  3. 3. Buildings - Hospitals - Airports - Townships - Stadiums - Industrial Parks - Residential & Commercial Infrastructure - Roads - Rail - Drainage - Bridges - Utilities - LandscapingEarthworks- Earth cutting and filling- Ground treatment- Retaining wall system
  4. 4. 500 400 300USD Million 200 100 0 2007 2008 2009 Year
  5. 5.  40 years’ experience in engineering & construction 880 experienced professional staff (Engineers, Architects, QS, Accountants) USD 315 million paid up capital USD 1.3 billion total assets Machineries available for local and international projects USD 80mil worth of equipment in India, Malaysia and Qatar
  6. 6. LANDMARK PROJECTShttp://www.uembuilders.com/uemc_n/
  7. 7. NORTH SOUTH EXPRESSWAY  848 km of tolled expressway  Completed in 1993  Project cost: USD 1.8 bil.  Role: Concessionaire, Project Management, Construction
  8. 8. KUALA LUMPUR INTERNATIONAL AIRPORTIntegrated Development Development Area 100 km2 Development Period 7 years Gross Development Value (GDV) USD 3.6 bil Project Management Role Construction (Satellite Building)
  9. 9. NATIONAL SPORTS COMPLEX 100,000 seat capacity National Stadium (outdoor stadium) 16,000 seat Putra Stadium (indoor stadium) 3,700 seat National Aquatic Centre (swimming complex) Completed in 1998 Project cost: USD 400 million Role: Concessionaire, Project Management, Construction
  10. 10. KUALA LUMPUR LIGHT RAIL TRANSIT Total length: 29 km (22 km elevated, 5 km underground and 2 km at-grade) First world’s longest driverless LRT system completed in 1999 Capacity: 25,000 passengers/hr/direction Project cost: USD2.04 billion Role: Concessionaire, Project Management, Construction.
  11. 11. COMPLETED PROJECTShttp://www.uembuilders.com/uemc_n/
  12. 12. EXPRESSWAYS NORTH SOUTH EXPRESSWAY Construction and O&M of 955 km tolled HighwayPENANG BRIDGEOperation and Maintenance of 13.5 km bridgeMALAYSIA SINGAPORE SECOND CROSSINGConstruction and O&M of 44 km of highways including 2 km bridge NORTH SOUTH EXPRESSWAY CENTRAL LINK Construction and O&M of 45 km of tolled expressway
  13. 13. NORTH-SOUTH EXPRESSWAY  Construction of several packages amounting to 203 km dual two lanes tolled expressway.  Involved in implementation of heavy repair works and routine maintenance of the completed 848 km expressway since 1994.  Completed in May 1995.  Project cost: USD 630 million.
  14. 14. NORTH SOUTH EXPRESSWAY CENTRAL LINK  Construction of 45 km of tolled expressway linking NKVE to Nilai North Interchange at NSE. Gateway to KLIA airport and Cyberjaya/Putrajaya.  Involved in implementation of heavy repair works and routine maintenance of the completed 60 km expressway since 1997.  Completed in December 1997.  Project cost: USD 236 million.
  15. 15. MALAYSIA-SINGAPORE SECOND CROSSING BRIDGE Construction of 44 km of dual two/three lane tolled expressway and 2 km of bridge linking Johor to Singapore and to Johor City & NSE. Involved in implementation of heavy repair works and routine maintenance of the completed 44 km expressway since 1997. Completed in December 1997. Project cost: USD 310 million.
  16. 16. NORTH-SOUTH EXPRESSWAY- THIRD LANE WIDENING North South Expressway – Proposed Third Lane Widening and Modification for Non- Stop Through Traffic for Packages 1, 2A, 2B, 3A, 3B, 4, 5 and 5A. Commenced: Package 1 -July 2005 (Completed) Package 2A,2B,3A,3B & 4 –Aug 2005 (Completed) Package 5 – August 2005 (Completed) Package 5A –July 2005 (Completed) Value : USD 253 million
  17. 17. PENANG BRIDGE WIDENING Construction of widening of the existing Penang Bridge. Involvement of rejuvenation of the existing east side approach embankment foundations alongside extending the existing substructure of the main viaduct and providing longitudinal beams and construction of Uni- Directional Ramps to mainland side. Completed on August 2009. Project cost: USD 143 million.
  18. 18. COMPLETED HIGHWAYS IN INDIA
  19. 19. MAJOR HIGHWAYS COMPLETED IN INDIA Construction & Maintenance (for 15 years) of Tuni - Anakapalli, NH 5, Andhra Pradesh  Length : 59 km.  Project Cost (@ EPC) : USD 48 mil. Construction & Maintenance (for 15 years) of Tambaram-Tindivanam,NH 45,Tamil Nadu  Length : 93 km.  Project Cost : USD 63 mil. Tumkur–Haveri-NH4, Pkg. 2,4,5-Karnataka  Length : 200 km.  Project Cost (@ EPC) : USD 152.7 mil.
  20. 20. MAJOR HIGHWAYS COMPLETED IN INDIA Bhiwandi-Kalyan-Shil Phata, Maharastra  Length : 25 km.  Project Cost : USD 17 mil. Etawah to Sikandra-NH 2, Uttar Pradesh – Pckg.1C  Length : 72km.  Project Cost : USD 63 mil. Kerala State Transport Project Phase-1  Length : 127 km.  Project Cost : USD 50 mil.
  21. 21. MANILA-CAVITE TOLL EXPRESSWAY PKG 1, PHILIPPINES  Upgrading of existing R1 Expressway  Length: 6.6km dual 3-lane highway  Completed: April 1998  Project cost: USD23 million
  22. 22. PROJECT IN QATAR  Qatar Primary Routes - Salwa Road Phase 1  Upgrading 81 km dual 4 lane highway linking Qatar-Saudi Border at Salwa to Doha  Total project cost: USD 265 million.  Completed: December 2008
  23. 23. TRANSPORTATION ELECTRIFIED DOUBLE TRACK Construction of total 182km of Electrified Double Track Railway Lines between two major citiesLIGHT RAIL TRANSIT SYSTEMConstruction of total 29km elevated, underground and atgrade track including stations for the driverless automatedLight Rail Transit.
  24. 24. PUTRA LIGHT RAIL TRANSIT STATIONS, KUALA LUMPUR Completed: 1999 Value: USD 494.3 millionProject involved the construction of 29 km track way for LightRail Transit System in Kuala Lumpur involving 22 km elevatedtrack, 5 km underground tunnel and 2 km at-grade track.Construction of 5 underground LRT stations, 17 above-groundand 2 at-grade stations throughout the LRT system.Longest driverless automated LRT in the world.Implemented in November 1994 and completed in June 1999.
  25. 25. IPOH-RAWANG ELECTRIFIED DOUBLE TRACKING  Construction of 155 bridge crossings for the 182 km electrified railway line linking Rawang to Ipoh.  Project Cost: USD 436 million.  31st March 2007
  26. 26. BUILDINGS & FACILITIESMARDI Agriculture CentreConstruction of National Stadium,aquatic centre and indoor stadium NATIONAL HEART INSTITUTEfor the nation sport facilities. Construction of new healthcare facilities for the extension of the National Heart Institute.NATIONAL SPORTS COMPLEX KUALA LUMPUR INTERNATIONALConstruction of National Stadium, aquatic centreand indoor stadium for the nation sport facilities. AIRPORT (KLIA) Construction of Satellite Building and ancillary works for the Malaysia’s largest airport.MINISTRY OF FINANCE II BUILDINGConstruction of Government Building for theFederal Government Administrative Centre inPutrajaya. JSNAC Construction of Johor State New Administration Centre in Johor
  27. 27. NATIONAL SPORTS COMPLEX, BUKIT JALIL, KUALA LUMPUR Completed: 1998 Value: USD 286 million100,000 capacity National Stadium (outdoorstadium), 3,700 seat National Aquatic Centre(swimming complex) and 16,000 seat PutraStadium (indoor stadium).Implemented in January 1994 and completed inJuly 1998 for the XVI Commonwealth Games.
  28. 28. COMMONWEALTH GAMES VILLAGE, BUKIT JALIL, KUALA LUMPUR Completed: 1998 Value: USD 77.7 million Gross Floor Area: 198,774 m² Construction of multi storey apartment blocks complete with recreational facilities. 1,500 units were built in total.
  29. 29. KUALA LUMPUR INTERNATIONAL AIRPORT, SATELLITE BUILDING, SEPANG Completed: 1998 Value: USD 157 million Gross Floor Area: 148,000 m².Design and construction of the satellite buildingand its ancillary works as part of the KualaLumpur International Airport Complex.Project implementation in joint venture withinternational construction companies asconsortium partners.
  30. 30. EAST MALAYSIA HOSPITALS Completed: 2005 Value: USD 256 million The planning, design, construction, equipping, commissioning and maintenance of six hospitals with a combined total of 976 beds were delivered to the Ministry of Health Malaysia in stages from 2002 till 2005. Five of the hospitals are located in the state of Sabah in East Malaysia, namely Lahad Datu, Keningau, Kuala Penyu, Pitas and Kunak. One more hospital is located in the state of Sarawak, also in East Malaysia, in Sarikei.
  31. 31. EAST MALAYSIA HOSPITALS Sarikei, Sarawak  Completed: December 2005  Value: USD 74 million  Total of 268 beds  Gross Floor Area: 40,000 sq. ft Pitas, Sabah Completed: June 2005 Value: USD 24 million Total of 76 beds Gross Floor Area: 15,284 m2
  32. 32. EAST MALAYSIA HOSPITALS Kuala Penyu, Sabah  Completed: May 2005  Value: USD 22 million  Total of 76 beds  Gross Floor Area: 15,284 m2 Kunak, Sabah Completed: May 2005 Value: USD 24 million Total of 76 beds Gross Floor Area: 15,284 m2
  33. 33. EAST MALAYSIA HOSPITALSKeningau, Sabah  Completed: September 2002  Value: USD 58 million  Total of 212 beds  Gross Floor Area: 63,477 m2
  34. 34. EAST MALAYSIA HOSPITALSLahad Datu, Sabah  Completed: January 2002  Value: USD 61 million  Total of 268 beds  Gross Floor Area: 68,1000 m2
  35. 35. EAST MALAYSIA HOSPITALSSarikei Hospital, Malaysia (268 Beds)  Completed: December 2003  Value: USD 74 million  Total of 268 beds  Gross Floor Area: 40,000 sqft.
  36. 36. UNIVERSITY OF TECHNOLOGY PETRONAS (UTP) MOSQUE, TRONOH, PERAK Completed: October 2005 Value: USD 7.7 million Gross Floor Area: 5,659 m² The construction and completion of this uniquely designed ‘floating’ mosque at Bandar Seri Iskandar, Perak has a capacity to accommodate 4,000 people. The enclosed main prayer area is air- conditioned and can accommodate 1,000 people. The covered prayer area, accommodating 3,000 people, which was previously ventilated naturally, has been changed into an air-conditioned system.
  37. 37. DANAU VILLA LINK HOME, TAMAN DESA, KUALA LUMPUR• Commenced: 10 September 2004• Completion: 6 November 2005• Value: USD90.5 millionConstruction and completion of 64units of 3-storey link home andsewerage pump, Danau Villa LinkHome, Taman Desa, Kuala Lumpur.
  38. 38. MINISTRY OF FINANCE BUILDING 2, PUTRAJAYA Commenced: 4 December 2002 Completed: 30 April 2007 Value: USD 60 million Gross Floor Area: 67,108 m² Design, construction and completion of office buildings to house agencies under the Ministry of Finance at the New Federal Government Administrative Centre in Putrajaya. 2 office blocks, 8 and 10-storey high with each housing two levels of basement car parks. Scope of works include interior design works.
  39. 39. CASA DESA CONDOMINIUM, KUALA LUMPURCommenced: 11 July 2005Completed : 31 March 2008 For the 410-unit Casa Desa Condominium, theValue: USD 24 million contract package consists of substructure works andGross Floor Area: 9,794 m2 superstructure works. Project involves construction of 7 blocks of condominium buildings including earthworks, bored piling and pile caps.
  40. 40. AGRICULTURE EXPOSITION CENTRE (PHASE 2)-MARDI, SERDANG Project : Agriculture Exposition Centre (Phase 2) – MARDI, Serdang Commenced : 27 November 2007 Completed : 30 June 2008 Value : USD 64 million Gross Floor Area: 25,000 m²
  41. 41. JOHOR STATE NEW ADMINISTRATIVE CENTRE (JSNAC), PHASE 1, JOHOR Commenced: November 2005 Completed: August 2008 Value: USD 62 millionThe development of the JSNAC on a 320-acre sitelocated at Bandar Nusajaya, 25 km from JohorBahru, Johor is divided into three precinctscomprising the Government precinct (273 acres), VIPresidences and Istana reserve (17 acres) andgovernment housing reserve (30 acres). Phase 1 of this development is divided into five packages where three packages, has been awarded. Project involves the construction of office buildings for the new state administrative centre in Johor.
  42. 42. STATE DEPARTMENT COMPLEX (JSNAC), NUSAJAYACommenced: November 2005Completed: February 2009Value: USD 63 million
  43. 43. UEM GROUP NEW CORPORATE OFFICE, KUALA LUMPUR Commenced: 1 June 2005 Completed: December 2008 Value: USD 45 million Gross Floor Area: 35,000 m² This project involves the design and construction of a 29- storey office building with an 8-storey annex building at KL Sentral. The scope of works involves interior design.
  44. 44. PLUS HEADQUARTERS, SUBANG  Development of one block of 10-storey office tower at Subang Toll, Petaling Jaya, Selangor Darul Ehsan  Commenced : 15 January 2007  Completed : December 2008  Value : USD 29 million
  45. 45. NATIONAL HEART INSTITUTE, KUALA LUMPURCommenced: 5 September 2005Completed: March 2009Value: USD 64.6 millionGross Floor Area: 32,840 m² Design, construction, supply and commissioning and maintenance of new healthcare facilities for the extension of the National Heart Institute. This project is divided into four phases and works entail the renovating and refurbishing of existing facilities.
  46. 46. COLLEGE OF TECHNOLOGY (COT), DOHA, QATAR Constructionof 21 multidisciplinary buildings comprisingclassrooms, workshops/labs, cafeterias, recreation facilities,auditorium and administration buildings with a total area of63,000 m2 and external infrastructure for campus area of300,000 m2. Project cost: USD 100 million. Completed: October 2006
  47. 47. GOVERNMENT APARTMENTS, PUTRAJAYA  Project : 548 Units (5 Blocks) Apartment  Using Industrialised Building System (IBS) Method  Commenced : September 2006  Exp. Completion : March 2008  Value : USD 39 million  Gross Floor Area: 60,500 m²
  48. 48. RESORTS WORLD AT SENTOSA, SINGAPORE Proposed Basement Structural Works for Universal Studio Commenced: March 2008 MC04-F1 Completed: July 2008 Value: USD 4.5 million Gross Floor Area: 65,800 m²
  49. 49. ON-GOING PROJECTShttp://www.uembuilders.com/uemc_n/
  50. 50. BANK KERJASAMA RAKYAT HEADQUARTERS, KUALA LUMPUR  Design, construction and completion of 2 office towers (32 and 38-storeys), 1 block of 8-storey annex comprises of car parks and 1 unit PPU  Commenced : 1 June 2009  Exp. Completion : December 2011  Value : USD 26 million  Gross Floor Area: 188,000 m²
  51. 51. PENANG SECOND BRIDGE Project : Design, Construction and Completion of the Penang Second Bridge.  Package 2 : Super-structure Works of Approach Spans. • Overall length - 24 km • Length over water - 17 km, • Main span : Length - 250 meters • Height clearance (above water) – 30 meters • Number of vehicle lanes – 2 + 1 for motorcycles (each direction) Commenced : June 2009 Exp. Completion : March 2013 Value : USD 473 million
  52. 52. PHG’-S’GOR RAW WATER TRANSFER PROJECT  Pahang - Selangor Raw Water Transfer Project Lot 1-1, Water Transfers Tunnel & Related Works (2,260 Mld.)  Commenced : June 2009  Exp. Completion : May 2014  Value : USD 400 million  Length: 44.6km ; Diameter: 5.2m
  53. 53.  1,765-acre Sushant Golf City Project in Lucknow, Uttar Pradesh  Project : Construction of various building and engineering works at Sushant Golf City, Lucknow U.P. India.  Commenced : 1 April 2008  Exp. Completion : February 2012  Value : USD 497 million  Total Development Area : 1,765 acre
  54. 54. 4000 UNITS HOUSING PROJECT, BRUNEI Project : 4000 units Housing Project for the National Housing Scheme, Brunei. Commenced : 2 February 2010 Exp. Completion : February 2014 Value : USD 290 million Total Development Area: 309 hectares
  55. 55. NEW LCC TERMINAL AT KLIA, SEPANG  Project : Design, Construction and Completion, Testing, Commissioning and Maintenance of Main Terminal Building, Satellite Building, Sky Bridge and Piers.  Commenced : 16 August 2010  Exp. Completion : April 2012  Value : USD 316 million
  56. 56. Thank YouThis document is the property of United Engineers (Malaysia) Berhad. Neither the whole nor any part of this document may be reproduced, stored or transmitted in any forms or by any means withoutwritten permission of United Engineers (Malaysia) Berhad.This document is designed to provide information in relation to the subject matter covered for this presentation and should not be used for any other purpose. Whilst every care has been taken in itspreparation, no person should draw conclusions purely on the basis of the material contained herein. If assistance is required, reference should be made to the relevant professional of United Engineers(Malaysia) Berhad.

×