BUDDH INTERNATIONAL CIRCUIT
PRESENTED BY: CHANDRADARSHAN JAIN
M.PHARM + MBA (P’CEUTICS)
P007
About Project
India’s Racing Arena
Jaypee International Circuit
Location : Greater Noida ,UP, India
Capacity : 1,20,000
Owner : Jaypee Group
Operator : Jaypee Sports International
Limited
Start : 2007
Opened : Oct. 2011
Construction cost : INR 20 billion
Architect : Hermann Tike
Project Manager : Sameer Gaur
Area : 2,500 acres
Circuit : Fact Sheet
• Length: 5.14km
• Turns: 16
• Highest point of elevation: 14m
• Width of the track: Between 18m – 20m
•
• Top speeds on the circuit: About
• 320km/h, for an F1 car
• Total seating capacity: About 120,000
• Distance from New Delhi: 40km approx.
• Surface : Asphalt concrete with Graywacke
Facts about Construction
In constructing Circuit
4 million cubic ton of Earth
were removed
325000 tons of asphalt were
used
130000 metric cube of
concrete were used
450 km of fiber optic cables
were used
Project Objectives
 Bring the F1 closerto the fans and the indian masses
 Make india a multi-sport country
 Boost to the hotel and tourism industry
 Lift to the country profile
 Potential to generate huge revenues and employment opportunities
Stake
holder
• IOA ( Indian Olympic Association )
• FIA (Federation Internationale de l’Automobile )
• FOA (Formula One Administration )
• JPSK Sports Pvt Ltd
• Participating Teams
• Fans
Tilke GmbH of Aachen, Germany (Design partner)
L & T (General contractor)
Kimley-Horn & Associates (Transportation and urban planning )
Walter P Moore & Associates (Traffic planning and transportation engineering)
Terracon Consultants (Geotechnical engineering & material quality)
Carlson Brigance & Doering inc. (Surveying & infrastructure expertise)
Miro Rivera Architects (Specific designs for structures & facilities)
Siemens (Race control management system)
Teracom + BSNL (Modems)
Airtel (Communication)
BHEL (Power)
BEL (Surveillance equipment)
ESPN-STAR (Telecasting)
Request for proposalRequest for proposal Site Plan
Project Planning
• A main Grand Stand
• 10 Temporary stands to seat more 100000 people
• 3 story cantilever building with 41 garages
• A race control room
• A state art of media center to cater more than 600 media person
• 18 fully furnished team buildings
• Pit zones
• A medical building
• A challenging Circuit
Site Specification
Project Execution
Plan
1. Acquisition of land
2. Construction of roads
3. Construction of first layer of circuit
4. Construction of stadium
5. Construction of pit zones
6. Construction of second layer of circuit
7. Construction of medical building
8. Construction of final layer of circuit
Construction Project - WBS
Work process
In October 2009 Earthwork was started
to build the track
Earth to a layer of 25 cm were compacted to a degree of
97% to make an embankment which will not sink
In July 2010 Project came to Halt Due to
Nature’s Furry
In Oct 2010 Project Geared Up
• Asphalt Specialist Dr Rainer Hart joined the project to construct
the race track
• A high polishing aggregate was required for preventing tire
damage on high speed
• The aggregate was exported from nearly 300 km far from
constructing site
Construction of Race track
The race track was built in five layers :
1st
layer : 25 cm granular sub base
2nd
layer : 20 cm wet macadam
3rd
layer : 9 cm asphalt base coarse ( to withstand ith heavy forces)
4th
layer : 5 cm binder coarse ( to endure the shearing forces from fast running cars)
5th
layer : 4 cm wear in coarse ( asphalt paved over a bind coarse to complete the track)
Construction of main grand stand
Foundation of main grand stand was completely water logged. So the first task in constructing it was to
pump that water.
After pumping water the structure of main grand stand was build from concrete and steel
The main grand stand has :
 A height of 30 m
 Length of 138 m
 56 trusses weighing 40 metric ton each
 40 m cantilever roof with 50000 square meters of
insulated aluminium sheeting
Aluminium sheets were chosen for roofing the main
grand stand due to its durability flexibility and
light weight.
50000 square meter aluminium sheets of 0.9 cm
thickness and 55 m length were used for roofing
the main grand stand.
150 km of fiber optical cables and 450 km of data and electric cables were spread beneath
the track connecting various hi-tech equipment to control room.
This includes :
 Real time video surveillance of race track
 Digital signalling system
 Electronic time keeping system
 50 race track cameras
 33 marshal post
 32 digiflags
Crash barriers of latest technology are employed in circuit to
ensure safety of the each car drivers as well as other people
present in the circuit.
Tec-Pro barriers replacing the tire barriers are employed in
the circuit
Nearly 2000 barriers along with 10 km guard rail 15 km FIA
fencing and 16 km U-drain has been provided in the track
PIT LANE & PIT
GARAGES
Get ready for virtual tour !!!
BUDDH INTERNATIONAL CIRCUIT: INDIA'S PREMIER RACING VENUE

More Related Content

What's hot

Automobile exhibition design
Automobile exhibition designAutomobile exhibition design
Automobile exhibition designDeepam Shah
 
Presentation GIFT City.pdf
Presentation GIFT City.pdfPresentation GIFT City.pdf
Presentation GIFT City.pdfAnahatVikram3
 
Amanora town centre pune presentation - 02.09.15
Amanora town centre  pune presentation - 02.09.15Amanora town centre  pune presentation - 02.09.15
Amanora town centre pune presentation - 02.09.15Shadab Khan
 
Case Study - Forum mall , Bangalore
Case Study - Forum mall , Bangalore Case Study - Forum mall , Bangalore
Case Study - Forum mall , Bangalore Onal Kothari
 
Thesis report on Habitat Centre, Noida
Thesis report on Habitat Centre, Noida Thesis report on Habitat Centre, Noida
Thesis report on Habitat Centre, Noida Saurav Chaudhary
 
India habitat centre, New Delhi.
India habitat centre, New Delhi.India habitat centre, New Delhi.
India habitat centre, New Delhi.Mayur Waghulde
 
Indian habitat centre (6)
Indian habitat centre (6)Indian habitat centre (6)
Indian habitat centre (6)tivar rose
 
Bangalore international exhibition centre case study
Bangalore international exhibition centre case studyBangalore international exhibition centre case study
Bangalore international exhibition centre case studyself employer
 
Dilli haat janakpuri
Dilli haat janakpuriDilli haat janakpuri
Dilli haat janakpuriBISHAL KHANAL
 
Ramoji Rao Film City.pptx
Ramoji Rao Film City.pptxRamoji Rao Film City.pptx
Ramoji Rao Film City.pptxSuparnSaluja
 
Pakistan Grand Prix (Project Management)
Pakistan Grand Prix (Project Management)Pakistan Grand Prix (Project Management)
Pakistan Grand Prix (Project Management)Sikander Sardar
 
Hyderabad international convention centre
Hyderabad international convention centreHyderabad international convention centre
Hyderabad international convention centrericha bihari
 

What's hot (20)

India Heritage Transport Museum
India Heritage Transport MuseumIndia Heritage Transport Museum
India Heritage Transport Museum
 
Automobile exhibition design
Automobile exhibition designAutomobile exhibition design
Automobile exhibition design
 
Presentation GIFT City.pdf
Presentation GIFT City.pdfPresentation GIFT City.pdf
Presentation GIFT City.pdf
 
Synopsis 1
Synopsis 1Synopsis 1
Synopsis 1
 
Final
FinalFinal
Final
 
Amanora town centre pune presentation - 02.09.15
Amanora town centre  pune presentation - 02.09.15Amanora town centre  pune presentation - 02.09.15
Amanora town centre pune presentation - 02.09.15
 
Jns stadium, Delhi.
Jns stadium, Delhi.Jns stadium, Delhi.
Jns stadium, Delhi.
 
Indian Habitat Centre
Indian Habitat CentreIndian Habitat Centre
Indian Habitat Centre
 
Case Study - Forum mall , Bangalore
Case Study - Forum mall , Bangalore Case Study - Forum mall , Bangalore
Case Study - Forum mall , Bangalore
 
Formula 1 Track Design & Safety
Formula 1 Track Design & SafetyFormula 1 Track Design & Safety
Formula 1 Track Design & Safety
 
Thesis report on Habitat Centre, Noida
Thesis report on Habitat Centre, Noida Thesis report on Habitat Centre, Noida
Thesis report on Habitat Centre, Noida
 
India habitat centre, New Delhi.
India habitat centre, New Delhi.India habitat centre, New Delhi.
India habitat centre, New Delhi.
 
Ramoji film city
Ramoji film cityRamoji film city
Ramoji film city
 
GIFT City
GIFT CityGIFT City
GIFT City
 
Indian habitat centre (6)
Indian habitat centre (6)Indian habitat centre (6)
Indian habitat centre (6)
 
Bangalore international exhibition centre case study
Bangalore international exhibition centre case studyBangalore international exhibition centre case study
Bangalore international exhibition centre case study
 
Dilli haat janakpuri
Dilli haat janakpuriDilli haat janakpuri
Dilli haat janakpuri
 
Ramoji Rao Film City.pptx
Ramoji Rao Film City.pptxRamoji Rao Film City.pptx
Ramoji Rao Film City.pptx
 
Pakistan Grand Prix (Project Management)
Pakistan Grand Prix (Project Management)Pakistan Grand Prix (Project Management)
Pakistan Grand Prix (Project Management)
 
Hyderabad international convention centre
Hyderabad international convention centreHyderabad international convention centre
Hyderabad international convention centre
 

Similar to BUDDH INTERNATIONAL CIRCUIT: INDIA'S PREMIER RACING VENUE

Presentation on Millau viaduct
Presentation on Millau viaductPresentation on Millau viaduct
Presentation on Millau viaductJayanta Sen
 
Presentation made during Key Note Addess
Presentation made during Key Note AddessPresentation made during Key Note Addess
Presentation made during Key Note AddessIEI GSC
 
101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_AkhtarJavad Akhtar
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 
TRENCHLESS-TECHNOLOGY.pdf
TRENCHLESS-TECHNOLOGY.pdfTRENCHLESS-TECHNOLOGY.pdf
TRENCHLESS-TECHNOLOGY.pdfKARTHIKGOUD64
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 
ADTO Ringlock System introduction and projects list
ADTO Ringlock System introduction and projects listADTO Ringlock System introduction and projects list
ADTO Ringlock System introduction and projects listColin Cai
 
Presentation : Future of Civil Engineering
Presentation : Future of Civil EngineeringPresentation : Future of Civil Engineering
Presentation : Future of Civil EngineeringIEI GSC
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptxAditya Mane
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptxAditya Mane
 
Runway construction project execution plan
Runway construction project execution plan Runway construction project execution plan
Runway construction project execution plan David H Moloney
 
Bouygues Travaux Publics_Corporate Presentation
Bouygues Travaux Publics_Corporate PresentationBouygues Travaux Publics_Corporate Presentation
Bouygues Travaux Publics_Corporate PresentationPierre HUBERT
 
Brief introduction of Beijing Yueji
Brief introduction of Beijing YuejiBrief introduction of Beijing Yueji
Brief introduction of Beijing YuejiSales Manager Paul
 
Dcl hdd presentation 9 2-2014
Dcl hdd presentation 9 2-2014Dcl hdd presentation 9 2-2014
Dcl hdd presentation 9 2-2014Mohammed wahab
 

Similar to BUDDH INTERNATIONAL CIRCUIT: INDIA'S PREMIER RACING VENUE (20)

Presentation on Millau viaduct
Presentation on Millau viaductPresentation on Millau viaduct
Presentation on Millau viaduct
 
Presentation made during Key Note Addess
Presentation made during Key Note AddessPresentation made during Key Note Addess
Presentation made during Key Note Addess
 
101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
TRENCHLESS-TECHNOLOGY.pdf
TRENCHLESS-TECHNOLOGY.pdfTRENCHLESS-TECHNOLOGY.pdf
TRENCHLESS-TECHNOLOGY.pdf
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
TRENCHLESS TECHNOLOGY
TRENCHLESS TECHNOLOGYTRENCHLESS TECHNOLOGY
TRENCHLESS TECHNOLOGY
 
transtech.pptx
transtech.pptxtranstech.pptx
transtech.pptx
 
Metro Work
Metro WorkMetro Work
Metro Work
 
ADTO Ringlock System introduction and projects list
ADTO Ringlock System introduction and projects listADTO Ringlock System introduction and projects list
ADTO Ringlock System introduction and projects list
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
Trench less Technology
Trench less Technology Trench less Technology
Trench less Technology
 
Presentation : Future of Civil Engineering
Presentation : Future of Civil EngineeringPresentation : Future of Civil Engineering
Presentation : Future of Civil Engineering
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
Runway construction project execution plan
Runway construction project execution plan Runway construction project execution plan
Runway construction project execution plan
 
Shotcrete technology
Shotcrete technologyShotcrete technology
Shotcrete technology
 
Bouygues Travaux Publics_Corporate Presentation
Bouygues Travaux Publics_Corporate PresentationBouygues Travaux Publics_Corporate Presentation
Bouygues Travaux Publics_Corporate Presentation
 
Brief introduction of Beijing Yueji
Brief introduction of Beijing YuejiBrief introduction of Beijing Yueji
Brief introduction of Beijing Yueji
 
Dcl hdd presentation 9 2-2014
Dcl hdd presentation 9 2-2014Dcl hdd presentation 9 2-2014
Dcl hdd presentation 9 2-2014
 

Recently uploaded

Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfBalamuruganV28
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHSneha Padhiar
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier Fernández Muñoz
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfShreyas Pandit
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSneha Padhiar
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESkarthi keyan
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptJohnWilliam111370
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodManicka Mamallan Andavar
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxStephen Sitton
 

Recently uploaded (20)

Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdf
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptx
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdf
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument method
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptx
 

BUDDH INTERNATIONAL CIRCUIT: INDIA'S PREMIER RACING VENUE

  • 1. BUDDH INTERNATIONAL CIRCUIT PRESENTED BY: CHANDRADARSHAN JAIN M.PHARM + MBA (P’CEUTICS) P007
  • 2. About Project India’s Racing Arena Jaypee International Circuit Location : Greater Noida ,UP, India Capacity : 1,20,000 Owner : Jaypee Group Operator : Jaypee Sports International Limited Start : 2007 Opened : Oct. 2011 Construction cost : INR 20 billion Architect : Hermann Tike Project Manager : Sameer Gaur Area : 2,500 acres
  • 3. Circuit : Fact Sheet • Length: 5.14km • Turns: 16 • Highest point of elevation: 14m • Width of the track: Between 18m – 20m • • Top speeds on the circuit: About • 320km/h, for an F1 car • Total seating capacity: About 120,000 • Distance from New Delhi: 40km approx. • Surface : Asphalt concrete with Graywacke
  • 4. Facts about Construction In constructing Circuit 4 million cubic ton of Earth were removed 325000 tons of asphalt were used 130000 metric cube of concrete were used 450 km of fiber optic cables were used
  • 5. Project Objectives  Bring the F1 closerto the fans and the indian masses  Make india a multi-sport country  Boost to the hotel and tourism industry  Lift to the country profile  Potential to generate huge revenues and employment opportunities
  • 6. Stake holder • IOA ( Indian Olympic Association ) • FIA (Federation Internationale de l’Automobile ) • FOA (Formula One Administration ) • JPSK Sports Pvt Ltd • Participating Teams • Fans
  • 7. Tilke GmbH of Aachen, Germany (Design partner) L & T (General contractor) Kimley-Horn & Associates (Transportation and urban planning ) Walter P Moore & Associates (Traffic planning and transportation engineering) Terracon Consultants (Geotechnical engineering & material quality) Carlson Brigance & Doering inc. (Surveying & infrastructure expertise) Miro Rivera Architects (Specific designs for structures & facilities) Siemens (Race control management system) Teracom + BSNL (Modems) Airtel (Communication) BHEL (Power) BEL (Surveillance equipment) ESPN-STAR (Telecasting)
  • 8. Request for proposalRequest for proposal Site Plan Project Planning
  • 9. • A main Grand Stand • 10 Temporary stands to seat more 100000 people • 3 story cantilever building with 41 garages • A race control room • A state art of media center to cater more than 600 media person • 18 fully furnished team buildings • Pit zones • A medical building • A challenging Circuit Site Specification
  • 10. Project Execution Plan 1. Acquisition of land 2. Construction of roads 3. Construction of first layer of circuit 4. Construction of stadium 5. Construction of pit zones 6. Construction of second layer of circuit 7. Construction of medical building 8. Construction of final layer of circuit
  • 12. Work process In October 2009 Earthwork was started to build the track Earth to a layer of 25 cm were compacted to a degree of 97% to make an embankment which will not sink
  • 13. In July 2010 Project came to Halt Due to Nature’s Furry
  • 14. In Oct 2010 Project Geared Up • Asphalt Specialist Dr Rainer Hart joined the project to construct the race track • A high polishing aggregate was required for preventing tire damage on high speed • The aggregate was exported from nearly 300 km far from constructing site
  • 15. Construction of Race track The race track was built in five layers : 1st layer : 25 cm granular sub base 2nd layer : 20 cm wet macadam 3rd layer : 9 cm asphalt base coarse ( to withstand ith heavy forces) 4th layer : 5 cm binder coarse ( to endure the shearing forces from fast running cars) 5th layer : 4 cm wear in coarse ( asphalt paved over a bind coarse to complete the track)
  • 16. Construction of main grand stand Foundation of main grand stand was completely water logged. So the first task in constructing it was to pump that water. After pumping water the structure of main grand stand was build from concrete and steel The main grand stand has :  A height of 30 m  Length of 138 m  56 trusses weighing 40 metric ton each  40 m cantilever roof with 50000 square meters of insulated aluminium sheeting
  • 17. Aluminium sheets were chosen for roofing the main grand stand due to its durability flexibility and light weight. 50000 square meter aluminium sheets of 0.9 cm thickness and 55 m length were used for roofing the main grand stand.
  • 18. 150 km of fiber optical cables and 450 km of data and electric cables were spread beneath the track connecting various hi-tech equipment to control room. This includes :  Real time video surveillance of race track  Digital signalling system  Electronic time keeping system  50 race track cameras  33 marshal post  32 digiflags
  • 19. Crash barriers of latest technology are employed in circuit to ensure safety of the each car drivers as well as other people present in the circuit. Tec-Pro barriers replacing the tire barriers are employed in the circuit Nearly 2000 barriers along with 10 km guard rail 15 km FIA fencing and 16 km U-drain has been provided in the track
  • 20.
  • 21. PIT LANE & PIT GARAGES
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27. Get ready for virtual tour !!!